ODOT DISTRICT 3 2017 CONSTRUCTION PROGRAM Crawford Richland SERVING ASHLAND, CRAWFORD, ERIE, HURON, LORAIN, MEDINA, RICHLAND AND WAYNE COUNTIES Erie Lorain Huron Medina Ashland Wayne JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR HOWARD HUEBNER, DISTRICT DEPUTY DIRECTOR The environmental review, consultation, and other actions required be applicable Federal environmental laws for these projects are being, or have been, carried-out by ODOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 11, 2015, and executed by FHWA and ODOT
Ashland County Projects PID Number Route Section Work Type Location Sale Date 98400 ASD-95-1.46 Chip Seal From SR 39 to the Wayne County line 9/22/2016 Est. Start Est. End 05/31/17 10/31/17 Est. Cost Contactor $677,797.80 Specialized Construction Maintenance of Traffic Traffic maintained with flaggers 79746 ASD-30-5.90 Smooth seal From SR 60 to the Wayne County line 11/3/2016 06/01/17 08/31/17 $2,255,181.29 Shelly Sands One lane maintained in each direction at all times 99534 ASD-Culvert- FY2017 A Culvert SR 3, just south of Twp. Rd. 739 SR 3, just north of Twp. Rd. 739 US 42, just north of Co. Rd 995 2/16/2017 04/01/17 $308,000 SR 3: 30-day detour SR 3 US 42: Traffic maintain by flaggers 99546 ASD-Culvert FY2017 B Culvert US 42 just north of SR 511 SR 511 just south of US 250 5/11/2017 06/01/17 $275,000 SR 511: 30-day detour US 42: Maintained with flaggers 87720 ASD-71 Smooth seal From the Richland County line to just inside the Wayne County Line 6/22/2017 08/01/2017 11/01/2017 $4,885,142 One lane maintained in each direction during night hours two lanes maintained in each direction during daytime hours 88844 ASD-96-2.35 SR 96, just west of Wells Rd SR 96, just east of Wells Rd. 7/13/2017 09/01/17 04/27/18 $330,000 45- day detour ASHLAND COUNTY 1
Resurfacing Reactive/Preventive Maintenance /Culvert Continued Construction from 2016 New Construction in 2017 ASHLAND COUNTY 2
PID Number Route Section 88804 CRA-103-9.89 Resurfacing Crawford County Projects Work Type Location Sale Date From SR 4 to the Huron County line and on SR 602 from Guiss Rd to SR 103 9/22/2016 98403 CRA-96-3.66 Chip seal From SR 602 to Richland County line 10/20/2016 94384 CRA-100-18.37 Resurfacing From SR 19 to Seneca County line and on SR 19 from SR 100 to Seneca County line 2/02/2017 94147 CRA- 98-7.87 Resurfacing From SR 4 to the City of Bucyrus 4/27/2017 Est. Start Est. End 04/01/16 10/15/17 05/01/17 10/31/17 06/01/17 06/26/17 04/27/18 Est. Cost Contactor $3,133,387.10 Erie Blacktop $429,470.00 Specialized Const. $1,799,000.00 Kokosing $2,555,140 Maintenance of Traffic Traffic maintained by flaggers Traffic maintained by flaggers SR 100: Traffic maintain with flaggers SR 19: 14-day detour Traffic maintained by flaggers 84666 CRA-19-12.06 Resurfacing From the City of Bucyrus to SR 4 overlap 4/27/2017 06/26/17 04/27/18 $790,460 Traffic maintained by flaggers 99548 CRA-103-16.89 Culvert Just east of Chapel Rd 5/25/2017 08/01/17 10/01/17 $137,500 30-day detour 88973 CRA-BH- FY2018 C Repair Various locations on US 30 7/27/2017 04/01/18 07/01/18 $695,621 One lane maintained at all times CRAWFORD COUNTY 3
Resurfacing Reactive/Preventive Maintenance /Culvert Continued Construction from 2016 New Construction in 2017 CRAWFORD COUNTY 4
Erie County Projects PID Number Route Section Work Type Location Sale Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic 97611 ERI-13-2.50 Slide Repair Just south of Horn Rd 1/19/2017 03/25/2017 05/26/2017 425,000.00 Rudzik Excavating Inc. 45-day detour 103191 ERI-61-7.55 Drainage In the Ceylon area TBD TBD $330,000.00 Traffic maintained by flaggers 90939 ERI-250 0.59 Repair Just east of Butler St. 2/16/2017 04/01/17 05/15/18 $651,994.00 Traffic Maintained. Detour on Butler St. Ramp ERIE COUNTY 5
Resurfacing Reactive/Preventive Maintenance /Culvert Continued Construction from 2016 New Construction in 2017 ERIE COUNTY 6
Huron County Projects PID Number 97544 Route Section HUR- TR107/CR138/ RIC CR184 Work Type Location Sale Date HUR TR 107: between Willow Dr. and North St; HUR CR 138: between Delta Rd and Edwards Rd; RIC CR 184: between Hazel Brush Rd and London West Rd 1/19/2017 Est. Start Est. End 04/04/17 10/15/17 Est. Cost Contactor $1,630,000 R I Construction Maintenance of Traffic 45-day detour per structure 93111 HUR-547-7.13 ERI-113-1.84 Resurfacing SR 547 from the Village of Monroeville to US 20; SR 113 from east of Bellvue to US 250 2/2/2017 05/01/17 $2,147,000.00 Gerken Paving Maintain with flaggers SR 547 : Signalized lane closure 98517 HUR-20- SYSSIGN FY2 Signs Various locations on US 20 02/02/2017 05/01/17 04/30/18 $301,000.00 Lake Erie Traffic maintained at all times 93110 HUR-4-6.68 Minor Rehabilitation Various locations on SR 4 2/16/2017 05/01/17 10/01/17 $2,202.359 Traffic maintained by flaggers. 97612 HUR-250-00.18 GSM Slide Repair Just south of Erie County line 3/30/2017 09/05/17 10/20/17 $129,519 14-day detour 96257 HUR-224-7.60 Drainage Between Bullhead Rd and Center St 4/27/2017 08/01/17 10/13/17 $3,849,151 Maintain with flaggers 14-day detour for railroad 92882 HUR-20-00.00 Resurfacing From the Sandusky County line to the City of Bellevue 5/11/2017 07/01/17 12/31/17 $500,390 Traffic maintained by flaggers. 88856 HUR-99-5.82 Deck/ Culvert Replace box beams on a 126 structure over a tributary of the Huron River. Culvert: HUR-99-10.46.28 miles N. Hanville Rd. 8/24/2017 04/01/18 08/31/18 $960,871 90-day detour HURON COUNTY 7
Resurfacing Reactive/Preventive Maintenance /Culvert Continued Construction from 2016 New Construction in 2017 HURON COUNTY 8
Lorain County Projects PID Number Route Section Work Type Location Sale Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic 82265 LOR SYSSIGN FY2016 Signs Various locations on I-480, SR 10 SR 83 3/24/2016 01/03/17 04/30/17 $137,620.00 Lake Erie. 97551 LOR-15-2.42/ LOR- 129-0.67 Parsons Rd: east of West Rd; Snell Road east of Boone Rd 9/10/2015 02/23/16 11/15/16 $1,307,838.00 RI Const. TR-15: 60-day detour TR-129: 60-day detour 97554 LOR-TR 137-0.07 TR 137 between Folley Rd and West River Rd 12/01/2016 12/31/16 $438,550 Shelly Sands 90-day detour 92880 LOR-83-17.94 Minor Rehabilitation From just north of Bentley Dr. to US 6 in the City of Avon and Avon Lake 6/16/2016 09/12/16 07/28/17 $2,366,810.33 Karvo Traffic maintained by flaggers 94397 LOR-301-00.00 Minor Rehabilitation From the Medina County line to US 20 10/6/2016 11/24/16 $2,594,028.87 Karvo Traffic maintained by flaggers 100771 LOR-113-00.00 Resurfacing From the Erie County line to the City of Elyria 12/1/2016 05/01/17 $2,977,023.10 Erie Blacktop Traffic maintained by flaggers 83449 LOR- 90-13.20 I-90 at bridges over SR 57 West River Rd 1/19/2017 04/01/17 09/30/18 $14,366,000 J D Williamson Two lanes of traffic will be maintained in each direction at all times 102520 LOR- 90 20.55 Turn Lane I-90 at the SR 83 exit ramps 3/16/2017 04/17/17 06/01/18 $1,026,500 92886 LOR-6-3.37 Resurfacing US 6 in the City of Lorain; SR 611 from US 6 to just west of West Park Rd; SR 57 from US 6 to W 9 th St. 3/30/2017 06/01/17 08/31/17 $3,175.184 Traffic maintained by flaggers 101882 LOR-165-1.04 Cook Street over East Branch of Black River 4/27/2017 05/15/17 07/31/17 $1,507,000 90-day detour 80126 LOR-301-22.56 Repair SR301 just north of SR 254 5/25/2017 04/04/18 08/18/18 $640,771 90-day detour LORAIN COUNTY 9
79762 LOR- 90-18.61 Resurfacing From just west of SR 611 to Cuyahoga County line 7/13/2017 09/01/17 09/01/18 $4,942,961 88859 LOR-83-6.82 At bridge over Bannister Ditch just north of Capel Road 10/5/2017 06/01/18 08/30/18 $574,750 60-day detour 99509 LOR-2-8.33 GSM Rock Slope Maintenance SR 2 between Oberlin Rd and North Ridge Rd 11/16/2017 01/01/18 04/01/18 $538,080 Shoulder closures as needed LORAIN COUNTY 10
Resurfacing Reactive/Preventive Maintenance /Culvert Continued Construction from 2016 New Construction in 2017 LORAIN COUNTY 11
Medina County Projects PID Number Route Section Work Type Location Sale Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic 81338 MED-94-3.80 Rehabilitation From West Street to Smokerise Drive, near the I-76 interchange 2/11/2016 05/11/16 06/30/18 $12,425,403.34 Karvo One lane in each direction at all times 94688 MED-94-11.91 Intersection Improvement Roundabout construction at Granger Road 5/19/2016 08/10/16 $2,518,046.50 Fechko 70-day detour 99742 MED-CR 44-11.83 State Rd bridge between Metropolitan Park W East Dr. 5/19/2016 03/30/17 06/30/17 $667, 909.97 Rietschlin 90-day closure 92954 MED-42-17.68 Section Improvement From just south of Harding Street to just south of Fenn Rd 7/28/2016 10/04/16 10/15/18 $17,024,509.22 Digioia- Suburban One lane in each direction at all times 99636 MED Granger Dam Removal Mitigation Banking On Rocky River, just north of Granger Road 8/11/2016 TBD 05/05/17 $131,231.50 Mark Haynes 97545 MED-TR 164/ CR 32/CR 4 Muntz Rd: north of Abbyville Rd; Weymouth Rd: east of SR 3; Grafton Rd: west of Station Rd 10/6/2016 04/01/17 11/15/17 $1,141,900.00 Mosser Muntz Rd; 45-day detour Weymouth Rd: 90-day detour Grafton Rd: 45-day detour 97553 MED-CR 4-TR 170- Harmony St. West Smith Rd: between Huntington St. S Prospect St.; Harmony St: between East Union St. and East North St.; TR-170: just north of CR 130 11/17/2016 12/01/16 $1,526,253.00 Mosser All three structures 90- day detour 77317 MED- 71- SYSSIGN FY2 Signs Various location on I-71 12/15/2016 03/01/17 12/31/17 $437,845.00 Lake Erie 88806 MED-162-2.97 Resurfacing From the Village of Spencer to US 42 12/1/2016 05/01/17 10/31/17 $1,638,354.23 Kokosing 87714 MED-71-15.78 Resurfacing From the Ridgewood Road overpass to the Cuyahoga County line 3/16/2017 05/15/17 10/31/17 $8,693,510 MEDINA COUNTY 12
98628 MED- CR 37-3.69 Remsen Rd at bridge over East Branch of the Rocky River 3/16/2017 04/03/17 07/31/17 $417,252 60-day detour 94388 MED-261-0.00 Resurfacing From SR 94 to the Summit County line 4/13/2017 06/01/17 09/01/17 $519,367 Traffic maintained by flaggers. 14821 MED N Carpenter Road Major Reconstruction From SR 303 to Boston Road 7/27/2017 09/01/17 07/31/19 $11,264,926 One lane maintained at all times MEDINA COUNTY 13
Resurfacing Reactive/Preventive Maintenance /Culvert Continued Construction from 2016 New Construction in 2017 MEDINA COUNTY 14
Richland County Projects PID Number Route Section Work Type Location Sale Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic 100383 RIC-71/30 Noise Wall Along I-71 south, south of US 30 6/2/2016 11/07/16 04/01/17 $1,816,950.00 Shelly Sands Single lane closures as necessary 97552 RIC-CR 371- TR 37-CR 48 Union St/Moffet Rd: south of Pleasant St in Lucas; Shauck Rd: north of Iberia-Bellville Rd; Millsboro West Rd: east of Horning Rd 10/20/2016 08/15/16 11/15/17 $1,536,819.00 Shelly Sands Union St: 60-day detour Shauck Rd: 45-day detour Millsboro W Rd: 45-day detour 98488 RIC-546-0.00 Chip Seal/ Resurfacing From the Knox County line to US 42 (Resurfacing within the Village of Lexington) 11/17/2016 05/01/17 10/31/17 $656,045.04 Shelly Sands Maintained with flaggers 98627 RIC-CR 48-4.18 CR 48 AKA Millsboro West Road between Bowers Rd and Rudy Rd 1/19/2017 03/01/17 11/15/17 $484,000 Crawford Construction 75-day detour 94402 RIC-97-0.00 Resurfacing Various locations on SR 97 3/16/2017 04/01/17 12/31/17 $2,052,931 99487 RIC- 30-9.13 FY 17 Reactive Maintenance The ramps at the I-71 US 30 interchange and spot repairs on US 30 in the City of Mansfield 5/11/2017 06/01/17 08/01/17 $312,000 Single-lane closure as necessary 99549 RIC CULVERT FY17 Culvert US 30: at Laver Rd; SR 309: between All American Dr. and Earick Rd. 5/25/2017 08/01/17 12/01/17 $247,500 21-day detour for each structure. RICHLAND COUNTY 15
Resurfacing Reactive/Preventive Maintenance /Culvert Continued Construction from 2016 New Construction in 2017 RICHLAND COUNTY 16
Wayne County Projects PID Number Route Section Work Type Location Sale Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic 96316 WAY-94-0.00 Resurfacing From the Holmes County line to US 30 4/27/2016 07/01/17 $2,029,604 Maintained by flaggers 97044 WAY-250-0.00 Resurfacing From the Ashland County line to US 30 4/27/2016 06/15/17 $2,260,218 Maintained by flaggers 88889 WAY-71-2.22 Kline Road bridge over I-71 3/16/2017 05/01/17 10/31/17 $1,183,739 180-day detour WAYNE COUNTY 17
Resurfacing Reactive/Preventive Maintenance /Culvert Continued Construction from 2016 New Construction in 2017 WAYNE COUNTY 18
District Wide Projects PID Number Route Section Work Type Location Sale Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic 89446 D03 Loop FY15 Loop Detector Repair Various routes and sections throughout District Three 2/26/2015 06/17/15 05/31/17 $189,312.75 Perram Electric 97377 D03 PR FY2016 Tree Pruning Brush Removal Various routes and sections throughout District Three 9/10/2015 01/22/16 $104,173.00 VanCuren 94466 D03 Chip FY2017 Chip Seal Various routes and sections throughout District Three 6/16/2016 08/30/16 05/31/16 $928,185.25 Foill 102947 D03 PR FY2017 Tree Pruning Brush Removal Various routes and sections throughout District Three 8/11/2016 10/03/16 $649,860.00 Eco Tree 101988 D03 Mow FY17-18 Mowing Routes within Ashland, Crawford, Richland and Wayne Counties 10/6/2016 05/01/17 11/15/18 $751,560.00 Linkel 101994 D03 Mow FY17-18 Mowing Routes within Medina County 11/3/2016 05/01/17 11/15/18 $334,940.00 Brypan LLC 102003 D03 LG FY2017 Lighting Maintenance SR 2 at the I-90 interchange 11/17/2016 03/01/17 10/31/17 $177,500.00 Miller Cable 102943 D03 GR FY2017 Guardrail Various routes and sections throughout District Three 11/17/2016 02/01/17 01/31/18 $894,875.00 Lake Erie 101996 D03 MOW FY2017-18 C Mowing Routes within Erie, Huron and Lorain Counties 12/15/2016 05/01/17 11/15/18 $393,564.00 Linkel 93868 D03 Mohican SP FY2016 Slide repair Along State Park Road 58 02/02/2017 03/13/17 05/26/17 $242,000.00 Freedom Construction 88979 D03 Culvert FY17 Culvert Various locations in Crawford, Lorain, Medina, Richalnd and Wayne Counties 2/16/2017 04/01/17 $929,500.00 DISTRICT WIDE PROJECTS 19
94462 D03 PM FY17 Pavement Marking Various routes and sections throughout District 3 4/13/2017 07/01/17 12/31/17 $1,854,000 101832 D03 LOOP FY17 Loop Detector Repair Various routes and sections throughout District Three 4/13/2017 06/17/17 05/31/19 $190,000 82267 D02 SYSSIGN FY17 Signs Various routes in Ashland, Richland and Wayne Counties 4/27/2017 07/01/17 12/31/17 $275,000 94461 D03 RPM FY17 Raised Pavement Markers Various routes and sections throughout District Three 4/27/2017 07/01/17 12/31/17 $302,500 93097 D03 RM FY17 Mill and Fill Routes within Erie, Huron, Medina and Wayne Counties 5/11/2017 07/01/17 12/31/17 $1,297,800 101523 D03 TSG FY17 Signals US 42 at King in Ashland County; SR 57at College Street in Medina County 5/25/2017 07/01/17 12/31/17 $555,000 87719 D03 Smooth FY18 Smooth Seal Routes within Lorain and Medina Counties 5/25/2017 08/01/17 10/15/17 $1,443,357 Maintained by flaggers 96731 D03 Smooth FY18 Smooth Seal Various routes and sections throughout District Three 5/25/2017 08/01/17 11/01/17 $4,137,595 Maintained by flaggers 104251 D03 Chip FY18 Chip seal SR 98: from US 30 to Dickson Rd; SR 96: from the City of Shelby to SR 13 6/8/2017 08/01/17 11/01/17 $886,210 Maintained by flaggers 96732 D03 CHIP FY18 Chip Seal On SR 60 in Ashland County from US 250 to the Huron County line; SR 539 in Wayne County from SR 302 to the Village of Congress 6/8/2017 08/01/17 11/01/17 $576,356 Maintained by flaggers 96730 D03 MICRO FY18 Micro Surfacing Various routes and sections throughout District Three 6/22/2017 08/01/17 11/01/17 $2,255,009 Maintained by flaggers DISTRICT WIDE PROJECTS 20
96778 D03 CRSEAL FY18 Crack Seal Various routes and sections throughout District 3 8/10/2017 09/01/17 11/15/17 $340,000 Maintained by flaggers 101522 D03 PR FY18 B Tree Pruning Brush Removal Various routes and sections throughout District 3 8/24/2017 10/01/17 09/30/19 $132,000 Maintained by flaggers DISTRICT WIDE PROJECTS 21
ODOT DISTRICT 3 2017 CONSTRUCTION PROGRAM Resurfacing Reactive/Preventive Maintenance /Culvert Continued Construction from 2016 New Construction in 2017 DISTRICT WIDE PROJECTS 22
O UR MISSION To provide easy conveyance of people and goods from place to place, we will: Take care of what we have; Make our system work better; Improve safety; Enhance capacity O UR VISION A long-term, reliable, professional and highly productive organization For more information, Howard Huebner, District Deputy Director at (419) 207-7002, Mike Fair, P.E., District Construction Administrator at (419) 207-7087; or Public Information Office at (419) 207-7181. Like us on Facebook: www.facebook.com/ohiodepartmentoftransportationdistrict3 Follow us on Twitter: www.twitter.com/odot_northcenoh Statewide Traffic Information: www.ohgo.com For general information, call (800) 276-4188 or visit District 3 s Web site at: www.transportation.ohio.gov/dist3