Distributed Multi-Nodal ATFM Project Overview & Progress. ICAO MID ATFM/TF/1 & ICAO World Cup 2022 TF/ Sep 2018

Similar documents
ATFM Implementation Thailand and Southeast Asia. 55 th DGCA Conference October 2018 Nadi, Fiji

Thailand ATFM Operations at Sub- Regional Level

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

Multi Nodal Regional ATFM/CDM Concept and Operational Trials Colombo 7 May 2014

Information Paper 2 SUMMARY

Asia/Pacific Region A-CDM Planning

Why ANSP Management Needs to Drive ATFM Implementation Stuart Ratcliffe, Co-Chair CANSO ATFM Workgroup Metron Aviation

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

AEROTHAI Air Traffic Management Network Management Centre IATA ICAO Cross Border ATFM Workshop

MULTI-NODAL ATFM COMMON OPERATING PROCEDURES (COP)

REPORT ON PROGRESS AND ACCOMPLISHMENTS OF THE ICAO APAC FLIGHT PROCEDURE PROGRAMME (FPP) IN 2012

Suvarnabhumi Airport (VTBS/BKK) Runway Maintenance 3 Mar 2 May ICAO SAIOACG/7 & SEACG/24 March 2017 Bangkok, Thailand

International Civil Aviation Organization. Twenty-Fourth South East Asia ATM Coordination Group (SAIOACG/7) Bangkok, Thailand, March 2017

F r o m B O B C AT t o C r o s s - B o r d e r AT F M

CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA CATFM. ATFM Global Symposium /22/2017 ATFM Global Symposium 2017

INTERNATIONAL CIVIL AVIATION ORGANIZATION

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

Performance Based Navigation (PBN) Update on ICAO APAC Regional Sub-Office, APAC Flight Procedure Programme, and COSCAP Supports

International Civil Aviation Organization

International Civil Aviation Organization FIT-ASIA CRA ARRANGEMENTS, PROBLEM REPORTS, AND PERFORMANCE DATA ANALYSIS REPORTING

ATFM Procedure using the Bay of Bengal Cooperative ATFM System

CATFM CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA. ATFM TF 1 Meeting September 2018

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness

1 st Bangladesh India Myanmar Thailand ATM Coordination Meeting (BIMT/1) August 2014 ICAO Asia-Pacific Regional Office Bangkok, Thailand

ORGANISER HOST LEAD SPONSOR

The EU as a partner for low carbon development Prospects for the aviation sector

TWELFTH AIR NAVIGATION CONFERENCE

ICAO Asia-Pacific Flight Procedure Programme

Network Manager Adding value to the Network 29 September 2011

OVERVIEW OF ADS-B COST BENEFIT STUDY

Leveraging on ATFM and A-CDM to optimise Changi Airport operations. Gan Heng General Manager, Airport Operations Changi Airport Group

55 TH CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

A-CDM AT HONG KONG INTERNATIONAL AIRPORT (HKIA)

B1 AMET implementation IWXXM

(Presented by Secretariat) EXECUTIVE SUMMARY

ECOsystem: MET-ATM integration to improve Aviation efficiency

International Civil Aviation Organization. Aviation System Block Upgrade (ASBU) Methodology An Overview

12 TH COSCAP-SEA STEERING COMMITTEE MEETING

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

Asia/Pacific Air Traffic Management Perspectives

South African ATFM & A-CDM - Progress and Integration Status. Mikateko Chabani

Remarks of CANSO Director General, Jeff Poole, at the CANSO Asia-Pacific Conference, 5-7 May 2014

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat)

INTERNATIONAL CIVIL AVIATION ORGANIZATION

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016

ATC Global 2014 EUROCONTROL WORKSHOP Towards GLOBAL ATFM 18 September Ken Mclean Director SFO IATA Singapore

THE CIVIL AVIATION AUTHORITY OF THAILAND. Aeronautical Information Service Department AIP SUPPLEMENT

PBN/TF/7 DRAFT Appendix D to the Report D-1

International Civil Aviation Organization. Performance Based Navigation Sub-Group (PBN SG) MID FLIGHT PROCEDURE PROGRAMME

Global 8 ATFM Conference 4 6 November 2014 Cancun, Mexico

NM Interoperability Strategy. Idalina Mendes Videira Network Strategy and Development EUROCONTROL

COMMISSION IMPLEMENTING REGULATION (EU)

TWELFTH AIR NAVIGATION CONFERENCE

Cooperative traffic management

ICAO Bay of Bengal ATS Coordination Group ATFM Task Force

APPENDIX E ACTION PLAN FOR THE IMPLEMENTATION OF ATFM AT SAM AIRPORTS A: AIRPORT. Task description Start End

AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI

Global ATM System ~Interoperability and Harmonization ~

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

CANSO ATFM Data Exchange Network for the Americas (CADENA) (Presented by ALTA, CANSO, COCESNA and IATA)

Growth. Helping Asian aviation grow

From local to regional to global ATFM

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status

January 2018 Air Traffic Activity Summary

Trajectory-Based Operations (TBO)

ATM Collaboration & Data Sharing

Air Traffic Flow & Capacity Management Frederic Cuq

Data link Implementation in Singapore FIR Kwek Chin Lin

Pacific Project. CPWG/8 - WP/6 Appendix A

EUROCONTROL approach to the execution of the PBN IR Mandate

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

30 SEP - 02 OCT, 2014

SSP progress in Latvia. Overview

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

NORTH ATLANTIC VISION

Future Network Manager Methods

European Commission. A European Community Contribution to World Aviation Safety Improvement. Singapore 14/01/2004

6th Meeting Collaborative Arrangement for the Prevention and Management of public health events in Civil Aviation Asia Pacific (CAPSCA-AP)

ASEAN Aviation Services and Liberalization

ICAO GANP Requirements and Evolution

International Civil Aviation Organization. Seventh Meeting of CNS/MET Sub-Group of APANPIRG and Tenth Meeting of CNS/ATM IC Sub-Group of APANPIRG

Air Transportation Optimization. Information Sharing for Global Benefits

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

Financing of Aviation Development Projects by the Asian Development Bank. Asian Development Bank

DANUBE FAB real-time simulation 7 November - 2 December 2011

Seen through an IATA lens A-CDM Globally

INTRODUCTION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) AT SINGAPORE CHANGI AIRPORT

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico

Global Operational Data Link Doc 10037

A FOCUS ON TACTICAL ATFM. ICAO ATFM Workshop Beijing, 29 th -30 th October 2014

TWELFTH AIR NAVIGATION CONFERENCE

Airport Collaborative Decision Making Michael Hoehenberger, (Munich Airport) on behalf of ACI World

Terms of Reference for a rulemaking task. Requirements for Air Traffic Services (ATS)

ICAO APAC SCHEDULE OF MEETINGS, WORKSHOPS AND SEMINARS 2018

FAA: ASBU Deployment Status. ASBU Prepared by: Midori Tanino, ATO International NextGen Lead Date: August, 2016

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

Transcription:

Distributed Multi-Nodal ATFM Project Overview & Progress ICAO MID ATFM/TF/1 & ICAO World Cup 2022 TF/1 23 27 Sep 2018

Introduction DISTRIBUTED MULTI-NODAL AIR TRAFFIC FLOW MANAGEMENT

What We Are Trying To Do: Operational Environment ARRIVAL ATFM NODE DEPARTURE ATFM NODE Flight Operations Centre (FOC) Pilot AeroMET Flow Management Position (FMP) ATFM Information Exchange FMP ATS Units ATS Units Airport Operator Airport Operator A-CDM 3

How We Approach The Project: Multi-Phase Work Phase 1 (2015-2016) Phase 2 (2017-20XX) Phase X Distributed GDP/CTOT to regulate traffic into constrained arrival airports Distributed GDP/CTOT to regulate traffic into constrained airspace Globally-interconnected ATFM network, enabled by SWIM infrastructure Identification of Elements Development of Relevant Provisions ATFM System-to-System Information Linkage (SWIM-Enabled) 4

Who The Members Are: Tiered Participation Level 3 ATFM Nodes Generate, Distribute, Comply to CTOT Level 2 ATFM Nodes Receive and Comply to CTOT Level 1 ATFM Nodes Observers (soon to upgrade) China Hong Kong China Singapore Thailand Cambodia Indonesia Malaysia Myanmar Philippines Lao PDR** Viet Nam** 5

Phase 1 Airport ATFM Programs DISTRIBUTED MULTI-NODAL AIR TRAFFIC FLOW MANAGEMENT

Phase 1 Key Objective & Work Plan Distributed GDP for Constrained / Congested Arrival Airports Phase 1 Stage 1 Phase 1 Stage 2 Phase 1 Stage 3 Communication Linkage and Information Exchange Protocol Design Procedure Development and Demonstration Flights Progressive implementation effort ATFM System-to-System Information Linkage Stakeholder Engagement 7

Key Achievements Planned Events Ad-Hoc WX-Induced Emergency Spectrum of ATFM Operations Validated procedures for distributed GDP Proven benefits for constrained airports Increased awareness for cross-border ATFM Contribution to APAC States ATFM readiness 8 8

Phase 2 Airspace ATFM Programs DISTRIBUTED MULTI-NODAL AIR TRAFFIC FLOW MANAGEMENT

Phase 2 Key Objective & Work Plan Distributed GDP (+other measures) for Constrained / Congested Airspace Volume Phase 2 Stage 1 Phase 2 Stage 2 Phase 2 Stage 3 Airspace Demand- Capacity Assessment Capability Procedure Development for Single-Constraint DCB Procedure Development for Multi- Constraint DCB ATFM System-to-System Information Linkage Stakeholder Engagement For recent ATFM programs, refer to http://tinyurl.com/multi-nodal-16 10

ATFM System Readiness Status for Phase 2 GDP System Status ATFMU Resource Status Bangkok (AEROTHAI) Hong Kong (HKCAD) Airport Airspace Airport Airspace Operational Waypoint: Operational Sector: In Dev In Development In Development CTOT Delivery Method E-Mail, Web, AFTN E-Mail, Web, AFTN AFTN: Q3 2019 E-Mail, Web AFTN: Q3 2019 E-Mail, Web

ATFM System Readiness Status for Phase 2 GDP System Status ATFMU Resource Status Sanya (CAAC ATMB) Singapore (CAAS) Airport Airspace Airport Airspace Operational Waypoint: Operational Sector volume: operational Operational Operational CTOT Delivery Method AFTN E-Mail, Web (available) AFTN E-Mail, Web (available) E-Mail, Web AFTN: 2019 E-Mail, Web AFTN: 2019

Forward Airspace ATFM Implementation Plan ATS Route MINIT Conversion Route Lead ATFMU Status A1 Sanya ATFMU Ongoing A202 Sanya ATFMU Ongoing A581 Bangkok ATFMU Ongoing M771 Singapore ATFMU Ongoing DOTMI A470 Hong Kong ATFMU Expected: Oct/Nov 18

Key Revisions to Common Operating Procedure DISTRIBUTED MULTI-NODAL AIR TRAFFIC FLOW MANAGEMENT

Key Areas of COP Revisions Routine CDM Conference Scope of Attendance ATFMUs (+team) Timing Weekly, Thursdays 0800z Topic Outlook of ATM resource issue and possible ATFM programs Commencement Start with Level-3 ANSPs, expand subsequently Start date: Thursday 20 Sep 2018

Key Areas of COP Revisions Resolution of Conflicting ATFM Measures Requirement: 1 flight should be subjected to only 1 ATFM measure (1 CTOT) Possible Issue: Conflicting CTOTs given by >1 ATFM nodes Solution Insofar as possible, conduct CDM conference to resolve by comparing ATFM delay If CDM conference not possible Departure ATFMU note the conflict and request appropriate exemption

Key Areas of COP Revisions Standard Phrases for CDM Actions Issue: Difficulty in CDM communication between ATFMUs and stakeholders, sans phraseologies Solution: Communication guideline Sample list of phrases for basic coordination To be provided as an Annex to COP

Key Areas of COP Revisions Revised Requirement for Participation Levels Tiered Participation Level 3 Level 2 Expected Capabilities Capable to generate, deliver and receive CTOT. Able to comply with CTOT from all Level 3 ATFM node Capable to receive and comply with CTOT from all Level 3 ATFM node Level 1 Observe and participate in the Trial Progress

Key Challenges to the Project DISTRIBUTED MULTI-NODAL AIR TRAFFIC FLOW MANAGEMENT

Key Problem Areas from Post-Ops Analysis CTOT Compliance Lack of compliance remains an issue Adherence to Procedure Respect of lead time requirement for CTOT revision Overall / System Delay for Compliant Flights The struggle with adverse effect from non-compliance flights Conflicting ATFM Measures Occurrences of double penalties due to concurrent ATFM measures and restrictions

Technical Work Toward ATFM-on-SWIM DISTRIBUTED MULTI-NODAL AIR TRAFFIC FLOW MANAGEMENT

Multi-Nodal ATFM Communication Today MET Info ADP Flight Info ATFM Measure WEB AFTN E-mail AFTN AFTN AFTN WEB E-mail AFTN E-mail Fax Phone WEB Operations Control Centre (OCC)

Multi-Nodal ATFM Communication Tomorrow 23

Technical Subgroup Main Tasks Identify NEEDS Required data elements Operational scenarios Demand Monitoring GDP Activation Congested Airport CTOT Management GDP Activation Congested Airspace Develop Infrastructure Map with FIXM provisions (v4.1) Initial FIXM extension (CTOT, CLDT) Connection, system, operational tests Influence Provisions Coordinate with APAC SWIM TF Engage FIXM CCB Drive suitable provisions 24

Technical Work Technical Subgroup Work Plan DISTRIBUTED MULTI-NODAL AIR TRAFFIC FLOW MANAGEMENT

Multi-Nodal ATFM Communication Tomorrow Loose system coupling Use of open standards Use of interoperable services SWIM System-to-system connection designed based on SOA with the use of XML-based information exchange model

Collaboration ICAO APAC SWIM TF ICAO APAC ATFM/IR/SWG Multi-Nodal Technical Subgroup Operational Scenarios (Operational Requirements) CTOT, CLDT, etc. not included in FIXM4.0 and FIXM 4.1 Core Required Data Elements Mapping to FIXM ATFM Sys-Sys Connection Develop FIXM Extension ATFM Sys-Sys ICD System Test

Operational Scenarios (Operational Requirements) Demand-Capacity Monitoring GDP Activation CTOT Management Required Data Elements Mapping to FIXM Develop FIXM Extension Finalized service description Data elements to be exchanged between ATFM units Developed FIXM v4.0 Extension for CTOT and CLDT With FIXM v.4.1 released in Dec 2017, new FIXM v4.1 was developed in Feb 2018 and validated in Apr 2018 System Test Conducted system test between AEROTHAI and CAAS at the end of August 2017, using FIXM 4.0 with Extension Flight Creation Flight Update CTOT Distribution CTOT Cancellation

ICD Update Detailed interface requirements Assumptions ATFM-to-ATFM system interconnection through EMS using AMQP v1.0 I. Detailed service specification II. Readiness of FIXM v4.1 Extension Within Sep 2018 III. Security requirements (done by EMS)

ICD Update Detailed interface requirements Synchronize with the SWIM in ASEAN Demonstration project timeline TIM/2 Update ICD Sep 2018 Oct 2018 Nov 2018 Dec 2018 Finalization of Required Services Review updated ICD Start planning for system-to-system test

ATFM-on-SWIM Forward Plan ATFM-related services development based on operational scenarios SWIM in ASEAN Demonstration 2018 June 2019 Dec 2020 Key considerations Network connection: CRV ICD amendment to include ADP service

In the Meantime we use Slot Allocation Message (SAM) ANSP SAM distribution CATS CAAC ATMB HK CAD Q3/2019 CAAS Q3/2019 AEROTHAI

ASEAN ATFM Implementation Support Group DISTRIBUTED MULTI-NODAL AIR TRAFFIC FLOW MANAGEMENT

ASEAN ATFM Implementation Support Team Core Idea: ASEAN ATM Master Plan ASEAN Members supporting ATFM as Level-2 by 2018 Support group to aid AMS in ATFM implementation Workshop series Guided / specific operational trials Proposed Strategy: Singapore (CAAS) & Thailand (AEROTHAI) to lead Kick-off meeting: 24 August 2018, Bangkok Develop a roadmap for harmonized ATFM implementation among ASEAN Members

Summary ASEAN ATFM Implementation Support Team Kick-Off Meeting

Updated AMS ATFM Implementation Status + (Informal) Update during ASEAN ATFM Support / 1 BRUNEI AMS Expected Starting Date To be provided Phase 1 1 Jan 2018 to 31 Dec 2020 Expected Completion Date To be provided Progress (ASEAN ATFM/1) Expected Starting Date To be provided Phase II 1 Jan 2018 to 31 Dec 2022 Expected Completion Date To be provided Progress (ASEAN ATFM/1) CAMBODIA Started 31-Dec-17 100% Started 31-Dec-20 Completed INDONESIA 26-Jun-16 31-Dec-17 100% 26-Jun-16 31-Dec-18 Expect completion 31 Dec 2019 LAO PDR 28-Dec-18 31-Dec-20 30% 31-Dec-20 30-Dec-22 None MALAYSIA Started Completed 100% 01-Dec-19 3rd Quarter 2020 MYANMAR Started 31-Dec-19 Completed Started 31-Dec-20 PHILIPPINES 02-Apr-18 01-Nov-18 01-Nov-18 01-Nov-19 SINGAPORE Started 01-Apr-17 100% Started 01-Sep-18 Completed 30 Sep 2017? THAILAND Started 31-May-17 100% Started 30-Sep-17 100% VIETNAM Started 31-Dec-18 80% Started 31-Dec-20 ASEAN ATFM Implementation 24 August 2018 Updated : As of Oct Support 2017 As of Jul 2018 36

Prioritized Work Areas ATFM Implementation Support Wish List Prioritized Elements - Phase I 1. ATFM operations training 2. Regulatory framework development Prioritizes Elements - Phase II 1. ATM resource capacity assessment Input into EU ARISE Plus workshops 24 August 2018 ASEAN ATFM Implementation Support 37

EU ARISE Plus Workshops Workshop # 1: ASEAN ATM Master Plan Introduction to ATM Master Plan and Key Initiatives Date 10 12 September 2018 Host Civil Aviation Authority of Thailand (CAAT) Venue Pathumwan Princess Hotel, Bangkok Workshop # 3: Implementation of ATFM To assist implementation of ATFM in ASEAN Date 24 26 September 2018 Host AirNav Indonesia Venue AirNav Indonesia HQ, Tangerang City 24 August 2018 ASEAN ATFM Implementation Support 38

Thank You!