ENVIRONMENTAL EVALUATION DOCUMENT. Donlin Gold Project

Similar documents
c and Native Population Served

Alaska Aviation System Plan Update

43 USC NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see

Yupiit of Andreafski P.O. Box 88 Saint Marys, AK Tel# (907)

Figure 34: Airports Not Meeting Demand for Lease Lot Space

ROSIE BARR, VICE PRESIDENT OF LANDS AND NATURAL RESOURCES

2018 Alaska General Contractors Annual Conference ALASKA MARINE HIGHWAY SYSTEM

Federal Register / Vol. 83, No. 107 / Monday, June 4, 2018 / Notices

NAPAIMUTE TRIBAL SAFETY PLAN Tribal Transportation Program

Facilities that must be inspected in 2014 (these facilities must be inspected a second time in either 2015 or 2016)

GRANT AVIATION NEWSLETTER

Final Environmental Impact Statement

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Airports & Aviation Alaska Dept. of Transportation

U.S. Activities in Puerto Rico, U.S. Virgin Islands and the Wider Caribbean. NOAA and the US Coral Reef Task Force

WILDLIFE BIOLOGY. Monday 20 Feb 2017


Progress Report March 2002 Project FIS Summary of Whitefish movement, Whitefish Lake Weir, Yukon Delta National Wildlife Refuge, Alaska, 2001

Chapter Seven REFERENCES

Alaska Airports. Page 1 of 5

PROUDLY BRINGING YOU CANADA AT ITS BEST. Management Planning Program NEWSLETTER #1 OCTOBER, 2000

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

KUSPUK School District

U.S. Army Corps of Engineers Wilmington District

January 2018 Air Traffic Activity Summary

A journey that will take you farther. A culture that will bring you closer. Yukon-Kuskokwim Health Corporation Sub-Regional Clinic Guide

SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012

Connecting Nevada Partners The Connecting Nevada Stakeholders that participated in this effort are listed below in alphabetical order.

Stakeholder Briefing The Bays Precint Urban Transformation Program

Ahtna Region. Ahtna Heritage Foundation

TRIBAL LEADERS DIRECTORY

ALASKA RRT. Arctic & Western Alaska Area Committee Brief March 5, 2019

Alaska Aviation System Plan (AASP) Overview. June 2010

Water Resources Update after NCGA Long Session

New Mexico State Publications Program

Clam Harbour Provincial Park

Willow.

AGENCY SCOPING MEETING

CHAPTER 4 - COMMENTS AND COORDINATION Introduction Comments and Responding to Comments

4.0 Context for the Crossing Project

Engage Room (Lobby Level)

Measuring Sustainable Tourism. Gaining momentum and political support. Tourism in the 2030 Agenda

2. The EPA provided the following information regarding EPA s activities in Newark Bay during the meeting:

CHAPTER 7 DISTRIBUTION LIST

Flow Chart Study Questions Milan (2016) - Sydney (2017)

Daisy Dean Trail 628/619 ATV Trail Construction

As of Barbara Stanley, Hydropower Coordinator U.S. Forest Service 648 Mission Street Ketchikan, AK

Alaska s Federally Recognized Tribes April 2010

2014 STATEWIDE COMPREHENSIVE OUTDOOR RECREATION PLAN

U.S. Department of the Interior Office of Inspector General

Juvenile coho salmon use of constructed off-channel habitats in two Lower Klamath River tributaries: McGarvey Creek & Terwer Creek

ANC Airport Community Outreach Plan

MUNICIPALITY OF ANCHORAGE LIST OF CURRENT REGISTRANTS (July 1, June 30, 2019)

Community Forum 17 August Resort Management Update

Norfolk District North Atlantic Division

TRINITY RIVER CORRIDOR

PLAN VIEW ACCESS ROAD ENGINEERING MAP

Economics 300: The Economy of Alaska NOTES: INTRODUCTION TO ALASKA GEOGRAPHY by Gunnar Knapp Updated January 16, 2005

UNESCO s World Heritage Program California Current Conservation Complex

ACTION UPDATE January 2014

FISH HABITAT PERMIT FH12-III-0246

MUNICIPALITY OF ANCHORAGE

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1

Southeast Alaska by the Numbers 2016

Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State. Kurt Beckett Deputy Chief Executive Officer

Galveston Bay Estuary Program. Carla G. Guthrie, Ph.D. Galveston Bay Council Member Texas Water Development Board

TRANSATLANTIC PLATFORM FOR ACTION ON THE GLOBAL ENVIRONMENT (T-PAGE) 1. Background Paper on US Marine Protected Areas (MPAs)

MUNICIPALITY OF ANCHORAGE LIST OF CURRENT REGISTRANTS (July 1, June 30, 2019)

#1. Why is the City doing this project?

Rethink Vancouver. Tourism Industry Summit. March 31, 2011

PACIFIC FISHERY MANAGEMENT COUNCIL CHAIR S RECEPTION

MEMO TO STATE PUBLICATION PROGRAM LIBRARIES June 2, 2005

City of Chelan Comprehensive Plan Update. Vision Workshop. Agenda

Cheatham County, TN. Hotel, Restaurant, and Travel Industries: Economic Profile and Business Trends, 2006

SENSITIVE AREAS: PART FIVE - AREAS OF LOCAL CONCERN

Manhattan Project National Historical Park. Tracy D. Atkins Principal Representative

AK DOT/PF Overview. 11/4/2016 Alaska DOT&PF

THE PLUS INDUSTRIAL MANUFACTURING EMPLOYER OF THE YEAR USACE BUFFALO DISTRICT BARGES MILLER BOAT LINE FERRY WILLIAM MARKET RYBA MARINE BARGES & TUG

LOUISIANA Department of Culture, Recreation, & Tourism

Part III Administrative, Procedural, and Miscellaneous

SF1363 / HF 1061: Legacy Funding; Conference Agreement

Creating a User-Driven Long-Distance OHV Trail Through Partnering

Loudon County, TN. Hotel, Restaurant, and Travel Industries: Economic Profile and Business Trends, Loudon County (Loudon and Lenoir City areas)

Cat Island Chain Background & Access Guide

Maury County, TN. Hotel, Restaurant, and Travel Industries: Economic Profile and Business Trends, Maury County (Columbia and Spring Hill area)

Ted Stevens Anchorage International Airport

PROGRESS REPORT IV 2007

MANAGING GEOGRAPHIC SCOPE. AUTHORITY Gulf of Maine Council on the Marine Environment

of the substantial governmental functions of the Indian tribal government. SECTION 2. APPLICATION

Noise Oversight Committee

Colorado s Instream Flow Program at 40. ICWP Annual Conference October 16, 2013 Denver, Colorado

MUNICIPALITY OF ANCHORAGE LIST OF CURRENT REGISTRANTS (July 1, June 30, 2018)

MUNICIPALITY OF ANCHORAGE LIST OF CURRENT REGISTRANTS (July 1, June 30, 2018)

PIERCE COUNTY-THUN FIELD AIRPORT MASTER PLAN MASTER PLAN ADVISORY COMMITTEE (MPAC) AIRPORT TOUR RD AVE. E., PUYALLUP, WA WEDNESDAY,

Click here to view:

DOWNLOAD OR READ : THESE AMERICAN LANDS PARKS WILDERNESS AND THE PUBLIC LANDS REVISED AND EXPANDED EDITION PDF EBOOK EPUB MOBI

CHAPTER TWO THE PROPOSAL

Chapter 1: Introduction

Exchange Sunshine Coast 2014

Chapter 1: Introduction Draft

Transcription:

ENVIRONMENTAL EVALUATION DOCUMENT Donlin Gold Project May 2013

ENVIRONMENTAL EVALUATION DOCUMENT Donlin Gold Project May 2013 4720 Business Park Blvd. Suite G-25 Anchorage, Alaska 99503 Prepared By: ARCADIS 420 L Street, Suite 100 Anchorage, AK 99501

6.0 OUTREACH AND COMMUNITY COORDINATION Donlin Gold, LLC (Donlin Gold) and previous operators of the Donlin Gold project have engaged in extensive outreach activities to apprise regulatory agencies and stakeholders of the project s scope, components, benefits, potential impacts, and development schedule. More specifically, there has been an iterative consultation process regarding project design and issues that have arisen as the project has progressed. This iterative consultation process was designed to inform and engage stakeholders and interested parties so that comments and input could be incorporated into the project description. This process began in March 2004 and is ongoing. Donlin Gold s outreach and consultation activities are bolstered by a strong local-hire commitment, which has brought individuals from around the region to work on the exploration phase of the proposed project. These locally hired members of the exploration team gain not only hands-on experience and training, but also serve as sources of information about the project, allowing village residents to get first-hand accounts from people they know of Donlin Gold s operations, plans, and environmental controls. The following tables (Tables 6.0-1 through 6.0-4) summarize a small selection of the meetings, presentations, employment recruiting, and informational sessions that have occurred since 2004. In addition to these meetings, Donlin Gold has hosted numerous tours of the Donlin Gold exploration project and operating mines similar in scope for local stakeholders, state and federal agencies, and lawmakers. Table 6.0-1 Jan 2004 Native and Tribal Organization s Date Organization Topic Calista Corporation, The Kuskokwim Corporation, Crooked Creek, ADOT Incorporate community and regional input into a recommendation on project access from proposed Donlin Gold port April 2004 The Kuskokwim Corporation (TKC) Presentation at the TKC annual meeting May 2004 Calista Corporation Stakeholder meeting May 2004 Crooked Creek Traditional Council Stakeholder meeting May 2004 The Kuskokwim Corporation Stakeholder meeting June 2004 Calista Corporation Stakeholder meeting June 2004 Crooked Creek Traditional Council Stakeholder meeting June 2004 The Kuskokwim Corporation Stakeholder meeting Aug 2004 The Kuskokwim Corporation Stakeholder meeting June 2005 The Kuskokwim Corporation with the Kuskokwim Corporation board in Sleetmute Aug 2005 Association of Village Council Presidents (AVCP) Presentation at AVCP special convention Dec 2005 Calista Corporation Presentation on proposed Donlin Gold project Jan 2006 Kuskokwim Native Association Presentation on proposed Donlin Gold project Feb 2006 Chuathbaluk Tribal Council Presentation of proposed Donlin Gold project at council meeting March 2006 Association of Village Council Presidents Presentation to update AVCP on activities July 2006 Georgetown Tribal Council Presentation of proposed Donlin Gold project at council meeting Donlin Gold LLC 6-1 May 2013

Sep 2006 Date Organization Topic Association of Village Council Presidents Host AVCP tour of the Donlin Gold exploration project Feb 2007 Calista Corporation Technical review of proposed Donlin Gold project Jan 2007 The Kuskokwim Corporation Project update presentation to TKC board Feb 2007 Kuskokwim Native Association Presentation at Kuskokwim Native Association Elders and Youth Conference in Kalskag July 2007 Napaimute Traditional Council Presentation of proposed Donlin Gold project at council meeting Aug 2007 Georgetown Tribal Council Presentation of proposed Donlin Gold project at council meeting March 2010 Annual YK Delta Job Fair 2010 Donlin had a table and made a presentation during a panel discussion 2010 Crooked Creek Traditional Council, Orutsararmuit Native Council 2010 Calista, TKC, AVCP, NCAI, Kuskokwim River Watershed Council meeting, Feb 2011 Feb 2011 Feb 2011 Oscarville Traditional Council, Oscarville Native Corporation Native Village of Napaskiak, Napaskiak Incorporated Organized Village of Kwethluk, Kwethluk Incorporated Stakeholder meeting Stakeholder meeting Project update presentation Project update presentation Project update presentation Feb 2011 Akiak IRA, Kokarmuit Corporation Project update presentation Feb 2011 Kuskokwim Native Association Project update presentation Feb 2011 Chuathbaluk Traditional Council Project update presentation Feb 2011 Bethel Native Corporation Project update presentation Feb 2011 Village of Atmautluak, Atmautluak Limited Project update presentation March 2011 Village of Chefornak Project update presentation March 2011 Native Village of Eek Project update presentation March 2011 Native Village of Tuntutuliak Project update presentation April 2011 Village of Kalskag Project update presentation April 2011 Village of Lower Kalskag Project update presentation April 2011 Village of Sleetmute Project update presentation April 2011 Crooked Creek Traditional Council Project update presentation April 2011 August 2011 Native Village of Nunapitchuk, Nunapitchuk Limited Yukon Kuskokwim Health Corporation Executive Board Project update presentation Project site tour Feb 2012 Lower Kalskag Tribal Donlin Gold LLC 6-2 May 2013

Feb 2012 Feb 2012 Feb 2012 Feb 2012 Feb 2012 Date Organization Topic March 2012 March 2012 March 2012 March 2012 March 2012 March 2012 March 2012 March 2012 Akiachak, Calista Shareholder Kalskag (both), Calista Shareholder Atmauthluak, Calista Shareholder Crooked Creek, Calista Shareholder Stony River, Calista Shareholder Alakanuk, Calista Shareholder Toksook Bay, Calista Shareholder Tununak, Calista Shareholder Relations Committee Community Nightmute, Calista Shareholder Newtok, Calista Shareholder Relations Committee Community Mekoryuk, Calista Shareholder Kongiganak, Calista Shareholder Platinum, Calista Shareholder Relations Committee Community March 2012 Calista Corporation Donlin Gold/Calista Annual Technical Committee Update of the proposed Donlin Gold project April 2012 April 2012 Napaskiak, Calista Shareholder Quinhagak, Calista Shareholder April 2012 Tuluksak, Calista Shareholder Relations Donlin Gold LLC 6-3 May 2013

Date Organization Topic Committee Community April 2012 April 2012 May 2012 May 2012 May 2012 Eek, Calista Shareholder Relations Committee Community Kasigluk, Calista Shareholder Relations Committee Community Aniak, Calista Shareholder Relations Committee Community Sleetmute, Calista Shareholder Chuathbaluk, Calista Shareholder june 2012 Russian Mission Donlin Gold representative attended the Iqurmiut Tribal Gathering July 2012 Chuathbaluk Tribal Donlin Gold representative attended the Chuathbaluk Tribal meeting July 2012 CIRI Provided copy of Donlin Gold Project, Natural Gas Pipeline Plan of Development Draft Sep 2012 Regional ANSEP Hosted regional students at Donlin Gold camp for youth mining camp Oct 2012 AVCP Regional Conference Presented updated project update to the Association of Village Council Presidents Oct 2012 First Alaskan s Youth and Elders Convention Face to face communication with participants Oct 2012 Alaska Federation of Natives Convention Face to face communication with participants Nov 2012 American Indian Science and Engineering Society Face to face communication with participants March 2013 Akiachak, Limited Donlin Gold LLC 6-4 May 2013

Table 6.0-2a Community s Date Community Topic Jan 2004 Crooked Creek Community meeting to discuss road routing for the proposed Kuskokwim River to Donlin-Jungjuk Road May 2004 Grayling, Holy Cross with Yukon River villages regarding proposed Donlin Gold project Aug 2004 Crooked Creek Alaska Department of Transportation (ADOT) visit to village Aug 2004 Holy Cross ADOT visit to village April 2006 Aniak Project update and water quality monitoring program Kuskokwim watershed meeting May 2006 Cenaliulriit Subsistence and Environmental Summit, Bethel Aug 2006 Sleetmute Mining education meeting Project update and environmental baseline program Oct 2006 Bethel Update on environmental baseline program May 2007 Sleetmute Update community residents on progress of proposed Donlin Gold project June 2007 Bethel City Council Project cyanide management July 2007 Napaimute Project update July 2007 Bethel Presentation at Bethel community meeting July 2007 Crooked Creek to update community residents on progress of proposed Donlin Gold project July 2007 Crooked Creek Presentation at Crooked Creek Annual Tribal Gathering March 2008 April 2008 Emmonak, Kotlik, Marshall Village, Napakiak, Atmauthluak Alakanuk, Nutoc, Tuntutuliak, Kipnuk Present project information and employment recruiting Present project information and employment recruiting May 2008 Lower Kalskag and conduct employment recruiting Oct 2008 Goodnews Bay and conduct employment recruiting Oct 2008 Crooked Creek Crooked Creek Dec 2008 Crooked Creek Pre-NEPA Scoping Stakeholder Dec 2008 Jan 2009 Jan 2009 Feb 2009 Kwethluk (Akiak, Akiakchak, and Tuluksak also attended) Quinhagak (Goodnews Bay, Eek, and Tuntutliak also attended) Saint Mary s (Mountain Village, Pitka s Point, Pilot Station, Marshall, and Russian Mission also attended) Kipnuk (Kongiganak, Kwigillingok, and Chefornak and conduct employment recruiting Donlin Gold LLC 6-5 May 2013

Date Community Topic Feb 2009 also attended) Napakiak (Oscarville, Napaskiak, Atmautluak, Kasigluk, and Nunapitchuk also attended) March 2009 Aniak Open house project update March 2009 March 2009 Toksook Bay (Tununak, Newtok, Nightmute, and Mekoryuk also attended) Emmonak (Alakanuk and Nunam Iqua also attended) April 2009 Bethel Open house project update April 2009 McGrath April 2010 Nikolai April 2010 Skwentna 2010 Lower Kalskag, Crooked Creek, Bethel, Upper Kalskag, Tuluksak, Stony River, Sleetmute, Chuathbaluk Feb 2011 March 2011 April 2011 May 2011 April 2012 Oscarville, Napaskiak, Napakiak, Kwethluk, Akiak, Aniak, Chuathbaluk, Bethel, Chefornak, Eek, Tuntutuliak, Quinhagak, Saint Mary s, Mountain Village Skwenta, Nunapitchuk, Crooked Creek, Upper Kalskag,, Sleetmute, Russian Mission McGrath, Nikolai, Grayling, Willow, Tuluksak, Akiachak, Goodnews Bay, Napaimute (in Bethel) Skwentna Open House Update on progress of proposed Donlin Gold project Update of the Donlin Gold natural gas pipeline study April 2012 Crooked Creek Workforce Development presentation at the Crooked Creek School April 2012 Sleetmute Workforce Development presentation at the Sleetmute School April 2012 Kasigluk, Calista Shareholder Relations Committee Community May 2012 Aniak Workforce Development presentation at the Aniak School May 2012 Kalskag Workforce Development presentation at the Kalskag High School Donlin Gold LLC 6-6 May 2013

Date Community Topic May 2012 Regional Youth Donlin Youth Mining Camp at Donlin for regional high school students July 2012 McGrath Attended McGrath Festival and presented information about the Donlin Gold project Oct 2012 Holy Cross Attended GASH village gathering and presented information about Donlin Gold project Nov 2012 Regional Donlin Gold project description for statewide high school students Table 6.0-2b Project Site Tours and Mine Tours Date Community Topic Oct 2008 Regional Stakeholders Golden Sunlight mine tour in Montana Oct 2009 Regional Stakeholders Golden Sunlight mine tour in Montana Summer 2010 Tuluksak, Stony River, Upper and Lower Kalskag, Sleetmute, Chuathbaluk, Bethel Alaska State Chamber of Commerce statewide stakeholders Donlin project site tour Oct 2010 Regional Stakeholders Golden Sunlight mine tour in Montana April 2011 Regional Stakeholders Golden Sunlight mine tour in Montana June 2011 Chuathbaluk HS Donlin project site tour July 2011 Aug 2011 Sep 2011 DOL, Napaskiak, Nikolai, Napakiak, Kongiganak, Tuntutuliak, Aniak, Marshall, Kwethluk, Lime Village, Eek, Kipnuk, Akiak, Goodnews Bay, Mekoryuk, LKSD Teachers, Bethel, ANSEP Students, AVCP RHA, BRHS Students, Pilot Station, Akiachak, AVCP E Board, Quinhagak, Nightmute, Bethel, Platinum Bethel HS, Aniak HS, Bethel, McGrath Donlin project site tour Donlin project site tour Donlin project site tour Sep 2011 Regional Stakeholders Mine tour in Elko, Nevada Oct 2011 Regional Stakeholders Golden Sunlight mine tour in Montana Donlin Gold LLC 6-7 May 2013

Date Community Topic Oct 2011 Chefornak Donlin project site tour Nov 2011 Regional Stakeholders Golden Sunlight mine tour in Montana May 2012 Regional Stakeholders Golden Sunlight mine tour in Montana July 2012 Aug 2012 Napakiak, Newtok, Kwethluk, Toksook Bay, Kongiganak, Kasigluk, Bethel, Lower Kalskag, Tuntutuliak, Quinhagak, Atmauthluak, Upper Kalskag, St. Mary s, Chuathbaluk, Aniak, Russian Mission, Tuluksak Donlin Gold project site tour for community representatives Donlin Gold project site tour for community representatives Oct 2012 Regional Stakeholders Golden Sunlight mine tour in Montana Oct 2012 Holy Cross Donlin Gold project site tour for community representatives Oct 2012 Regional Stakeholders Gold Strike mine tour in Nevada Table 6.0-3 Federal and State Agency Consultation Date Agency/Organization Topic Aug 2003 ADNR-LMPT Baseline studies planning discussions Feb 2004 USFWS Baseline studies planning discussions: wildlife March 2004 ADNR Project description discussions: power sources March 2004 BLM, DOI Project description discussions: project access April 2004 ADNR-LMPT, USFWS, DOT, USEPA, USACE, ADEC Project update April 2004 ADF&G Project update April 2004 ADEC-AQ, ADNR-LMPT Baseline studies discussions and updates: air quality April 2004 ADNR-LMPT Preliminary regulatory discussions May 2004 BLM Preliminary regulatory discussions May 2004 USACE Project update June 2004 ADNR-OHMP Project update and preliminary regulatory discussions June 2004 USFWS Project update and preliminary regulatory discussions June 2004 ADNR Project update and preliminary regulatory discussions June 2004 USEPA Region 10 Preliminary regulatory discussions July 2004 USFWS Baseline studies discussions and updates: aquatic biomonitoring July 2004 DOI Project description discussions: project access July 2004 ADEC-WQ, ADNR, ADNR-OHMP, Baseline studies discussions and updates: water Donlin Gold LLC 6-8 May 2013

Date Agency/Organization Topic USEPA quality/waste characterization July 2004 ADOT Project description discussions: project access Aug 2004 ADOT Project site tour Aug 2004 ADOT, Federal Highway Administration Project description discussions: project access Aug 2004 ADOT Project description discussions: project access Aug 2004 ADNR-OHMP Preliminary regulatory discussions Aug 2004 ADEC, ADNR, ADNR-LMPT, ADNR- MLW, ADNR-OHMP, AGO, USEPA, USFWS Project site tour and project update Aug 2004 USACE Preliminary wetlands mitigation discussions Sep 2004 Senator Stevens Impact of upcoming legislature May 2005 BLM Project update June 2005 USEPA Project update July 2005 BLM Project site tour and project update July 2005 ADEC Project update Sep 2005 USFWS Project update Sep 2005 USEPA Project site tour and project update Oct 2005 USFWS - Subsistence Regional Advisory Council Project update Dec 2005 ADEC-AQ Baseline studies discussions and updates: air quality Dec 2005 USEPA Region 10 Project update March 2006 USCG Project overview April 2006 ADF&G Project update Feb 2007 USEPA Project update May 2007 ADNR-LMPT Project update Feb 2009 ADNR-LMPT Project update Feb 2009 ADNR Preliminary regulatory discussions Feb 2009 ADEC, ADNR, ADF&G, LAW Project description discussions: Timeline March 2009 ADNR-LMPT Preliminary regulatory discussions April 2009 ADNR, USEPA, USFWS, SOA LAW, ADEC, USACE, NOAA/NMFS, ADHSS, ADF&G, ADNR -OPHP, BLM, NOAA- HCD Project update May 2009 NOAA-Fisheries Baseline studies discussions and updates: aquatic biomonitoring May 2009 USACE Preliminary regulatory discussions June 2009 USEPA, USACE, ADNR-LMPT Project site tour June 2009 ADEC-AQ Baseline studies discussions and updates: air quality Nov 2009 USACE, ADNR-LMPT, ADNR, ADHSS Baseline studies discussions and updates: HIA Dec 2009 BLM Project description discussions: natural gas pipeline Donlin Gold LLC 6-9 May 2013

Date Agency/Organization Topic Dec 2009 ADNR-SPCO Project description discussions: natural gas pipeline Jan 2010 BLM Project description discussions: natural gas pipeline Feb 2010 ADNR-SPCO, ADF&G Project description discussions: natural gas pipeline Feb 2010 ADNR-SPCO, SHPO Project description discussions: natural gas pipeline Feb 2010 BLM Baseline studies discussions and updates: wildlife March 2010 Kuskokwim Working Group Baseline studies discussions and updates: aquatic biomonitoring March 2010 BLM Baseline studies discussions and updates: wildlife/vegetation April 2010 ADF&G (State s Large Mine Team) Teleconference on Proposed natural gas pipeline April 2010 ADNR-LMPT, ADF&G, Joint Pipeline Office Project update May 2010 ADNR-SHPO Baseline studies discussions and updates: cultural resources June 2010 ADEC-AQ Baseline studies discussions and updates: air quality June 2010 ADNR-SPCO Project update July 2010 ADEC-AQ Baseline studies discussions and updates: air quality Oct 2010 ADHSS, ADNR-LMPT Baseline studies discussions and updates: HIA Nov 2010 ADNR-LMPT, ADEC Project description discussions: water management/dam safety Nov 2010 BLM, ADNR-SPCO Project description discussions: natural gas pipeline Jan 2011 USACE Project update Feb 2011 ADNR-SPCO Project description discussions: natural gas pipeline Feb 2011 ADEC-WQ Baseline studies discussions and updates: water quality March 2011 Yukon Delta National Wildlife Refuge Potential Wetland Mitigation March 2011 ADNR-SHPO, BLM Baseline studies discussions and updates: cultural resources March 2011 ADF&G Baseline studies discussions and updates: aquatic biomonitoring May 2011 BLM, ADNR-SPCO Project description discussions: natural gas pipeline July 2011 USACE Project update July 2011 ADEC-WQ Project description discussions: water management July 2011 ADEC, ADNR, EPA Donlin operational water management review and APDES pre-application planning July 2011 ADEC-AQ/ADNR-LMPT Project description discussions: air modeling Aug 2011 ADNR-Dam Safety Baseline studies discussions and updates: hydrology/dam safety Aug 2011 ADEC Project update Aug 2011 USACE Preliminary wetlands mitigation discussions Donlin Gold LLC 6-10 May 2013

Date Agency/Organization Topic Aug 2011 ADNR Project update Sep 2011 ADNR-LMPT, ADHSS Baseline studies discussions and updates: HIA Sep 2011 ADHSS, ADNR, YKHC, Newfields, HIA update meeting Sep 2011 USFWS Project update Nov 2011 ADHSS, ADNR, YKHC, Newfields HIA update meeting March 2012 ADHSS, ADNR, Newfields HIA update meeting March 2012 Juneau Briefed rural legislators on workforce development issues March 2012 BLM Plan of Development Discussion Notes: ADEC = Alaska Department of Environmental Conservation ADF&G = Alaska Department of Fish and Game ADHSS = Alaska Department of Health and Social Services ADNR = Alaska Department of Natural Resources ADOT = Alaska Department of Transportation AQ = Division of Air Quality BLM = Bureau of Land Management DOI = U.S. Department of the Interior HCD = Habitat Conservation Division HIA = Health Impact Assessment LMPT = Large Mine Permitting Team MLW = Division of Mining, Land and Water NMFS = National Marine Fisheries Service NOAA = National Oceanic and Atmospheric Administration OHMP = Office of Habitat Management and Planning SHPO = State Historical Preservation Office SOA LAW = SPCO = State Pipeline Coordinator s Office USACE = U.S. Army Corps of Engineers USCG = U.S. Coast Guard USEPA = U.S. Environmental Protection Agency USFWS = U.S. Fish & Wildlife Service WQ = Division of Water Quality Table 6.0-4 Non-governmental Organizations Date Agency/Organization Topic Oct 2003 Resource Development Council Presentation March 2004 Bethel Regional Economic Summit June 2005 Anchorage Downtown Rotary Donlin Creek and Modern Mining Industry in Alaska Presentation May 2010 Iditarod Historic Trail Alliance Project update June 2010 March 2011 Iditarod Race Committee Board of Directors Alaska Association of Environmental Professionals - Anchorage Presentation Project Environmental Baseline Studies Program August 2011 Alaska Resource Education Project Site Tour for Teachers Summer 2011 Rural Alaska Community Action Project update Program Donlin Gold LLC 6-11 May 2013

This page intentionally left blank. Donlin Gold LLC 6-12 May 2013

References This page intentionally left blank. Donlin Gold LLC 7-28 May 2013