CITY OF SAN ANTONIO RIVER BARGE DESIGN COMPETITION UPDATED 11/19/2015

Similar documents
SAN ANTONIO RIVER IMPROVEMENTS PROJECT. April 27, 2009

SAN ANTONIO RIVER IMPROVEMENTS PROJECT. August 6, 2008

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services

New ADA Accessibility Standards for the Attractions Industry

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

San Antonio's River Walk Behind the scenes tour or did you know?

Program Manual Version 2.0 July 2018

Final Design Approval of the Weather Shelters and Summit Stair for the Mount Umunhum Summit Project

DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America. RE: Accessible Trails Checklist 1

Park Board Chair and Commissioners

Park Board Chair and Commissioners

DELLS RIVER ARTS DISTRICT

Ossington Station Easier Access Project - Construction & Public Art Concept Update

MASSACHUSETTS PORT AUTHORITY REQUEST FOR LETTERS OF INTEREST DEVELOPMENT OF THE MASSPORT MARINE TERMINAL

Header i

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

Lansing Municipal Airport 3250 Bob Malkas Dr., Lansing, Illinois (708) phone (708) fax

INFILL HARD CORNER & REDEVELOPMENT OPPORTUNITY 731 PROBANDT and 134 & 138 KING ROGER ST

County of Elgin Tourism Signage Policy Addendum A

Welcome to the AccessibilityOnline Webinar Series

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163

City of Lafayette. Request for Proposals Municipal Airport Fixed Based Operator

Basic Idea Regarding the Selection of Cruise Ship Liners. to have a Partnership with the Naha Port Authority on a

REQUEST FOR PROPOSAL 2017 ATIA CONVENTION & TRADE SHOW

PROPOSED PARK ALTERNATIVES

Peter Axelson. Beneficial Designs, Inc. Minden, NV

Port Gamble Shoreline Area Conceptual Trail Proposal

San Antonio Channel Improvement Project MISSION REACH ECOSYSTEM RESTORATION PROJECT. Welcome Assistant Secretary (CW) Jo-Ellen Darcy December 8, 2009

Request for Proposals

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

Understanding user expectations And planning for long term sustainability 1

Demand Response Service Guide

Water Space. A development opportunity at the Canting Basin, Pacific Quay, Glasgow

Program Manual. January 1, EarthCraft House Single Family Program. Viridiant 1431 West Main Street Richmond, VA

CITY OF BILLINGS MET PLUS. A Guide for Riders, Operators, Agencies.. Contact Numbers. Passenger Handbook

ROYAL GORGE PARK and RECREATION AREA. A Feat of Natural and Man-Made Engineering

Outdoor Developed Areas

What s covered. What s not covered. Options for those not covered. ABA Coverage

DRAFT FINAL ACCESSIBILITY GUIDELINES FOR OUTDOOR DEVELOPED AREAS

Coronado National Forest Santa Catalina Ranger District

Mechanized River Valley Access Public Engagement Report. April 2015

Appalachian Trail Community

A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A

Becker County Trail Routing Feasibility Study

Legal Notice. Columbus and Franklin County Metro Parks Request for Statement of Qualifications (RFQ): Professional Design and Engineering Services

Project Summary 2009

Chapter 1: Introduction Draft

Chapter 1: Introduction

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Mt. Hood National Forest

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

CONVENTION AND EXPO CENTER HOTEL BRANDING/MANAGEMENT OPPORTUNITY

Introduction. Access statement for Jurys Inn Christchurch

DESTIMED PROJECT CALL FOR EXPRESSION OF INTEREST FOR THE IMPLEMENTATION OF ECOTOURISM PILOT ACTIONS IN CROATIAN MPAS

The Falls: A Visitor & Interpretive Center for the Upper Lock

AUGUST 5, 2010 UPDATE # 3 AMTRAK/FEC PROJECT: STATION LOCATIONS AND CONCEPTUAL DRAWINGS

Coca-Cola Zero Belfast Bikes.

Flow Stand Up Paddle Board Parkway Plan Analysis

LOS ANGELES WORLD AIRPORTS' AUTOMATED PEOPLE MOVER

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road

THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions

Playa Vista Ability2Change Webinar

VILLAGE OF WINNETKA, ILLINOIS DEPARTMENT OF COMMUNITY DEVELOPMENT

Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD Submitted via online portal. 2 June 2017.

Hemisfair Civic Park. Vision and Program Plan

River Barge Concession Contract. May 17, 2017 B-Session Carlos Contreras, Assistant City Manager Kevin Barthold, City Auditor

INTRODUCTION. Mailing address: Burke County Community Development Attn: Tim Johnson P. O. Box 219 Morganton, NC

If we make accessibility an up-front consideration that guides our planning & design efforts.

how it started where we are now what is coming up NEW WESTMINSTER WATERFRONT PARK THE RIVER THE PAST THE PEOPLE

CHECKLIST FOR AWARDS ENTRIES. Organised by

AAPA 2017 COMMUNICATION AWARDS CATEGORY: OVERALL CAMPAIGN

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

VENTURA PORT DISTRICT

CONTACT: Chuck Cullom Ted Cooke Report on Opportunity to Participate in Colorado River Museum Display

INTERNATIONAL STUDENTS PRE-ARRIVAL INFORMATION

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

2016 Regional Transportation Alternatives Program (TAP) Grant Application

The Port of Seattle. page 2

Name of Property: Location/City: Anticipated dates(s) for event:

Rodrigues Regional Assembly Chief Commissioner s Office

Chorley Park Trail Connection New Design Options. Information Booklet Prepared for June 9, 2014 Public Meeting

Ozaukee County Transit Development Plan

ROAD AND TRAIL PROJECT APPROVAL

Chair and Members of Harbour East - Marine Drive Community Council. Brad Anguish, Director, Parks and Recreation

INFORMATION FOR COMPLETING THE FORM at

Metrolinx Board of Directors. President, Union Pearson Express Date: September 22, 2015 UP Express Quarterly Board Report

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

POLICY DCS-04: Tourism Directional Sign Policy. Development and Cultural Services

Operating Principles Tourism Dawson Creek will operate on the following operating principles:

Chapter 6. Trail Design. Trail Design

2017 Exhibitor Packet Austin, TX

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Paper 87 - INTERNATIONAL COLLABORATION CONCERNING THE USE OF THE DANUBE RIVER IN ROMANIA

Airport Planning Area

Welcome to the AccessibilityOnline Webinar Series. Listening to the Webinar. Listening to the Webinar, continued

Picnic Units A picnic unit is a part of a picnic area

June 28, 2017 Press Conference

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park

Transcription:

CITY OF SAN ANTONIO RIVER BARGE DESIGN COMPETITION UPDATED 11/19/2015

BACKGROUND The City of San Antonio is the seventh largest city in the United States. A large city with a small town feel, San Antonio s fabled River Walk is one of its most distinguishing features. Designed by architect Robert H. H. Hugman, AIA in the 1920s, the River Walk was constructed between 1938 and 1940 and is among the highest rated tourist attractions in the State of Texas. Since its earliest beginnings, the River Walk has been navigated by small watercraft. Hugman s bridge designs were tall enough to allow Venetian gondolas to float underneath. When San Antonio celebrated its 250 th Birthday during HemisFair 68, flat bottomed barges offered visitors rides up and down the length of the river. The same river barge design continues to be used today for tourist cruises, river taxis, and dinner barge excursions, all of which have a combined annual ridership of over 1.5 million. In 2018, San Antonio will celebrate its 300 th anniversary. This occasion prompted a desire by the City s elected leaders to re-imagine the river barge experience with a newly designed, more sustainable, modular fleet using innovative technology that can respond to the needs of both tourists and residents. The river barge must provide a feasible transportation option for daily commuters as well as a quality experience to the estimated 11.5 million visitors to the River Walk every year. COMPETITION OVERVIEW The San Antonio River Barge Design Competition will be determined in two phases. The first phase is an open call, from which a jury will select up to three finalists. Finalist teams will receive a $7,500 stipend to allow for development of their conceptual design as well as a $2,500 travel stipend to enable an in-person presentation to members of the jury and the general public, which will take place in San Antonio on February 8-9, 2016. Additionally, they must develop a presentation that will include the following: 3-D physical model (1/10 scale) Renderings Technical specifications with solutions for batterypowered propulsion Cost Estimate Modular component options and material samples All submittal information becomes the property of the City of San Antonio, including all moral and intellectual property rights. The City of San Antonio reserves the right to incorporate any design element from submitted proposals in any final design without regard to its source in any of the original submitted proposals. The City of San Antonio reserves the right to reject any and all proposals and not proceed with the second phase of finalist candidates. PRIZE Cash prizes will be awarded to the top three finalist teams in the amounts of $20,000 for first place, $10,000 for second place, and $5,000 for third place. The selected team will be awarded a professional services contract with the City of San Antonio to complete construction documents for watercraft design in an amount of at least five percent of the initial barge procurement. The City of San Antonio will procure at least 44 barges and the newly constructed river barge fleet is anticipated to go into operation on the River Walk in January 2017. SITE CONTEXT The San Antonio River is a major waterway that originates in central Texas in a cluster of springs in San Antonio, approximately four miles north of Downtown. It follows a roughly southeastern path through the state and eventually feeds into the Guadalupe River about five miles from San Antonio Bay on the Gulf of Mexico. The river is 240 miles long and crosses five counties: Bexar, Wilson, Karnes, Goliad, and Refugio. The San Antonio River is central to the City s history. Archeological excavations have shown evidence of human habitation more than 10,000 years ago. Hundreds of years ago, the river was a gathering place for Native Americans. The first Spanish settlers built their homes along its banks in the 1700s. In the next century, German immigrants saw opportunity in placing breweries and grain mills adjacent to the river. In the late 1920s, a series of disastrous floods prompted a plan to pave the river into a concrete storm sewer. San Antonio government officials, businessmen, and members of the San Antonio Conservation Society recognized an opportunity for a different solution. In 1938, with funds from the federal Works Progress Administration, visionary local architect Robert H.H. Hugman, AIA, transformed the river into a linear park that today is the envy of cities all over the world. The first 21-block section completed in 1941, stretching from Nueva to Lexington Streets, has 31 unique staircases, bridges, water features and an outdoor theatre.

The historic downtown section of the San Antonio River Walk is a verdant oasis of cypress-lined paved paths, arched stone bridges, and lush landscapes. It is the heart and soul of the downtown of the seventh largest city in the United States. Its charming human scale beckons visitors to its banks where a myriad of dining, cultural attractions, and historic sites can be found. Open 365 days a year, this three-mile network of walkways along the banks of the San Antonio River is located one story below street level in downtown San Antonio. Lined by shops, restaurants and bars, the River Walk is an essential part of the city's urban fabric and attracts visitors from around the world. Additional revitalization of the River Walk took place in 1968 as San Antonio prepared to host the World s Fair in celebration of the City s 250 th Anniversary. New hotels were built along the river s banks and many historic buildings were renovated. The River Walk was extended from South Alamo Street to the new Convention Center. It was at this time that the City launched a fleet of passenger river barges for sightseeing tours and dining. The River Walk received international attention and set the stage for what has become one of the state s top visitor destinations. In 1998, city leaders initiated the $384.1 million San Antonio River Improvements Project, which included flood management, amenities, ecosystem restoration, and recreational improvements to over 13 miles of the San Antonio River. The project s northern section the Museum Reach extends approximately four miles from Hildebrand at Brackenridge Park to Lexington Street. The Urban Segment of the Museum Reach opened in May 2009 and extends approximately 1.3 miles and extended navigation by river barge through the addition of a lock and dam and created access along a linear park featuring hike and bike trails, lush landscaping, overlooks, boat landings, stairs, water features, and pocket parks. The Museum Reach also links major historic, commercial, and cultural institutions to downtown via the river. The Mission Reach transformed an eight mile stretch of the San Antonio River south of the original River Walk into a quality riparian woodland ecosystem and it connects 4 of the 5 San Antonio Missions which were recently collectively designated as a World Heritage Site. Construction of this $271.4 million Mission Reach extension of the River Walk was completed in October 2013. An economic impact study released in May 2014 on the five year anniversary of this grand opening indicated the Museum Reach section of the River Walk has an annual economic impact of $139 million. The project has also been a catalyst for the development of more than 50 new businesses and over 2,000 new housing units currently online or under construction along this stretch of the river. This represents over $331 million in private investment, making a commuter barge shuttle a feasible transportation option for residents along the river. The total navigable part of the San Antonio River Walk by river barge is approximately 3.4 miles, which includes the historic river bend that was developed in 1941, the 1968 extension, and the 1.3 mile Museum Reach Urban Segment. River barges navigate throughout the river bend area and through the length of the route passing through the Museum Reach lock and dam to their final destination at the Pearl turning basin (see appendices). More than 11.5 million people visit the River Walk annually. Of these, 9.3 million are from outside Bexar County and 2.2 million River Walk patrons are locals, approximately two thirds of which visit the River Walk more than twice a year. These visitors stimulate an overall economic impact of $3.1 billion and support 31,000 jobs. The River Walk, including the recently completed San Antonio River Improvements Project, is a key element of the city s tourism infrastructure that also improves quality of life for locals and businesses, enhancing the vibrancy of San Antonio. DESIGN CHALLENGE This design challenge is being underwritten by the San Antonio River Authority and the Convention and Visitors Bureau. AIA San Antonio, in partnership with the City of San Antonio, seeks an innovative, visionary approach to the 21 st century watercraft experience on the San Antonio River. The design solution should support a ridership that includes tourists, residents, and daily commuters, and responds to the competition goals listed below: All-electric, battery-powered, 50 barge fleet (hybrid propulsion will not be considered) Motor propulsion choice of inboard, inboard/outboard, or outboard 3

Provides for a 15-20 year barge lifespan, at a cost of $40,000 to $65,000 per barge Utilizes innovative materials in the construction of the barges Accommodations for disabled riders, including companion seating for riders in wheelchairs Accommodations for commuters Accommodate up to 40 passengers per barge tour Accommodations for dining and other events Ability to traverse through the lock with a barge size no larger than 9 feet by 27 feet Provides a safe ride with minimal wake Complements City of San Antonio branding ADDITIONAL CHALLENGE CONSIDERATIONS Provides modularity for boats in a variety of sizes and uses (small standing options to large linked barge options) Provisions for sun shading innovation Provisions for self-leveling technology to accommodate level boarding EVALUATION CRITERIA Constructability to include, but not limited to, the economic feasibility of manufacturing the barge. o The goal is to have a majority of the fleet in operation by January 2017. Functionality including durability and longevity of the barge and batteries. Maintenance Design Innovation ELIGIBILITY The San Antonio River Walk Barge Design Competition is open to all interested parties, provided that the team includes an architect, engineer, or design professional licensed in the State of Texas to seal construction and permitting documents. REGISTRATION To register for this design competition, visit the AIA San Antonio website at www.aiasanantonio-riverbarge.org. A $250 entry fee applies. Questions about the competition should be sent to info@aiasanantonioriverbarge.org. 4

JURY The jury will be comprised of up to 11 jurors that represent a variety of interests. Of the 11, 3 will include the following: Nationally Recognized Architect; Internationally Recognized Boat Designer; and a Naval Architect or Marine Engineer. Technical advisors may advise the jury as needed. SUBMISSION REQUIREMENTS Attendance of at least one mandatory Pre-Submittal conference to be held on the following dates: November 18, 2015 at 10:00 AM CST in the Board Room of the San Antonio River Authority offices at 100 E Guenther Street, San Antonio, Texas 78204. Attendance can be in person or through GotoMeeting. Applicants should indicate their preferred method of attendance upon registration. The GotoMeeting can be accessed using the following link: https://global.gotomeeting.com/join/643624461. Alternatively, attendees may dial in at (408) 650-3123 using the access code: 643-624-461. January 8, 2016 at 10:00 AM CST in the Board Room of the San Antonio River Authority offices at 100 E Guenther Street, San Antonio, Texas 78204. Attendance can be in person or through GotoMeeting. Applicants should indicate their preferred method of attendance upon registration. The GotoMeeting can be accessed using the following link: https://global.gotomeeting.com/join/444192709. Alternatively, attendees may dial in at (872) 240-3311 using the access code: 444-192-709. For those joining via GoToMeeting, please type your name and the organization you represent in the chat box so that we have a record in the saved chat transcript. River barge tours are strongly encouraged and can be arranged in advance by contacting AIA San Antonio. Applicants should indicate their desire to participate in a barge tour on the registration form. Phase I submission entries are due February 5, 2016 by 4:00 PM CST and must be submitted in digital format (zip file no larger than 10 MB in size) and include 2 separate PDF files, to AIA San Antonio s competition Dropbox, dropbox@sanantonio-riverbarge.org, and include the following requirements outlined below: PHASE I Design Team Information single PDF file 1. Project Title 2. Team Name 3. Team Members (with physical address, email address, and telephone number for each member) Project Narrative single PDF file So that AIA San Antonio can maintain anonymity of the teams for the jurors we ask that these documents be submitted free of team member names, firm names, logos, or any other proprietary indicators. 1. Project Title 2. Design Concept Rendering(s) limited to (5) five 8 ½ x 11 or (5) five 11x17 pages 3. Detailed design concept narrative limited to (5) five 8 ½ x 11 pages that briefly addresses the evaluation criteria listed on page 4 and the following: - Technical specifications with solutions for battery-powered propulsion - Cost estimate - Modular component options (if any) PHASE II Three finalist teams will be notified that they have been selected to move into phase II. Each finalist team will receive a $7,500 stipend to allow for development of their conceptual design as well as a $2,500 stipend to travel to San Antonio to present their concept and design to members of the jury. 5

Finalist teams must submit the following: 1. 3-D physical model of proposed barge solution (at 1/10 scale) 2. Renderings, to include site context 3. Technical specifications with specific solutions for battery-powered propulsion 4. Cost estimate 5. Modular component options 6. Barge material samples Finalist teams must be available to be in San Antonio March 28-29, 2016. No team member names, firm names, logos, or any other proprietary indicators are permitted. All components for Phase II submissions should be sent to the following address no later than March 18, 2016 by 4:00 PM CST: AIA San Antonio ATTN: Torrey Stanley Carleton, Hon. AIA, Executive Director 1344 S Flores St #102 San Antonio, TX 78204 Scoring Phase II submissions scoring will be broken down as follows: 60% Constructability, functionality, and maintenance 40% Design and innovation SCHEDULE October 30, 2015 Competition Registration Opens November 18, 2015 Mandatory Pre-Submittal Conference - 10:00 AM CST (see Submission Requirements section for details) January 5, 2016 Competition Registration Closes January 8, 2016 Mandatory Pre-Submittal Conference - 10:00 AM CST (see Submission Requirements section for details) February 5, 2016 Phase I Submittals due - 4:00PM CST February 12, 2016 Jury Announces Short List Teams March 18, 2016 Phase II Submittals due 4:00PM CST March 28, 2016 Open House for public to view the submittals and meet the teams 6:00PM CST March 29, 2016 Presentation by short listed teams to Jury in San Antonio March 30, 2016 Competition winner announced and City Council B Session Presentation April 21, 2016 City Council Action on Professional Services Contract with winning team to assist in the manufacturing of the barges and authorization for staff to issue an RFP for the Barge Operation. INQUIRIES Questions about the competition should be sent to info@aiasanantonio-riverbarge.org. RESOURCES Appendix A: River Walk Map Appendix B: River Walk Measurements Appendix C: River Walk Fact Sheet 6

http://www.sanantonioriver.org/ http://www.thesanantonioriverwalk.com/history/history-of-the-river-walk www.riosanantonio.com/rivertours www.sariverfoundation.org http://www.sanantonioriver.org/museum_reach/museum_reach.php http://www.lib.utexas.edu/taro/utaaa/00027/aaa-00027.html http://www.uiw.edu/sanantonio/riverwalk.html 7

Appendix A: River Walk Map

Appendix B: MEASUREMENTS

1 MARINA BOAT STALL

Appendix C: River Walk Fact Sheet Existing Rio San Antonio Cruise tour boat 27 L x 9 W Existing Lady Eco water way cleaning vessel 29 x 10 Lock and Dam 32 L x 11 W: Slide 25 Minimum depth of River 32 La Mansion: Slide 6 Maximum depth of River 18 Villita Street : Slide 2 Minimum width of River 12 La Mansion, Convention Center lagoon: Slide 6 & 12 Maximum width of River 44 Westin Hotel area Minimum height from water surface to lowest bridge 6 5 S. Presa St. metal bridge: Slide 21 Maximum boat size of 28 L x 9 W Maximum draft of 24 Ability to execute a 360 turn in an area 85 x 65 square Center City Development & Operations Department PO Box 839966 San Antonio, TX 78283 Tel: 210-207-1041 Fax: 210-207-8151

Appendix D: San Antonio Disability Access Office Preferred ADA Compliance Criteria Final barge designs must be able to comply with the following ADA compliance criteria. In addition, finalist teams must identify the slope and stability of the wheelchair load/unload area on the barge decks; openings, width and length of wheelchair spaces; turning specifications for wheelchairs for entry and exit of the barge; device(s) to secure wheelchairs; protrusions into wheelchair spaces, and shoulder to shoulder companion seating adjacent to wheelchair space. Transition from dock to deck: 1. Ramp running slope from dock to deck no steeper than 1:12 (8.3%). 2. Ramp width minimum 36. 3. Ramp edge protection on both sides no less than 4 high. 4. Ramps with rises greater than 6 include handrails on both sides. 5. Clear width of boarding entry minimum 36. 6. Handrails on both sides at boat entry. General criteria: 1. 30 minimum by 48 minimum clear space for wheelchair. 2. Securement devices and seatbelts for wheelchairs provided and secured by staff. 3. Barges easily adaptable to provide wheelchair and shoulder to shoulder companion seating. 4. No less than 50% of taxi stops accessible and publicized as such. 5. Regular training for assistance and evacuation of persons with all types of disabilities integrated in the customer safety program. 6. Any step risers 4 high minimum and 7 high maximum; step treads 11 deep minimum. Companion Seating: Shoulder to shoulder companion seating adjacent to the wheelchair space is REQUIRED. It is preferred that shoulder to shoulder companion seating be incorporated with the general ridership. In addition to the San Antonio Disability Office ADA Compliance Criteria, barge designs must comply with Department of Justice 2010 Standards for Accessible Design and the United States Access Board s June 2003 Guidelines for Accessible Amusement Rides for barge design and operation. Center City Development & Operations Department PO Box 839966 San Antonio, TX 78283 Tel: 210-207-1041 Fax: 210-207-8151