AIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI

Similar documents
Airport Master Plan Update

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

Austin-Bergstrom International Airport Master Plan Update

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

Merritt Island Airport

City of Monett, Missouri. Pride and Progress. Airport Master Plan Update. for the Monett Municipal Airport

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

Table of Contents. Overview Objectives Key Issues Process...1-3

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Public Review Draft South County Airport Master Plan Report. County of Santa Clara San Martin, California

CHAPTER 1: INTRODUCTION

Appendix C AIRPORT LAYOUT PLANS

AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

Element 640 State of Rhode Island Airport System Plan - Overview

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

Planning, Development and Environment Committee

General Aviation Master Plan Update Peter O. Knight Airport Public Meeting #1 September 24, Peter O. Knight Airport

Master Plan Update Technical Advisory Committee Meeting

MASTER PLAN UPDATE GRANT NUMBER

CHAPTER 3 ALTERNATIVES CONSIDERED

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Chapter Two FORECAST OF AVIATION DEMAND A. DESCRIPTION OF FORECAST ELEMENTS

Study Committee Meeting. September 2015

Chapter 1 Introduction and Project Overview

Chapter 1 Introduction and Project Overview

Lake Tahoe Airport Master Plan

General Aviation Master Plan Update

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Bremerton National Airport Airport Master Plan Project Update February 12, 2013

Forecast and Overview

Minneapolis-St. Paul International Airport Monthly Runway Use System Report. June 2015

Minneapolis-St. Paul International Airport Monthly Runway Use System Report. June 2016

Public Information Meeting. September 2015

Chapter 4 Airport Facility Requirements

Hartford-Brainard Airport Potential Runway Closure White Paper

Master Plan Update Community Advisory Committee Kick-off Meeting

STUDY WORK GROUP MEETING No. 3. November 29, 2016

Current Airport Roles

Westover Metropolitan Airport Master Plan Update

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Chapter 4.0 Alternatives Analysis

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

II. Purpose and Need. 2.1 Background

Introduction DRAFT March 9, 2017

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

New Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together

Yakima Air Terminal/McAllister Field Airport Master Plan Update

Forecast of Aviation Activity

STUDY WORK GROUP MEETING No. 4. July 12, 2017

EXHIBIT A SCOPE OF SERVICES For an AIRPORT MASTER PLAN STUDY AND AIRPORT LAYOUT PLAN (ALP) UPDATE For LAWRENCE MUNICIPAL AIRPORT LAWRENCE, KANSAS

EXHIBIT A. LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project #

Feasibility Study Federal Inspection Service Facility at Long Beach Airport

CHAPTER 4 DEMAND/CAPACITY ANALYSIS

BNA Master Plan Update Public Meeting No. 2

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Chapter 2 FINDINGS & CONCLUSIONS

Key Purpose & Need Issues

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

1. Background and Proposed Action

CHAPTER 1 EXECUTIVE SUMMARY

Chapter 5 Facility Requirements

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

PUBLIC MEETING 2. Airport Master Plan Update. March 2019

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012


MASTER PLAN GEORGE BUSH INTERCONTINENTAL AIRPORT/HOUSTON. Houston Airport System Houston, Texas DRAFT TECHNICAL REPORT.

Runway Length Analysis Prescott Municipal Airport

MASTER PLAN UPDATE WORKING PAPER NO. 3. Demand/Capacity Analysis and Facility Requirements. March 18, 2013

COMMERCIAL AND GENERAL AVIATION

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017

Nantucket Memorial Airport Master Plan Update

Draft Palo Alto Airport Master Plan Report County of Santa Clara, California October 2005

FORECASTING FUTURE ACTIVITY

Update on the Aspen/Pitkin County Airport Improvements

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

~ s: Memorandum

BNA Master Plan Update Community Advisory Committee Meeting No. 5

C > Capacity Analysis and Facility Requirements

Chapter 5 Facility Requirements

and Forecast Review and Approval Process

6.C.1 AIRPORT NOISE. Noise Analysis and Land Use Impact Assessment FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT

General Aviation Land Use Planning

Finance and Implementation

CHAPTER D Capacity Analysis and Facility Requirements INTRODUCTION

Transcription:

AIRPORT MASTER PLAN FOR charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI Prepared For The City of Kansas City, Missouri By Coffman Associates, Inc. January 2004 "The contents of these documents reflect the views of Coffman Associates, Inc., which is responsible for the parts and accuracy of the data contained herein. The contents do not necessarily reflect the official views or policy of the FAA. Acceptance of these documents by the FAA does not in any way constitute a commitment on the part of the United States to participate in any development depicted herein nor does it indicate that the proposed development is environmentally acceptable in accordance with Public Laws 90-495,91-190,91-258, 94-343, and/or 100-223." This document has been adopted by the City of Kansas City, Missouri under Resolution No. 040066 (attached).

RESOLUTION NO. 040066 Adopting the 2003 Charles B. Wheeler Downtown Airport Master Plan as the official guide for development of Charles B. Wheeler Downtown Airport. WHEREAS. Kansas City has completed a study of Charles B. Wheeler Downtown Airport (MKC) following guidelines of the Federal Aviation Administration (FAA); and WHEREAS, Kansas City in conjunction with the consulting finn of Coffman Associates, has developed projected activity levels at ~KC for the next 20 years; and WHEREAS, improvements necessary to meet the projected aviation activity levels and FAA design standards have been identified~ and WHEREAS. alternative methods of providing these improvements have been reviewed with federal. regional and local officials, airport t;na.nts and users, community representatives and interested citizens through four planning advisory committee meetings and four public meetings; and WHEREAS, the annual economic impact of the airport on the Kansas City region has been determined to be $2890 million~ and WHEREAS, a recommended development program has been established including a preliminary capital funding plan~ and WHEREAS, the above-mentioned analysis and recommendations for development are presented in the 2003 Charles B. Wheeler Downtown Airport Master Plan; NOW. THEREFORE. BE 1 T RESOLVED BY THE COUNCIL OF KANSAS CITY: That the 2003 Charles B. Wheeler Downtown Airport Master Plan be adopted by Kansas City, Missouri, as the official guide for development at Charles B. Wheeler Downtown Airport. Authenticated as Passed DATE PASSED JAN 2 9 20G't

entents Kansas City Downtown Airport Kansas City, Missouri AIRPORT MASTER PLAN INTRODUCTION AND summary AIRPORT ROLE... ii DEMAND-BASED PLANNING... iii AIRPORT PLANS......................................... iii Airfield Recommendation............................. iv Landside Improvements... v CAPITAL NEEDS FINANCING............................. vi AIRPORT ECONOMIC VALUE... vii PLANNING ADVISORY COMMITTEE....................... ix Chapter One INVENTORY REGIONAL SETTING......................................... 1-1 Climate... 1-2 HISTORICAL PERSPECTIVE... 1-3 THE AIRPORT'S SYSTEM ROLE................................ 1-4 Development History..................................... 1-4 Previous Master Plan..................................... 1-4 Regional Planning... 1-5 National Planning....................................... 1-5 AIRPORT ADMINISTRATION... 1-6 AIRPORT FACILITIES........................................ 1-6 Airside Facilities......................................... 1-6 Landside Facilities... 1-11

Chapter One (Continued) Airport Utilities... 1-15 General Aviation Services... 1-16 VICINITY AIRSPACE, NAVIGATIONAL AIDS, AIR TRAFFIC CONTROL, AND AIRPORTS..................... 1-17 Vicinity Airspace... 1-17 Tenninal Area And Enroute Navigational Aids............... 1-18 Air Traffic Control... 1-22 Area Airports... 1-22 AREA LAND USE... 1-24 ENVIRONMENTAL INVENTORY.............................. 1-24 Wetlands... 1-25 Biotic Resources... 1-26 Air And Water Quality... 1-26 Flooding And Floodplain Data... 1-27 Geology And Soils... 1-28 Solid And Hazardous Waste... 1-29 Historic And Cultural Resources... 1-29 Storm Water Permit SWPpp And SPCC Plans... 1-30 Aboveground Storage Tanks.............................. 1-30 Underground Storage Tanks (USTs)... 1-31 Baseline Conditions And Potential Sensitivities... 1-32 SOCIOECONOMIC CHARACTERISTICS... 1-32 Population............................................. 1-32 Employment... 1-33 Per Capita Personal Income... 1-36 SUMMARy................................................. 1-36 DOCUMENT SOURCES...................................... 1-37 Chapter Two FORECASTS NATIONAL AVIATION TRENDS................................ 2-2 FORECASTING APPROACH................................... 2-4 BASED AIRCRAFT............................................ 2-4 Registered Aircraft Forecasts... 2-5 Based Aircraft Forecast................................... 2-8 Based Aircraft Fleet Mix... 2-12 AIRCRAFT OPERATIONS... 2-13 General Aviation Operations... 2-13 Air Carrier And Air Taxi Operations....................... 2-15 Military Operations... 2-16 Operational Aircraft Mix................................. 2-17

Chapter Two (Continued) PEAKING characteristics................................ 2-20 ANNUAL INSTRUMENT APPROACHES........................ 2-21 summary... 2-22 Chapter Three FACILITY REQUIREMENTS planning HORIZONS....................................... 3-1 AIRFIELD CAPACITY... 3-2 Airfield Layout... 3-3 Meteorology............................................. 3-3 Runway Use............................................ 3-4 Aircraft Mix............................................ 3-5 Percent Arrivals... 3-6 Touch-and-Go Operations................................. 3-6 Exit Taxiways........................................... 3-8 Capacity Analysis... 3-8 AIRFIELD REQUIREMENTS... 3-10 Critical Aircraft... 3-10 Runways.............................................. 3-14 Taxiways... 3-23 Navigational Aids and Lighting... 3-24 LANDSIDE REQUIREMENTS................................. 3-26 General Aviation Facilities... 3-26 SUMMARY................................................. 3-33 Chapter Four ALTERNATIVES REVIEW OF 1982 LAND USE AND DEVELOPMENT PLAN......... 4-2 ISSUE CONSIDERATIONS..................................... 4-3 NON-DEVELOPMENT ALTERNATNES... 4-4 No Action Alternative... 4-4 Service From Another Airport.............................. 4-5 AIRFIELD ALTERNATNES.................................... 4-6 Runway 1-19 Safety Area Determination... 4-7 Runway 3-21 Safety Area Determination... 4-23 Taxiway Considerations.................................. 4-29 LANDSIDE ALTERNATNES.................................. 4-31 Landside Alternative 1... 4-32 Landside Alternative 2... 4-32 Landside Summary..................................... 4-33

Chapter Five AIRPORT PLANs DESIGN STANDARDs......................................... 5-1 AIRFIELD RECOMMENDATIONS.............................. 5-2 Runway 1-19... 5-2 Runway 3-21............................................ 5-3 Taxiway Improvements................................... 5-4 Landside Improvements... 5-5 CAPITAL IMPROVEMENT PROGRAM........................... 5-5 ENVIRONMENTAL OVERVIEW................................ 5-7 Chapter Six FINANCIAL IMPLEMENTATION ANALYSIS FINANCIAL ANALYSIS OBJECTIVES........................... 6-1 OVERALL APPROACH... 6-1 Capital Funding Sources... 6 2 Rates & Charges/Leasing Practices Review................... 6-5 Financial Analysis And Implementation Plan For The Master Plan Capital Improvement Program... 6-12 Financial Analysis Exhibits... 6-21 EXHIBITS A PROPOSED PLAN............................... after page iv 1A LOCATION MAP............................... after page 1-2 lb EXISTING FACILITIES... after page 1-6 1C LANDSIDE FACILITIES... after page 1-12 ld AIRSPACE CLASSIFICATION... after page 1-18 IE AREA AIRSPACE.............................. after page 1-18 IF KANSAS CITY METROPOLITAN 2A SYSTEM OF AIRPORTS... after page 1-22 U.S. ACTIVE GENERAL AVIATION AIRCRAFT FORECASTS... after page 2-4 2B REGISTERED AIRCRAFT FORECAST............. after page 2-6 2C BASED AIRCRAFT FORECAST.................. after page 2-12 2D GENERAL AVIATION OPERATIONS FORECAST.. after page 2-14 2E TOTAL OPERATIONS FORECASTS... after page 2-16 3A AIRFIELD CAPACITY FACTORS................. after page 3-4 3B RUNWAY IN USE SCENARIOS HOURLY CAPACITY. after page 3-6

EXHIBITS (Continued) 3C DEMAND VS. CAPACITY... after page 3-10 3D AIRPORT REFERENCE CODES................. after page 3-12 3E WIND ROSES................................. after page 3-14 3F RUNWAY SAFETY AREA AND OBJECT FREE AREA REQUIREMENTS............................ after page 3-20 3G AIRFIELD FACILITY REQUIREMENTS.......... after page 3-33 3H LANDSIDE REQUIREMENTS................... after page 3-33 4A DEVELOPMENT CONSIDERATIONS............. after page 4-4 4B RUNWAY 1-19 BASELINE CONDITION PREVIOUSLY APPROVED ALP... after page 4-12 4C ALTERNATIVE 1 PROVIDE FULL SAFETY AREAS..................................... after page 4-14 4D ALTERNATIVE 2 REALIGN RUNWAY............ after page 4-16 4E NORTH SAFETY AREA GRADING PLAN......... after page 4-18 4F ALTERNATIVE 3 MAXIMIZE SAFETY AREA... after page 4-18 4G ALTERNATIVE 4 RUNWAY EXTENSIONS........ after page 4-20 4H UNDERSHOOT/OVERRUN DISTANCES APPROACH CATEGORY C/D AIRCRAFT......... after page 4-20 4J PROPOSED SAFETY AREA DETERMINATION.... after page 4-22 4K EMAS FOR AIRCRAFT OVERRUNS.............. after page 4-22 4L ALP APPROVED RUNWAY 3-21... after page 4-26 4M DESIGN FOR ARC B-II STANDARDS............. after page 4-26 4N PARALLEL TAXIWAY ALTERNATIVES... after page 4-30 4P TAXIWAY ALTERNATIVE 1.................... after page 4-30 4Q TAXIWAY ALTERNATIVE 2... after page 4-30 4R TAXIWAY/LAND USE ALTERNATIVES... after page 4-32 4S TAXIWAY/LAND USE ALTERNATIVES WITH CLOSURE OF CROSSWIND RUNWAY... after page 4-32 5A PROPOSED PLAN.............................. after page 5-4 5B EXISTING AIRCRAFT NOISE EXPOSURE......... after page 5-8 5C LONG-RANGE AIRCRAFT NOISE EXPOSURE...... after page 5-8 6A-1 ESTIMATED PROJECT COSTS AND DEVELOPMENT SCHEDULE WITH MODERATE FMV RENT ESCALATION... after page 6-12 6A-2 CAPITAL FUNDING SOURCES WITH MODERATE FMV RENT ESCALATION... after page 6-12 6A-3 ACTUAL, BUDGETED AND PROJECT OPERATIONS & EXPENSES WITH MODERATE FMV RENT ESCALATION.......... after page 6-12 6A-4 ACTUAL, ESTIMATED AND PROJECTED OPERATING REVENUES WITH MODERATE FMV RENT ESCALATION... after page 6-12

EXHIBITS (Continued) 6A-5 FINANCIAL PLAN SUMMARY- BUDGETED AND PROJECTED NET REVENUES, CAPITAL FUNDING AND CAPITAL EXPENDITURES- MODERATE FMV RENT ESCALATION.......................... after page 6-12 6B-l ESTIMATED PROJECT COSTS AND DEVELOPMENT SCHEDULE WITH AGGRESSIVE FMV RENT ESCALATION........ after page 6-14 6B-2 CAPITAL FUNDING SOURCES WITH AGGRESSIVE FMV RENT ESCALATION........ after page 6-14 6B-3 ACTUAL, BUDGETED AND PROJECT OPERATIONS & EXPENSES WITH AGGRESSIVE FMV RENT ESCALATION........ after page 6-16 6B-4 ACTUAL, BUDGETED AND PROJECT OPERATING REVENUES WITH AGGRESSIVE FMV RENT ESCALATION........ after page 6-18 6B-5 FINANCIAL PLAN SUMMARY- BUDGETED AND PROJECTED NET REVENUES, CAPITAL FUNDING AND CAPITAL Appendix A EXPENDITUREs............................. after page 6-20 GLOSSARY AND ABBREVIATIONS AppendixB AIRPORT LAYOUT PLANs AppendixC ECONOMIC BENEFIT ANALYSIS