Airport Master Plan Update

Similar documents
ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

Austin-Bergstrom International Airport Master Plan Update

Merritt Island Airport

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

AIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI

Table of Contents. Overview Objectives Key Issues Process...1-3

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

City of Monett, Missouri. Pride and Progress. Airport Master Plan Update. for the Monett Municipal Airport

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

General Aviation Master Plan Update

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Public Review Draft South County Airport Master Plan Report. County of Santa Clara San Martin, California

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Chapter 2 FINDINGS & CONCLUSIONS

MASTER PLAN UPDATE GRANT NUMBER

Appendix C AIRPORT LAYOUT PLANS

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

CHAPTER 1 EXECUTIVE SUMMARY

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Update on the Aspen/Pitkin County Airport Improvements

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

CHAPTER 1: INTRODUCTION

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter 9 - AIRPORT SYSTEM DESIGN

15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long

Airport Master Plan Update June 15, 2017

Chapter 4 Airport Facility Requirements

AIRSIDE CAPACITY AND FACILITY REQUIREMENTS

EXHIBIT A. LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project #

MASTER PLAN GEORGE BUSH INTERCONTINENTAL AIRPORT/HOUSTON. Houston Airport System Houston, Texas DRAFT TECHNICAL REPORT.

General Aviation Master Plan Update Peter O. Knight Airport Public Meeting #1 September 24, Peter O. Knight Airport

Draft Palo Alto Airport Master Plan Report County of Santa Clara, California October 2005

Airport Master Plan Update June 15, 2017

Lake Tahoe Airport Master Plan

Bremerton National Airport Airport Master Plan Project Update February 12, 2013

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

STUDY WORK GROUP MEETING No. 3. November 29, 2016

Feasibility Study Federal Inspection Service Facility at Long Beach Airport

Master Plan Update Technical Advisory Committee Meeting

Burke Lakefront Airport (BKL) Master Plan Update

CHAPTER 5 - FACILITY REQUIREMENTS

Chapter 1 Introduction and Project Overview

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot

Chapter 5 Airport Development Alternatives

CHAPTER 3 ALTERNATIVES CONSIDERED

Addendum - Airport Development Alternatives (Chapter 6)

I-3 DFW Extension Public Hearing. June 2, 2011

Introduction DRAFT March 9, 2017

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

Sam Imperati Facilitator

DRAFT MASTER PLAN UPDATE

COMMERCIAL AND GENERAL AVIATION

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

2015 PURDUE ROAD SCHOOL March 11, 2015

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

Alternatives. Introduction. Range of Alternatives

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

Chapter One INVENTORY

TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017

Tabl b e of o f Con o tents t

FORECASTING FUTURE ACTIVITY

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

CITY OF HAMMOND HAMMOND NORTHSHORE REGIONAL AIRPORT MASTER PLAN UPDATE Work Authorizatiou for Professional Services

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Airport Systems: Planning, Design, and Management

Chapter 1 Introduction and Project Overview

Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM

Nantucket Memorial Airport Master Plan Update

Chapter 4.0 Facility Requirements

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

Hartford-Brainard Airport Potential Runway Closure White Paper

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:

FAA RECORD OF DECISION. Appendix D FINAL EIS ADDENDUM DOCUMENTS

Study Committee Meeting. September 2015

Chapter Two FORECAST OF AVIATION DEMAND A. DESCRIPTION OF FORECAST ELEMENTS

Public Information Meeting. September 2015

BNA Master Plan Update Community Advisory Committee Meeting No. 5

1. Background and Proposed Action

Yolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California

AIRPORT MASTER PLAN UPDATE

Dallas Executive Airport Town Hall Meeting April 3, 2014

Key Purpose & Need Issues

Master Plan Update Community Advisory Committee Kick-off Meeting

CHAPTER 3 AIRPORT FACILITY REQUIREMENTS

Alternatives Development and Evaluation Report

MASTER PLAN CONCEPT 1 DRAFT

Technical Advisory Committee Meeting February 29, 2016

Transcription:

Duttchessss Countty Airrporrtt Masstterr Plan Updatte Airport Master Plan Update Final Report Dutchess County Airport Town of Wappingers, New York C&S Engineers, Inc. 499 Col. Eileen Collins Blvd. Syracuse, New York 13212 October 2004 The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration as provided in the Airport and Airway Improvement Act of 1982, as amended. The contents of this of this report reflect the analysis and findings of C&S Engineers, Inc., who are responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official views or policy of the FAA. Acceptance of this report by the FAA does not in any way constitute a commitment on the part of the United States to participate in any development depicted therein nor does it indicate that the proposed development is environmentally acceptable with applicable Public Laws.

Chapter 1- INTRODUCTION TABLE OF CONTENTS 1.01 General...1 1.02 Purpose and Scope of Study...1 1.03 The Planning Process...2 1.04 Related Regional Studies...2 Chapter 2 FINDINGS AND CONCLUSIONS 2.01 General...5 2.02 Funding Categories and Resources...6 2.03 Findings and Conclusions...8 Chapter 3 INVENTORY OF EXISTING FACILITIES 3.01 Study Area...11 3.02 Socioeconomic Conditions...11 3.03 Climate...14 3.04 Topography...14 3.05 Soils...14 3.06 Drainage...18 3.07 Airspace...18 3.08 Aircraft Fleet Mix...23 3.09 Airside Facilities...24 3.09-1 Critical Aircraft...24 3.09-2 Runways...25 3.09-3 Wind and Weather Data...25 3.09-4 Navigation Aids/Visual Landing Aids...27 3.09-5 Taxiways...28 i

3.09-6 Safety Areas...29 3.09-7 Object Free Areas (OFA)...30 3.09-8 Runway Separation Standards...30 3.09-9 Runway Protection Zone (RPZ)...31 3.09-10 Runway Design Standards...32 3.09-11 Airside Summary...33 3.10 Landside Facilities...35 3.10-1 Parking Apron...35 3.10-2 Terminal Building...37 3.10-3 Automobile Parking...40 3.10-4 Ground Access...41 3.10-5 Airport Maintenance Building and Equipment...43 3.10-6 Airport Rescue and Fire Fighting Building...45 3.10-7 Aircraft Fuel Storage Facilities...46 3.10-8 Deicing System...47 3.10-9 Weather Observations...48 Chapter 4 AVIATION DEMAND FORECASTS 4.01 General...49 4.02 Aviation Demand Elements...50 4.03 General Aviation Activity...50 4.03-1 Based Aircraft...50 4.03-2 Based Aircraft Fleet Mix...52 4.03-3 Annual General Aviation Operations...53 4.03-4 Peak Period Activity Forecasts...54 4.04 Instrument Approaches...55 ii

4.05 Demand Forecast Summary...55 Chapter 5 AIRFIELD CAPACITY ANALYSIS 5.01 General...57 5.02 Definition of Airfield Capacity...57 5.03 Methodology Used...57 5.04 Hourly Capacity...59 5.05 Annual Service Volume...60 Chapter 6 FACILITY REQUIREMENTS 6.01 Airfield Facilities...61 6.01-1 Runways and Taxiways...61 6.01-2 Airfield and Instrumentation...67 6.02 Landside Facilities...68 6.02-1 General Aviation Requirements...68 6.02-2 Fuel Storage Requirements...73 6.02-3 Aircraft Rescue and Firefighting Requirements...73 6.03 Airside and Landside Facility Requirements Summary...74 Chapter 7- ENVIRONMENTAL STUDY 7.01 Background...77 7.02 Noise...77 7.03 Compatible Land Use...79 7.04 Social Impacts...86 7.05 Induced Socio-Economic Impacts...87 7.06 Air Quality...87 7.07 Water Quality...87 7.07-1 Ground Surface Waters...88 iii

7.08 Department of Transportation Act Section 4(f) Lands[Recodified 49 U.S.C. 303 (c)]...90 7.09 Historic and Cultural Resources...91 7.10 Biotic Communities/Endangered and Threatened Species of Flora and Fauna...91 7.11 Wetlands...92 7.12 Flood Plains...96 7.13 Coastal Zone Management...96 7.14 Coastal Barriers...96 7.15 Wild, Scenic and Recreational Rivers...97 7.16 Prime and Unique Farmland...97 7.17 Energy Supply and Natural Resources...97 7.18 Light Emissions...97 7.19 Solid Waste Impacts...97 7.20 Construction Impacts...98 7.21 Environmental Justice...99 7.22 Impacts to Children...99 7.23 Indirect, Secondary and Cumulative Impacts...100 7.24 Anticipated Permits and Approvals...103 Chapter 8 ALTERNATIVES OF AIRPORT DEVELOPMENT 8.01 General...104 8.02 Descriptions of Alternative Plans...104 8.03 Evaluation Criteria...107 8.03-1 Airport Design Standards...107 8.03-2 Environmental Impacts...111 8.03-3 Development Costs...111 8.03-4 Facility Requirements...111 iv

8.03-5 Implementation Feasibility...112 8.04 Evaluation of Alternatives...112 8.04-1 Airport Design Standards...112 8.04-2 Environmental Impacts...114 8.04-3 Development Costs...115 8.04-4 Facility Requirements...117 8.04-5 Implementation Feasibility...118 8.04-6 Evaluation Summary...119 8.05 Preferred Alternative...120 Chapter 9 AIRPORT SYSTEM DESIGN 9.01 Preferred Alternative...122 9.02 Facility Requirements...122 9.03 Airport Layout Plan...128 9.04 Obstruction Plan and Profile...129 9.05 Land Use and Ground Access...134 Chapter 10 FINANCIAL PLAN 10.01 General...137 10.02 Capitol Improvements...137 10.03 Financing Capitol Improvements...139 10.04 Airport Operating and Capitol Improvement Expenses...144 10.05 Airport Revenues...146 10.06 Conclusions...148 v

LIST OF FIGURES 1-1 Work Flow Diagram...4 3-1 Vicinity Map...12 3-2 Soils Map...17 3-3 Drainage Plan...20 3-4 Airspace Environment and Adjacent Airports...22 3-5 Existing Airport Layout...26 3-6 Terminal Floor Plan...39 7-1 Existing Noise Contours...82 7-2 Future Noise Contours (2020)...83 7-3 National Wetland Inventory Map...94 7-4 NYSDEC Freshwater Wetland Map...95 8-1 Alternative 1...105 8-2 Alternative 2...108 8-3 Alternative 3...109 8-4 Approach Surface Dimensions...110 9-1 Airport Layout Plan...126 9-2 Terminal Area Plan...127 9-3 Obstruction Plan...131 9-4 Obstruction Plan and Profile Runway 15-33 & Runway 6-24...132 9-5 Land Use and Ground Access Plan...136 vi

LIST OF TABLES 3-1 History and Projection of Population...13 3-2 Employment by Sector...13 3-3 Dutchess County Airport Soils Types...13 3-4 Victor Airways...15 3-5 Jet Airways...19 3-6 Neighboring Airports...21 3-7 Based Aircraft Characteristics...23 3-8 Transient (Visiting) Aircraft Characteristics...24 3-9 Annual Operations...24 3-10 Runway System Characteristics...25 3-11 Navigational Aids...27 3-12 Runway Marking and Lighting...28 3-13 Published Approaches...26 3-14 Taxiways...28 3-15 Runway Protection Zone Dimensional Standards...32 3-16 Runway System Design Standards and Existing Conditions...33 3-17 Existing Dutchess County Airport Airfield Facilities Data...34 3-18 Landside Characteristics...35 3-19 Aircraft Parking Apron Characteristics...36 3-20 Terminal Building...38 3-21 Automobile Parking Spaces...40 3-22 Maintenance Equipment...44 3-23 Aviation Fuel Storage...46 3-24 Storage Tanks...47 4-1 Based Aircraft History and Forecast...51 4-2 Based Aircraft Fleet Mix Percentage Forecast...52 vii

4-3 Fleet Mix Forecast...53 4-4 Annual General Aviation Operations Forecast...54 4-5 General Aviation Operational Peaking Forecast...55 4-6 Forecast Instrument Approaches...55 4-7 Demand Forecast Summary...56 5-1 ACDM Aircraft Classification System...59 5-2 Hourly Capacity Summary...60 5-3 Annual Service Volume...60 6-1 Airport and Runway Data...63 6-2 Design Standards...64 6-3 Airfield Instrument and Lighting...67 6-4 General Aviation Building Requirements...68 6-5 General Aviation Terminal Building Requirements...69 6-6 Itinerant Aircraft Apron Requirements...70 6-7 Hangar Area Demand...72 6-8 Auto Parking Requirements...73 6-9 General Aviation Fuel Storage Requirements...73 6-10 Airside Facilities Summary...75 6-11 Landside Facilities Summary...76 7-1 Land Use Compatibility with Yearly Day-Night Sound Levels...84 7-2 NYSDOT Land Use Compatibility...86 8-1 Design Standards...111 8-2 Unit Costs for Airport Development...116 8-3 Opinion of Probable Costs...117 viii

8-4 Alternative Ratings...120 9-1 Airside Facilities Summary...123 9-2 Landside Facilities Summary...124 10-1 Unit Costs for Development...138 10-2 Total Anticipated Development Costs...140 10-3 Phase I Capitol Improvement Program (2000-2005)...141 10-4 Phase II Capitol Improvement Program (2006-2010)...142 10-5 Phase III Capitol Improvement Program (2011-2020)...143 10-6 Summary Capitol Improvement Program...143 10-7 Anticipated Operating Costs...145 10-8 Airport Operating Costs...146 10-9 Airport Operating Revenue...147 10-10 Projected Annual Cash Flow...149 LIST OF PHOTOS 3-1 Front entrance to the Terminal...37 3-2 Parking area at ARFF/Maintenance Bldg./T-hangar...41 3-3 ARFF/Maintenance Building (Rear)...43 3-4 Line Services Office...43 ix

APPENDICES Appendix A Technical Advisory Committee Appendix B Survey Results Appendix C Environmental Correspondence Appendix D Noise Data Appendix E Hangar Configuration Appendix F Engineering Costs and Estimates Appendix G Landing Fee Schedules of Other Airports Appendix H Glossary of Acronyms and Definitions x