SOUTHEAST BOULEVARD Planning Study Washington, DC. Progress Drawings October 6, 2014

Similar documents
NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

Lake Erie Commerce Center Traffic Analysis

Union Station Queens Quay Transit Link Study

Southwest LRT Alignment Video Narration

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes

Appendix 4.1 L. No-Build Project Descriptions

DC Circulator Service Changes. Implementation Plan for June 24, 2018

A VISION FOR EL MIRAGE

chapter - Hex Highway Touring Route Hamburg to Strausstown Overview

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Fuller/Fuller Heights Road Improvements

Second Avenue: Union Street to Lenora Street, Condominium Owners c/o Michael McQuaid 1521 Second Avenue Seattle, WA 98101

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

SEVAN BARSEGHIAN'S PORTFOLIO GLENDALE COMMUNITY COLLEGE

MBTA WOLLASTON. Station Improvements Public Meeting. January 14, 2016

All Groups. Conserve/

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.

FORT YORK PEDESTRIAN & CYCLE BRIDGE

TEMPE BEACH PARK - RECOMMENDATIONS

RW Bruhn Bridge and Approaches Project

Aurora Hills. Getting There

Appendix 1: Phase I Strategies

gables station s dixie hwy & ponce de leon blvd coral gables, fl 33133

Figure 1: Little Dry Creek Trail Crossing

TORONTO TRANSIT COMMISSION REPORT NO.

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

CHAPTER 1 TRANSIT MARKET AREAS AND EXISTING SERVICE

The Atlanta BeltLine. Project Overview Map

A retrospective look at work program counting activities since 2001 is found in Table 8, on the last page of this document. Hours of Operation

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

A. CONCLUSIONS OF THE FGEIS

Milestone: Bridge to Nowhere scheduled for demolition Aug 14

RETAIL POTENTIAL ON 1/2 ACRE SITE

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

SWEDISH FIRST HILL MEDICAL CENTER

Transportation TRANSPORTATION PROJECTS

V. DATA COLLECTION PROGRAM

I-579 Urban Open Space CAP Project. Final Land Development Plan (FLDP) Pittsburgh Department of City Planning

Springettsbury Township. Road Improvement Projects

DRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017

UNION STATION ACCESS AND CAPACITY IMPROVEMENT STUDY PROJECT REPORT

NDG-Westmount Neighbourhood Committee. November 16, 2015

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

DOWNTOWN BRT ALTERNATIVE - 19th AVE

I-70/I-71 Project Public Meeting Presented By

// LEARN // ENGAGE // VOLUNTEER // DONATE // PROJECT OVERVIEW MAP

York Street Pedestrian Promenade Plan, Front Street West to Queens Quay West

BOSTON, MA 171 TREMONT IMPACT ADVISORY GROUP 5/19/16

FDOT Treasure Coast Traffic Report through

SOUTHERN BELTWAY I-79 TO MON/FAYETTE EXPRESSWAY

Williamsburg Town Hall Meeting

AGENCY NAME TRANSPORTATION

San Pedro Waterfront Development Efforts Presentation for Trade, Commerce & Technology Committee

BICYCLE AND PEDESTRIAN COUNT PROGRAM 2016 Annual Report

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5

Cell: (408) Release MA June 25, 2012

M E S T I Z O C U R T I S P A R K

LUDLAM TRAIL CORRIDOR DISTRICT

HEARST GARDENS BERKELEY, CA 94702

Discovering the Trails of Prince George s County

Site Location and Setting

SR 934 Project Development And Environment (PD&E) Study

RARE STAND ALONE PAD WITH DRIVE-THRU ACCESSIBILITY ON

Survey Summary. 1. Overview. Pilot Implementation Survey Toronto Parks & Trails Wayfinding Strategy (Phase II) September 30 November 6, 2017

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION

2.1 HISTORIC CONTEXT. View looking South from Main & 6th circa Typical logging scene with bullocks and skid road, 1885

Pattullo Bridge Replacement Project

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

Figure 1: Route 56B Hazelwood

Ossington Station Easier Access Project - Construction & Public Art Concept Update

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

San Diego Convention Center Phase III Expansion. SDCCC Presentation to Mayor s Task Force June 2, 2009

I-10 will close overnight Sunday through Thursday next week. Crews continue to make progress on Sunland s new bridges and ramps.

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

2018 NCFL Grand Nationals. Parking Information. This document contains the following:

Capitol Hill Prime Retail Space For Lease

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

Information Requests. Street Car Wildlife Golden Valley Leash Ordinance/Dog Park

Treasure Island Supplemental Information Report Addendum

PROCEEDING COMMENCED UNDER subsection 22(7) of the Planning Act, R.S.O. 1990, c. P.13, as amended

Changes in TIP projects Draft vs. Final Draft

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

HARP AUTHORITY GATEWAY CENTER BOATHOUSE & CHANNEL EXTENSION TO SANTA FE AVENUE. Pueblo City Council Presentation September 17, 2018

St. Dennis Drive Conversion of Traffic Lanes to On- Street Parking and Bicycle Lanes

Understanding Your I-66 Trip

Spadina Avenue Built Form Study Preliminary Report

PORTS TORONTO Billy Bishop Toronto City Airport Summary of 2015 Traffic and Passenger Surveys

Pattullo Bridge Replacement Project

Fairfax County Transportation Advisory Commission (TAC)

3660 MARKET STREET, ST. LOUIS, MO armorydistrict.com

I. Course venue: Preston Auditorium, 1818 H Street, N.W. Washington DC, 20433

Pedestrian Safety Review Spadina Avenue

5.1 Traffic and Transportation

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

Transcription:

Existing Conditions Site Plan

CONGRESSIONAL CEMETERY SOUTHEAST BOULEVARD Planning Study Concept A (formerly A-1) Site Plan

Concept A (formerly A-1) Concept A proposes an expansion of the Capitol Hill neighborhood fabric, and street and block system. 13th, 14th, and 15th Streets SE are extended toward the Anacostia River, ending at a 4-lane boulevard north of the CSX right-of-way. Connections across the CSX tracks to the waterfront are provided for pedestrians and cyclists. NEW STREETS New 4-lane boulevard at L-Street SE elevation extends from 11th Street to Barney Circle. New boulevard integrates bike lanes and on-street parking. Grid streets extend south and connect to the new boulevard. L Street SE becomes double-sided with residential on both sides of the street. CONNECTIONS TO WATERFRONT Pedestrian connections across CSX tracks to Boathouse Row at 13th, 14th and 15th Streets SE. 13th Street SE connection could be a spiral ramp for pedestrians and cyclists. Allows connection across M Street to a future revitalized Virginia Avenue. 14th Street SE could connect to M Street SE and waterfront via pedestrian stairs and ramp. 15th Street SE could connect to a new park at Boathouse Row, implementing an element of the Boathouse Row Planning Study. LAND USES Moderate to medium density residential - predominantly multifamily and/or rowhouse. Potential for a small amount of new neighborhood commercial at ground floors of buildings along extension of 13th Street, SE close to Potomac Avenue SE and future revitalize Virginia Avenue SE. Potential for a small amount of new neighborhood commercial at ground floors of buildings along extension of 15th Street SE, close to commercial near Barney Circle. Potential future new park at Boathouse Row, in keeping with the Boathouse Row Planning Study. Potential for a future commercial or recreational building along M Street between 12th and 13th Streets. BUS PARKING Under-deck Commuter/ Tour Bus or Streetcar parking could potentially be located below the new boulevard right-of-way. Entry/ exit points for this parking area would be from 11th Street and/or Barney Circle only, ensuring vehicles do not circulate through the residential neighborhood. SOUTHEAST BOULEVARD Planning Study Concept A (formerly A-1) Concept Diagram and Site Section

CONGRESSIONAL CEMETERY SOUTHEAST BOULEVARD Planning Study Concept A (formerly A-1) Interim Site Plan

Concept A (formerly A-1) Perspective View 1

Concept A (formerly A-1) Perspective View 2

Concept A (formerly A-1) Perspective View 3

CONGRESSIONAL CEMETERY SOUTHEAST BOULEVARD Planning Study Concept B (formerly A-2) Site Plan

Concept B (formerly A-2) Concept B proposes an expansion of the Capitol Hill neighborhood fabric, and street and block system. 13th, 14th, and 15th and 16th Streets SE would be extended toward the Anacostia River, intersecting with a new 2-lane neighborhood street north of the CSX right-ofway. Connections across the CSX tracks to the waterfront would be provided for pedestrians and cyclists. NEW STREETS 2-lane neighborhood street at L-Street elevation extends from 11th Street SE to Barney Circle. New neighborhood street integrates bike lanes and onstreet parking. Grid streets extend south and connect to new neighborhood streets. L Street SE becomes double-sided with residential on both sides of the street. CONNECTIONS TO WATERFRONT Pedestrian connections across CSX tracks to Boathouse Row at 13th, 14th and 15th Streets SE. 13th Street SE connection could be a spiral ramp for pedestrians and cyclists. Allows connection across M Street SE to future revitalized Virginia Avenue SE. 14th Street SE could connect to M Street SE and waterfront via pedestrian stairs and ramp. 15th Street SE could connect to a new park at Boathouse Row, implementing an element of the Boathouse Row Planning Study. LAND USES Moderate to medium density residential - predominantly multifamily and/or rowhouse. Potential for a small amount of new neighborhood commercial at ground floors of buildings along extension of 13th Street SE, close to Potomac Avenue SE and future revitalized Virginia Avenue SE. Potential for a small amount of new neighborhood commercial at ground floors of buildings along extension of 15th Street SE, close to commercial near Barney Circle. Potential future new park at Boathouse Row, in keeping with the Boathouse Row Planning Study. Potential for a future building along M Street SE between 12th and 13th Streets SE. BUS PARKING Under-deck Commuter/ Tour Bus or Streetcar parking may not be possible with this concept due to narrowness of street right-of-way. SOUTHEAST BOULEVARD Planning Study Concept B (formerly A-2) Concept Diagram and Site Section

Concept B (formerly A-2) Perspective View 1

Concept B (formerly A-2) Perspective View 2

Concept B (formerly A-2) Perspective View 3

CONGRESSIONAL CEMETERY SOUTHEAST BOULEVARD Planning Study Concept C (formerly C-1) Site Plan

Concept C (formerly C-1) Concept C proposes a new a new neighborhood park between the Capitol HIll neighborhood to the north and the CSX right-of way. The four-lane boulevard would split around the park with two westbound lanes north of the park and two eastbound lanes south of the park. 13th, 14th, 15th and 16th Streets SE would be extended toward the Anacostia River, intersecting with the park and new roadways north of the CSX right-of-way. Connections across the CSX tracks to the waterfront would be provided for pedestrians and cyclists. NEW STREETS 4-lane boulevard extends from 11th Street SE to Barney Circle and splits around the new park with two westbound lanes north of the park and two eastbound lanes south of the park. Grid streets extend south and connect to new park and split boulevard. L Street SE would be separated from the new roadways and park by a tree-lined promenade. CONNECTIONS TO WATERFRONT Pedestrian connections across CSX tracks to Boathouse Row at 13th, 14th and 15th Streets SE. 13th Street SE connection could be a spiral ramp for pedestrians and cyclists. Allows connection across M Street to future revitalized Virginia Avenue. 14th Street SE could connect to M Street SE via pedestrian stairs and ramp. 15th Street SE could connect to a new park at Boathouse Row, implementing an element of the Boathouse Row Planning Study. LAND USES Predominant land use is park space. A small amount of residential infill could be located at the extention of 15th and L Streets SE. Potential future new park at Boathouse Row, in keeping with the Boathouse Row Planning Study. Potential for a future building along M Street between 12th and 13th Streets. BUS PARKING Under-deck Commuter/ Tour Bus or Streetcar parking could potentially be located below the new park and boulevard rights-of-way. Entry/ exit points for this parking area would be from 11th Street and/or Barney Circle only, ensuring vehicles do not circulate through the residential neighborhood. SOUTHEAST BOULEVARD Planning Study

Concept C (formerly C-1) Perspective View 1

Concept C (formerly C-1) Perspective View 2

Concept C (formerly C-1) Perspective View 3

Rendering Views

Concept A (formerly A-1) Perspective View for Render

Concept B (formerly A-2) Perspective View for Render

Concept C (formerly C-1) Perspective View for Render