EXHIBIT 1. BOARD AUTHORIZATION FOR PUBLIC HEARING AND SUBSEQUENT ISSUANCE OF A JOINT DEVELOPMENT SOLICITATION

Similar documents
Huntington Metro Station Joint Development

Report by Finance Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary

Follow-up to Proposed Fare Changes for FY2013

Shared Use by Marriott of WMATA s Parking Garage at Prince George s Plaza Metrorail Station

Approval to Conduct Public Hearings to Increase Metrobus Charter Fee Schedule

Silver Line Operating Plan

Establishes a fare structure for Tacoma Link light rail, to be implemented in September 2014.

RULES AND REGULATIONS

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus

Operational Performance

SRTA Year End Fixed Route Ridership Analysis: FY 2018

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

METROBUS SERVICE GUIDELINES

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of February 22, 2014

Metro s Transit Police Crime Statistics and Upcoming Events Information

Washington Metropolitan Area Transit Authority Services Utilization Study

P D E C. Establishment of Opening Dates for New Carrollton Yard and College Park and New Carrollton Parking Garages

COMMUNICATIONS DEPARTMENT (Lisa Belsanti, Director) (Joshua Schare, Public Information Officer)

Welcome. Sign in Pick up comment form Visit stations to learn more Submit your comment form

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Memorandum. DATE: May 9, Board of Directors. Jim Derwinski, CEO/Executive Director. Fare Structure Study Fare Pilot Program

7:00 p.m. General meeting called to order. Paul Conte, Chair 7:05 p.m. Introductions Reminder: All JWN members should fill out and return a sign-in

APPENDIX B. Arlington Transit Peer Review Technical Memorandum

Capital Metropolitan Transportation Authority. Monthly Performance Report

GREENBELT-BWI THURGOOD MARSHALL AIRPORT EXPRESS LINE ROUTE B30

IL 390 Station. Wood Dale Open House Summary 5/18/17

Fiscal Management and Control Board. Fare Policy October 16, Draft for Discussion & Policy Purposes Only

Creating Sustainable Communities Through Public Transportation

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

TTI REVIEW OF FARE POLICY: PRELIMINARY FINDINGS

SECTION 106 ACTIVITIES ANNUAL REPORT

Chapel Hill Transit: Short Range Transit Plan. Preferred Alternative DRAFT

Transportation Supporting Dulles Airport

REAL ESTATE TRANSACTION ADVISORY SERVICES

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

SAMTRANS SERVICE PLAN

EX28.6 REPORT FOR ACTION. Advancing Fare Integration SUMMARY. Date: October 16, 2017 To: Executive Committee From: City Manager Wards: All

To: Mary Beth Avedesian B.F. Saul Company

Resolution of Support for the Ettrick Site as the Future Location of the Tri-Cities Multimodal Station

The Corporation of the City of Kawartha Lakes Council Report

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA

Call for Public Hearing August 2019 Service Changes

DC Circulator Service Changes. Implementation Plan for June 24, 2018

FY Year End Performance Report

Madison Metro Transit System

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

RACINE COUNTY PUBLIC TRANSIT PLAN:

SKAGIT COUNTY PUBLIC WORKS DEPARTMENT Ferry Operations Division Ferry Fare Revenue Target Report

STAFF REPORT INFORMATION ONLY

1 SUBWAY EXTENSION TO VAUGHAN CORPORATE CENTRE - OPERATING AGREEMENT UPDATE

RELATED SANTA CLARA SANTA CLARA, CALIFORNIA. RELATED SANTA CLARA Santa Clara, CA

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

Rapid Transit From Arbutus Street to UBC. Policy and Strategic Priorities Council Meeting January 30, 2019

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014

Att. A, AI 46, 11/9/17

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Quarterly Report Transit Bureau, Local Transit Operations. First Quarter, Fiscal Year 2015 (July 2014 September 2014) ART & STAR

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW

Maximizing Transit Opportunities

11th and Vermont Streets Special General Land Use Plan (GLUP) Study

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

Chapter 3. Burke & Company

Matt Miller, Planning Manager Margaret Heath-Schoep, Paratransit & Special Projects Manager

Lansing Municipal Airport 3250 Bob Malkas Dr., Lansing, Illinois (708) phone (708) fax

SAMTRANS TITLE VI STANDARDS AND POLICIES

Metropolitan Washington Airports Authority (MWAA)

ARLINGTON COUNTY, VIRGINIA


Draft for approval by TCC on 2/3, TAQC on 2/9 and ARC Board on 2/22. Regional Trail Plan. Mike Alexander, Director, Center for Livable Communities

Manual vs. Automatic Operation and Operational Restrictions

West Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018

Arlington County Board Meeting Project Briefing. October 20, 2015

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.

DEMOGRAPHICS AND EXISTING SERVICE

SECTION 106 ACTIVITIES ANNUAL REPORT

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

Approval of August 2019 Service Changes

Regional Fare Change Overview. Nick Eull Senior Manager of Revenue Operations Metro Transit

Date: 11/6/15. Total Passengers

DRAFT Service Implementation Plan

PREFACE. Service frequency; Hours of service; Service coverage; Passenger loading; Reliability, and Transit vs. auto travel time.

MARTA & City of Atlanta Sales Tax Referendums. Public Hearings May 25 & 26, 2016 June 1 & 2, 2016

TORONTO TRANSIT COMMISSION REPORT NO.

Central Beach Entertainment District. Public Engagement Workshop March 15, 2018

Presentation Outline

SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY NOTICE OF PUBLIC HEARING

Western Placer County Transit Operators Short Range Transit Plan Updates FY to FY Project Update and Alternatives Discussion

Riders Advisory Council Rail Subcommittee April 9, 2008

Appendix A: Regional Fare Policy, SANDAG

EXECUTIVE DIRECTOR. The Potomac Rappahannock Transportation Commission is seeking an ABOUT THE ORGANIZATION

Disposition of Spadina Expressway Properties - Memorandum of Understanding with Infrastructure Ontario

RECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES

TRANSIT WINDSOR REPORT

City of Jacksonville Beach

Passenger Facility Charge (PFC) Program: Eligibility of Ground Access Projects Meeting

Figure 2: Public Transit Systems Operating in Northern Virginia Operating Statistics and Performance Indicators, FY 2004

LA Metro Rapid - Considerations in Identifying BRT Corridors. Martha Butler LACMTA, Transportation Planning Manager Los Angeles, California

PARRAMORE OAKS FRAMEWORK PLANNED DEVELOPMENT OVERVIEW. Presented by Dean Grandin, AICP ZON

Berkshire Flyer Working Group. February 13, 2018

Executive Summary Downtown Park Fund Allocation HEARING DATE: MAY 5, 2016

Transcription:

EXHIBIT 1. BOARD AUTHORIZATION FOR PUBLIC HEARING AND SUBSEQUENT ISSUANCE OF A JOINT DEVELOPMENT SOLICITATION

Washington Metropolitan Area Transit Authority Board Action/Information Summary @Action O Information MEAD Number: 201942 Resolution: @Yes o No TITLE: Joint Development of Deanwood Metro Station PRESENTATION SUMMARY: Staff will present for Board approval a proposal to issue a Joint Development Solicitation and authorize a Compact Public Hearing for Deanwood Metro Station. PURPOSE: To seek Board approval to: (1) issue a Joint Development Solicitation for Deanwood Metro Station, and (2) authorize a Compact Public Hearing to remove the 194-space surface Park & Ride lot required for the Deanwood Metro Station solicitation. DESCRIPTION: Deanwood Metro Station has the third lowest ridership of the 91-station Metrorail system with an average of approximately 1,200 riders per weekday. The 194-space surface Park & Ride lot had an average of 70 daily parkers (36% parking utilization) during the first half of FY18. The station also has a high crime compared to other Metrorail stations and is one of the few stations where the Metro Transit Police Department has an officer stationed 24 hours a day. Joint development is an effective strategy to increase ridership, reduce crime, and increase revenue at this Metro station. The District of Columbia supports the same goals, as evidenced by the DC Council's approval of the 2008 Small Area Plan for Deanwood/Great Streets-Nannie Helen Burroughs Ave NE & Minnesota Ave NE Strategic Development Plan (Small Area Plan). Accordingly, staff seeks Board approval to offer the 1.6-acre, 194-space surface Park & Ride lot at Deanwood Metro Station for joint development. Staff surveyed Metro's parking customers at Deanwood Metro Station to determine what choices they would make if the parking lot were removed in favor of joint development. The survey indicated that a majority of the existing transit customers who currently park at the Deanwood Metro Station would continue to use the sysem. Further, redevelopment of the Kiss & Ride lot over the next decade for apartments and neighborhood retail use is estimated to produce 129 new weekday riders. The net benefit to Metro of eliminating parking in favor of joint development is positive; that is, joint development without replacement parking will produce more revenue for Metro than is generated today. Because staff is proposing to eliminate Park & Ride spaces at Deanwood Metro Station, a Compact Public Hearing is required. The results will be analyzed and presented to the Board for review and approval. Key Highlights:

A proven effective strategy, joint development of Deanwood Station is estimated to result in 129 new weekday riders and eliminate the mostly vacant surface parking lot in favor of residential and commercial activity, which could prevent crime at the station. Development should be completed within the next ten years. To maximize the revenue and ridership potential of joint development, staff proposes to eliminate the 194-space surface Park & Ride lot. Survey results found that a majority of Metro's transit customers who currently park at Deanwood Metro Station would choose to park at nearby Metrorail stations and still ride Metro. The proposed removal of the Park & Ride lot requires a Compact Public Hearing. Background and History: Metro first issued a Joint Development Solicitation for Deanwood Metro Station in March 1996 and again, in July 1999. Both times, Metro did not receive any bids or responses. Since 1999, the District of Columbia's Office of Planning published the "2008 Small Area Plan for Deanwood/Great Streets-Nannie Helen Burroughs Ave NE & Minnesota Ave NE Strategic Development Plan", which articulates specific goals for Metro's Deanwood Metro Station site. Metro also completed a Joint Development Station Access Improvement Study in June 2013 to determine the size and type of development that could be supported at Deanwood Metro Station. The study evaluated the entirety of the Deanwood Metro Station, to include the 194- space surface Park & Ride lot, the Kiss & Ride lot, the bus loop, and the pedestrian tunnel that connects the neighborhoods to the north to the station entrance. Four alternative site plans were developed and presented to the local neighborhoods and communities. The local communities responded favorably and commented on their desire to see underutilized parking lots transformed into housing and development. Specifically, the 2013 study proposed a joint development with a 150-space Metro parking garage, a 138-unit residential development with 10, 000 square feet of retail. The study proposed only developing the Park & Ride lot and not the bus loop or Kiss & Ride. Parking utilization has historically been low at Deanwood Metro Station and averaged 36% utilization in the first half of FY18. In June 2017, staff surveyed registered SmarTrip parkers for a week to determine how eliminating the 194 Park & Ride spaces would impact their choice to ride Metrorail. The results were positive. Since most of the parking customers at Deanwood Metro Station are Prince George's County residents, 55.5% of respondents stated they would park at a different Metrorail station (i.e. Cheverly and Addison Road) and 26% said they would access Metrorail by walking, taking the bus, or by other means. Only 18.5%of respondents (13 people) stated that they may not continue to ride Metrorail. Based on these results, staff concluded that proceeding with joint development without requiring replacement parking would generate the greatest ridership and revenue benefits to Metro. Discussion: Prior to issuing a Joint Development Solicitation, staff identifies the jurisdiction's and community's goals for the joint development site, as well as articulates Metro's goals for the project. In the case of Deanwood Metro Station, the three interests are highly

aligned. The District of Columbia's 2008 Small Area Plan summarizes the top goals for development at Deanwood Metro Station as follows: Expanded neighborhood-serving commercial uses; Redevelopment of vacant and abandoned properties into residential households to support retail and walkability to the station; and, Prioritize attractive, pedestrian-friendly design and de-emphasize auto-oriented uses and surface parking lots. The surrounding communities are also supportive of development at Deanwood Metro Station and specifically would like to see senior housing, mixed-income housing, both rental and home-ownership opportunities, as well as new commercial uses. The community believes, as does Metro staff, that development will activate the street and reduce crime in the station area. The community further articulated a desire to see Minnesota Avenue connect through from the Minnesota Avenue Metro Station to the Deanwood Metro Station. The 2040 ridership goal staff has established for the Deanwood Metro Station is 425 to 600 new weekday riders, which would produce an additional $750,000 to $1 million in annual ridership revenue. The joint development proposed at Deanwood Metro Station is estimated to increase ridership by 129 new weekday riders (21 % to 30% of the 2040 goal) as a result of 160 new residential units and 10,000 square feet of neighborhoodserving retail. Metro's other goals for joint development include improving pedestrian and bicycle connections to the station, reducing crime at the station, maximizing real estate revenue by eliminating any requirement for replacement parking, and reducing some nominal Metro operating expenses by eliminating the Park & Ride and reducing crime. The proposal to eliminate the 194-space Park & Ride surface lot is justified by the low parking utilization (36%) at Deanwood Metro Station, the June 2017 parking customer survey responses, and the community's vision to eliminate or reduce vacant parking lots in the neighborhood. The customer survey responses indicated that a majority (55.5%) of the existing parking customers would choose an alternate parking location to take Metro. Since most of the parkers at Deanwood Metro Station are Prince George's County residents, the two stations that were cited most frequently where people would park instead are Cheverly and Addison Rd Metro Stations. Of parking customers surveyed, 26% stated they would get to Deanwood Metro Station by other means (bus, taxi, walk, shuttle, or park elsewhere), and 18.5% of existing parking customers stated they may choose not to ride Metrorail altogether. Given that Metro would potentially lose 13 parking customers, but gain 129 transit riders through joint development, the net gain in ridership justifies proceeding with a maximum build out of the joint development site. The fiscal impact analysis of joint development without replacing Park & Ride parking is positive. The lost ridership and parking revenue from parkers at Deanwood is calculated to equal $112,246 annually. However, with current parking customers choosing to park elsewhere in Metro-owned parking facilities, or arrive at Metro station by other transportation modes, Metro would continue to receive $89,790 annually in revenue from parkers. Metro would also generate $199,500 new revenue from new riders coming from the joint development. This is a net positive

impact of $177,044 annually to Metro, once development is complete. The real estate revenues from joint development would be determined by through the Joint Development Solicitation competition and a complete fiscal impact of the joint development will be presented to the Board after selection of a developer. Lastly, because staff is proposing to eliminate the Park & Ride surface lot, Metro must conduct a Compact Public Hearing on the proposed changes to the Mass Transit Plan. Staff proposes to hold the Compact Public Hearing prior to bringing a Joint Development Agreement for Board approval. FUNDING IMPACT: Joint development is a revenue-producing activity for Metro, which results in new ridership revenue and real estate revenue. Project Manager: Rosalyn Doggett, Senior Real Estate Advisor Project CFO/LAND DepartmenUOffice: TIMELINE: March/1996 - Joint Development Solicitation issued; no responses July/1999 - Joint Development Solicitation issued; no responses Previous Actions June/2013 - Deanwood Metro Station Access Improvement Study completed June/2017 - Deanwood Metro Station Parking Customer Survey completed March/2018 - Compact Public Hearing Anticipated actions after April/2018 - Issuance of a Joint Development Solicitation presentation June/2018 - Staff to present to Board results of the Compact Public Hearing RECOMMENDATION: Board approval to: (1) issue a Joint Development Solicitation for Deanwood Metro Station, and (2) hold a Compact Public Hearing to remove the 194-space surface Park & Ride lot at Deanwood Metro Station.

Washington Metropolitan Area Transit Authority Deanwood Metro Station Joint Development Capital & Strategic Planning Committee January 11, 2018

Purpose Seek Board approval to: Issue a Joint Development Solicitation at Deanwood Metro Station Hold a Compact Public Hearing to remove a 194-space surface parking lot 2

Background March 1996 July 1999 June 2013 June 2017 Metro issued a Joint Development Solicitation; no responses received Metro issued a Joint Development Solicitation; no responses received Deanwood Metro Station Access Improvement Study completed Parking customer survey conducted 3

Proposed Joint Development Site 6 bus bays Kiss & Ride facility 194-space Park & Ride (1.6 acres) Average 1,242 weekday rail entries 3 rd lowest ridership of 91 stations Access Mode Share Shuttle 1% Walked 39% Other 4% Car 24% Metrobus 25% Dropped off 7% 4

DC s Goals for Redevelopment of Deanwood Metro Station Small Area Plan goals Metro station site: Expanded neighborhood-serving commercial uses Redevelopment of vacant and abandoned properties into residential households to support retail and walkability to the station Prioritize attractive, pedestrian-friendly design and de-emphasize auto-oriented uses and surface parking lots Community Support of Development Supportive of senior housing, mixed-income housing, both rental and home-ownership opportunities, also commercial uses Believe development will activate the street and reduce crime Desire Minnesota Avenue connection from the Minnesota Avenue Metro Station to the Deanwood Metro Station 5

Metro s Joint Development Goals 2040 Ridership Goals Current Ridership Current Revenue Ridership Target New Revenue Target 1,242 weekday riders $3,300/weekday 425 to 600 more weekday riders $750,000 - $1 million/year Joint development estimated to create 129 new riders (21% - 30% of 2040 goal) Improve pedestrian and bicycle connections Reduce crime at/around station area Maximize real estate revenue Reduce Metro expenses 6

Joint Development Scenarios Scenario 1 Less than 1:1 replacement parking 150-space replacement 138 residential units 10,000 SF retail Scenario 2 No replacement parking 160 residential units 10,000 SF retail 7

Parking Survey Results Customer survey in June 2017 Majority of parkers are Prince George s County residents 55.5% would park at another station (Cheverly, Minnesota Ave, Addison Rd) 26.0% would arrive by other means (bus, walk) 18.5% may be lost customers Customers Arriving by Other Means 8

Net Fiscal Benefit of Joint Development Recommend no replacement parking Positive net revenue gain after joint development Deanwood Joint Development Projected Annual Revenue Current net revenue from parkers* ($112,246) Projected net revenue from parkers* $89,790 Projected ridership revenue gain from joint development $199,500 Net Revenue Subtotal $177,044 *Net revenue includes fare revenue and parking fees paid, less parking operation and maintenance costs 9

Estimated Project Timeline Estimated timeline, without changes in market conditions: Metro solicitation and approvals: 20 months Private development process: 48+ months 2018 2019 2020 2021 2022 2023 2024 Milestones 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 Board approval of Joint Development Solicitation Board approval of Compact Public Hearing Compact Public Hearing Board approval Compact Public Hearing Staff Report Issuance of Joint Development Solicitation Selection of Developer Board approval to Negotiate and Execute a JDA Negotiate and Execute a JDA 6-months FTA Review and Concurrence 3-mos Design/Entitlements (PUD) 12-16 mos Design/Permitting/Construction 36-months Project Completion 10

Recommendation Approval to: Issue a Joint Development Solicitation at Deanwood Metro Station Hold a Compact Public Hearing to remove a 194-space surface parking lot 11

PRESENTED AND ADOPTED: January 25, 2018 SUBJECT: APPROVALS TO ISSUE A JOINT DEVELOPMENT SOLICITATION FOR THE DEANWOOD METRORAIL -STATION AND TO HOLD A COMPACT PUBLIC HEARING 2018-01 RESOLUTION OF THE BOARD OF DIRECTORS OF THE WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY WHEREAS, Resolution 2014-32 requires approval of the Washington Metropolitan Area Transit Authority (WMATA) Board of Directors to offer sites in a proposed joint development solicitation; and WHEREAS, WMATA Compact Section 15 requires the Board of Directors to transmit proposed changes to the Mass Transit Plan (MTP) to certain enumerated agencies and to conduct a Public Hearing before a MTP is altered, revised or amended; and WHEREAS, In June 2013, staff completed a Station Access Improvement Study for Deanwood Metrorail Station which resulted in a recommendation for a joint development concept for residential development and neighborhood-serving retail to replace Metro's surface Park & Ride lot; and WHEREAS, The recommended joint development concept is consistent with the District of Columbia's approved Small Area Plan, and the surrounding communities are supportive of development at Deanwood Metrorail Station; and WHEREAS, The elimination of the existing 194-space surface Park & Ride lot located at the Deanwood Metrorail Station will result in changes to the MTP; NOW, THEREFORE, be it RESOLVED, That the Board of Directors authorizes staff to issue a joint development solicitation for redevelopment of the 194-space surface Park & Ride lot at Deanwood Metro Station; and be it further RESOLVED, That, in accordance with WMATA Compact Section 15, the Board of Directors authorizes staff to transmit the proposed MTP changes to the enumerated agencies and to hold a public hearing on the proposed changes to the Deanwood Metrorail station as a result of the removal of the Park & Ride lot, and directs staff to bring to the Board for its approval a Public Hearing Staff Report; and be it finally Motioned by Mr. Corcoran, seconded by Mr. Goldman Ayes: 7 - Mr. Evans, Ms. Harley, Mr. Corcoran, Mr. McMillin, Mr. Goldman, Mrs. Hudgins and Mr. Horner

RESOLVED, That, this Resolution shall be effective 30 days after adoption in accordance with Section B(b) of the WMATA Compact. Reviewed as to form and legal sufficiency, WMATA File Structure Nos.: 18.8 Public Hearings and Meetings 21.9.1 Joint Development Solicitations and Request for Proposal 2