In your area. Warmfield to Swillington and Woodlesford LA15. June Introduction

Similar documents
In your area. Stourton to Hunslet LA17. June Introduction. High Speed Two (HS2) is

In your area. South Kirkby to Sharlston Common LA14. June Introduction

In your area. Manchester Piccadilly Station MA08. June Introduction. High Speed Two (HS2) is

In your area. Pinxton to Newton and Huthwaite LA08. June Introduction

In your area. Stonebroom to Clay Cross LA09. June Introduction

In your area. Tibshelf to Shuttlewood LA10. June Introduction

July 2016 Briefing pack: David Higgins South Yorkshire Report

EXHIBIT LIST. No Exhibit Name Page. 1 R391 HS2 Residents Charter.pdf (R391) R392 Response to Select Committee

The Government s Aviation Strategy Transport for the North (TfN) response

TRANSPORT UPDATE. September/October 2018

An Introduction to HS2

Northern Powerhouse Rail

HS2 Update 19 FEBRUARY 2017

High Speed Two: From Crewe to Manchester, the West Midlands to Leeds and beyond

The Hybrid Bill and the journey to Royal Assent. Andy Taylor Head of Public Affairs, HS2 Ltd

2nd March, 2017 Corporate Report Format. Conisbrough Mexborough Sprotbrough

High Speed Two: From Crewe to Manchester, West Midlands to Leeds and beyond

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES

SHAPING REGIONAL INFRASTRUCTURE

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise

Plugging the greater Midlands region into global wealth

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

East Midlands Rail Franchise Public Consultation

H1: BIRMINGHAM CURZON STREET STATION

Doncaster Chamber of Commerce. Andy Taylor Head of Public Affairs, HS2 Ltd

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Bridging the Northern Gap:

EAST WEST RAIL EASTERN SECTION. prospectus for growth

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

THE STOPS ARE JUST THE START

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government

Heathrow Consultation January March 2018

M6 CORRIDOR. Strategic Infrastructure Prospectus

Report of the Strategic Director (Place) to the meeting of Environment and Waste Management Overview & Scrutiny Committee to be held on 28 March 2017.

ConneCting the northern Powerhouse

Strategic Cross Border Planning in the West Midlands

A63 Preferred Route Announcement

The Future of Air Transport

Realising the potential

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Emerging Strategy. Executive Summary November Midlands Connect Powering the Midlands Engine

Reducing traffic: a new plan for public transport

Workplace Parking Levies: the contribution of commuters to funding public transport. Sue Flack Consultant

LISBON STREET, LEEDS LISBON STREET, LEEDS DEVELOPMENT OPPORTUNITY

On the right track. Stansted s vision for improved rail connectivity

Strategic Transport Forum

Update on the Thameslink programme

FUTURE AIRSPACE CHANGE

New free City connector bus service

WHAT ARE THE LIKELY ECONOMIC AND SOCIETAL IMPACTS OF HS2?

Infrastructure for Growth

Moseley Gardens. surrendeninvest. Birmingham. residential. Exclusive to Surrenden Invest

A GREAT PLACE TO INVEST. wearedoncaster.co.uk

BACKGROUND TO THE EAST COAST MAIN LINE AND INTERCITY EAST COAST FRANCHISE

Getting the best out of the North East

CABINET 1 MARCH 2016 DEVELOPMENT OF A RAIL STRATEGY FOR LEICESTER AND LEICESTERSHIRE REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT PART A

Llandudno Junction. Regeneration Proposals for the Future. December 2009

HS2 Plans & Updates. Prof Andrew McNaughton

AIREBOROUGH NEIGHBOURHOOD DEVELOPMENT FORUM

About ABTA. Executive summary

HIGH SPEED RAIL: INVESTING IN BRITAIN S FUTURE

Why MANCHESTER? MANCHESTER CASE

Crossrail / Elizabeth Line An Update

DEVELOPMENT MAP 2017/18

Michèle Dix Managing Director 17 January 2018

HS2 DRIVING FORWARD GROWTH IN THE LEEDS CITY REGION

Wokingham Borough Council Response to the Consultation on the Draft Airports National Policy Statement

Barnsley, Dearne & Dove Canals Trust HS2 Mitigation Options

opyright East Riding of Yorkshire Cou

Re-opening of the Skipton to Colne Railway Executive Summary

a manifesto for business

LEEDS. INNOVATIVE INFRASTRUCTURE DELIVERY Creating a catalyst for regeneration and unlocking investment opportunities. Leeds Railway Station

A30 Chiverton to Carland Cross Statement of Community Consultation

This paper outlines the development of the HS2 scheme since the then Government decided to set up HS2 Ltd and explore options in January 2009.

insouthglos Economy .co.uk Our economy

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

The Rail Network in Wales

Chapter 12. HS2/HS1 Connection. Prepared by Christopher Stokes

AIRSPACE PRINCIPLES CONSULTATION DOCUMENT JANUARY 2018

THE GATWICK DIAMOND INITIATIVE BUSINESS PLAN

Appendix 12. HS2/HS1 Connection. Prepared by Christopher Stokes

Open for. creativity and growth. business.

GATWICK AND WANDSWORTH

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

DEVOLUTION OF RAIL FRANCHISING. A new strategy for rail in the North of England

What we know about the economic benefits of naval shipbuilding for South Australia

4 Transport projects underway in Western Sydney

Response to the London Heathrow Airport Expansion Public Consultation

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1

THE NEXT STAGES FOR DELIVERING HEATHROW EXPANSION

Economics and Business Advanced Unit 4B: The Wider Economic Environment and Business

Getting our Priorities Right

Smart Cities Plan IMPLEMENTATION. Townsville City Deal. April 2017

Rail Fares Explained

Jim O Sullivan Chief Executive

Department for Transport

National Training Awards 2011 Outshine the competition - enter today

Public Submissions in response to the Bill closed on 2 July 2015 and Council lodged a copy of the submission provided as Attachment 1.

Yorkshire Forum for Water Customers

Transcription:

June 2018 www.hs2.org.uk In your area Warmfield to Swillington and Woodlesford LA15 LA15 Rothwell to Leeds A642 M62 M1 Woodlesford Oulton Bottom Boat to York HS2 Phase 2b Altofts A642 Swillington Methley Great Preston A639 High Speed Two (HS2) is the Government s planned new high speed railway. High Speed Two Limited is the company responsible for developing and promoting the UK s new high speed rail network. In July 2017, the Government confirmed the route for the next phase of HS2: Crewe Manchester and West Midlands Leeds (Phase 2b). Stanley Ferry Normanton Wakefield Kirkthorpe Warmfield A655 to Birmingham N Introduction This information has been produced by HS2 Ltd to update you about the route from Warmfield to Swillington and Woodlesford. It includes: a summary of the proposed route in your area and how the design has developed since July 2017; what we are currently working on and what we will be consulting on later in the year; the benefits that HS2 will bring to your area; how to find out more about the project; and how to get in touch with us. Page 1 of 8

The route of the proposed scheme from Warmfield to Swillington and Woodlesford The Warmfield to Swillington and Woodlesford community area covers approximately 15.8km. It passes through largely rural parts of West Yorkshire between Sharleston Common in the south and Swillington Common in the north. From Sharleston Common, the route passes between the communities of Kirkthorpe and Warmfield, over the existing railway and immediately to the east of Newland Hall. The route then passes to the west of Altofts and crosses the Aire and Calder Navigation and River Calder before passing over the M62. The route then again crosses the Aire and Calder Navigation and River Aire and remains broadly parallel and to the South of Swillington Lane before reaching Swillington Common close to junction 46 of the M1. The line into Leeds leaves the mainline at the M62 and passes beneath Woodlesford in a tunnel. The majority of this section of route is a mix of cuttings and embankments with two significant viaducts and one deep-bored tunnel. The most significant cuttings, which are approximately 18m deep, are to the west of Altofts, the longest being to the west of Swillington Lane, which is 1.5km in length. The most significant embankments are between Kirkthorpe and Newland Hall and to the West of Swillington. The two viaducts across the Aire and Calder Navigation are both around 2km in length and reach a maximum height of 28m. The deep-bored tunnel beneath Woodlesford is just over 1km in length with a short section of shallow cut-and-cover tunnel on the southern approach. Design development Since the community information events in September 2017, we have continued to develop our design for the railway, which will be included in the working draft Environmental Statement that you will have an opportunity to give feedback on later this year. We have also produced detailed maps showing the evolving design that includes construction compounds, road realignments and public rights of way. These show our work in progress and are likely to be refined or changed before we publish them as part of a consultation later in the year. To view the maps, please visit www.hs2.org.uk/building-hs2/building-the-line/phase-2b/mid- 2018-information-events. The main change in this area has been to develop proposed locations for construction compounds while carefully considering feedback raised by communities around visual intrusion and construction impacts. There have also been changes to reduce the impact of the southern tunnel entrance at Woodlesford. Work is on-going to move the point at which the trains enter the tunnel further away from residential properties. Although the deep-bored tunnel remains at the same depth, there are plans to provide a cut-and-cover section There is already a lot of work going on to ensure that Leeds is HS2 ready and we are working with stakeholders to ensure the business voice is heard as plans evolve so that economic benefit is maximised. Already we have seen plans for a new iconic rail station in the city which will accommodate HS2, classic rail services and future plans for a continuation of the high speed network connecting Leeds and Manchester, Liverpool, Hull and Sheffield. Confidence in the city is very high at the moment and we are seeing interest and investment driven by the prospect of improved regional and national connectivity. The opportunities afforded by new high-speed rail links are now firmly at the heart of business and economic planning in Leeds City Region. Paula Dillon, President, Leeds Chamber of Commerce Page 2 of 8

in the vicinity of Fleet Lane. There has also been a slight shift in the alignment to meet an environmental and constructional challenge in relation to landfill spoil below ground level. In response to a strong community desire to reduce traffic impact around Woodlesford, we are investigating the potential for using the Aire and Calder Navigation to contribute to the movement of both surplus excavated material and new construction material required to build earthworks. Autotransformer stations (ATS) and autotransformer feeder stations (ATFS) are pieces of infrastructure needed to power the railway. An ATFS is proposed at a site to the south of the M62 near Newmarket Lane. ATS sites are proposed to the south of the A655 between Wakefield and Warmfield, close to the point at which Bullerthorpe Lane passes over the M1 and close to the Aire and Calder Navigation to the north of Rothwell Country Park. Transport for the North and Midlands Connect We are working with Transport for the North and Midlands Connect to consider how HS2 can help further improve connectivity, and the Government is currently considering whether additional connections should be included in the Phase 2b scheme. Once the Government has decided how this work should be taken forward, we will explain what this means for the design of the Phase 2b route. Environmental Impact Assessment As part of the development of the Phase 2b proposed scheme, we are carrying out an Environmental Impact Assessment that will identify the likely significant effects of the construction and operation of the railway and the means to reduce or avoid such effects. This will be reported in our Environmental Statement, which will accompany the hybrid Bill that we expect to deposit in Parliament in late 2019. For the purposes of reporting the findings of the Environmental Impact Assessment the Phase 2b route has been divided into 26 community areas, of which Warmfield to Swillington and Woodlesford is one (reference LA15). The working draft and formal Environmental Statement will have a detailed report for each community area. This will include an assessment of the local environment and likely significant effects of the proposed scheme, suggested methods of reducing or avoiding those effects, and the proposals for monitoring our impact during construction and operation. As part of the Environmental Impact Assessment process, we are carrying out surveys to better understand the current local environment including noise conditions and ecology. We have also been engaging with local authorities, parish councils and other statutory bodies to collect information and local knowledge. More information about our survey work can be found online at: www.gov.uk/government/publications/a-guide-to-environmentalsurveys-being-carried-out-by-hs2 National College for High Speed Rail The newly opened National College for High Speed Rail will play a key role in generating the workforce of the future, designing and building the UK s new high speed rail network and future infrastructure projects including HS2. With state-of-the-art facilities in Birmingham and Doncaster, the college offers courses and apprenticeships in all elements of the rail industry whether leaving school, wanting to upskill, or take a new career direction. HS2 alone is set to create 25,000 new jobs, including 2,000 apprenticeships, and careers in this industry are set to become more and more sought after. If you would like further information, or to apply, visit the college website www.nchsr.ac.uk/ call the college on 0330 120 0375 or email on enquiries@nchsr.ac.uk Page 3 of 8

LA16 Leeds Station LA18 Garforth and Church Fenton t LA16 Stourton to Hunslet LA17 Warmfield to Swillington and Woodlesford Please note: These maps are based on our emerging design and may change as we continue LA15 Proposed Leeds Rolling Stock Depot - currently subject to consultation This map shows the route of HS2 through the community area, however, owing to the scale we have not included emerging design details. To see more detailed maps, please visit www.hs2.org.uk/ building-hs2/building-theline/phase-2b/mid-2018information-events. to refine the design, complete environmental assessments and take into consideration further feedback. South Kirkby to Sharlston Common LA14 New Crofton Rolling Stock Depot - currently subject to consultation t Woodlesford

Future consultations Later in the year, we will consult on a working draft of the Environmental Statement. This will be an opportunity to see and comment on our work in progress. Parliament does not require us to consult on a draft of the document; however we believe it is important for communities and stakeholders to have a formal opportunity, to understand the progress of our work and provide feedback at this stage. This will also be accompanied by the working draft Equality Impact Assessment, which identifies people with protected characteristics that may be disproportionately affected and any action that may be necessary to limit such effects. Feedback to these consultations will be considered in the development of the proposed scheme presented to Parliament. The benefits of HS2 in your region Over 80 companies in Yorkshire have already been awarded work on HS2, either directly or through its supply chain, and HS2 Ltd has engaged with more than 360 businesses in Yorkshire on potential opportunities. Over 40 businesses from across Yorkshire, 76% of which were small and medium-sized enterprises, met with HS2 Ltd s direct contractors at our largest supply chain engagement event to date on 10 May 2018. Improved transport connectivity that HS2 provides will strengthen the attraction of Yorkshire as a business location and support the development of highly skilled jobs in the region. Factsheets HS2 Ltd has published factsheets that explain how we intend to manage areas of concern and minimise impacts on the environment. These factsheets can be found online at: www.hs2.org.uk/buildinghs2/building-the-line/ phase-2b/mid-2018- information-events HS2 will increase the number of skilled workers that businesses based in Yorkshire can access both directly on HS2 services, and by releasing capacity on the existing rail network for local commuter services. HS2 will provide fast, frequent and reliable access to job opportunities in a broader network of places without the need to relocate. For example, someone living close to Leeds station will have the option of accessing jobs in Sheffield and the East Midlands in under 30 minutes travel time on HS2 services, in addition to improved local career opportunities in West Yorkshire. Yorkshire s strong and diverse tourist offer contributed over 5 billion to the region s economy in 2015. Yet visitors from London and the South East accounted for a low share of visitors to the Yorkshire and Humber region (5% in 2011). HS2 will bring Yorkshire s tourist destinations closer for people based in the Midlands, London and the South East, as well as improving rail links to airports to attract international tourists to the region. HS2 will help support growth and productivity by integrating with Northern Powerhouse Rail to ease the combination of congestion and poor connectivity across the region. Page 6 of 8

What is HS2? HS2 is the largest infrastructure project in Europe and the most advanced railway ever built in the UK. It is a catalyst for growth revitalising the country, creating new opportunities for jobs and skills, regenerating towns and cities, and bringing the nation closer together. It will increase capacity on our railways and improve connectivity between eight of Britain s ten biggest cities. It will run between London and Birmingham (Phase One) from 2026, extend to Crewe (Phase 2a) by 2027 and then link to Manchester, Leeds and further north from 2033 (Phase 2b). Once completed HS2 will travel to over 25 stations and serve 30 million people across Britain. Why do we need HS2? The future prosperity of the UK depends on a modern, strong and growing economy which enables us to compete on the international stage. Good rail links are essential for a strong economy, making it easier to import and export goods, for people to do business and to get to work. HS2 will not only reduce journey times, it will provide more capacity for local, regional and freight services on the current network, relieving congestion and providing better travel options. By transforming journey times, HS2 will bring more opportunities within closer reach for employment, business, leisure and education. What is the process for building HS2? We have legal powers from Parliament to construct Phase One and must now gain approval to build the route from the West Midlands to Leeds and Manchester (Phase Two). On 17 July 2017 the Secretary of State for Transport confirmed the route for Phase 2b, and we are now preparing the documentation, known as the Phase 2b hybrid Bill, ready for submission to Parliament in 2019. Submitting a hybrid Bill to Parliament is how the Government gains permission to build this nationally important infrastructure. As part of the Parliamentary process we will consult with the public on various aspects of the proposals. This is a real opportunity for communities to get involved and contribute to helping design the railway. In addition, people whose property or interests are specially and directly affected by the Bill can petition the Parliamentary committee considering the legislation, which can result in changes to the Bill. Next steps 2017 2019 Carry out Environmental Impact Assessment Late 2018 Consultation on the working draft Environmental Statement and working draft Equality Impact Assessment 2019 Deposit hybrid Bill for Phase 2b route and consult on final Environmental Statement and Equality Impact Assessment 2022 Gain Royal Assent for the Phase 2b hybrid Bill 2023 Start of construction period of Phase 2b 2033 Start of train services on the Phase 2b route Page 7 of 8

Keeping you informed We are committed to keeping you informed and making sure that if you are affected by the Government s plans, you understand what to expect (and when), and how we can help. Community engagement We have a local engagement team which covers your area. If you would like to speak to them, please contact us using the contact details provided here. We have published a Community Engagement Strategy, which sets out our approach to community engagement and what it means for those who either live or work within the communities along the line of the new railway. You can read it by visiting: www.gov.uk/government/publications/hs2-ltds-communityengagement-strategy Residents Charter and Commissioner The Residents Charter is our promise to communicate as clearly as we possibly can with people who live along or near the HS2 route. You can read it by visiting: www.gov.uk/government/publications/hs2-residents-charter We also have an independent Residents Commissioner whose job is to make sure we keep to the promises we make in the Charter and to keep it under constant review. The Residents Commissioner s reports are published at: www.gov.uk/government/collections/hs2-ltd-residentscommissioner You can contact the Commissioner at: residentscommissioner@hs2.org.uk Property and compensation You can find our guide to property schemes by visiting: www.gov.uk/government/collections/hs2-property Contact us at HS2 If you have any questions about the information in this booklet, please get in touch. You can also contact us if you d like a free copy of this booklet in: Large print l Braille l Audio l Easy Read or for help and information in a different language. Online www.hs2.org.uk Telephone 08081 434 434 Minicom 08081 456 472 Email hs2enquiries@hs2.org.uk Write to High Speed Two (HS2) Limited, Two Snowhill, Snow Hill Queensway, Birmingham B4 6GA You can also find out if you are eligible for compensation at: www.gov.uk/claim-compensation-if-affected-by-hs2 Page 8 of 8 D539(06/18) CS926w