Ground Transportation Strategy. Victoria Airport Authority

Similar documents
Victoria International Airport Your Gateway to the World

Annual Public General Meeting

PUBLIC TRANSIT IN KENOSHA, RACINE, AND MILWAUKEE COUNTIES

Ministry of Transportation

BY AIR VICTORIA TRANSPORTATION OFFERS BUSINESS EVENTS VICTORIA. Harbour Air Seaplanes. HeliJet

TERMINAL DEVELOPMENT PLAN

Zoom Zoom Bowen. Scooter Rentals. Proposal for BIM Land Use Bylaw (3.3.5) Amendment

PORTS TORONTO Billy Bishop Toronto City Airport Summary of 2015 Traffic and Passenger Surveys

Airport Consultative Committee

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary

CONSOLIDATED MAY 8, 2017 CITY OF CAMPBELL RIVER PROVINCE OF BRITISH COLUMBIA BYLAW NO. 3211

BACKGROUNDER Office of the Premier Government of Canada

Greater Orlando Aviation Authority

Getting to OUR Ecovillage 1565 Baldy Mountain Road, Shawnigan Lake, BC

StraitAway Airways. "We make flying special again!" Background Information

Edmonton International Airport Master Plan Open House Display Boards April 16, 2011

Airport Consultative Committee

ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

VOL. 6, NO. 1 SUMMER 2009 IN THIS ISSUE: Silver Lining Helicopter Celebration of Friendship Eagles Landing

THE BIG MOVE. Transforming Transportation in the Greater Toronto & Hamilton Area (GTHA) W. Michael Fenn, CEO October 23, 2008

TOURISM SAMPLE ASSESSMENT MATERIALS - EXTERNAL VOCATIONAL. WJEC Level 3 Applied Certificate and Diploma in

Metrolinx Board of Directors. President, Union Pearson Express Date: September 22, 2015 UP Express Quarterly Board Report

Airport Consultative Committee

Transportation Demand Management Plan for the Proposed Hampton Inn & Suites in San Mateo, California

A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A

Annual Public General Meeting Summary of Proceedings. 7:00 8:50 pm, Thursday, May 10, 2012 Mary Winspear Centre 2243 Beacon Avenue, Sidney, BC

284,557 inhabitants + 23% 60,000 vehicles during peak periods Growing need in terms of moving people public transit Saturation of the road network

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017

Response to the London Heathrow Airport Expansion Public Consultation

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES

VOL. 5, NO. 2 WINTER 2008/2009 IN THIS ISSUE: Aviation Museum United Way Red Coats

Application Decision Amendment

Toronto Pearson Master Plan Greater Toronto Airports Authority October 4, 2017

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017

Application Decision. Application: Applicant: Trade Names: Address: Principals: Current Authorization: Type of Application:

COMOX VALLEY AIRPORT. Strategic Plan Summary. October 2010

Federal Budget Submission. Prepared for the House of Commons Standing Committee on Finance. Greater Toronto Airports Authority

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

PACIFIC JAMBOREE TRAVEL HANDBOOK

Wokingham Borough Council Response to the Consultation on the Draft Airports National Policy Statement

Sharing the Way with Sustainable Transport Options

The Next Phase: A Five-year Strategy for Aboriginal Cultural Tourism in British Columbia DRAFT

October 7, Mr. Geoffrey Wilson Chief Executive Officer PortsToronto 60 Harbour Street Toronto, Ontario M5J 1B7. Dear Geoff,

Transit Fare Review Phase 2 Discussion Guide

2015 Independence Day Travel Overview U.S. Intercity Bus Industry

TORONTO TRANSIT COMMISSION REPORT NO.

The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway

OUTLINE RESPONSE FROM WELWYN PLANNING & AMENITYGROUP (WPAG) TO CONSULTATION OVER PROPOSED EXPANSION OF LUTON AIRPORT

Final Licence Application Decision Inter-city Bus

The Government s Aviation Strategy Transport for the North (TfN) response

Transforming Intra-African Air Connectivity:

5 Rail demand in Western Sydney

South of Fraser Transportation Priorities March 2017 Engagement

AIRPORT OF THE FUTURE

Resort Municipality Initiative Annual Report 2015

Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

Noise Mitigation Program

Airport Consultative Committee

4 YORK REGION TRANSIT DON MILLS SUBWAY STATION ACCESS AGREEMENT

RW Bruhn Bridge and Approaches Project

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

TORONTO TRANSIT COMMISSION REPORT NO.

KING STREET PILOT STUDY PUBLIC MEETING

General Issues Committee Item Transit Operating Budget Ten Year Local Transit Strategy

Airport Planning Area

Thank you, Director Heijl and Bon Jour. It s good to be back in Montreal for this important symposium.

Multi-modal Integration and the Collaborative Economy

CHAPTER 4: ALTERNATIVES

Transit in Toronto. Chair Adam Giambrone Sunday, October

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT

Stimulating Airports is Stimulating the Economy

Bus Priority Package. Presentation to Leigh Business Forum. 11 December 2015

Organization Date. Sound Regional Council Regional Project Evaluation Committee. Brian Nielsen, Program Administrator

Rapid Transit From Arbutus Street to UBC. Policy and Strategic Priorities Council Meeting January 30, 2019

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY

2017/2018 Q3 Performance Measures Report. Revised March 22, 2018 Average Daily Boardings Comparison Chart, Page 11 Q3 Boardings figures revised

National Market Report

BUSINESS AVIATION COMMITMENT ON CLIMATE CHANGE

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

Performance Term 4 An Opportunity to Reset Ferry Fares. Background:

PASSENGER TRANSPORTATION BRANCH MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE LICENCE. Passenger Transportation Licence COPY

MASTER PLAN UPDATE Toronto Pearson International Airport. City of Toronto Planning and Growth Management Committee September 5, 2007

Brisbane Airport Ground Transport Operators Forum Tuesday 25 July, 2pm Brisbane Airport Meeting Room Ground Transport Operators

Status. Agreement announced: June 2004 Completed: Value for Money Report. released: Nov 2004 *CCPPP: Financing Award Agreement announced:

2013 Base Plan TransLink Technical Briefing

Parallel Taxiway and Apron Widening at Abbotsford International Airport

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Canada s Airport Occupations: the important unseen workforce David Berrington 3 November 2010

Photo credit: Dan Anthon, Royal Roads University, Hatley Park National Historic Site GREATER VICTORIA FILM COMMISSION

Annual Public General Meeting. Report from the President and CEO. May 10, 2018

Non-Motorized Transportation

Port Gamble Shoreline Area Conceptual Trail Proposal

ROUTE EBA EAST BUSWAY ALL STOPS ROUTE EBS EAST BUSWAY SHORT

Number 1 Gross Regional Product per capita in Queensland

2018 Airport Master Plan. Public Meeting and Open House February 7, 2018

WESTERN EL DORADO COUNTY SHORT AND LONG-RANGE TRANSIT PLAN Executive Summary

Transcription:

Ground Transportation Strategy Victoria Airport Authority

VAA Ground Transportation Strategy We live on an Island in the Pacific, but we are not isolated. A 15 minute flight from the Victoria International Airport takes you to Vancouver, the largest commercial centre in British Columbia. A few more hours in the air, and you can step off the plane in Toronto, Calgary, San Francisco or a whole list of other destinations. And it all starts at Victoria International Airport, our connection to the world. Connectivity enriches our lives. Who doesn t want to visit family members in another part of the country or the world? Who doesn t enjoy a vacation in the sunny south? But connectivity is more than that; connectivity is key to a community s economic prosperity. And our Airport plays a major role. It is The World s Gateway to Victoria and Vancouver Island. Tourism and high technology sectors, in particular, rely heavily on air transportation. The new United Airlines daily return flight to San Francisco is a good example of how well industry can be served from Victoria. The list of daily non-stop flights includes Toronto, Calgary, Edmonton, Kelowna, Seattle, Abbotsford and Vancouver. Very soon we hope to add overseas destinations to that list.

The Ground Connection When people think of airports, they naturally think of airplanes. But an airport is more. It is a multi-modal connecting point, enabling travelers to move between land and air, and back again. Ground links, are a key element in air travel. For example, on shorter flights the journey to and from the airport consumes a large portion of a passenger s total travel time. If there is any part of this that the VAA can make more convenient and efficient, we want to do that. Other dimensions we must consider are the issues of green house gases and constantly increasing fuel costs. The VAA Master Plan responds to anticipated air travel growth rates of 2.8 percent annually through 2025. In that year, the total number of passengers flying in and out of Victoria is projected at 2.3 million. This increase in air travel will increase demands on ground links between the Airport and surrounding communities. We need to plan wisely. And because we are located on an island with limited road access, we need to be certain that nothing is overlooked. Key ground strategy recommendations of the Master Plan include expansion of the surface parking area, realignment of Willingdon Road and, ultimately, an airport parking structure. 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 Domestic 969,007 1,071,361 1,042,942 987,439 1,000,503 987,367 1,052,831 1,101,502 1,171,939 1,245,515 1,280,300 Transborder & Intl 134,006 142,868 148,532 151,823 157,610 114,880 129,990 148,474 146,456 144,613 201,306 Total Passengers 1,103,013 1,214,229 1,191,474 1,139,262 1,158,113 1,102,247 1,182,821 1,249,976 1,318,395 1,390,128 1,481,606 10 Year Passenger Volumes 1,500,000 1,200,000 + 10.0% + 5.7% +5.5% - 1.9% - 4.4% + 1.7% - 4.8% + 7.3% + 5.4% + 6.6% Millions of Passengers 900,000 600,000 300,000 Transborder & Intl Domestic - 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007

Traffic coming to the Airport. Pat Bay Highway Road links between the Airport and Victoria city centre have not kept pace with Airport improvements. Traffic leaving the Airport passes smoothly through the new roundabout at East Saanich Road and along Canora Road, until it reaches the stop sign at McTavish Road. This is an increasingly congested and dangerous intersection. Driving to the Airport from Victoria city centre is equally problematic. During peak hours, airport bound traffic backs up in the left turn lane on Pat Bay Highway at the McTavish Road intersection. This line of slow moving or stopped vehicles often extends into the left passing lane, which is already clogged with fast moving vehicles heading north to the Swartz Bay Ferry Terminal. The VAA continues to work with the Province to advance the priority for a new interchange at this location, and has resolved to offer $3 million as its portion of the estimated $13 million project. The Pat Bay Highway not only serves communities on the Saanich Peninsula, but it is the area s main route to the Swartz Bay Ferry Terminal and the Airport, making it Vancouver Island s major ground connector to the mainland. One day conventional passenger vehicles and buses will be unable to meet the increasing demands for environmental friendly transportation to the Airport. Recognizing this, VAA has reserved a future right-of-way on Airport property to accommodate light rail. At present, this right-of-way is just a line on paper, but it is a line that will help secure our future.

This map shows the route of a proposed future light rail corridor to the Airport.

The entrance to the Airport White Spot Restaurant. Parking Consider that by 2025, the passenger terminal area will need to be 55 percent greater than it is today to accommodate traffic. This increase will affect demands on parking space as well. In 2006, VAA expanded the parking lot by 575 spaces, using a design friendly to the environment. Instead of conventional catch basins and culverts to manage rain water, we constructed rain gardens and swale ditches to collect run-off from paved areas. This system filters out pollutants from parked vehicles, before the storm water is released back into the drainage system. But we have already outgrown the 2006 parking expansion. This is most evident during peak travel times such as during the Christmas season. A 2008 expansion project will increase parking by another 135 spaces, but this is clearly a band-aid solution and it will not come close to meeting the needs of 2015. In the long term, parking space availability must increase by 70 percent. This means we need to increase from 800 to 1,400 parking spaces. To facilitate this expansion, in 2009 VAA will commission a conceptual design for the realignment of the Willingdon access road, and a multi-year surface parking expansions. But even this is not enough. At some point prior to 2025, a parking structure will be required. Designed with future expansion capability, the structure will provide convenient access to the terminal. We must also consider ground links to the general aviation and commercial customers at the north side of the Airport. Construction of additional groundside access from Mills Road to this area is proposed. The Board has also looked at parking rates to help manage demand, and has decided to increase rates in the daily lot, while decreasing short term parking rates. Daily parking rates, currently $12 for the first four days and $4 a day thereafter will increase to $15 for the first five days and $7 a day thereafter. Short term parking, however, will decrease from two dollars to one dollar for two hours. People parking in the short term lot and spending $10 at any airport food outlet will have the one dollar parking cost taken off their bill.

These modern hybrid taxis provide safe and environmentally friendly ground transportation to Airport customers. VAA is undertaking a review of public transit service to the Airport. AKAL Airport Express provides half hour service, seven days a week. Taxi Service Long ranks of taxi cabs are a familiar sight at every airport in the world. Recently, VAA signed a four year contract with Yellow Cab of Victoria (City and Country Taxi Service). The agreement extends through March, 2012. A minimum of 90 taxi cabs are available during normal operating hours, and approximately 70 percent of the taxis are environmentally friendly hybrid vehicles. Regular taxi service is available between the hours of 05:00 a.m. and 00:30 a.m. Hotel Shuttle A new license with AKAL Airport Express Bus Link Ltd. is valid for seven years, extending to October 31, 2013. Part of the agreement includes an AKAL commitment to replace all buses used in the Airport service with new ones. Shuttle service is available between the Airport and city centre every half hour from 4:00 a.m. to midnight, seven days a week. Pick up and drop off points include downtown hotels, and McTavish Park and Ride. Public Transit Victoria Regional Transit System provides regular frequent service to the Airport from locations throughout the CRD. To better understand demand and increase ridership, VAA will undertake a review of public transit service to the Airport during the summer of 2008.

Airport CEO Richard Paquette arrives at the Airport. Bicycles Aware that more and more people want to bring their bicycles when they fly, VAA has made it easier. Flying cyclists will find a dedicated bicycle assembly station located just across the road from the departure area of the terminal building. The covered station includes an air pump and a bicycle rack. Cyclists planning to travel by bicycle after arrival can access a bike lane leaving the Airport and connecting with Lochside Regional Trail, which runs the length of the Saanich Peninsula. Once on the trail, they have a choice of riding north to the Swartz Bay Ferry terminal, or south to Victoria. Those choosing the southern route will connect with the Galloping Goose Regional Trail, which opens up the whole of Vancouver Island for their vacation. In 2008, VAA will also be constructing a bike path to extend along Mills Road at the north side of the airport. The Airport CEO and other employees cycle to work on a regular basis. The VAA encourages Airport staff to follow this example when possible.

The new car rental facility has vastly improved traffic flow at the Airport. Auto Rentals The majority of car rental business in Greater Victoria originates at the Airport. To serve this industry better, the Victoria Airport Authority has constructed a four bay Car Rental Service Facility south east of the Terminal Building. This strategic location improves the efficiency of car rental operations and reduces vehicular traffic in front of the Terminal Building. This results in a reduction of fuel usage, reducing green house gas emissions from vehicles being driven off airport for servicing.

A publication of the Victoria Airport Authority. Phil Jensen, Editor (250) 383-0667 pjensen@shaw.ca Laura Lavin, Production ljlavin@shaw.ca Victoria Airport Authority 201-1640 Electra Blvd., Sidney, B.C. V8L 5V4 (250) 953-7500 www.victoriaairport.com