Training Manual. Hand Rope Pump, P Model. Module 1: Production

Similar documents
Hammer, Discus, Shot Put, Javelin

Tuf-Lite and Tuf-Lite II Fans 6000M Series Hub

Hammer, Discus, Shot Put, Javelin

Enhanced Emergency Shelter Kit (EESK)

INSTRUCTION MANUAL 10M x 10M

[tips & tricks for modelmakers] Plate 4 Decks. Required tools

Tuf-Lite and Tuf-Lite II Fans 6000 Series Hub

EXTRA-STRONG ROPE PUMP MANUAL OF TECHNICAL DRAWINGS

Tuf-Lite III Fans 4000KW Series Hub

* * KR54-F, KR9854 & KR9954 Installation Instructions. Read All Warnings Before Starting Installation! Index:

02 Storage. Roller cabinet. Magnetic tray 25 Modular storage 28 Fixed storage 30. Metal trolley. Plastic box. Aluminium case.

Setup. Assembling. Attaching the sharpening stone

11 12 STORAGE 15 AND 15 ETS S

300 ft. 5/8 Hose wagon

FIXING THE PLASTIC TO GREENHOUSE STRUCTURE: THE RIGHT CHOICE OPTIONS USED IN LOCKING THE PLASTIC TO GREEENHOUSE STRUCTURE METHODS:

Thomas Scientific Swedesboro, NJ U.S.A.

Strut Clamp Pipe & Conduit

Beds and Related Equipment for HSP

POP-UP OPTION USER HARDWARE MANUAL. EdgeTech 4 Little Brook Road West Wareham, MA _REV_B 8/29/2018

Cassette-folding arm-awning markilux 990

MALCO S MOST POPULAR. Pouches. LEATHER POUCH! TP3 ELECTRICIAN'S Heavy Chrome Tanned, Brushed Leather

Section 11 Workstation Components

BUILDING A BANNER STAND & STANDARD

MODEL # 1 MANUAL CAN OPENER

BALCONIES. protect against falling ( Bauteile, die gegen Absturz sichern ) must be observed.

How to Build Your Own Flour Mill and Sifter

Canvas Buckets & Lineman Accessories

M129 SERVICE MANUAL- M129 MODEL #G-2 MANUAL CAN OPENER

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V

Door Bushing Replacement & Latch Adjustment Monaco Group Coaches

Notes, Parts List & Drawings

Y Camper Shell Tracks, 37 Cross Bars. Y Camper Shell Tracks, 44 Cross Bars.

PRODUCT LIST CONSTRUCTION ITEMS.

INSTRUCTION SHEET DETHATCHER KIT. STS-422LX LPSTS-42JD Assembly Installation Operation Repair Parts L-1660-D. Visit us on the web!

INSTRUCTION MANUAL ALEKO RETRACTABLE AWNING

SERVICE MANUAL- M126

WINTERIZATION KIT. UNHCR Item No Item Application Sample. General Information and Description. Packing. Pallet Details

Advanced Customization Type 1. White Paper

HVAC Products for Better Ductwork Product Overview

Installation Guide: Round Trampoline

Installation Instructions Traditional Awnings in a box Classic Awnings in a Box

10 Economy Popup Tent

OWNER S MANUAL 10x10 SUN SHELTER WITH NETTING

MACHETES & MACHETE SHEATHS HUDSON BAY AXE SINGLE EDGE AXE GUARD DOUBLE EDGE AXE GUARD LADDER PLATFORM. Machete CAT. NO.

Installation guidelines street light poles from Sapa with ground piece

Page 92

MMSlog MULTIFUNCTIONAL TROLLEY

80070 TOP MOUNT CAMPER SHELL and TRANSIT CONNECT RACK TMCS_3:1

Levels & Measuring Tools

SteadiCam Parts List*

Installation and Maintenance Manual

JOINING MULLION (DIRECT MULL) ASSEMBLY INSTRUCTIONS FOR 3-WAY OR 4-WAY JOINTS FOR IMPERVIA AWNING, CASEMENT AND LARGE AWNING

13401 Brooks Drive Baldwin Park, CA p f shademakerusa.com

AND LOAD CANOPY RACK SPECIFICATIONS

Swagelok Thermoplastic Hose Hand Swager User s Manual

Ferrule Design Manual

BEV-TENT COMPONENTS. Made in South Africa

CUBICLE BEDDING. 22 Tel. (+31)(0) Fax. (+31)(0)

Sun awning V225 Porto

Railing & Wall Mount Storage Systems

C11.15 HANDLES AND LOCKCASES C11 SIDE HUNG WINDOWS

flatbed kit InstalLation Instructions kit contents KIT (tacoma ) kit (hilux )

[tips & tricks for modelmakers] Plate 4 Decks. Required tools 19

Lift Handle. Spring Loaded Flush Lift. Locking Hasp. Swivel Hasp (Stamped) Safety Hasp (Stamped) w/fixed Plate PWB-3977S 5/16 2-3/16 3

MANDATORY BULLETIN No. EV a (ZBEV a) SPORTSTAR 004 a (ZBSPORTSTAR-004a)

PortesPivotantes PivotTüren Porta-a-Bilico PivotDoors Taatsdeuren Пивот-дверь от компании PuertasPivotantes. يروحملا بابلا 轴门 PortasPivotantes

The safe & affordable install

Installation Instructions for. Thrifty King CT Series Fountains

Kajak Sediment Sampler Model Manual. KC Denmark. Research Equipment Limnology Oceanography Hydrobiology

Leather Pouches and Belts

Spiral Duct. Contents. Introduction 1. Duct & Fitting Range 2. Duct Sizes 3. Fittings 5. Round Duct Connector 7. Installation 8

PRODUCT SPECIFICATION

HINGES & STAYS. Hinges & Stays Large Take-Apart Hinge. Medium Take-Apart Hinge

CBO-750 ASSEMBLY INSTRUCTIONS

ROOF-TOP SAFARI TENT. ASSEMBLY & CARE INSTRUCTIONS Part No ENSURE YOU READ AND UNDERSTAND THESE INSTRUCTIONS PRIOR TO INSTALLATION

A11.15 HANDLES AND LOCKCASES A11 TURN-TILT WINDOWS

2015/16 PROTECTING THE TOOLS OF YOUR LIVELIHOOD

Ground Clamps Cable Tray

Installation instruction

BEV-TENT COMPONENTS. Made in South Africa

FLEX KEY ASSEMBLY. ..._ o RAFTER ARM TUBE MAIN ARM TUBE CAP NUT CLAW HINGE

TIMBER BOLLARDS TYPE I. TYPE ll TS mm Radius 150 x 100 white painted Timber post dia Timber Post. Ground Level NOTES:

ASSEMBLY & CARE INSTRUCTIONS

Home Improvement Fittings Wardrobe Fittings

User s Manual Trampoline 8

SIMPLE PLANS FOR THE SUNKEN POT APROSTOVE

300 Model 870 Four Wheel Hose Cart Owner s Manual

Cabinet Mount Assist Lift n Lock Instructions

Manual Awning. Assembly Instructions. Product No Toll-free:

C Locker. Options: Small compartment storage perfect for personal effects. Louvered doors, simple and convenient to open and close.

ASSEMBLY & CARE INSTRUCTIONS. 7 x4 TRAILER TENT SERIES 4 9. OPTIONAL SUNROOM Wall and floor kit. OPTIONAL SPARE ROOM Roof, wall and floor kit

Assembly Instructions - TSK

A good choice. By purchasing a DACAPO, you have opted for a MAY side-post umbrella of premium quality.

Antenna Tower Positioning System

Installation manual. Awning. V480 Cannes

Exploded views meat slicer: 800S. DEKO Holland bv B Arnhem The Netherlands

Installation Instructions for. Thrifty King CT Series Fountains

Grounding Clamp. Pins and Ball-Socket Clamps for Temporary Grounding

User Manual for Separera 40

TWO PERSON WALL MOUNT

Transcription:

Training Manual PI-Model Rope Pump, Module 1, Production Training Manual Hand Rope Pump, P Model Module 1: Production June 2006, Chibombo, Zambia July 2006, Chimoio, Mozambique Arrakis September 2006 Arrakis 1

Training Manual PI-model Rope Pump, Module 1 Production Table of Contents 1 Introduction... 3 MODULE 1: PRODUCTION... 5 1.1 Introduction... 6 1.2 Pump drawing... 7 1.3 The Handle (10)... 8 1.4 The wheel (20)... 10 1.5 The Cover for Hand dug wells (30)... 12 1.6 The pump structure for Hand dug wells (40)... 14 1.7 The tubing (50)... 16 1.8 Selection of pump tubing... 17 1.9 Construction of well cover for hand dug well (60)... 18 1.10 Rope with pistons (80)... 19 1.11 Guide box for Hand Dug Well (90)... 20 1.12 Painting... 22 ANNEXES... 23 ANNEX I Material list.... 23 2 Arrakis

Training Manual PI-Model Rope Pump, Module 1, Production 1 Introduction This training manual is made as an aid for Technicians which were trained in the Production, Installation and Operation & Maintenance (O&M) of the PI model rope pump model as introduced in Mozambique, Zambia and India, in 2005 and 2006, by Jan de Jongh of Arrakis and Henk Holtslag of Practica-Foundation. The manual is to be distributed to the participants, who can use it as a reference handbook. Experiences indicate that for a successful production and installation of rope pumps on a large scale, the use of this manual has to be combined with hands on training by an experienced trainer. The Manual has a modular set up, aimed at different functions which may be executed by the same group or separate groups. E.g. a workshop might be involved in production, installation plus O&M, but could also restrict its activities to production alone. The modules are: 1 Production 2 Installation 3 Operation and Maintenance Arrakis 3

Training Manual PI-model Rope Pump, Module 1 Production 4 Arrakis

Training Manual PI-Model Rope Pump, Module 1, Production MODULE 1: PRODUCTION This Manual describes the PI model used in Mozambique, Zambia and India, and is the latest version (version date September 2006) Arrakis 5

Training Manual PI-model Rope Pump, Module 1 Production 1.1 Introduction This section presents fabrication drawings, parts lists and some basic steps to be followed during production of the component parts. Numbering The pump drawing gives a total view of the rope pump and the main components are coded with numbers 10 to 90. The parts of each component have additional numbers; e.g. Pump handle is: 10-1 Drawing system: The 2 D American Projection drawing system is used following general engineering standards, Modifications: The pump model version of this manual is defined by the date on the manual. All drawings in this manual have the same date. All data given in this manual on parts, description of production steps, etc. refer to the pump model version of this date. All eventual forthcoming, updated versions, will be documented in drawings with a new date. 6 Arrakis

Training Manual PI-Model Rope Pump, Module 1, Production 1.2 Pump drawing PI - Model ROPE PUMP Drawn/Date JdJ/15-12--005 Modification/Date 20-09-2006 Scale: Not to scale American projection GENERAL ASSEMBLY ARRAKIS Arrakis 7

Training Manual PI-model Rope Pump, Module 1 Production 1.3 The Handle (10) PI - Model ROPE PUMP Drawn/Date JdJ/15-12--005 Modification/Date 20-09-2006 Scale: Not to scale PART: HANDLE 10 American projection ARRAKIS 8 Arrakis

Training Manual PI-Model Rope Pump, Module 1, Production Parts list Handle Nr Item Material Size Length (mm) Number Remarks 10-1 Handle Galv. pipe 3/4 2000 1 Thickwalled pipe 3mm 10-2 Grip PVC tube 1 230 1 10-3 Bushing Galv pipe 1 50 2 Thickwalled pipe 3 mm 10-4 Spacer ring Galv pipe 1 8 4,, 10-5 Bushing strip Strip GI 25x3 100 2 Manufacturing Steps Handle 1 Cut V grooves at spots A and B. 3 Bend and weld; make sure that the tubes stay parallel 4 Weld spacer rings at point A and B with 3 spot welds, on one side Bushings 5 Drill lubricating holes of 6 mm on top site of bushings 10-3 6 Make sure that clearance Tube/ Bushing does not exceed 0.5 mm If this is more, reduce size of bushing by cutting a piece, and tack weld again 7 File sharp edges, makes sure inside weld of tubes is smooth 8 Drill holes of 6 mm in bushing strips, 2 holes on top site, and 2 holes on bottom site. File off any burr. 9 Weld bushing strips to bushings, with filler of a piece of 6 mm bar or 3 mm welding rod. For standardized production use the jig. 10 Mount PVC grip tube and secure end of handle 11 After mounting the first bushing, add spacer ring and tack weld at three points. Arrakis 9

Training Manual PI-model Rope Pump, Module 1 Production 1.4 The wheel (20) PI - Model ROPE PUMP Drawn/Date JdJ/15-12--005 Modification/Date 20-09-2006 Scale: Not to scale PART: WHEEL 20 American projection ARRAKIS 10 Arrakis

Training Manual PI-Model Rope Pump, Module 1, Production Parts list wheel Nr Part Material Size Length (mm) Amount Observations 20-1 hub Galv. pipe 1 100 1 Thickwalled 3 mm 20-2 Spar Bar, Ø 10 156 +/- 0.5 mm 6 Depends on size of clamp, Tight fit between hub and clamp 20-3 Clamp Strip 25x3 65 6 Depends on type of tire 20-4 Spar support Bar Ø 10 100 3 Optional 20-5 Nut Galv. M 10 2 20-6 Bolt Galv. M10 25 2 20-7 Wheel rings Car tire 14 45 2 Manufacturing steps: 1 Cut all parts, tolerance +/- 1 mm, except indicated otherwise. 2 Cut rings 20-7 of car tire, use a compass. 3 Make clamps 20-3 according to shape of car tire, or cut 11/4 pipe through half over a length of 25 mm and make two clamps out of it. 4 Drill holes in hub 20-1 and weld nuts 20-5. Weld in steps to avoid damaging of thread of the bold and nut. Protect thread with grease. 5 Place the clamps over the wheel halves and place the hub with spars inside, then weld the spars to the clamps. 6 Weld the spar supports to the spars and hub. To reduce labour time and to obtain better quality it is advised to use a jig. Jig for proper assembling of the wheel. Using a Jig to weld the clamps and spars to the Hub. The spars should fit tightly. Arrakis 11

Training Manual PI-model Rope Pump, Module 1 Production 1.5 The Cover for Hand dug wells (30) PI - Model ROPE PUMP Drawn/Date JdJ/12-July 2006 Modification/Date 20 September 2006 Scale: Not to scale American projection PART:COVER (30) ARRAKIS 12 Arrakis

Training Manual PI-Model Rope Pump, Module 1, Production Parts list Nr Item Material Size Length (mm) Number Remarks 30-1 Cover p Galv. sheet 1 mm 1000x200 1 * if 1 mm is not available, than minimally 0.6 mm is allowed. 30-2 Rivets steel Ø 3 mm 25 mm 8 Manufacturing steps 1 Cut the plate, file sharp edges 2 Drill 4 crack arrestor holes of 6 mm, at end of cutting lines. 3 Drill 4 holes of 3 mm (the rivet size), as indicated on top view 4 Fold the cover in shape at the dotted lines 5 Make the wooden cover support between the 2 poles 6 Mount cover on the support with 2 galvanised nails 7 Connect cover sides with rivets 8 Drill additional holes for another 4 rivets 9 Mount the rivets Arrakis 13

Training Manual PI-model Rope Pump, Module 1 Production 1.6 The pump structure for Hand dug wells (40) PI - Model ROPE PUMP Drawn/Date JdJ/15-12 005 Modification/Date 12-July 2006 Scale: Not to scale American projection PART:PUMP STRUCTURE 40 ARRAKIS 14 Arrakis

Parts list pump structure Training Manual PI-Model Rope Pump, Module 1, Production The pump structure consists of two wooden poles of ca 3 a 4 m long and 10 cm thick on top site. The poles are placed inclined towards each other, to reduce the distance for the handle. These poles are placed in dug out holes between 0.5 to 1 m deep, depending on soil type. The holes are filled up with stones and sand. Remark: depending on the height of the well rim and placing of the handle, a platform may be required to reach belly height of the handle. The pump structure for Borehole Wells The pump structure consists of two wooden poles of ca 2.5 to 3 m long and 10 cm thick on top site. The poles are placed vertically at a distance of 0.5 m., to make the handle as short as possible. The total pipe length to make the handle is now reduced to 1 m (instead of 2 m.) These poles are placed in dug out holes between 0.5 to 1 m deep, depending on soil type. The holes are filled up with stones and sand. Arrakis 15

Training Manual PI-model Rope Pump, Module 1 Production 1.7 The tubing (50) PI - Model ROPE PUMP Drawn/Date JdJ/15-12--005 Modification/Date 20-09-2006 Scale: Not to scale PART: TUBING 50 American projection ARRAKIS 16 Arrakis

Training Manual PI-Model Rope Pump, Module 1, Production 1.8 Selection of pump tubing Diameter of the tubes depends on total elevation Elevation means distance between water level and outlet. The elevation should be measured or estimated for the worst situation which is at the end of the dry season after some time of continuous pumping. Recommended diameter of the Pump tube (or pump) tubes: Elevation 0-5 meter Tubes (inside diameter) 40 mm (1½ Inch) 5-10 meter 30 mm (1 Inch) 10-20 meter 23 mm ( ¾ Inch) 20-35 meter 18 mm ( ½ Inch) 35-60 meter 18 mm ( ½ Inch) Double handle At the top, the top tube and outlet tube diameter should be one size bigger or double the diameter of the pump tube tube. The outlet tube should be fixed to the pump structure or another fixed point. Parts list tubing For 10 m elevation Nr Item Material Size Length (m) Number 50-1 Top-tube PVC tube 1 ½ Ca. 0.5 m 1 50-2 T-joint PVC tube 1 ½ - 1 50-3 Outlet tube PVC tube 1 ½ 1.5 m 1 50-4 Reducer PVC 1 ½ - 1-1 50-5 Pump tube (or rising main) PVC tube 1 6 m 2 50-6 Return tube PVC tube 1 ½ Ca 0.3 m 1 50-7 Return inlet PVC tube 1 ½ 0.3 m 1 Manufacturing steps. Normally the pump is mounted during the installation Preparations are 1 Make flares at lower end of pump tube 50-5 and upper end of return inlet tube 50-7. 3 Make sure all PVC tubes have good connections (see installation part) 4 Make sure guide box tubes are mounted 5 Select top-tube, T-piece and reducer Arrakis 17

Training Manual PI-model Rope Pump, Module 1 Production 1.9 Construction of well cover for hand dug well (60) The well cover can be made, either in 2 halves, or in one conically shaped cover with a small square lid for installation and maintenance purposes. The mould is made, and tubes should be properly positioned. Some reinforcement bars 6 mm plus wire shopuld be placed. Not yet completed at the picture. Prepare cement and put it in the form of the well cover Standard diameter of cover is 1.20 m, but depending on well dimensions it could be taken different. Important: The finished well cover should be left unused for about minimally one week for the cement to cure. The cover should be kept wet, continuously! 18 Arrakis

Training Manual PI-Model Rope Pump, Module 1, Production 1.10 Rope with pistons (80) Rope Polypropylene (PP) rope gives the best results. Nylon can also be used, it is stronger than PP rope but it tends to slide. To avoid slipping it can be roughened with a stone or hacksaw. Also the wheel V grove can be roughened with a hack saw. Rope length : twice the depth of the well, + 3 meters, + 5% (for the knots) Rope thickness: For wells up to 35 m. the rope should preferably be 6 mm, but 5 mm is allowed as well. For wells deeper than 35 meter, it is recommended to use rope of 6 mm. Pistons Pistons can be made of different materials but most common are Rubber or PE. Rubber pistons can be made out of the side part of the car tire used to make the wheel. The rubber should not be too thick, maximum 4 mm, to be able to cut it with a knife or scissors. Diameter of new pistons should be maximally 0.5 mm less than the inside diameter of the pump tube. It is important that the hole is in the middle! A special marker tool can be made to mark the piston, and keeping the hole in the middle. Piston made of rubber and a tool (a punch) to make standardized pistons Mounting of Pistons Number of pistons: sufficient for the complete rope placed at every one (1) meter. Pistons can be fixed to the rope with two knots. Arrakis 19

Training Manual PI-model Rope Pump, Module 1 Production 1.11 Guide box for Hand Dug Well (90) PI - Model ROPE PUMP Drawn/Date JdJ/15-12--005 Modification/Date 20-09- 2006 Scale: Not to scale American projection PART: GUIDE BOX 90 ARRAKIS 20 Arrakis

Training Manual PI-Model Rope Pump, Module 1, Production Parts list guide box based on a 1 pump tube tube. The indicated parts change with changing pump tube diameter Nr Item Material Size Length (mm) Number Observations 90-1-A Tube clamp for pump tube Galv. pipe 1 80 1 Depending on size of pump 90-1-B Tube clamp for return tube tube* Galv pipe 1 ¼ 80 1 Depending on size of pump tube* 90-2 Connect pipe Galv Pipe 90-3 Rope guide Galv pipe 3/4 45 1 90-4 Rope container Galv pipe ½ 400 1 90-5 Bottom connector Galv pipe ½ 100 2 Size of clamps are according to size of pump tube ½ 80 1 Flattened at the end In case of 1 tubes, tube clamp for return tubes should be 1 1/4 as in table. In case of ¾ tubes, tube clamps for return tubes should be 1 In case of ½ tubes, tube clamps for return tubes should be ¾ Manufacturing steps 1 Tube clamps to be cut open and bend outwards, until PVC pipes fit. After mounting of pump tube and return tube in the clamps, the clamps can be tightened, with care, in a vice. Take care not to deform the PVC tubes in an oval shape so that the pistons cannot pass any more. 2 File sharp parts 2 Bend rope container and flatten pipe ends 3 Weld pipe 90-2 to rope guide 4 Weld rope container to rope guide 6 Weld tube clamps to pipe 90-2 For Boreholes with well casings of 3 or 2, the Guide boxes are slightly different, because they have to fit in the casings. Arrakis 21

Training Manual PI-model Rope Pump, Module 1 Production 1.12 Painting To avoid corrosion, it is essential to paint the parts that have not been galvanized or where galvanization is damaged. Steps : Remove all grease and oil with solvent, Remove all welding slack and rust with a hammer and steel brush. Make sure that your hands are free of grease. Paint first with anticorrosive primer paint. Paint the strip used for the wheel clamps. Allow painted objects to dry in the shade and NOT in the sun. When dried in the sun blisters will occur. After it is completely dry, paint all metal parts with finish paint (on oil basis). Make sure hands are free of grease during handling of objects. Do not dilute the paint, except when it is really necessary (when the paint is too thick and can only be applied with great resistance). Use only paint diluter and nothing else. Close the paint cans carefully after painting. Hold the can up side down for some time to control the closure and to let the paint inside lock the seam of the lid. 22 Arrakis

Training Manual PI-Model Rope Pump, Module 1, Production ANNEXES ANNEX I Material list. One complete pump The material list consists of 2 pages. Table 1 contains all the parts with fixed dimensions, regardless of the pumping depth. Four tables number 2 a till 2 d contain the parts with variable dimensions, because PVC tubing for pump size and casing depends on total elevation height (from lowest waterlevel to highest outlet point). For each of the following elevation heights, a separate table 2 is given. Elevation Rising main Table [m] diameter 0-5 1½ 2a 5-10 1 2b 10-20 ¾ 2c 20-35 ½ 2d Arrakis 23

Training Manual PI-model Rope Pump, Module 1 Production Table 1 TOTAL MATERIAL For PI Hand Rope Pumps LIST Parts with fixed dimensions Nr. Sub Part Material Size Part Nr Total Remarks assembly Length Net Length Nr. 30_1 Cover Plate Galv Sheet (m) (m) Galv pipe 1 1/4" 0.08 1 0.08 Galv. pipe 1" 0.3 1 0.3 Galv. pipe ¾ 2 1 2 Galv. pipe ½ 1.5 1 1.5 0.6-1 mm 1 1 1 40-1 legs Wooden poles 3 2 6 Bar Ø 10 1.5 2 3 Strip 25x3 1.5 1 1.5 wall thickness 3.25 mm wall thickness 2.5 mm Wall thickness 2.5 mm width 200 mm 20_6 Galv. Nuts and bolts Bolt M10x25 6 6 or 3/8 "" wire Galv wire 1.5 mm 10 1 10 20_7 Wheel rings Car tire, used 14 2 2 10.2 Handle grip PVC Tube 1 0.5 1 0.5 Nails GI nails 70 mm 10 PVC Glue Small tin or tube 1 1 Car Oil (10 W 40) Litre 1 1 1 Paint anti corrosive Litre 1 1 1 Paint Gloss Liter 1 1 1 Eventually 15", not damaged Wall thickness approx. 1.8 mm 24 Arrakis

Training Manual PI-Model Rope Pump, Module 1, Production Table 2a PARTS for ELEVATION HEIGHT 0-5 meter TOTAL MATERIAL LIST Nr. Sub Part Material Size Part Nr Added Total Net assembly Length Parts Length Nr. Pump 50-5 Pump tube 50-1 Top-tube 50-7 Return inlet 50-6 Return tube 50-2 T-joint 50-3 Outlet tube mm Length per Mat Remarks Size PVC Tube PVC tube 1 ½ " 6 1 6 1 PVC tube 2" 0.5 1 0.5 PVC tube 2" 0.3 1 0.3 PVC tube 2" 0.7 1 0.7 PVC tube 2" - 1 PVC tube 2" 1.5 1 1.5 50-4 Reducer PVC 2-1 ½ " - 1 80 Rope Poly pr. 6 mm 14 1 14 2 60 Cover Concrete Cement Bag 50kg 2 3 70 Slab Concrete Cement Bag 50 kg 2 3 Reinforcement 60 & 70 bars Iron rod 6 mm 8 1 8 Remarks pump height 0-5 1 m * Optional Nylon 2 rope 3 Depending on size Elevation height is distance between water level (at its lowest point) to outlet. Arrakis 25

Training Manual PI-model Rope Pump, Module 1 Production Table 2b PARTS for ELEVATION HEIGHT 5-10 meter TOTAL MATERIAL LIST Nr. Sub Part Material Size Part Nr Added Total Net Remarks Len assembly Length Parts gth Nr. Pump PVC Tube (m) Length per Mat (m) Size 50-5 Pump tube PVC tube 1" 6 2 12 1 50-1 Top-tube PVC tube 1 ½ " 0.5 1 0.5 50-7 Return inlet PVC tube 1 ½ " 0.5 1 0.5 50-6 Return tube PVC tube 1 ½ " 0.7 1 0.7 50-2 T-joint PVC tube 1 ½ " - 1 50-3 Outlet tube PVC tube 1 ½ 1.5 1 1.5 50-4 Reducer PVC 1 ½ - 1" - 1 80 Rope Poly pr. 6 mm 26 1 26 2 60 Cover Concrete Bag 50 kg 2 3 70 Slab Concrete Bag 50 kg 2 3 60 & 70 Reinforcement bars Iron rod 6 mm 8 1 8 Remarks 1 pump height 5-10 m * 2 Optional Nylon rope 3 Depending on size 26 Arrakis

Training Manual PI-Model Rope Pump, Module 1, Production Table 2c PARTS for ELEVATION HEIGHT 10-20 meter TOTAL MATERIAL LIST Nr. Sub Part Material Size Part Nr Added Total Net Remarks Len assembly Length Parts gth Nr. Pump PVC Tube (m) Length per Mat 50-5 pump tube PVC tube 3/4" 6 4 24.0 1 50-1 Top-tube PVC tube 1 " 0.5 1 0.5 50-7 Return inlet PVC tube 1 " 0.5 1 0.5 50-6 Return tube PVC tube 1 " 0.7 1 0.7 (m) Size 50-2 T-joint PVC tube 1 " - 1 50-3 Outlet tube PVC tube 1 1.5 1 1.5 50-4 Reducer PVC 1" ¾ 1 1 1.0 80 Rope Poly pr. 6 mm 46 1 46.0 2 60 Cover Concrete Bag 50 kg 2 3 70 Slab Concrete Bag 50 kg 2 3 60 & 70 Reinforcement bars Iron rod 6 mm 8 1 8.0 Remarks 1 pump height 10-20 m * 2 Optional Nylon rope 3 Depending on size Arrakis 27

Training Manual PI-model Rope Pump, Module 1 Production Table 2d PARTS for ELEVATION HEIGHT 20-35 meter TOTAL MATERIAL LIST Nr. Sub Part Material Size Part Nr Added Total Net Remarks Len assembly Length Parts gth Nr. Pump PVC Tube Length per Mat (m) (m) Size 50-5 Pump tube PVC tube ½ " 6 7 42.0 2 50-1 Top-tube PVC tube 1 " 0.5 1 0.5 50-7 Return inlet PVC tube 1 " 0.5 1 0.5 50-6 Return tube PVC tube 1 " 0.7 1 0.7 50-2 T-joint PVC tube 1 " - 1 PVC 50-3 Outlet tube tube 1 1.50 1 3.0 50-4 Reducer PVC 1" ½ - 1 40-6 Tube support holder Galv pipe 1" 0.03 1 0.03 3 80 Rope Poly pr. 6 mm 82 1 82.0 4 60 Cover Concrete Bag 50 kg 2 3 70 Slab Concrete Bag 50 kg 2 3 60 & 70 Reinforcement bars Iron rod 6 mm 8 1 8.0 Remarks 1 pump height 20-35 m * 2 Optional Nylon rope 3 Depending on size 28 Arrakis