Chetco River Kayaking Permit

Similar documents
Chetco River Kayaking Permit

Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit Proposed Action

DECISION MEMO. Rawhide Trail #7073 Maintenance and Reconstruction

Decision Memo Ice Age Trail Improvement (CRAC 37)

Daisy Dean Trail 628/619 ATV Trail Construction

White Mountain National Forest Saco Ranger District

USDA Forest Service Deschutes National Forest DECISION MEMO. Round Lake Christian Camp Master Plan for Reconstruction and New Facilities

RIM TRAIL EXTENSION PROJECT

Decision Memo Sun Valley Super Enduro & Cross-Country Mountain Bike Race. Recreation Event

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation

White Mountain National Forest

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

Sawtooth National Forest Fairfield Ranger District

BACKGROUND DECISION. Decision Memo Page 1 of 6

DECISION MEMO For Bullis Hollow Trail

Continental Divide National Scenic Trail Legislative History and Planning Guidance

WORKSHEET 1 Wilderness Qualities or Attributes Evaluating the Effects of Project Activities on Wilderness Attributes

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa

Proposed Action. Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties. United States Department of Agriculture

Project Planning, Compliance, and Funding

3.12 Roadless Areas and Unroaded Areas

Decision Memo for Philmont Scout Ranch Bike Trail and Access Reroute Project

DECISION MEMO North Zone (Legacy Trails) Trail Stabilization Project

Recreation Opportunity Spectrum for River Management v

Rochester Ranger District Wellness Trails Project

White Mountain National Forest Saco Ranger District

Chattahoochee- Oconee National Forests. Decision Memo

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

DECISION MEMO Whetstone Ridge Trail #8020 Relocation

PURPOSE AND NEED. Introduction

Office of Commercial Space Transportation: Notice of Availability, Notice of Public

Wilderness Character and Wilderness Characteristics. What s the difference? Why does it matter?

White Mountain National Forest

RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan, Preliminary Ideas and Concepts

Tahoe National Forest Over-Snow Vehicle Use Designation

Figure 1-Example of terracing from livestock

Wilderness Process #NP-1810: Your letter ID is NP September 5, 2018

Flow Stand Up Paddle Board Parkway Plan Analysis

National Forests and Grasslands in Texas

Coronado National Forest Santa Catalina Ranger District

Appendix A BC Provincial Parks System Goals

Connie Rudd Superintendent, Black Canyon of the Gunnison National Park

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MANUAL TRANSMITTAL SHEET

MANAGEMENT DIRECTION STATEMENT June, 1999

Description of the Proposed Action for the Big Creek / Yellow Pine Travel Plan (Snow-free Season) and Big Creek Ford Project

Theme: Predominately natural/natural appearing; rustic improvements to protect resources. Size*: 2,500 + acres Infrastructure**:

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

Fossil Creek Wild & Scenic River Comprehensive River Management Plan Forest Service Proposed Action - details March 28, 2011

MANAGEMENT DIRECTION STATEMENT June, 1999

Buffalo Pass Trails Project

French Fire Recovery and Restoration Project Wilderness Resource Impact Analysis

Finn Creek Park. Management Direction Statement Amendment

USDA FOREST SERVICE, HIAWATHA NATIONAL FOREST Alger County, Michigan. Grand Island Primitive Cabins Project

Kelly Motorized Trails Project Proposed Action

Camping Freshwater Fishing Big Game Hunting VIII. Summary Decision

Commercially Guided Helicopter Skiing on the Kenai Peninsula. Record of Decision. United States Department of Agriculture.

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

Alternative 3 Prohibit Road Construction, Reconstruction, and Timber Harvest Except for Stewardship Purposes B Within Inventoried Roadless Areas

USDI, BUREAU OF LAND MANAGEMENT BURNS DISTRICT HINES, OREGON 97738

National Wilderness Steering Committee

DECISION MEMO Grand Targhee Resort Summer Trails. USDA Forest Service Caribou-Targhee National Forest Idaho Falls, Idaho 83401

Yard Creek Provincial Park. Management Plan

112th CONGRESS. 1st Session H. R. 113 IN THE HOUSE OF REPRESENTATIVES

Wilderness Areas Designated by the White Pine County bill

Williamson Rock/Pacific Crest National Scenic Trail (PCT) Project EIS. Notice of intent to prepare an Environmental Impact Statement.

Draft Revised Land Management Plan and DEIS Comments

The Roots of Carrying Capacity

United States Department of Agriculture. Forest Service

PROPOSED ACTION South 3000 East Salt Lake City, UT United States Department of Agriculture

2. CANCELLATION. AC 39-7B, Airworthiness Directives, dated April 8, 1987, is canceled.

DESIGN FEATURES ASSOCIATED WITH THE SELECTED ALTERNATIVE

As outlined in the Tatshenshini-Alsek Park Management Agreement, park management will:

COASTAL CONSERVANCY. Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL

Order of the Minister of Environment #39, August 22, 2011 Tbilisi

Teton Basin Ranger District

Lolo National Forest Plan Amendment #38

RUSHMORE CONNECTOR TRAIL PROPOSAL

White Mountain National Forest. Pond of Safety Accessible Trail & Shoreline Access Project. Scoping Report. Township of Randolph Coos County, NH

KOOTENAY LAKE PROVINCIAL PARK (MIDGE CREEK SITE)

Wilderness Stewardship Plan Scoping Newsletter Winter 2013

FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF RECREATION AND PARKS RECREATIONAL CARRYING CAPACITY GUIDELINES

National Park Service Wilderness Action Plan

1803 West Hwy 160 Monte Vista, CO (719) TTY (719)

CatExes vs. EAs When and How to Prepare

Appendix 1: Best Management Practices For Hang Gliding and Paragliding in Jasper National Parks

Whitefish Range Partnership Tentatively Approved by WRP 11/18/2013!Rec. Wilderness Page 1

David Johnson. Tom, Attached please find the final scoping letter and figures for your review. David

Hiawatha National Forest St. Ignace Ranger District. File Code: 1950 Date: August 5, 2011

Proposed Action Kaibab Campground Capital Improvement Project September 2008

TONGASS NATIONAL FOREST

Buford / New Castle Motorized Trail

S Central Coast Heritage Protection Act APRIL 21, 2016

Decision Notice and Finding of No Significant Impact

Cultural Resource Management Report Deer Valley 4wd Restoration and Blue Lakes Road Maintenance Project R

Whychus Creek Wild and Scenic River Management Plan

Foreign Civil Aviation Authority Certifying Statements. AGENCY: Federal Aviation Administration (FAA), DOT.

FOREST SERVICE MANUAL NATIONAL HEADQUARTERS (WO) WASHINGTON, DC

ROAD AND TRAIL PROJECT APPROVAL

Dear Reviewing Officer:

Wilderness Research. in Alaska s National Parks. Scientists: Heading to the Alaska Wilderness? Introduction

Transcription:

Decision Memo USDA Forest Service Rogue River-Siskiyou National Forest Gold Beach Ranger District - Curry County, Oregon Wild Rivers Ranger District Josephine County, Oregon BACKGROUND A special use permit has been requested by Zachary Collier, Northwest Rafting Company, LLC, Hood River, Oregon, to authorize commercially guided kayaking trips on the Wild and Scenic segments of the Chetco River, including through the Kalmiopsis Wilderness. Most of the Chetco River proposed for kayaking is classified as wild under the Wild and Scenic Rivers Act. The Act states in section 2(b): Wild river areas - - Those rivers or sections of rivers that are free of impoundments and generally inaccessible except by trail, with watersheds or shorelines essentially primitive and waters unpolluted. These represent vestiges of primitive America. The wild segment of the Chetco River is also within the Kalmiopsis Wilderness Area. The Wilderness Act states in section 2(a), administered for the use and enjoyment as wilderness, and so as to provide for the protection of these areas, the preservation of their wilderness character. The Act also states at section 4(c) 5, Commercial services may be performed within the wilderness areas designated by this Act to the extent necessary for activities which are proper for realizing the recreational or other wilderness purposes of the areas. The above direction set the bar high for proposals for commercial services given the objectives of providing primitive settings and maintaining wilderness character. PURPOSE AND NEED The purpose of the proposal is to authorize commercially-guided kayaking trips on the Wild and Scenic portions of the Chetco River, including through the Kalmiopsis Wilderness. Currently there are no commercial services for kayaking trips on the Chetco Wild and Scenic River. Between 1997 and 2003 a kayaking outfitter operated under a permit similar to the one being requested. The outfitter discontinued trips after the 2002 Biscuit Fire. Inspections have located no trace of these previous trips. MANAGEMENT DIRECTION Activities on the Chetco River are administered under the Wilderness Act of 1964, the 1988 Wild and Scenic River Act, the 1993 Chetco Wild and Scenic River Management Plan, and the 1989 Siskiyou National Forest Land and Resource Management Plan, as amended. Decision Memo Page 1

The Siskiyou Land and Resource Management Plan states at page IV-77: The goal is to maintain the river environment in a natural state while providing for recreation opportunities. The 1993 Chetco Wild and Scenic River Management Plan (Chetco RMP) identified the outstandingly remarkable values for the Chetco Wild and Scenic River as: recreation, water quality and fish. Motorized boat use is not allowed within any segments of the Chetco Wild and Scenic River designation, except for emergency purposes. Standards and guidelines for each segment Wild, Scenic, and Recreational were also described (Chetco RMP p. 39-36). Within Wild segments, the Chetco RMP (p. 23) states: The existing primitive character of the Wild section of the Chetco River will be maintained overall. This section will appear to be affected primarily by the forces of nature, with the imprint of human activities substantially unnoticeable. The Plan also stated that the probability of experiencing solitude would be very high, and recreation use would be light. Monitoring of recreation use and impacts would be ongoing. Scenic segments allow river oriented recreation compatible with the undeveloped character of the shoreline and use was anticipated to increase (Chetco RMP p. 26). These segments anticipated a moderate to low level of use and a semi-primitive recreation experience, where complete solitude is not expected, but is possible. Summer use anticipated moderate to low user densities, with uses primarily limited to fishing, floating, swimming or hiking. Recreational segments of the river allow for a semi-social or scenic recreation experience with the expectation of seeing other people much of the time (Chetco RMP p. 26). PROJECT DESCRIPTION (Maps p. 9-10) The Forest Service would issue a permit to allow commercially-guided kayaking trips on the Wild and Scenic segments of the Chetco River. Trips would start from the east edge of the Kalmiopsis Wilderness in Josephine County, traverse the river through the wilderness, and end west of the wilderness boundary in Curry County. No pack animals or mechanized/motorized equipment would be used. Trips would be limited to 12 people per trip and not exceed 4 trips per season. They would occur from June 1st through September 30th. Duration would not exceed 5 days per trip. The permittee will be allowed a maximum of 80 priority use days per year. A priority use day is defined as one day of use for any part of one day. For example, a 5-day trip with 4 people on the trip would be 20 priority use days. Exact trip duration, length, and timing would be dependent on water flow and snow pack. Participants would begin at Chetco Pass in T38S-R10W-Section 12, hike 3 to 4 miles to the junction of Slide Creek and Chetco River, and then kayak the Chetco River for 18 to 24 miles through the Kalmiopsis Wilderness. Boat take-out would occur at either the Chetco River steel bridge in T38S-R12W-Section 28 or near Tolman Ranch in T38S-R12W-Section 11, depending on river flows. Decision Memo Page 2

The proponent would use leave-no-trace principles as described and available for download at: http://www.fs.usda.gov/detail/inyo/learning/safety-ethics/?cid=stelprdb5196926. These would include a human waste containment system to pack out all human waste. All food waste and garbage would be packed out. Camping would occur primarily on the gravel bars along the river, as conditions allow. Camping areas are first-come first-served (not exclusive use). No noise above ambient levels would occur. Food would be stored to prevent access by wildlife. There would be some clearing of existing Forest Service trails when needed to gain access. Clearing would comply with Forest Service standards using hand tools only and within existing cleared limits. Mitigation Measures and Project Design Features Mandatory measures to avoid or minimize impacts to resources are described in Attachment A. They include project design features and project design criteria identified by specialists and contained within applicable consultations. Also included are standards and guidelines from the Chetco Wild and Scenic River Management Plan and the 1989 Siskiyou National Forest Land and Resource Management Plan, as amended. SCOPING AND PUBLIC INVOLVEMENT A public notice was published in the Illinois Valley News, the Curry Coastal Pilot, and the Curry County Reporter announcing a public meeting on May 29, 2012, at the Best Western Beachfront Inn in Harbor, Oregon. Six people attended that meeting. All attendees were in favor of the proposal, and no negative comments were received. The Gold Beach Ranger District also received two written responses during the 30-day public scoping period which ended June 9, 2012. Both supported the proposed permit. Concerns raised and addressed in the preliminary decision were Port-Orford-cedar root disease, water quality, fisheries, invasive species, wilderness character, leave no trace, access, trail clearing, human waste, safety, motorized use and camping. On January 10, 2013, the preliminary Decision Memo was made available for a 30-day comment period. A total of four letters were received, and one concern was raised. The one concern is addressed in the Response to Comment Report on page 11. REASONS FOR CATEGORICAL EXCLUSION It is my decision to authorize this action based on site evaluation and the information provided by resource specialists. This action will have either no or negligible adverse effects on wildlife, fish, botany, fuels, cultural, and recreation resources (including Wild and Scenic River and wilderness characteristics). Mitigation measures have been designed to protect these resources, are easily implemented, and would be effective at maintaining effects below measurable levels. Upon review and consideration of potential site-specific environmental effects, I find my decision to authorize the issuance of the Chetco River Kayaking permit will not result in any extraordinary circumstances because effects would be of limited context and intensity, and Decision Memo Page 3

because I have determined that implementation will result in little or no adverse environmental effects to either the physical or biological components of the environment. I find my decision to issue the Chetco River Kayaking permit will not individually or cumulatively have a significant effect on the quality of the human environment (40 CFR 1508.22). As a result, I am categorically excluding this action from documentation in an Environmental Impact Statement or Environmental Assessment per FSH 1909.15-2010-1, Chapter 30, Section 32.2, Categories of Actions for Which a Project or Case File and Decision Memo Are Required. My decision falls within category (3) Approval, modification, or continuation of minor special uses of NFS lands that require less than five contiguous acres of land. [36 CFR 220.6(e)(3)]. RELATIONSHIP TO EXTRAORDINARY CIRCUMSTANCES There are no extraordinary circumstances that will warrant an environmental assessment (EA) or environmental impact statement (EIS). The following resource conditions have been considered in determining whether extraordinary circumstances related to the proposed action warrant further analysis and documentation in an EA or an EIS: Endangered Species Act of 1973, as amended - Per the Endangered Species Act, federal activities cannot jeopardize the continued existence of any species listed or proposed for listing, nor result in the adverse modification of that species critical habitat. The proposed activities would be in compliance with the provisions of that act. Fisheries - The proposed use will have no measureable effect on threatened, endangered or sensitive species and is in compliance with the Aquatic Conservation Strategy. Due to the small number of boats and trips proposed, there would be no measurable effect on sensitive fish species due to a startle response caused by boats. Wildlife - Activities would occur within suitable habitat and adjacent to known nesting sites for federally-listed marbled murrelets and northern spotted owls. No habitat or critical habitat for listed wildlife species would be removed or altered because no ground disturbance or tree removal would occur. Disturbance to nesting owls and murrelets would not occur because noise levels will not exceed ambient noise levels. The Forest has determined that activities may affect, but are not likely to adversely affect, spotted owls and marbled murrelets. There would be no modification of critical habitat. Consultation with the U.S. Fish and Wildlife Service has been completed. Botany - The project is limited in scope and nature; therefore, the potential for adverse impacts to threatened, endangered or sensitive plants is negligible. The potential to spread non-native invasive plant species is near zero. The potential for Port-Orford-cedar root disease spread is minimal because of the prescribed mitigation measures. Wilderness - Wilderness character and the primitive setting would be maintained by incorporating mandatory mitigation measures (Appendix A) and through compliance monitoring. Decision Memo Page 4

Cultural Resources - There will be no effects on cultural resources because no ground disturbance will occur. Camping will take place primarily on gravel bars and fire pans will be utilized for camp fires. Other Resources - This project would not create measurable adverse effects on air quality, soil productivity, water quality, hydrological function, or visual resources because project design and mitigation measures would effectively eliminate the risk of impacts. Wild and Scenic Rivers - Commercial kayaking activities would improve recreational opportunities on the Wild and Scenic Chetco River by offering a unique activity in an area with limited access. Activities would not measurably affect water quality or scenic attractions. Outstandingly remarkable values of water quality, fisheries, and recreation would be maintained. Floodplains - The purpose of Executive Order 11988 is to avoid adverse impacts associated with the occupancy and modification of floodplains. This decision will not affect floodplains because there would be no occupancy or modification of floodplains. Wetlands - The purpose of Executive Order 11990 is to avoid adverse impacts associated with destruction or modification of wetlands. The proposed project is not located in or near wetlands, so it will not affect wetlands. CONSISTENCY FINDINGS I find the Chetco River Kayaking permit is consistent with direction in the 1989 Siskiyou National Forest Land and Resource Management Plan, as amended. This action has been analyzed and designed under other laws, regulations and agreements applicable to the management of National Forest System lands and resources, including: 16 USC 1604(g)(3), 36 CFR 219.14 and 36 CFR 219.27 (b). I find this decision to be consistent with the National Environmental Policy Act of 1969 (NEPA); the Council on Environmental Quality regulations for implementing NEPA, 40 CFR 1500-1508, July 1, 1986; the Multiple-use Sustained Yield Act of 1960; and the National Forest Management Act of 1976. I also find this project to be in compliance with the Endangered Species Act of 1973, as amended, and the Historic Preservation Act. ADMINISTRATIVE REVIEW OR APPEAL Only those who provided comment or expressed interest in this proposal during the comment period which ended on February 8, 2013, are eligible to appeal this decision pursuant to 36 CFR part 215 regulations. Comments were accepted for 30 calendar days (through February 8, 2013) following the publication on January 10, 2013, of legal notice of availability of the preliminary Decision Memo in the Curry County Reporter, Gold Beach. A total of four individuals responded. In light of a recent court ruling (Sequoia ForestKeeper v. Tidwell, 11-cv-00679-LJO-DLB (E.D. Cal.)), the Forest Service provides public notice, comment, and opportunity for administrative appeal for projects and activities documented with a Decision Memo (36 CFR 220.6(e)) until Decision Memo Page 5

new instructions are issued by the Washington Office, or the Agency issues regulations addressing the Court s ruling. MY DECISION AND THE RATIONALE FOR MY DECISION As Responsible Official of the Gold Beach Ranger District, I have made the decision to authorize the issuance of a special use permit to Zachary Collier with the Northwest Rafting Company, LLC. My decision will allow guided kayaking trips to occur on the Wild and Scenic Chetco River in a limited, safe and controlled manner. I am issuing this permit to allow for the opportunity for those with the skills and stamina to experience the river and wilderness in a unique and safe way, with little or no impact to the undeveloped assets of the river. My decision to issue this permit is consistent with the Wild and Scenic River and wilderness values for the area. Activities proposed will not diminish the values described above; such as, solitude, a primitive recreational experience, the extent of recreational use, and the existing natural state. The imprint of human activities will remain substantially unnoticeable. The permit will limit activities to a maximum of 80 priority use days per year. Concerns raised during public scoping were carefully considered and the mandatory mitigation measures in Attachment A (page 8) will avoid or minimize impacts. These measures will effectively address the issues raised regarding Port-Orford-cedar root disease, water quality, fisheries, invasive species, wilderness character, leave no trace, access, trail clearing, human waste, safety, motorized use and camping. Mitigation measures also include requirements necessary to maintain the primitive setting and wilderness character of this area. Monitoring of potential impacts under this permit will occur and activities would be adjusted accordingly. Because of the limited season of use, remoteness, and technical skills required to kayak the Wild and Scenic portion of the Chetco River, I do not anticipate a substantial increase in river use as a result of this decision. However, if additional commercial proposals were submitted in the future, a needs assessment and capacity analysis would occur in accordance with Forest Service Handbook 2709.14; Section 53.1f. A special use permit and operating plan will be agreed upon and signed by the permit holder and Forest Service Designated Officer. Authorization: William B. Blackwell, Jr. Acting District Ranger Gold Beach Ranger District Rogue River-Siskiyou National Forest DATE Decision Memo Page 6

For Further Information Contact: Nancy Schwieger Gold Beach Ranger District 29279 Ellensburg Avenue Gold Beach, OR 97444 (541) 247-3600 Email: nschwieger@fs.fed.us Decision Memo Page 7

ATTACHMENT A MITIGATION MEASURES & DESIGN FEATURES Wildlife Mitigation Measure/Design Feature Do not exceed ambient noise levels. Keep food stored to prevent access by wildlife, especially corvids (jays, crows and ravens). Do not feed wildlife. Pack out all garbage and food scraps. Wilderness Campfires only allowed on fire pans when seasonal restrictions allow. Ashes and unburned residue will be packed out. Trail clearing will only be completed by hand tools within the existing clearing limits. No pack animals will be utilized. No motorized/mechanized equipment will be utilized within the wilderness. No caches will be allowed. Camping will only occur primarily on gravel bars, as conditions allow. Water Quality A human waste containment system will be used to pack out all human waste. Invasive Species and Disease Spread The permitee is required to wash boats and clean all parts of motor vehicles (undercarriage, tires, wheels, etc.) before entering National Forest lands. Motorized use on Forest Service Road 4103-087 will only be allowed when the gate is open; no special provisions will be made for motorized access for this permit. Safety Chief of party will have at least one successful run down the Chetco River from Slide Creek to the wilderness boundary. A medical evacuation plan will be required and approved by the Forest Service in the Operating Plan. At least one guide will have a current Wilderness First Responder certificate. The permitee will carry at least two electronic communication systems (e.g., satellite radio, spot messenger etc.). Access Utilize existing Forest Service system roads and trails. Objective Prevent disturbance to federally-listed wildlife species. Prevent impacts to wildlife from predators. Prevent wildlife-human interactions. Leave no trace. Maintain wilderness character. Leave no trace. Maintain wilderness character. Maintain wilderness character. Leave no trace. Maintain water quality. Prevent transport and introduction of invasive species and the spread of Port-Orford-cedar root disease. Reduce the risk of spread of POC root disease. Trip safety. Trip safety. Trip safety. Trip safety. Utilize existing routes. Decision Memo Page 8

Decision Memo Page 9

Decision Memo Page 10

Decision Memo Page 11