IST FUNDING THROUGH CURRENT FISCAL YEAR ONLY

December 20,2016. George T. Webb, P.E. County Engineer. Tanya N. McConnell, P. Deputy County Engineer

Land Use Context Definitions

Ocean Way at U.S. #1 (Town of Jupiter) Installation of a new traffic signal.

Palm Beach County Infrastructure Sales Tax Program Project Tracking. FY 2017 Projects

Draft Year 2040 Cost Feasible Plan

PALM BEACH COUNTY INFRASTRUCTURE SURTAX REVENUES As of November 30, 2017

Road widening from 2 lanes to 4 lanes. Bridge removal and piping of the canal. Lane closures are not expected.

Palm Beach County Traffic Report July 13 through July 20, 2012

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

FALL Construction Project Status Report PROJECT HIGHLIGHT CURRENT PROJECTS. NORTH COUNTY DISTRICT PARK New Construction PROJECT SCOPE

Palm Beach County Traffic Report. Aug. 25 through Sept. 1, 2017

Palm Beach County Traffic Report August 24 through August 31, 2012

SUMMER Construction Project Status Report PROJECT HIGHLIGHT CURRENT PROJECTS. BRIDGEMAN DRIVE PARK New Construction PROJECT SCOPE

Government in Palm Beach County

AGENDA ITEM I. EXECUTIVE BRIEF PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

DCD:Z.ty Ea.~~ /{/Kile(

1 6:52 AM BUS YARD 4:38 PM 2 7:12 AM N SEACREST BLVD & NE 16TH AVE 4:18 PM

Infrastructure Sales Tax Capital Projects April 4, 2017

What is Shovel Ready Palm Beach? What is a Shovel Ready Site?

Future Land Use Amendments History Report

TRANDERSOL SAMPLING OF CENTRAL STATIONS BEGINNING IN FLORIDA CURRENT PROJECTS FLORIDA TRANDERSOL - EDERP MIAMI GRAND CENTRAL LONG EXPRESS EXPRESS

Forest Hill Blvd. at Kirk Road Widening Project FM#:

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

APPENDIX A: Planning Consistency Checklist

January 2018 Air Traffic Activity Summary

PALM BEACH MPO. May 3, Valerie Neilson, AICP Multimodal Manager Palm Beach MPO

2016 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON ORLANDO, GRANDE LAKES August 4-7, 2016

PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY I. EXECUTIVE BRIEF

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

SL~~ ===============================;;=~ Ill~, IIB\~t1,~l~,y]!~:; d' i Meeting Date: March 14, 2017 [] i1 D1:1 " l(t\\,: 1 t. I. Executive Brief [ ]

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 9

PALM BEACH MPO TRANSPORTATION IMPROVEMENT ADOPTED JUNE 15, Amended 7/20/17

East Coast Greenway (ECG) Southeast Region Miami-Dade/Broward/Palm Beach/Martin/St. Lucie/Indian River

FDOT Treasure Coast Traffic Report through

BCC Meeting Schedule for 10/1/2014 To 10/31/2014

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

Capital Program Delivery

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

Norfolk District North Atlantic Division

BOND 2012 PROPOSITION 1

068D 420B 068C 421E SEMINOLE PRATT WHITNEY RD 420A SOUTHERN BLVD 500J 500Q 500B

Monthly SunPass Transponder Sales Inception to June 2012

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:

State Highway System Key Sheet Broward County ²

Completion: August 2011 LS #321 Design LS #8

Whittier Bridge Project

Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP)

FDOT Treasure Coast Traffic Impact Report

Glades Target Area Projects Summary

FDOT Treasure Coast Traffic Impact Report

Project Update to Treasure Coast Regional Planning Council

Most people notice when ODOT builds something

State Route 8 Corridor. Northern Summit County s Path to Success

Highways: State Highways

Customer Service:

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

Campus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015

City of Grand Island Tuesday, December 12, 2017 Council Session

Highways: Interstate. Highways: State Highways

November 21, 2012 Barbara Kelleher, (954)

Administration and Projects Committee Meeting STAFF REPORT July 3, 2014 Page 2 of 2 Agreement Consultant Project General Scope CT 107 URS Corporation

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

lakeside centre Page 3

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

Delaware County Engineer

BOND 2012 PROPOSITION 1

FPL FiberNet Locations List CLLI ADDRESS MARKET SITE TYPE MIANFLHF W DIXIE HWY (Arcos) MIAMI CABLE LANDING STATION MIAMFLEL 1 NE 1ST ST MIAMI

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Fixed Capital Outlay: Facilities

Facility Renewal Project Budget Report July 01, 2018

Toll Rates for Florida Turnpike System and Florida Department of Transportation (FDOT) Toll Facilities. South Florida

Apparent Bids for Letting of April 10, 2018

STORES AVAILABLE FOR FRANCHISE

U.S. Army Corps of Engineers Wilmington District

Mainline Description

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

MOBILE DISTRICT 2018 DREDGING PROGRAM

FIXED ROUTE DASHBOARD JULY 2018

October 31, 2014 Chuck McGinness, (954)

MUNICIPAL COMMISSION/COUNCIL TERMS, TERM LIMITS, SALARIES AND BENEFITS SURVEY

ALTON TOWN CENTER PALM BEACH GARDENS, FLORIDA


2017 and Beyond Forecasted Acquisition Strategy- Jacksonville District Updated 17 Mar 2017

Sumter County Capital Improvement Program Summary

CityStats Southeast Florida Trends

AGENDA. WEDNESDAY, SEPTEMBER 23, :00 PM or immediately after the ICTC meeting

SEPTEMBER 2015 BOARD INFORMATION PACKAGE

Regional Planning for Tri-Rail Coastal Link

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

Penny for Pasco Update (Transportation Improvements, Environmental Lands Acquisition and Public Safety Expenditures) (February 21, 2012)

2017 FTBA CONSTRUCTION CONFERENCE February 2-3, 2017 Hyatt Regency, Orlando FDOT WORK PROGRAM OVERVIEW

S o u t h e a s t F l o r i d a R e g i o n a l G r e e n w a y s & T r a i l s P l a n

NCDOT, DIVISION SIX HIGHWAY INCIDENT MANAGEMENT PROGRAM

JANUARY 2018 BOARD INFORMATION PACKAGE

PERFORMANCE REPORT NOVEMBER 2017

SAN FRANCISCO DISTRICT FY 2018 NAVIGATION PROGRAM

Wichita Falls MPO - MTP Project List 1 of 6

Transcription:

Department of Engineering and Public Works P.O. Box 21229 INTEROFFICE MEMORANDUM West Palm Beach, FL 33416-1229 (561) 684-4 FAX: (561) 684-45 w ww.pbcgov.com Palm Beach County Board of County Commissioners Melissa McKinlay, Mayor Mack Bernard, Vice Mayor DATE: TO: THRU: -FROM: RE: February 15, 218 Honorable Melissa McKinlay, Mayor and Members of the Board of County Commissioners FayeW:~~~ Assistal}f' LOUT}'~drnlnistrator David L. Ricks, P.E. ~~ County Engineer FY 217 Annual Report Thoroughfare Roads Hal R. Valeche Paulette Burdick Dave Kerner Steven L. Abrams Mary Lou Berger County Administrator Verdenia C. Baker The Construction Status report (See Exhibit A) addresses a total of fifty-eight (58) projects. Construction projects include intersection improvements, bridges, slope protection, seawall repair, drainage improvements, safety improvements, milling and resurfacing, and miscellaneous roadway work resulting in approximately 3.5 road miles (37.4 new lane miles) at a total cost of$97.97 million. During the current fiscal year, (FY 218) twenty-four (24) projects totaling $62,89, are scheduled to be bid and awarded, when completed will add an additional 15.7 lanes miles (see Exhibit B). Twenty-one (21) construction contracts were awarded that included 23 projects (two of the contracts include two projects each), during the Fiscal Year 217. These projects total $49,742,, which, when completed, will add 18.2 lane miles to the County's Thoroughfare roadway system, (See Exhibit C). Exhibit D is the summary of consultant contract dollar awards. A total of twentysix (26) construction projects were funded and awarded, resulting in a SBE commitment of 2.84% for County funded projects, (See Exhibit E). A total of seven (7) projects were finaled, three (3) were federally funded and four (4) were County funded. The County funded projects resulted in SBE achievement of 32.64%, totaling $2,152,861.8, (See Exhibit F). "An Equal Opportunity Affirmative Action Employer Attachment pc: Verdenia C. Baker., County Administrator ~ printed on sustainable 16 1 and recycled paper

ROADWAY PRODUCTION DIVISION CONSTRUCTION STATUS Construction Name, Limits Description Costs Road Lane Number Mil.$ Miles Miles s Under Construction Start - Finish (1) 2351 Camino Real Rd./Boca Club over Intracoastal Waterway Bridge Rehabilitation Bridge Rehabilitation 8.892.1 2. NTP Pending 21361 Canal Point Pedestrian Bridge Bridge.812.. 2117-7117 2758A Center St., Thelma Ave. to Woodland Estates Dr..3mi, 3L 1.583.3.3 NTP Pending 21554 Coral Ridge Dr., S. County Regional Park N. Entrance to 75' N..1 mi, 2L 1.67..3 8117-12117 213619A CR88 West of 2 mile bend Slope Stabilization- Phase Ill Slope Stabilization.89.. 6117-1/17 21451 Drexel Rd., Fair Green Rd. to 15th Ln. N..1 ml 3L, Bridge Replacement-Culvert.754.1 3. 6/17-11/17 213526 Flavor Pict Rd., SR7 to Lyons Rd. 1.mi,2L 2.936 1. 2. 1/17. 9/18 21194 Garden Rd., S. of FOOT Canal to S. of Blue Heron Blvd..3 ml, 3 L.98.3.3 9116. 9117 214512 Gun Club Rd. over LWDD E-3 Canal Bridge Improvements.792.. 5/17 9117 2962 (2) Haverhill Rd., Lantana Rd. to South of the LWDD L-14 Canal 4LD 2153 (2) Haverhill Rd., South of the LWDD L-14 Canal to Lake Worth Road Widen 2L to 5L 7.445 2.2 5.9 1/17-3/18 213522 (3) Hood Rd. E. of Florida's Turnpike to W. of Central Blvd. 1.2 mi, 4L Includes new Bridge over 1-95 NTP Pending 14.136 1.5 1.9 21452 (3) Hood Rd. and Central Blvd. NTP Pending 265 Indiantown Rd. & Jupiter Farms Rd. 1.497.3.3 NTP Pending 214515 Kirk Rd. S. over LWDD L 7 Canal to Pot ' Gold St..1 mi 3 L, Bridge Replacement-Culvert 1.27.1.1 NTP Pending 21556 Kirk Rd. over LWDD L-5 Canal Bridge Replacement Culvert.849.1 2. NTP Pending 21353 Lyons Rd., Hillsboro Canal to SW 18th Street.3ml, 6L 1.612.3 2. 1/17-4118 213519 Northlake Blvd. & Military Trail 1.412.1.1 NTP Pending 2456 Old Dixie Hwy., Park Ave. to Northlake Blvd..9 mi, 3 L 3.84.9.9 5117-2118 2196 Point Chosen Swing Bridge over Rim Canal Fender System Replacement Fender System 1.288.. 7115. 1/16 213523 Purdy Lane, Forest Hill Elementary to E. of Major Dr..2 ml, 3 L, Bridge Replacement 2.398.2 1. NTP Pending 213529A (4} Roebuck Rd. -Jog Road to Haverhill Rd. 1.mi,5L NTP Pending 5.26 1.3 2. 213529B (4) Roebuck Rd. and Jog Rd. NTP Pending 2143 Sherwood Forest Blvd. over LWDD L B Canal Bridge Improvements.75.1. NTP Pending 215524 Summit Blvd. over LWDD E 3 Canal Bridge Improvements.297.. 8/17. 11/17 214519 SW 18th & Military Trail 1.225.4.2 5/17. 1/18 2219 Toney Penna Dr. and Old Dixie Hwy. 2.79.1.1 2117-9/17 27 s 62.894 9.4 24.4 Notes: (1) Start date Is notice to proceed date. Finish date Is the scheduled contract completion date at the time of this report. (2) s #2962 and #2153 combined and let as one contract. (3) s #213522 and #21452 combined and let as one contract. (4) s #213529A and #2135298 combined and let as one contract. ROADWAY PRODUCTION DIVISION ANNUAL REPORT FY 217 EXHIBIT "A", PAGE 1 OF 3

ROADWAY PRODUCTION DIVISION CONSTRUCTION STATUS Construction Name, Limits Description Costs Road Lane Number Mil.$ Miles Miles s Substantially Complete ( semi-final inspections are complete ) Sub. Complete 21211 Australian Ave., W. 1th St. to 33' N. of W 13th St..7.1.1 3117. '7117 21552 Connector Rd., Lyons Rd. to Acme Dairy Rd..5 ml, 2/3L.593.5 1. 4117- '9117 2154A Lyons Rd.; Lantana Rd ton. of LWDD L-14 Canal Widen 2L to 4LD 4.37.9 1.4 5116-7117 214615 Palmwood Road - 75' N. of Donald Ross Rd. to Susan Ave. Slope Stabilization 1.127.. 2/17- '8117 1997511A (3) Seminole Pratt Whitney Rd., S.R. 8 to S. of Okeechobee Blvd. 1.4mi,4L 9.734 1.4 2.8 4/14 1997511B (3) Seminole Pratt Whitney Rd., S. of Okeechobee Blvd. ton. of Sycamore Dr. 2.8m1,4L 2.8 5.6 1997511C1 (3) Seminole Pratt Whitney Rd., Sycamore Dr. ton. of Sycamore Dr..1 mi,4l.1.2 7 s 16.461 5.8 11.1 (3) 1997511A, 19975118, 1997511C1 combined and let as one contract. s substantially complete and on hold since April 214.!s Finaled ( accepted by contract review committee ) Flnaled 2457C 6th St. N. W. of Royal Palm Beach Blvd. to E. of Royal Palm Blvd..5ml,3 L 4.528.5.9 1117 2712 Burns Road & Military Trail 1.338.1.1 4/17 215525 CR88 Twenty Mile Bend Slope Protection- Phase II Slope Protection.884.. 2/17 213619 County Road 88 Twenty Mile Bend Slope Protection- Phase I Slope Protection 4.64.. 1116 215223 Old Dixie Hwy., 45th Street to Park Avenue Milling and Resurfacing 1.48 3.3. 3117 5 s 11.862 3.9 1. ROADWAY PRODUCTION DIVISION ANNUAL REPORT FY 217 EXHIBIT "A", PAGE 2 OF 3

ROADWAY PRODUCTION DIVISION CONSTRUCTION STATUS Construction Name, Limits Description Costs Road Lane Number Mil.$ Miles Miles I s Under Construction (Annual Contract) Start- Finish 21414 Fairgrounds Rd. and Weisman Way.65.2.2 11/17-1/17 21619 Loxahatchee River Rd. and Via Rio.27.1. 1/17-1/17 215515 Northlake Blvd., SR 71 to Military Trail Safety Improvements & Resurfacing 1.47 2.8. 1/17-12/17 2161 Okeechobee Blvd. and Skees Rd..46.1.1 2/1/17-4 s 2.22 3.2.3!s Finaled (Annual Contract) Finaled 21614 Glades Rd. & Sandpiper Shores Elementary School.31.1.1 8/17 213528A Haverhill Rd.; N. of Caribbean Blvd. to Dyer Park N. Pathway.356.. 8/17 265A Indiantown Rd. & Sierra Square.34.2.2 4/17 21612 Island Way and Limestone Creek Road.41.. 12/17 21713 Jog Rd. and LWDD L 16 Canal I ntersectlon Improvements.7.2. 11117 215513 Jog Rd., S. of Clint Moore Rd. to Linton Blvd. Safety Improvements & Resurfacing 1.349 2.2. 6/17 215514 Jog Rd., S. of Hypoluxo Rd. to 1th Ave. N. Safety Improvements & Resurfacing 1.417 4.1. 6/16 21615 Lantana Rd. and Brentwood Rd..16.. 4/17 21618 Lantana Rd. and Willowood Lane.21.. 6/17 21712 Lyons Road from PBCHS Entrance to LWDD L-7 Canal.323.2.1 8/17 21316 Okeechobee Blvd. & Ponce de Leon St. Safety Improvements & Resurfacing.138.1.1 12/16 21512 PGA Blvd. & Ellison Wilson Rd..148.1.1 5/17 21553 SR 8 and Kirk Rd..2.. 1/16 21356 Tradewind Rd. and Winding Creek Lane.48.. 4/17 215516 Woolbright Rd. -Military Trail to Lawrence Rd. Milling, Resurfacing and Drainage Improvements.8 1.. 11/17 15 s 4.731 8.2.6 P.B.C. Construction Totals 58 s $97.97 3.5 37.4 ROADWAY PRODUCTION DIVISION ANNUAL REPORT FY 217 EXHIBIT "A", PAGE 3 OF 3

1/29/218 ROADWAY PRODUCTION DIVISION FY 218 BIDDING SCHEDULE Proposed Bid Date Number Name, Limits Description Rd. MIies Addi. Ln. MIies 'Bid-Est. $(X 1) SM/PM Consultant Aug-17 21754 Annual Pavemen1 Marking $5, HK Sep-17 21753 Annual MIiiing and Resurfacing $16, HK Sep-17 21622 Haverhill Blvd. from Summit to Belvedere MIiiing and Resurfacing 2.. $9 HK N/A Oct-17 21755 Annual Pathway and Minor $9,5 HK Oct-17 2552 Australlan Ave. and Palm Beach Lakes Blvd..5.5 $1,2 KF-EF Wantman Nov-17 215518 Congress Ave., North of Okeechobee Blvd. to Ware Dr. Bridge Replacement w/culvert 4L to SL.2.2 $4 KF AMD HSQ Nov-17 21513 Linton Blvd. and S. Federal Hwy..1.1 $7 DY-MA HSQ Dec-17 (1) 213524 (1) 213525 Sandalfoot BlvdJSR 7 over LWDD E 1 Canal S.W. 3rd. SIJSR 7 over LWDD E-1 Canal Bridge Replacement and Intersection Improvement.4.4 $3, KF-ABK AGA Jan-18 21578 Overhead School zone Flashers FEDERALIZED Overhead School Signs N/A N/A $1, FJ..JM McMahon Feb-18 215525C CR88, 3.7 Ml, W. of SR 8 to 1.5 Ml. West of SR 8 Rehabllltatlon/Haavy Maintenance.. $1, DY Wantman Mar-18 213531 Palmetto Park Rd., SW 7111 Ave. to SW 5th Ave..2 ml, 4/6L & Bridge Replacement.2.4 $3,3 KF-AMD Wantman Apr-18 21253 Glades Rd. and Butts Rd..1.1 $3 DY-MK Klmley-Horn Apr-18 21251 Atlantic Ave. and Florida's Turnpike.2.2 $1,2 DY-MA Klmley-Horn Apr-18 214514 Davis Rd. over LWDD L-6 Canal Bridge Replacement. 2. $4 KFS-MCD Gerwig May-18 2135 Linton Blvd. and MIiitary Tran.2 1. $1,5 KF SJ Arcadls May-18 21685 Bishoff Rd., dead end to Jog Rd..1 ml,mstu.1.1 $2 KFS-SMO CDI May-18 May-18 213527A 21826 Lyons Rd., Clint Moore Rd. to N. of LWDD L-39 Canal Mack Dairy Rd. Indiantown Rd. to 2' N. Old Indiantown Rd..7 ml, 4 L.7 ml, 2 L.7 1.4.7. $2,7 $99 KF-ABK DY HSQ Wantman Jun-18 21458A Baynton Beach Blvd and Acme Dairy Rd..1.1 $2 DY-MA Klmley-Hom Jun-18 213528B Haverhill Rd., N. of Caribbean Blvd. to S. of Dyer Park North Entrance.4 ml, Widen 2L to 4LD 2. 4. $5, KF-ABK Behar Jun-18 213528C Haverhill Rd., S. of Dyer Park North Entrance to Bee Une Hwy. Widen 2L to 4LD 2. 4. $2,2 KF-ABK Behar Jun-18 21256 PGA Blvd. and MIiitary Trail.3.3 $1,4 KF-AMD Civil Design Jun-18 23514 Sliver Beach Rd., E. of Congress Ave. to Old Dixie Hwy..9 ml, Widen 2L to 3L.9.9 $4,8 KF-ABK Metric (1) 213524 and 213525 will be combined and lat as one contract FY 218 TOTAL 24PROJECTS 1.7 15.7 $62,89 ROADWAY PRODUCTION DIVISION ANNUAL REPORT FY217 EXHIBIT '6', PAGE 1 OF 1

ROADWAY PRODUCTION DIVISION CONSTRUCTION CONTRACT AWARDS FY 217 Name, Limits Description FY 217 Contracts 2351 Camino Real Rd./Boca Club over Intracoastal Waterway Bridge Rehabilitation Bridge Rehabilitation.1 2. $9, $8,892 9/12/17 KFS-SMO 2758A Center St., Thelma Ave. to Woodland Estates Dr..3mi,3 L.3.3 $1,1 $1,583 7/11/17 KFS-MCD 21552 Connector Rd., Lyons Rd. to Acme Dairy Rd..5ml, 2/3L.5 1. $6 $593 2/7/17 DY-FM 21554 Coral Ridge Dr. - S. County Reginal Park N. Entrance to 75' N..1 m1,2l..3 $1,13 $1,67 7/11/17 DY-MA 213619A CR88 West of2 mile bend Slope Stabilization- Phase Ill Slope Stabilization.5. $9 $89 5/2/17 SC-HK 21451 Drexel Rd., Fair Green Rd. to 15th Ln. N..1 mi 3L, Bridge Replacement-Culvert.1 3. $81 $754 414117 KFS-MCD 213526 Flavor Plct Rd., SR7 to Lyons Rd. 1. mi,2l 1. 2. $3,8 $2,936 8/15117 KF-AK 214512 Gun Club Rd. over LWDD E-3 Canal Bridge Improvements.. $47 $792 3114117 KF-EF (1) 213522 Hood Rd. - E. of Florida's Turnpike tow. of Central Blvd. 1.2 ml, 4L includes new Bridge over 1-95 1.5 1.9 $14,2 $14,136 9112/17 DY-MA (1) 21452 Hood Rd. and Central Blvd. KF-SJ 265 Indiantown Rd. & Jupiter Fanns Rd..3.3 $1,1 $1,497 8/15/17 DY-WC 214515 Kirk Rd. S. over LWDD L-7 Canal to Pot ' Gold St..1 ml3 L, Bridge Replacement-Culvert.1.1 $1,3 $1,27 9/12/17 KFS-MCD 21556 Kirk Rd. over LWDD L-5 Canal Bridge Replacement- Culvert.1 2. $5 $849 9112117 KFS-MCD 21353 Lyons Rd., Hillsboro Canal to SW 18th Street.3mi,6 L.3 2. $2, $1,612 9/12/17 KF-AMD 213519 Northlake Blvd. & Military Trail.1.1 $1,38 $1,412 612/17 DY-MA 214615 Palmwood Road- 75' N. of Donald Ross Rd. to Susan Ave. Slope Stabilization o.o. $1,1 $1,127 12/6/16 DY-FM 213523 Purdy Lane, Forest Hill Elementary to E. of Major Dr..2 mi, 3 L, Bridge Replacement.2 1. $2,3 $2,398 9/12117 KF-SJ (2) 213529A Roebuck Rd. -Jog Road to Haverhill Rd. 1.mi,5L (2) 213529B Roebuck Rd. and Jog Rd. 1.3 2. $6, $5,26 9/12117 KF-SJ 2143 Sherwood Forest Blvd. over LWDD L-8 Canal Bridge Improvements.1. $55 $75 9112117 KFS MCD 215524 Summit Blvd. over LWDD E-3 Canal Bridge Improvements o.o. $26 $297 3/14/17 DY-WC 214519 SW 18th & Military Trail.4.2 $1,15 $1,225 3/14/17 DY-FM 21196 Wallis Rd., LWDD E-3 Canal to Haverhill Rd. Pathway.6. $9 $744 6/6117 KFS-MCD (1) s #213522 and #21452 combined and let as one contract (2) s #213529A and #213529B combined and let as one contract FY217TOTAL 23 s ROADWAY PRODUCTION DIVISION ANNUAL REPORT FY 217 EXHIBIT -c, PAGE 1 OF 2

ROADWAY PRODUCTION DIVISION CONSTRUCTION CONTRACT AWARDS FY 217 Name, Limits Description Annual Contracts 2175 Annual Traffic Loops.. $815 $1, 3/14/17 HK 21751 Annual Traffic Signal.. $4,7 $3, 3/14/17 HK 21752 Annual Guardrail.. $67 $3 3/14/17 HK FY 217 TOTAL 3 s.. 6,185 4,3 I PROJECTS BUlL T BY ANNUAL CONTRACTORS Task Assigned ($X 1) Task Mgr./ LINE ITEM PROJECTS Est. Actual Authorized Eng. 213528A Haverhill Rd., N. of Caribbean Blvd. Bee Line Hwy. Pathway.. $27 $378 3/17 KF FM 215515 Northlake Blvd., SR 71 to Military Trail Safety Improvements and Resurfacing 2.8. 1,5 $1,35 9/17 DY-WC 2161 Okeechobee Blvd. and Skees Rd..1.1 41 $46 9/17 DY WC 23514 Silver Beach Rd. east of Congress Ave. Tum Lane Improvements.9.9 $24 $23 1/17 KF FM 215516 Woolbright Rd., Military Trail to Lawrence Rd. Resurfacing, Safety and Drainage Improvements 1.. $999 $711 8/17 DY-WC RESERVE INTERSECTIONS 21414 Fairgrounds Rd. and Weisman Way.2. $1 $65 9/17 KFS MCD 21614 Glades Rd., Sandpiper Shores Elementary School Intersection.1.1 $31 7/17 DY-WC 265A Indiantown Rd., and Sierra Square Intersection.2.2 $78 $34 3/17 DY-WC 21713 Jog Rd. and LWDD L-16 Canal Intersection Improvement.2. $6 $7 9/17 KF-5J 21615 Lantana Rd. and Brentwood Rd... $16 $3 3/17 KF SJ 21618 Lantana Rd. and Willowood Lane o.o. $21 $16 4/17 KF-SJ 21619 Loxahatchee River Rd. and Via Rio Intersection Improvement.1. $27 $21 8/17 KF SJ 21712 Lyons Rd., PBCHS Entrance to LWDD L-7 Canal Intersection Improvement.2.1 $324 $23 7/17 KF SJ FY 217 TOTAL 14 s 5.8 1.4 3,n5.2 3,328.8 ROADWAY PRODUCTION DIVISION ANNUAL REPORT FY 217 EXHIBIT "C", PAGE 2 OF 2

CONSULTANT COMPETITIVE NEGOTIATIONS ROADWAY PRODUCTION CONSULTANT CONTRACT DOLLAR AWARDS Number Specific Contracts Awards: Name, Limits Consultant Amount 2351 Camino Real Rd./Boca Club over Intra. Waterway-Bridge Rehad.- CEI AE Eng. $1,611,654.4 213519 Northlake Blvd. & Military Tr. - CEI JMT $184,159.9 21656 Palmetto Park Rd.- Military Tr. to 1-95 Erdman $4,465.86 SPECIFIC PROJECT AWARDS FY217- TOTAL $2,196,28.161 Annual Contracts Street Lighting Design Services Traffic Signal Design Services Construction Materials Testing, Geotechnical Engineering & Inspections Structural Engineering Services Civil Engineering Services FY217 ANNUAL AGREEMENT- TOTAL No. of Consultants New Contracts 2 2 4 4 12 No. of Consultants Contracts Renewed 1 3 4 Miscellaneous Activities No. of New Consultants Certified 34 No. of Consultants Re-Certified 12 New Tasks issued to Annual Consultants 29 Supplements issued on Specific Contracts 25 Supplements issued to Annual Contracts Tasks 3 I MISCELLANEOUS ACTIVITIES TOTALS 13 ROADWAY PRODUCTION DIVISION ANNUAL REPORT FY 216 EXHIBIT "D", PAGE 1 of 1

ROADWAY PRODUCTION DIVISION SBE GOAL & CONTRACTOR COMMITMENT FOR PROJECTS AWARDED Number Name Award Amount Award/Minus Contingent Items Contractor SBE Goal Contractor Commitment % $$ $$ FY 217 County Funded s 21752 Annual Guardrail 2175 Annual Traffic Loops 21751 Annual Traffic Signal $568,79.25 $1,263,7. $4,465,294. $4,661,389. $568,79.25 $1,263,7. $4,465,294. $4,661,389. Southeast Highway Guardrail & Attenuators, LLC AUM Construction, Gerelco Traffic Controls, Valiant Power South, LLC 15.% $85,36.39.% $. 15.% $189,555. 1.% $1,263,7. 15.% $669,794.1 37.69% $1,683,16. 15.% $699,28.35.79% $36,917.53 2351 2758A Camino Real Rd./Boca Club over Intracoastal Waterway Bridge Rehabilitation Center St, Thelma Ave. to Woodland Estates Dr. 21552 Connector Rd., Lyons Rd. to Acme Dairy Rd. 21554 Coral Ridge Dr. S. County Reglnal Park N. Entrance to 75' N. 213619A CR88 West of 2 mile bend Slope Stabilization Phase Ill $8,891,974.5 $1,583,167.36 $592,582.7 $1,67,218.45 $889,634. $8,877,774.5 $1,569,412.36 $592,582.7 $1,52,744.2 $889,634. Kiewet Infrastructure South Co. Rosso Site Development, Rosso Site Development, Rosso Site Development, Dickerson Florida, 15.% $1,331,666.18 16.3% $1,423,327.75 15.% $235,411.85 2.61% $323,387.3 15.% $88,887.31 46.7% $276,742.17 15.% $157,911.63 2.9% $211,474.39 15.% $133,445.1 15.18% $135,42.79 21451 Drexel Rd., Fair Green Rd. to 15th Ln. N. 213526 Flavor Plct Rd., SR7 to Lyons Rd. 214512 Gun Club Rd. over LWDD E 3 Canal $753,615.6 $2,936,34.65 $791,834.15 $752,415.6 $2,836,99.6 $715,52.7 MJC land Development Ross Site Development, Ferreira Construction 15.% $112,862.34 15.73% $118,371.77 15.% $425,548.59 45.37% $1,287,82.93 15.% $17,328.11 2.26% $16,21.48 (1) 213522 Hood Rd. E. of Florida's Turnpike tow. of Central Blvd. (1) 21452 Hood Rd. and Central Blvd. $14,135,972.41 $14,49,564.91 Ranger Construction Industries, 15.% $2,17,434.74 16.72% $2,348,763.24 265 Indiantown Rd. & Jupiter Farms Rd. 21556 Kirk over LWDD L 5 Canal 214515 Kirk Rd. S. over LWDD L 7 Canal to PDI"O Gold St. 21353 Lyons Rd., Hillsboro Canal to SW 18th Street 213519 Northlake Blvd. & Military Trail 214615 Palmwood Road 75' N. of Donald Ross Rd. to susan Ave. 213523 Purdy Lane, Forest Hill Elementary to E. of Major Dr. (2) 213529A Roebuck Rd. Jog Road to Haverhill Rd. $1,496,853.75 $849,298. $1,27,343.65 $1,612,166.68 $1,411,513.8 $1,127,274.3 $2,397,947.33 $5,25,814.2 $1,488,762.5 $844,798. $1,197,943.65 $1,58,313.13 $1,334,926.6 $1,125,454.3 $2,265,666.27 $4,67,218.2 Ross Site Development, Johnson-Davis, D.S. Eakins Construction Corp. R&D Paving, LLC Community Asphalt Corporation Lambert Bros, DP Development ofthe Treasure Coast LLC Hardrives, 15.% $223,314.38 25.76% $383,53.24 15.% $126,719.7 23.64% $199,734. 15.% $179,691.55 44.99% $538,986.7 15.% $237,46.97 34.53% $545,737.7 15.% $2,238.99 11.86% $158,316.43 15.% $168,818.15 2.74% $3,783.94 15.o/o $339,849.94 1.77% $4,. 15.% $691,82.73 16.72% $77,442.5 (2) 213529B Jog RdJRoebuck Rd. 2143 Sherwood Forest Blvd. over LWDD L-8 Canal $75,164.2 $75,164.2 R&D Paving, LLC 15.% $15,774.63 19.62% $138,38.5 215524 Summit Blvd. over LWDD E 3 Canal 214519 SW 18th & Military Trail 21196 Wallis Rd., LWDD E 3 Canal to Haverhill Rd. $297,391. $1,225,347.98 $743,93.1 $297,391. $1,21,877.48 $717,863.1 Ferreira Construction Weekley Asphalt Paving, Rosso Site Development, 15.% $44,68.65 2.1% $6,25. 15.% $18,281.62 15.92% $191,35. 15.% $17,679.47 42.67% $36,288.41 (1) s 11213522 and 1121452 combined and let as one contract (2) s ti213529a and 11213529B combined and let as one contract FY 217 TOTAL 26 PROJECTS $6,71,143.43 $59,663,19.62 15.% $8,949,466.44 2.84% $12,433,781.871 ROADWAY PRODUCTION DIVISION ANNUAL REPORT FY 217 EXHIBIT "E", PAGE 1 OF 1

ROADWAY PRODUCTION DIVISION SSE GOAL & CONTRACTOR ACHIEVEMENT FOR PROJECT FINALED Number Name Initial Amount Final Amount % +/- Contractor Initial Amount Less Less Contingency Contractor Commitment $$ % Final Contract Amount Less Final Contingency Contractor Achievement $$ % EY217 Countv fynd!d Profectt 2457C 6th St. N. from 12oth Ava. N. to East of Royal Palm Beach Blvd. $4,528,128.2 $4,35,466.81-4.92% J.W. Cheatham, LLC $4,521,743.2 $1,293,7.5 28.8% $4,34,91.81 $1,27,698. 28.8% 215525 CR88 Twenty Mile Bend Slope Protection Phase Ill $883,59. $862,893.67-2.34% Dickerson Florida, $883,59. $136,956.5 15.5% $759,922.17 $93,144.48 12.26% 2712 Bums Road & MIIHary Trail $1,338,248.21 $1,25,824.33.&.53% Rosso SHe Development, $1,32,135.21 $752,57.92 57.8% $1,238,553.33 $682,854.89 55.12% 213131 Penny Lane from llalaleuca Lane to Dead End $454,77.5 $335,998.81-28.12% R & D Paving, LLC $348,932.85 $95,589. 27.39% $293,318.81 $1M,363.73 57.74% FY217TOTAL 4 PROJECTS $7,24,735.8 $8,755,183.62-8.24% $7,56,41.8 $2,278,186.47 FY 217 Federally Fundtd Proltcts 213817 Bluegill Trail from Grassy Waters Preserve/Northlake Blvd. to N. of PGABIVd 213619 CRBBO Twenty Ml~ Bend Slopa Prot&o11on Phaooll $568,73.55 $4,64,12.4 $59,748.25 4.24% $2,823,51>4.92-3.52o/. Dickerson Florida, Shoreline Foundation, 215223 Old Dixie Hwy., 451h Str.. tto Park Avenue $1,48,217. $1,48,474A2.17% Ranger Construction _lnd.l31rloa. lnc FY217TOTAL 3 PROJECTS $5,678,932.95 $4,48,787.59 21.45% s w r. flllll.. d, but c:ould not b r nked for SBE CompDance due to Sta.t. andlor hderal Funding Restrictions. Notes: Initial and Final Award Amounts include Utility Company Participation. Percentage ftgoo.s are not rounded. ROADWAY PRODUCTION DIVISION ANNUAL REPORT FY 217 EXHIBIT "f", PAGE 1 OF 1