Pedestrian Safety Review Spadina Avenue

Similar documents
As the Toronto Transit Commission (TTC) operates a transit service on Dundas Street West, City Council approval of this report is required.

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Construction Staging Adelaide Street West

Construction Staging Area Blue Jays Way (357 King Street West)

Regulations to deter cut-through traffic - Heath Street V\fest, between Spadina Road and Avenue Road. Toronto and East York Community Council

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

Construction Staging Area 19 Western Battery Road

Construction Staging Area 197 Redpath Avenue

St. Dennis Drive Conversion of Traffic Lanes to On- Street Parking and Bicycle Lanes

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

KING STREET TRANSIT PILOT

Glasgow Street Traffic Review

Planning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL.

Construction Staging Area 700 Bay Street - Elizabeth Street and Walton Street

KING STREET TRANSIT PILOT

Lake Erie Commerce Center Traffic Analysis

TORONTO TRANSIT COMMISSION REPORT NO.

APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report)

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

PORTS TORONTO Billy Bishop Toronto City Airport Summary of 2015 Traffic and Passenger Surveys

A. CONCLUSIONS OF THE FGEIS

This report recommends two new TTC transit services in southwest Toronto.

York Street Pedestrian Promenade Plan, Front Street West to Queens Quay West

Washington St. & Ash Coulee Dr./43 rd Ave Intersection Study

TORONTO TRANSIT COMMISSION REPORT NO.

5.1 Traffic and Transportation

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

EXISTING CONDITIONS A. INTRODUCTION. Route 107 Corridor Study Report

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

MEMORANDUM. Bob Zagozda, Chief Financial Officer Westside Community Schools. Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig. DATE: June 11, 2018

Sky Temporary Car Park Transport Statement

FINAL TERMINAL TRAFFIC MONITORING STUDY

TORONTO TRANSIT COMMISSION REPORT NO.

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Chair and Members, The Etobicoke York Community Council. Mark Sraga, Director and Deputy Chief Building Official

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

TORONTO TRANSIT COMMISSION REPORT NO.

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

Mercer SCOOT Adaptive Signal Control. Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017

Pan Am Games: July 10 26, 2015 Parapan Am Games: August 7 15, 2015

Appendix B Connecting Track Options Evaluation Criteria

YORK UNIVERSITY BUSWAY SERVICE CHANGES

# 7. Date of Meeting: September 2, 2015 BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM SUBJECT:

London Borough of Barnet Traffic & Development Design Team

RW Bruhn Bridge and Approaches Project

V. DATA COLLECTION PROGRAM

SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER

TORONTO TRANSIT COMMISSION REPORT NO.

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

MEMORANDUM. for HOV Monitoring on I-93 North and the Southeast Expressway, Boston Region MPO, November, 2011.

SANTA CLARA COUNTY I-280 CORRIDOR STUDY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Score. Category. Access Aesthetics Community Resources

COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.

STAFF REPORT INFORMATION ONLY

Sheraton Centre Toronto Hotel Motor Court - Relocation of Taxi Facilities


Site Location and Setting

STAR Bond Development

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

TORONTO TRANSIT COMMISSION REPORT NO.

KING STREET PILOT STUDY PUBLIC MEETING

Non-Motorized Transportation

Treasure Island Supplemental Information Report Addendum

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need

Monthly Traffic Update

Arlington County Board Meeting Project Briefing. October 20, 2015

Traffic Management Plan 2018

Chapter 4 Route Window NE3 Manor Park station. Transport for London

McLean Citizens Association Transportation Committee Project Briefing

Southern Oregon Transportation Engineering, LLC

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

Finchley and Golders Green Area Committee 27 April 2017

Improving Transit Service to Major Music Festivals

EP8.2 Presentation Exhibition GO Station Improvements

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

2015 Volunteer Orientation Package

1.2 Corridor History and Current Characteristics

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

Update Report - Etobicoke Creek and South Mimico Creek Trails

DOGWOOD AT VILLA AVENUE PROJECT

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

Toronto and East York Community Council. Acting Director, Community Planning, Toronto and East York District

University Region Non-Motorized Plan 2015

LESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #6 January 30, 2014

TRAFFIC IMPACT STUDY REPORT FOR PROPOSED OFFICE PROJECT AT 959 SEWARD STREET IN HOLLYWOOD SNYDER PARTNERS

Chapter 2 Route window W25 Maidenhead station. Transport for London

TORONTO TRANSIT COMMISSION REPORT NO.

US 19 Sunset Point Rd to Countryside Blvd.

Strategic Signal Timing Changes = BIG Results. Barbara Jones, PE, PTOE DGL Consulting Engineers, LLC Senior Traffic Engineer

4. Safety Concerns Potential Short and Medium-Term Improvements

Request to Improve Transit along the Dufferin Street Corridor

Madison Metro Transit System

Project Deliverable 4.1.3d Individual City Report - City of La Verne

Transcription:

STAFF REPORT ACTION REQUIRED Pedestrian Safety Review Spadina Avenue Date: October 13, 2015 To: Toronto and East York Community Council From: Director, Transportation Services, Toronto and East York District Wards: Trinity-Spadina, Ward 20 Reference Number: Ts2015203te.top.doc SUMMARY As the Toronto Transit Commission (TTC) operates a transit service on Spadina Avenue, City Council approval of this report is required. At the June 16, 2015 meeting of the Toronto and East York Community Council, Transportation Services was directed to undertake a pedestrian safety review on Spadina Avenue, between Lake Shore Boulevard West and the Metrolinx rail corridor, and advise on the feasibility of installing a pedestrian crossing on the south side of the Bremner Boulevard/Fort York Boulevard intersection, as well as any other safety measures. Transportation Services does not support the installation of a pedestrian crossing on the south side of the Spadina Avenue and Bremner Boulevard/Fort York Boulevard intersection, based on the negative impacts on the intersection capacity that will result. The City of Toronto's policy requires that pedestrian crossings not be permitted where they will conflict with dual turn lanes at an intersection. RECOMMENDATIONS Transportation Services, Toronto and East York District recommends that: 1. City Council deny the introduction of a pedestrian crossing on the south side of Spadina Avenue at the intersection with Bremner Boulevard/Fort York Boulevard. Pedestrian Safety Review Spadina Ave. 1

Financial Impact There are no financial implications to the report. DECISION HISTORY On June 16, 2015, Toronto and East York Community Council requested Transportation Services staff undertake a traffic study on Spadina Avenue, between Lake Shore Boulevard West and the Metrolinx rail corridor (Item TE7.120). Staff were directed to report to the September 8, 2015 meeting of Toronto and East York Community Council to provide the study findings, including updated pedestrian volumes and the feasibility of installing a new pedestrian crossing on the south side of Bremner Boulevard/Fort York Boulevard, as well as any other safety measures. On September 8, 2015, Toronto and East York Community Council received Transportation Services report for information (Item TE10.91). Staff provided an update on this matter and requested that additional time be provided to undertake the necessary studies. COMMENTS Existing Conditions The intersection of Spadina Avenue and Bremner Boulevard/Fort York Boulevard is controlled by traffic signals. Spadina Avenue is a north-south major arterial road with a regulatory speed limit of 50 km/h and a daily two-way traffic volume of about 36,000 vehicles. It consists of three lanes in each direction and there are exclusive left-turn lanes provided at the intersection with Bremner Boulevard/Fort York Boulevard. TTC service on Spadina Avenue is provided by the '510 Spadina' streetcar, which operates within the median on an exclusive right-of-way. Transit loading platforms for northbound and southbound streetcars are provided on the north intersection leg. Bremner Boulevard is a minor arterial road that intersects the east side of Spadina Avenue. It has a posted speed limit of 40 km/h and a daily traffic volume of about 12,500 vehicles. It consist of two lanes in each direction. At the intersection with Spadina Avenue, dual westbound left-turn lanes are provided. There is no TTC service provided on Bremner Boulevard. Fort York Boulevard is a collector road that intersects the west side of Spadina Avenue, opposite Bremner Boulevard. It has a posted speed limit of 40 km/h and a daily traffic volume of about 8,500 vehicles. It consists of a single lane in each direction for vehicular traffic and curb-side bicycle lanes. At the intersection with Spadina Avenue, a single eastbound left-turn lane is provided. There is no TTC service provided on Fort York Boulevard. Pedestrian crossings are provided on the north, east and west legs of the intersection of Spadina Avenue and Bremner Boulevard/Fort York Boulevard. There is no pedestrian crossing designated on the south intersection leg. Pedestrian Safety Review Spadina Ave. 2

Collision History A review of Toronto Police Service records for the five-year period ending June 30, 2015 was undertaken at the intersection of Spadina Avenue and Bremner Boulevard/Fort York Boulevard. Over that time period, there were 202 collisions reported at this intersection. Further review of these 202 collisions disclosed that three involved pedestrians at the intersection. These collisions did not involve any pedestrian crossing on the south intersection leg. Current Signal Timings The following signal phasing has been implemented at the intersection of Spadina Avenue and Bremner Boulevard/Fort York Boulevard: 1. North-south left-turn green arrow; 2. North-south through/right, streetcars and east and west leg pedestrian crossings; 3. Westbound left-turn and through/right, north leg pedestrian crossings; and 4. Eastbound left-turn and through/right, no pedestrian crossings. Due to the high traffic volumes at this intersection, the cycle length generally required to serve all of the above-noted phases ranges between 128 and 150 seconds in length. Due to the length of time required for the signals to serve all of these phases, pedestrian delays may also be higher than is experienced at downtown intersections in the City of Toronto. Pedestrian Volumes A review of the historical pedestrian volumes at the intersection of Spadina Avenue and Bremner Boulevard/Fort York Boulevard confirmed that pedestrian volumes have increased significantly within the last ten years. A summary of traffic counts at this intersection, undertaken during the busiest eight-hour period of a typical weekday, has been provided in the table below. Intersection leg April 13, 2004 August 6, 2008 October 3, 2013 July 8, 2015 North 68 2,226 2,796 4,516 South 0 38 64 58 East 62 687 1,609 1,544 West 30 1,442 1,623 1,938 Total 160 4,393 6,092 8,056 As noted, east-west pedestrian volumes have almost doubled from 2008. Additionally, about 60 pedestrians were recorded during this time period crossing the south intersection leg, which is currently not permitted. Pedestrian Safety Review Spadina Ave. 3

Field Observations In addition to the recent traffic counts, field observations were also undertaken at this intersection on September 22, 2015 during the morning and afternoon peak periods. Generally, the intersection operates at capacity during these times, particularly in the afternoon peak period. High traffic volumes and long queues of motorists were observed in addition to the very high volumes of pedestrians crossing the north crosswalk of the intersection. Specific observations of the westbound left-turn movement disclosed that in the afternoon peak hour, 580 left-turns were made from the dual left-turn lane. This volume was comprised of 255 left-turns from the 'inner' lane (44 percent) and 325 left-turns from the 'outer' lane (56 percent). More westbound left-turns utilized the 'outer' lane, as most were destined to the on-ramp to the westbound F.G. Gardiner Expressway/Lake Shore Boulevard West. This ramp is the last access to the westbound F.G. Gardiner Expressway before Jameson Avenue, a distance of about 3.5 kilometres. Additionally, the ramp from Jameson Avenue is closed between the hours of 2:00 p.m. to 7:00 p.m., Monday to Friday. Accordingly, Spadina Avenue is the only alternative for traffic exiting the western part of the downtown area to access the F.G. Gardiner Expressway in the afternoon peak period. The observations also confirmed that westbound queues of traffic on Bremner Boulevard extended beyond Navy Wharf Court and even Rees Street, at times. Southbound queues on Navy Wharf Court were observed extending to Blue Jays Way. During the afternoon peak period, long queues of southbound and eastbound traffic were also observed. No unsafe pedestrian crossings were observed on the south intersection leg. Proposed south leg pedestrian crossing As indicated, a dual left-turn lane is provided on the westbound approach at the intersection of Spadina Avenue and Bremner Boulevard/Fort York Boulevard. These dual lanes are required to accommodate the high volume of left-turning traffic that uses this intersection. This operation reduces the length of left-turn storage required, which is critical in downtown locations where signalized intersections are closely-spaced. Provincial guidelines, provided in the Ontario Traffic Manual, state that where dual turn lanes are provided at a signalized intersection, consideration should be given to providing a fully-protected pedestrian crossing. This approach is for safety reasons, as a motorist turning from the one of the lanes may not be able to view crossing pedestrians, due to their sight lines being obstructed by motorists in the adjacent turn lane. The practice used by the City of Toronto is to prohibit these movements, as the provision of a fully protected crossing generally has a significant impact on the intersection's capacity. In order to assess the impacts that the introduction of a south leg pedestrian crossing would have on the operations of the intersection of Spadina Avenue and Bremner Boulevard/Fort York Boulevard, capacity analysis was undertaken. Four different scenarios were evaluated for the morning and afternoon peak periods: Pedestrian Safety Review Spadina Ave. 4

1. The existing intersection conditions and signal timings; 2. A south leg pedestrian crossing, coincident with removal of one of the westbound left-turn lanes; and 3. A south leg pedestrian crossing, to operate during the eastbound left-turn and through/right signal phase. 4. A south leg pedestrian crossing, operating on a pedestrian-only phase with the other three pedestrian crossings. All other traffic movements would continue to operate without pedestrian movements permitted. The results of the capacity analysis have been summarized in the table below. Option 1 2 3 4 Time Period Average delay to westbound left-turning Average westbound left-turn queue length motorists 50 th 95 th A.M. Peak 50.2 seconds/vehicle 30 metres 43 metres P.M. Peak 51.5 seconds/vehicle 57 metres 75 metres A.M. Peak 58.9 seconds/vehicle 50 metres 76 metres P.M. Peak 94.8 seconds/vehicle 110 metres 168 metres A.M. Peak 55.1 seconds/vehicle 34 metres 47 metres P.M. Peak 68.8 seconds/vehicle 72 metres 88 metres A.M. Peak 71.5 seconds/vehicle 40metres 58 metres P.M. Peak 100.6 seconds/vehicle 76 metres 112 metres As noted in the table above, the introduction of a pedestrian crossing on the south side of Spadina Avenue and Bremner Boulevard/Fort York Boulevard will significantly increases queues and delays for westbound motorists. All of the proposed scenarios to provide a south leg crossing will worsen the existing operations. For comparison purposes, the available storage for westbound motorists on Bremner Boulevard, between Spadina Avenue and Navy Wharf Court, is about 80 metres. Summary In view of the current safety record and the significant negative impacts that the proposed pedestrian crossing will have on the south leg of the intersection of Spadina Avenue and Bremner Boulevard/Fort York Boulevard, Transportation Services do not support this proposal. Pedestrian Safety Review Spadina Ave. 5

Councillor Joe Cressy has been advised of the recommendations of this staff report. CONTACT Ann S. Khan, P. Eng. Manager, Traffic Operations Toronto and East York District Transportation Services Telephone: (416) 397-5021 Fax: (416) 392-1920 E-mail: akhan5@toronto.ca SIGNATURE Kyp Perikleous Director, Transportation Services Toronto and East York District LIST OF ATTACHMENTS 1. Drawing No. 421G-1951, dated October 2015 P:\2015\Cluster B\Tra\Toronto and East York\Top\ts2015203te.top.doc - mb Pedestrian Safety Review Spadina Ave. 6