NORTHEAST CARLTON COUNTY BICYCLE ROUTE PLAN

Similar documents
MEETING MINUTES District 1 Trail Planning Meeting 1

Non-Motorized Transportation

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Welcome to the Cross County Trail Public Input Session!

University Region Non-Motorized Plan 2015

Trails. Lois Jensen Nature Preserve is a 30 acre parcel on the north end of the city. It provides unspoiled wooded paths.

CHAPTER FOUR: TRANSPORTATION

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

4. Safety Concerns Potential Short and Medium-Term Improvements

chapter - Hex Highway Touring Route Hamburg to Strausstown Overview

Segment 2: La Crescent to Miller s Corner

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

Two Harbors Trail System Plan

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights

Becker County Trail Routing Feasibility Study

FEASIBILITY CRITERIA

CITY OF ORR TRANSPORTATION IMPROVEMENT PLAN JUNE Prepared by: Arrowhead Regional Development Commission Regional Planning Division

Chapter 6: POLICY AND PROCEDURE RECOMMENDATIONS

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

2016 Regional Transportation Alternatives Program (TAP) Grant Application

EXECUTIVE SUMMARY FALL Introduction. Findings

OR MISSION TRAIL ELEMENTARY

Draft CITY OF TWO HARBORS TRAILS PLAN

Mohawk Hudson Bike Hike Trail Crossroad Connection Study

Minnesota Great River Road Transportation Alternatives Local Project Summaries December 19, 2016

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION

A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT

4.19 Parks, Recreation, and Conservation Lands

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Route 29 Solutions Projects

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Glacial Lakes State Trail Master Plan Amendment Trail Extension into Downtown Willmar

Community Development Committee

4.0 Context for the Crossing Project

Committee. Presentation Outline

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

FERN RIDGE TRAIL SYSTEM. Vision & Strategies

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

This section provides the basic information about the park or trail and the organizations responsible for it. Funding Application F

Business Item No

Committee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No.

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Little River Trail Feasibility Study

City of Mahtomedi Park System Plan Public Hearing Draft: September 13, 2006

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP).

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

Emily to Blind Lake Trail PROPOSED TRAIL DEVELOPMENT APPLICATION SUMMARY

Regional Wayfinding Sign Strategy Thurston County Trails 2017

1.2 Corridor History and Current Characteristics

State Route 8 Corridor. Northern Summit County s Path to Success

Schoolcraft Township is located in northeast Houghton County. A portion of the township borders Keweenaw County and Lake Superior.

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY

Grade Crossings in High Speed Rail Corridors

Coast to Coast Connector Summit

Environment and Natural Resources Trust Fund 2019 Request for Proposals (RFP)

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Lake Erie Commerce Center Traffic Analysis

COMMUNITY LOS PRIORITIES

3. Trail Alignment. Overview. Criteria for Location of the Trail

Cascade River State Park Management Plan Amendment

Chapter 6. Action Program. Heart of the Lakes Area Recreation Plan

Airport Planning Area

Hudson Highlands Fjord Trail Draft Master Plan. April 29, 2015

Waukee Trailhead Public Art and Amenities Project

Additional Economic Development Strategy submissions- Klickitat County

Northaven Trail Phase 2 Initial Project Overview

Northeast Quadrant Distinctive Features

County of Peterborough Active Transportation Master Plan

The Recreational Trail along Cushing Park road has been a successful addition to the city

Committee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No.

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Community Development

Tallahassee-St. Marks Historic Railroad Trail

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local

Transportation TRANSPORTATION PROJECTS

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services

FINCH HYDRO CORRIDOR TRAIL PROJECT

The Baker/Carver Regional Trail is intended to

Saginaw Charter Township Master Plan

Town of Limon Comprehensive Plan CHAPTER 6 TOURISM AND THE VISITOR ECONOMY

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

Greater Minnesota Regional Parks and Trails Commission Designation Application

Town of Frisco. Trails Master Plan. Legend. Planning Area 1. i l. 9 Campground. Lake Hill Development. Giberson Property. Frisco Transit Center

ALBANY-HUDSON ELECTRIC TRAIL FEASIBILITY STUDY. Final Report OCTOBER 2011

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

Greater Minnesota Regional Parks and Trails Commission Designation Application

Site Location and Setting

The Vision for the San Juan Islands Scenic Byway

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

LUDLAM TRAIL CORRIDOR DISTRICT

Transcription:

NORTHEAST CARLTON COUNTY BICYCLE ROUTE PLAN 5/31/2014 and St. Louis River Trail Plan Update Produced by the Arrowhead Regional Development Commission (ARDC) in Partnership with the State Health Improvement Program (SHIP), Minnesota s Lake Superior Coastal Program, the City of Cloquet and the Cloquet area Chamber of Commerce Trail Committee.

Plan Funders: Minnesota s Lake Superior Coastal Program City of Cloquet Carlton County Cloquet Area Chamber of Commerce Arrowhead Regional Development Commission This report was funded in part by the Coastal Zone Management Act of 1972, as amended, by NOAA s Office of Ocean and Coastal Resource Management, in conjunction with Minnesota s Lake Superior Coastal Program.

S T. L O U I S R I V E R T R A I L P L A N U P D A T E SUMMARY The communities of northeast Carlton County have a strong commitment to providing citizens and visitors with safe, convenient, and scenic options for walking and bicycling for both transportation and recreation. The Northeast Carlton County Bicycle Route Plan takes that commitment another step forward by identifying connections between existing facilities that make active transportation and recreation available to all area neighborhoods. The Plan makes seven recommendations for improvements in Thomson Township, Scanlon, Cloquet s Community Core, Big Lake Road area, Fond du Lac Reservation, South Cloquet Area and North Cloquet Area. Recommendations include route signage, new paved trails, policy changes, and road shoulder widening.

BACKGROUND Northeast Carlton County consists of the Cities of Carlton, Cloquet, Scanlon, Thomson, and Wrenshall, the Fond du Lac Reservation, and the Townships of Thomson (Esko), Perch Lake, and Twin Lakes. The total population of this area is over 25,000 residents. The area is bicycle oriented-the Willard Munger State Trail, a paved trail connecting nearby Duluth, Minnesota to Hinckley, Minnesota (63 miles), is a popular centerpoint for the region. The communities of northeast Carlton County have long advocated for direct and safe bicycle access to the trail from their homes and businesses. In 2005, the Arrowhead Regional Development Commission (ARDC) published the St. Louis River Trail Plan. That plan proposed a paved, non-motorized trail connecting the Willard Munger State Trail to the City of Cloquet through the Cities of Carlton and Scanlon. The trail was shown as roughly paralleling the St. Louis River. The first phase of the trail has been constructed. From south to north, it passes through Carlton neighborhoods, then passes through a scenic forested area and terminates at a parking lot just off of Interstate 35 and just south of Scanlon. The lot is known as the Scanlon Park and Ride. The other phases of the project have not been constructed. A safe, efficient, and cost effective alignment through the Scanlon commercial district and along the river has not been identified. Other ideas for alignments have not moved forward due to cost and easement concerns. Meanwhile, other trail initiatives in the area have moved forward. A paved trail to the east, in Esko along County Highway 61 is set to be constructed this summer (2013). A paved trail to the west, along Big Lake Road from Cloquet to the Fond du Lac Tribal facilities, is being constructed in 2014. The Cloquet Area Chamber of Commerce determined an update of the St. Louis River Trail Plan is needed and held a Trail Committee meeting in April 2013. The Committee asked ARDC to develop a scope of work outlining a planning process that can move bicycle connections forward in northeast Carlton County. Due to the other trail initiatives and the constraints on completing the St. Louis River Trail as originally proposed, ARDC proposes that a larger examination of bicycle potential in the area; not just an update to the St. Louis River Trail Plan should occur. Page 1

PLANNING PROCESS ARDC worked with the Cloquet Area Chamber of Commerce Trail Committee throughout the planning process. At each monthly meeting, ARDC staff presented information about the local trail system and potential improvements. Meeting participants provided feedback on ideas, clarified projects within their jurisdictions, and suggested the next steps to be completed in the process. This document was developed as the process moved along and was presented as a draft in April 2014. Following that meeting site visits were held to each proposed project location. After changes were made, ARDC developed an implementation checklist for the stakeholders to follow and use when working to meet the goals of this process. Concurrently, the City of Cloquet is completing an update of their Comprehensive Plan s transportation chapter. The Trail Committee decided to wait to present the final draft of this plan until the public meetings are held regarding the transportation chapter. The committee felt that this process and the transportation chapter update process were very closely aligned and that it was likely the recommendations from this document would be folded directly into the update. Therefore these recommendations will be publicly vetted as part of the transportation chapter update s extensive public input process. Process Participants City of Cloquet City of Scanlon Thomson Township Carlton County Fond du Lac Tribe Cloquet Active Transportation Coalition Cloquet Area Chamber of Commerce Trail Users/Stakeholders Page 2

RECOMMENDATIONS Area 1: Thomson Township (Esko) The community of Esko, in Thomson Township, surrounds the intersection of Carlton County Highways 1 and 61. The community has a school and some businesses. A. Connect Scanlon to Esko There is currently a paved off road trail going north from the 1/61 intersection to the school s ball fields and sports facilities. There is also a paved trail paralleling Highway 61 between Highway 1 and Maple Drive. Thomson Township and Carlton County have applied for funding to extend that trail about another mile west. The Highway 61 bridge over the St. Louis River on the Township s far west side has a separated facility on it south side for bikes and pedestrians, but is not connected to any off road trails. This plan recommends that the communities in northeast Carlton County continue to seek a paved trail connector between Scanlon and Esko. A route continuing the existing 10 foot wide paved trail in Esko extending west on the south side of Highway 61 would be preferred, as it could take advantage of the separated bridge facility near Scanlon. This new trail would need safe passage through Scanlon in order to connect to Cloquet, Fond du Lac, and Carlton (See Area 2 recommendations). Summary: Goal: Connect Esko to Scanlon Reasoning: Connecting two population centers, where people work and shop, and where schools are located is a priority for bicycle connectivity Existing facilities: Approximately one mile of paved, off road trail is constructed, another ½ mile is proposed and funding is currently being sought; separate lane for bikes and peds is in place across St. Louis River Needed improvements: Construction of the remainder of the paved, off road trail between Scanlon and Esko, on the south side of Highway 61, within Carlton County right of way. Distance: 2.2 miles Construction Cost: $900,000 Design and Engineering Cost: $135,000 Page 3

B. Connect Esko to Thomson and the Munger Trail County Highway 1 directly connects the City of Thomson and the community of Esko. It is a fairly busy roadway with a wide shoulder and an overpass and interchange with Interstate 35. Thomson is bisected by the Willard Munger State Trail, a former railroad bed that is now a paved, off road trail. The Munger connects northeast Carlton County with Duluth. This plan recommends that Highway 1 between Esko and Thomson be maintained as a bike route. It should be signed as a bike route and the shoulder s pavement should be kept in good repair. It is an important route connecting users to the popular Munger Trail. It also could be a part of a long loop connection Esko to Carlton, Carlton to Scanlon, and Scanlon back to Esko. Route Statistics: Goal: Connect Esko to Thomson and Munger Trail Reasoning: Connecting the population center of Esko to the Willard Munger State Trail opens the community to a major biking destination and multiple route opportunities Existing facilities: There is a paved shoulder on much of Highway 1 between Thomson and Esko, but it may be rough and deteriorated in some areas Needed improvements: The route may need pavement work and signage may need to be increased and improved Distance: 4.1 miles Construction Cost: $284,000 Design and Engineering Cost: $42,600 C. Support Future Development of Slate Mine Trails At the west edge of Thomson Township, on the east bank of the St. Louis River, is property that is owned by Minnesota Power, the entity that operates the River s dams and hydroelectric facilities, and Sappi Paper, who owns the nearby paper manufacturing facility. The site is home to some closed slate mine pits. The property has no current use or development and it will remain that way unless air quality restrictions are lifted. This plan recommends that action be taken to remove the site from use restrictions when the air quality conditions allow it. Use of the site for recreation can be examined at that time. A paved trail and/or a series of mountain bike trails may be an appropriate use. Page 4

Page 5

Area 2: Scanlon/Tall Pine Lane/St. Louis Trail Area The City of Scanlon has a commercial center on Highway 45 just north of Interstate 35. These businesses include taverns, restaurants, gas stations/convenience stores, and some auto/truck related facilities. The BNSF railroad bisects the City, cutting off most residences from the commercial area and from the Scanlon River Park recreation site. A. Extend St. Louis Trail north of Interstate 35 to the intersection of County Highway 45 and County Highway 61, and to Scanlon River Park. The St. Louis River Trail is a paved off road facility that connects the City of Carlton and the Willard Munger State Trail to the park and ride lot on the south side of Interstate 35 at Highway 45. The St. Louis River Trail Plan calls for the trail to extend into Scanlon and Cloquet. That has yet to be realized. The area between the park and ride lot and the traffic signals at the intersection of Highways 61 and 45 is quite congested with businesses that have a motor vehicle focus (many driveways/accesses on Highway 45) and the underpass of Interstate 35 by Highway 45 is narrow and offers very little room for bikes and peds. This creates a difficult situation in which to fit in a 10 foot wide off road paved trail. This plan recommends that the northeast Carlton County communities collaborate on a design project that does an in-depth examination of the area between the park and ride and the 45/61 intersection. This process would utilize existing right of way mapping, public input, business input, and City input to find a usable route for the trail. It would also examine non-trail options such as widened shoulders/bike lanes. The information from this design process will drive the pursuit of construction funding. The design process could also determine the feasibility and design for a potential new road crossing of the BNSF railroad at Tall Pine Lane. The design would look at interpretive possibilities at the site of Scanlon's first lumber mill and could determine if a tunnel under County Highway 45 to Scanlon River Park is at all feasible. Page 6

Primary Recommendation: Complete design project to determine potential route and feasibility of extending the St. Louis River Trail to the 45/61 intersection, Scanlon River Park, and Tall Pine Lane. Route Statistics: Goal: Connect Scanlon commercial area to the St. Louis River Trail Reasoning: Scanlon has several hospitality businesses that could benefit from a direct connection to the Trail. Existing facilities: St. Louis River Trail to Scanlon Park and Ride, traffic signal at 61 and 45 Needed improvements: Construction of a paved off road trail or designated bike lanes on Highway 45 Distance: 0.4 miles Construction Cost: $225,000 Design and Engineering Cost: $33,750 Goal: Connect St. Louis River Trail to Scanlon River Park Reasoning: Scanlon River Park is a natural amenity that is underutilized by the community and serves as a natural corridor to Cloquet. Existing facilities: Traffic signal at 61 and 45 Needed improvements: Construction of a paved off road trail or designated bike lanes on Highway 61 to Scanlon River Park entrance Distance: 0.18 miles Construction Cost: $81,000 Design and Engineering Cost: $12,150 Alternate Option: Bore a tunnel for the trail connection under County Highway 45 to Scanlon River Park Existing facilities: High grades on County Highway 45 due to railroad bridge Needed improvements: Construction of a paved off road trail and tunnel Distance: 0.21 miles Construction Cost: $700,000 Design and Engineering Cost: $105,000 Page 7

B. Examine the opportunity to develop Tall Pine Lane through Scanlon between Highway 45 and 22 nd Street as a roadway that accommodates bicycles at a high level (either a separate facility in the corridor or using striping and signage) and as a paved off road bicycle trail in Cloquet between 22 nd Street and 14 th Street. Tall Pine Lane is a corridor that is an unimproved road or just empty right of way that extends across the south side of Scanlon and the Cloquet core. The right of way includes properties on both the east and west sides of the BNSF railroad in Scanlon s commercial area. The Scanlon Comprehensive Plan calls for the City to examine the possibility of building a new roadway for Tall Pine Lane. The roadway would start at Highway 45 heading west, make a new crossing of the BNSF Railroad, and follow the existing Tall Pine right of way to the Scanlon city limits at 22 nd Avenue. An off road trail or designated bike lanes, along with sidewalks, could be part of the roadway design. Moving west into Cloquet, an off road paved trail could be built in the right of way, connecting to 14 th Avenue, a proposed bike route. There is an existing underutilized railroad crossing in Scanlon that could be closed if a new crossing is constructed. This plan recommends that the Tall Pine Lane idea be part of the design process recommended in Section D. This process will inform the communities about the idea s feasibility, route, and potential cost. Route Statistics: Goal: Connect Scanlon and Cloquet to each other and the St. Louis River Trail Reasoning: Safer, dedicated bike and ped facilities are needed between Scanlon and Cloquet, currently there are major barriers between the communities-this connection will also facilitate a safer connection to the St. Louis River Trail, Esko, Carlton, and the Willard Munger State Trail Existing facilities: right of way, rough roadway Needed improvements: Road construction, bike facility construction, sidewalk construction, bike trail construction, and railroad crossing construction Trail Distance: 0.5 miles Construction Cost: $225,000 Design and Engineering Cost: $33,750 Road Construction Distance: 0.6 miles Construction Cost: $3,992,180 Design and Engineering Cost: $589,827 Page 8

C. Extend St. Louis River Trail through Scanlon River Park and to Cloquet. On the west side of the St. Louis River in Scanlon is a wooded area with a non-motorized boat landing, a parking area, and a fishing pier. The site also has a cleared corridor running through it that is the path of a wastewater pipeline. The site is owned by Minnesota Power, who has a dam there. The site is referred to as Scanlon River Park. The park has a nice location and is generally underutilized. The original St. Louis River Trail Plan showed a potential trail corridor going through the park on or near the pipeline corridor, then crossing the BNSF railroad before paralleling Highway 45 into Cloquet s downtown. This plan continues that recommendation. This plan also recommends that the design of the trail and potentially other facilities in the park be part of the design process recommended in Sections D and E. This process will generate ideas for improving the value of the park to the community and will determine the feasibility and potential cost of a trail through the site. Route Statistics: Goal: Connect Scanlon River Park to Scanlon and Cloquet, connect Cloquet to St. Louis River Trail Reasoning: Scanlon River Park is underused natural resource in a scenic location and there are safety barriers for peds and bikes wishing to access it; Cloquet would benefit from a connection to the St. Louis River Trail Existing facilities: Parking lot, non-motorized boat access, cleared pipeline corridor Needed improvements: Trail through park, railroad bridge or tunnel, additional trail to Cloquet s downtown Distance: 1.7 miles Construction Cost: $956,400 Design and Engineering Cost: $143,460 Page 9

Page 10

Area 3: Cloquet Community Core The City of Cloquet covers several square miles and has two distinct areas, the central core that is the location of most of the City s residences, community facilities, and businesses. This plan calls this area the Community Core. The Cloquet Active Transportation Coalition is a group dedicated to improving active living opportunities in Cloquet. That group has published a map of preferred routes for walking and biking in the Community Core. A. Maintain and sign the bicycle routes promoted by the Cloquet Active Transportation Coalition and shown on their community walking and biking map. The Coalition s maps show preferred routes. The community should strengthen those designations by signing the routes and striping them where feasible. Route Statistics: Goal: Formalize the bike route system in Cloquet to ensure its continued use and designation Reasoning: Having promoted routes will create more community awareness of biking and walking opportunities and will enhance safety Existing facilities: Maps Needed improvements: Signage and striping Distance: Construction Cost: Design and Engineering Cost: Page 11

B. Add an on-street bike route on the eastern portion of Cloquet and the western edge of Scanlon. Including 22 nd Street in the bike network would accommodate this connection and would be a good connection to the potential Tall Pine Lane route. Adding the east portion of Carlton Avenue to the network would also help connectivity. Route Statistics: Goal: Ensure eastern Cloquet and western Scanlon are served by the bike route system Reasoning: Providing walking and biking opportunities in the eastern area of Cloquet and its important destinations (school, Scanlon community center) is important Existing facilities: (NOT SURE) Needed improvements: signage, striping, sidewalks? Distance: 1.6 miles Construction Cost: $183,150 Design and Engineering Cost: $27,470 Page 12

Page 13

Area 4: Big Lake Road Connections A. Connect Big Lake Road to Pinehurst Park and Carlton Avenue in Cloquet Big Lake Road is the main route between the Cloquet Community Core and the facilities of the Fond du Lac Tribe. The Tribe has constructed a short off road paved trail along Big Lake Road near its community store, and the tribe will be extending that trail all the way to the Tribal headquarters in the summer of 2014. This plan recommends developing a connection between the terminus of the Tribe s trail and downtown Cloquet. Big Lake Road has wide shoulders that can be used (parking could be eliminated and lanes could be striped) from the trail terminus east to Balsam Street. From there, a signed and striped route going north on Balsam, then east on Carlton Avenue, then north and east on Park Avenue would get users to Pinehurst Park. These roads generally have wide surfaces and sidewalks. The route would pass by a playground at Laurel and Carlton as well. Route Statistics: Goal: Connect Fond du Lac Tribal facilities and western Cloquet to Cloquet s parks, schools, and downtown Reasoning: This would connect two major destinations (Big Lake Road Trail and Pinehurst Park) and would provide a safe alternative to the narrow east end of Big Lake Road and busy Highway 33. Existing facilities: Trail from Cloquet to Fond du Lac, green spaces, right of way Needed improvements: Signage and striping, parking elimination, trail construction Distance: 0.6 miles Construction Cost: $225,000 Design and Engineering Cost: $33,750 Page 14

B. Connect Pinehurst Park to Doddridge Avenue Pinehurst Park is a major destination for people seeking recreation. The Doddridge Avenue area is a major retail and hospitality business area. A pedestrian facility between the two areas would be beneficial, particularly after the major pedestrian safety issues at Doddridge are addressed in a 2014 construction project. Route Statistics: Goal: Connect busy Pinehurst Park to a major commercial area and south Cloquet residences Reasoning: Both locations would be major destinations for walkers Existing facilities: Highway 33 corridor Needed improvements: Sidewalk or off road trail construction along Highway 33, most likely on the west side of the roadway. Distance: 0.4 miles Construction Cost: $60,150 (sidewalk) Design and Engineering Cost: $9,022 Page 15

Page 16

Area 5: Fond du Lac Tribal Facilities The Fond du Lac Tribe has government centers, housing areas, and Black Bear Casino Resort under its jurisdiction on the western edge of Cloquet. The facilities are somewhat spread out over the area. A. Connect Big Lake Road Trail to additional tribal facilities The Fond du Lac Tribal complex on Big Lake and University Roads, includes government facilities, schools, and health sites. The trail along Big Lake Road will terminate at the University Road intersection. This plan recommends extending the trail that is set to be constructed in 2014 to connect with the key destinations of the complex. Route Statistics: Goal: Directly connect trail users to tribal facilities Reasoning: Providing direct connections will enhance safety for bikes and peds Existing facilities: Trail to be built in 2014, Tribal facilities Needed improvements: Trail construction Distance: 0.6 miles Construction Cost: $225,000 Design and Engineering Cost: $33,750 Page 17

B. Connect Tribal Headquarters to Black Bear Casino Resort Black Bear Casino Resort is a major facility operated by the Fond du Lac Tribe. It has gaming, lodging, a golf course, and other services/attractions. It is located on Interstate 35 and Highway 210 south of Cloquet. It is isolated from some other Tribal facilities and is one of the largest employers in northeast Carlton County. This plan recommends developing a connection between the Tribe s headquarters and the Casino Resort. There are wide shoulders on University Road that could be designated for bikes from the Tribal headquarters to its intersection with Cartwright Road. From there, Cartwright road is being reconstructed in 2014 and will have wide shoulders following the project. Those shoulders could be designated to the Moorhead Road. Going east on the Moorhead Road would connect users to a service road to the Casino Resort. The Moorhead Road has narrow shoulders and there are no current reconstruction plans for that roadway. This plan recommends that Moorhead Road be signed to remind motorists bikes are used on it. It is also recommended that any opportunities to widen the road east of Cartwright be sought out and implemented when possible. Route Statistics: Goal: Connect tribal facilities to each other Reasoning: The Casino Resort and the Tribal headquarters are major destinations and employers and should be connected Existing facilities: Wide shoulders on University and Cartwright Roads Needed improvements: Wider shoulders on Moorhead Road Distance: 2.5 miles Construction Cost: $2,000,000 Design and Engineering Cost: $300,000 Page 18

C. Connect Black Bear Casino Resort to County Highway 3 Taking a service road on the north side of Black Bear Casino Resort and then going east on Moorhead Road over Interstate 35 will bring users to County Highway 3. This will serve to connect the Resort Casino to Cloquet, the St. Louis River Trail, Carlton, and the Willard Munger State Trail. Unfortunately, Moorhead Road is a barrier. It has narrow shoulders, and the bridge over the Interstate is narrow and has fairly low shoulder barriers on the bridge s edge. Once east of the Interstate, however, Moorhead Road s shoulders are wide and paved, making a nice connection. This plan recommends that opportunities to improve the Moorhead Road to make it more bike friendly be sought out and implemented when possible. In the meantime, the stretch of the road between the Casino Resort service road should be signed as a Share the Road segment for bikes. This may involve lowering the speed limit and raising the shoulder barriers on the bridge. Route Statistics: Goal: Connect major tourism and lodging facility to Cloquet, Carlton, Scanlon, and the Willard Munger State Trail Reasoning: Connecting the area s major tourism and service facilities for cyclists is a priority Existing facilities: Wide shoulders on Moorhead Road east of the interstate Needed improvements: Widen shoulders and improve the bridge on Moorhead Road east of the Casino Resort service road. Temporarily create a Share the Road situation for that segment. Distance: 0.3 miles Construction Cost: $1,031,300 (including bridge replacement) Design and Engineering Cost: $154,700 Page 19

Page 20

Area 6: South Cloquet Area The area south of the Cloquet Community Core is a mix of rural and suburban residential areas. Fond du Lac Community and Tribal College is located in this area south of Interstate 35 as well. County Road 3 (also known as 14 th Street and Carlton Road) bisects the neighborhood. County Road 3 has wide paved shoulders and an upcoming bridge upgrade will raise the shoulder barriers, enhancing the route s bikeability. A. Designate and sign County Highway 3 as a bike route County Highway 3, also known as 14 th Street and Carlton Road, has wide shoulders and provides connections to Cloquet, the St. Louis River Trail, and the Willard Munger State Trail. This plan recommends that the roadway be designated as a bikeway, particularly after the shoulder barriers on the Interstate 35 bridge are raised. Route Statistics: Goal: Connect Cloquet to Fond du Lac Community College, Carlton, St. Louis River Trail, the Willard Munger State Trail, and Black Bear Casino Resort Reasoning: This roadway is a key connector for several bike destinations Existing facilities: Wide shoulders Needed improvements: Signage, striping Distance:.4 miles Construction Cost: $47,760 Design and Engineering Cost: $7,160 Page 21

Page 22

Area 7: North Cloquet Area North of the Cloquet Community Core and the St. Louis River is an area that includes residences and businesses (including the area hospital). The only transportation connections between the Community Core and the North Cloquet area is the Highway 33 bridge and an ATV route bridge, creating a somewhat isolated area. The Highway 33 bridge is busy and has a sidewalk, but can be intimidating to cyclists. Additionally, Highway 33 north of the bridge has many automobile oriented business entrances and street intersections, creating a very busy, daunting area for bikes and peds. A. Construct a better connection to North Cloquet over the St. Louis River A better connection for peds and bikes should be developed over the River. There are multiple islands north of downtown Cloquet that could help facilitate such a project. Route Statistics: Goal: Provide a designated bike connection to North Cloquet, including its elementary school and hospital/clinic facility, to downtown Cloquet and City s bike route system OfReasoning: Using the Highway 33 bridge is unsafe for many cyclists. Existing facilities: Islands and parks north of Cloquet s downtown. Needed improvements: A new bridge and trail connections to that bridge Distance: 0.4 miles Construction Cost: $5,000,000 Design and Engineering Cost: $750,000 Page 23

Page 24

Appendix B: Implementation Checklist Area Goal Needed Improvement Action Responsible Party Timeline Notes A: Connect Scanlon to Esko Construct 2.2 miles of off-road trail Seek Funding for Engineering Thomson Township/Trails Committee Short DNR Local Trails Connection Grant; Coastal Program Grant Complete Engineering Carlton County Short Seek Contstruction Funding Thomson Township Short Next Safe Routes to School program is 100%! Construct Trail Carlton County Medium Maintain Trail Carlton County Long 1 B: Connect Esko to Thomson/Munger Trail Ensure quality paved shoulder Assess shoulder Carlton County Short Determine needed investment Carlton County Short Fix Shoulder/Identify Future Project Carlton County Medium C: Support Future Recreational Development of Slate Mine Area Elimination of Air Quality Zone Work with Industry to Determine Steps Trails Committee Medium Undesignate area Industries/State Medium Plan and Construct Trails Trails Committee Long A: Extend St. Louis River Trail north of Interstate 35 to 45/61 Construct 0.58 miles of off road trail Finalize funding for design ARDC/Trails Committee Short Complete Design ARDC/Consultant Short Seek Trail Funding Scanlon/Trails Committee Medium MnDOT may have partial funding for trail within their ROW 2 B: Examine the opportunity for Tall Pine Lane Extension Construct road with bike facility/rr Xing Share idea with the public Scanlon Short Design roadway/crossing ARDC/Consultant Short C: Connect St. Louis River Trail into downtown Cloquet 1.7 miles of off road paved trail Design trail & bridge ARDC/Consultant Short Design alternate trail (if needed) Scanlon/Trails Committee Medium seek construction funding Scanlon/Cloquet Short TAP funds for 2019 - apps due 2014 A: Designate bicycle routes in central Cloquet Signage of existing routes Identify sign locations Cloquet/Active Transporation Coalition Short Use existing map 3 Install signs Cloquet Medium B: Add an eastern bike route in Cloquet Signage of 22nd Street Identify sign locations Cloquet/Active Transporation Coalition Short Install signs Cloquet Medium A: Connect Big Lake Road Bike Route to Cloquet Striping and signage of Birch, Carlton, and Park Ave/Streets Identify sign locations Cloquet Short 4 Stripe route and install signs Cloquet Medium B: Connect Pinehurst Park to Doddridge Avenue Construct trail/sidewalk on west shoulder of Hwy 33 Write letter to MnDOT requesting action Trails Committee Short A: Connecti Big Lake Road to additional tribal facilities Construct trail in Tribal complex Identify routes Fond du Lac Short Seeking funding for construction Write applications Fond du Lac w/trail committee support Short TAP funds for 2019 - apps due 2014 B: Connect Tribal complex to Black Bear facility Sign Cartwright Road as bike route Identify sign locations Fond du Lac Short Install signs Fond du Lac TBD Depends on route connectivity 5 Install shoulders on Moorhead Road Review potential project & costs Carlton County Short seek construction funding Carlton County Medium Designate back service road to Black Bear as a bike route Identify sign locations Fond du Lac Medium Install signs and sharrows Fond du Lac Medium C: Connect Black Bear to County Highway 3 Make Moorhead bridge over I-35 safer Review potential project & costs MnDOT Short seek construction funding MnDOT Medium 6 7 A: Designate County Highway 3/14th St as a bike route A: Construct a better connection between N. Cloquet and downtown Designate route Construct bridge over river Review potential project & costs Review potential project & costs Carlton County Cloquet Short Medium Designate alternate route Install signs and construct stripes Construct paved trail to ATV bridge Carlton County Cloquet Short Medium Page 25

For more information about this document, please contact: Andy Hubley, AICP ARDC 221 West first Street Duluth MN 55812 ahubley@ardc.org 218-529-7512 www.arrowheadplanning.org/ Page 26