Appendix JK. Noise Barrier Visualizations. I-290 Eisenhower Expressway Cook County, Illinois. Prepared For: Illinois Department of Transportation

Similar documents
Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016

A History of the Construction of the Radial Expressway System in Cook County

Trans Canada Highway Corridor Management Plan. Final Draft Report. Drinkwater Road to Cowichan Bay Road. Prepared for:

INTERVIEW WITH ED ROGERS FOR THE FOREST PARK HISTORICAL SOCIETY-INTERVIEW BEGAN MIDSENTANCE, NO INTRODUCTIONS, DATE,

Section 3.6 Recreation

DOWNTOWN BRT ALTERNATIVE - 19th AVE

CHAPTER FOUR RECOMMENDED NOISE COMPATIBILITY PROGRAM MEASURES

APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

2013 Regional Water System Improvements Program Public Hearing March 14, 2013

Sears Centre Arena Julie Avis

CHAPTER 4 - COMMENTS AND COORDINATION Introduction Comments and Responding to Comments

Study Overview and Context

2954 WEST LAKE STREET KINZIE CORRIDOR

PART 12 - Directory Services 1st Revised Sheet 1 SECTION 3 - Directory Distribution

I-75 in Hamilton County Project Termini

Classifications, Inventory and Level of Service

Austin-Bergstrom International Airport Master Plan Update

Project Deliverable 4.1.3d Individual City Report - City of La Verne

Professional Providers Near You

Alternatives Development and Evaluation Report

2nd Annual Historic L Station Tour. November 19, Presented By: The Illinois Historic Preservation Agency

I-94 at Grand Avenue Interchange: The Ride before the Roller Coaster

Construction Update. Local Officials Briefing March 2016

Active Red Light Camera Approaches

ROUTE AVN ALLEGHENY VALLEY NORTH FLYER

South Bay Metro Green Line Extension

THE CTI STUDIO AT COBO CENTER. (800) Broadcast - Commercial - Photo - Webcast

METRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017

Advertising, Sponsorship, Directional, and Wayfinding Signage on Multi-Use Trails Policy

VISITOR GUIDE. Welcome to the Oak Park Area! Welcome

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

The Baker/Carver Regional Trail is intended to

CIRCULATION (RENEWAL) STATISTICS At all locations, Including through the Internet April

Project Deliverable 4.1.3f Individual City Report - City of San Dimas

REPRESENTATIVE ASSET PORTFOLIO» RECEIVER SERVICES // PROPERTY MANAGEMENT // BROKERAGE // GENERA L CONTRACTING

Portable Noise Monitor Report

For Sale or Lease: 415 North Avenue Lombard, IL

FARE MEDIA SALES OUTLETS

DAILY PERCENT OF ALL PERCENT OF ALL CATEGORY BOARDINGS BOARDINGS STATIONS STATIONS ACCESSIBLE 190, % %

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

2018 Service Implementation Plan Executive Summary

Percent Hispanic Chicago. Median Income. Total Population 46,781 2,824,064 52,657 44,261 46,207 12,315 13,735 30,263 44,627 59,478 55,258 32,672

Noise Abatement Decision Report

Cambridge Avenue. Cleveland Avenue. Chicago Avenue. Chicago Avenue. Curbed planters with groundcover,

Citrus Heights Creek Corridor Trail Project. Trail Advisory Group Meeting #3 July 8, 2013

CUY LAKE TO LAKES TRAIL (PHASE 2): PID

Submitted to: NYX CAPITAL CORP. 1131a Leslie Street, Suite 201 Toronto, Ontario M3C 3L8 Attention: Mr. Tim Jessop Development Manager

Building the transportation network we need for the future in Niagara Region

APPENDIX G WATER QUALITY IMPACTS

S i t e A n a ly s i s

Main Line System Recommendations

NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM

I-70/I-71 Project Public Meeting Presented By

Notice of Availability of the Final Re-Evaluation of the. O Hare Modernization Environmental Impact Statement (Final

Appendix 1: Phase I Strategies

Milestone: Bridge to Nowhere scheduled for demolition Aug 14

Damen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501

Pedestrian Safety Review Spadina Avenue

* New Meelng, needs your support

Major Projects Overview

Case: 1:14-cv Document #: 1 Filed: 05/02/14 Page 1 of 5 PageID #:1

Sex By Educational Attainment For The Population 25 Years And Over by Place and Township - CCDPH, 2000 Census

Transportation Guide

A BOAT RAMP TO NOWHERE

Poverty Status in 1999 by Age by Place and Township-CCDPH, 2000 Census Persons for Whom Poverty was Determined

* New Meekng, needs your support

CIRCULATION (RENEWAL) STATISTICS At all locations, Including through the Internet Year 2013

Section 6: Infant Mortality Infant Mortality 1 Neonatal Mortality 2 Post Neonatal Mortality 3

QEW - ALTERNATIVE 3. Ÿ Widen QEW by one HOV lane in both direc ons through Freeman Interchange to North Shore Boulevard Interchange.

Section 6: Infant Mortality Infant Mortality 1 Neonatal Mortality 2 Post Neonatal Mortality 3

change your view 200 South Wacker Drive Chicago, IL

IL 390 Station. Wood Dale Open House Summary 5/18/17

Raytown: overview. map. Santa Fe, Oregon, and California National Historic Trails KANSAS CITY KANSAS CITY. 38 Trail alignments: Raytown.

2015%Ironbound%Spring%Warmup% Directions!

ONE REMAINING OPPORTUNITY LAKE STREET, LOOKING SOUTHEAST

Williamsburg Town Hall Meeting

APPENDIX A DATA COLLECTION BIBLIOGRAPHY SANTA CLARA COUNTY I-680 CORRIDOR STUDY

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014

Memorandum / Letter of Intent

Berwyn (IL) (Images Of America) By Douglas Deuchler READ ONLINE

3.6 PARKLANDS, OPEN SPACE, AND RECREATION AREAS

Trigger Point Justification Note 30 th August 2013

About the Foothill Gold Line

Mohawk Hudson Bike Hike Trail Crossroad Connection Study

Lee County Board of County Commissioners January 24, 2017 Workshop Meeting

FY Transportation Improvement Program Basic Project List (in Thousands)

TRAIL INVENTORY. Appendix a. Trail INVENTORY A-1

Connectivity is the new currency. -Mayor Pete Buttigieg, South Bend

Ministry of Transportation

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

The Atlanta BeltLine. Project Overview Map

MAPS ARE ARRANGED IN ALPHEBETICAL ORDER BY STATE. SELECT THE CONTROL Ctrl and F KEYS AND TYPE YOUR CITY NAME San Diego: San Diego State University

APPENDIX H NOISE COMPATIBILITY PROGRAM ALTERNATIVES

Department-owned Facilities...Page A-2. Department-operated Facilities...Page A-4. Plaza Configurations - Department-owned Facilities

APPENDIX F List of Commitments

Addresses. Site. Delivery June 2018

TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712

Transcription:

Appendix JK Noise Barrier Visualizations I-290 Eisenhower Expressway Cook County, Illinois Prepared For: Illinois Department of Transportation Prepared By: WSP Parsons Brinckerhoff September August 2016

This page intentionally left blank

Appendix J Table of Contents NOISE BARRIER VISUALIZATIONS IDOT recognizes that noise barriers would be a new built element in the Project Corridor, and considers them a potential opportunity to provide visual enhancement to both the mainline and adjacent land uses. As such, IDOT is open to the innovative use of both traditional and new materials for noise barrier construction and will work with local communities to select the most appropriate material(s), character, and finishes for barriers with the local context. To achieve the ultimate desired character and aesthetic requested by the stakeholders, local financial participation may be required. The following illustrations are representative of the possible appearance of the proposed noise walls at various locations within the Project Corridor. The ultimate appearance of noise barriers will be determined during the final design phase of the project. No. Community Location 1 Westchester Wedgewood Drive and Bristol Avenue 2 Bellwood Harrison Street and 21 st Avenue 3 Maywood Bataan Drive and 18 th Avenue 4 Broadview Bataan Drive and 15 th Avenue 5 Maywood Bataan Drive and 8 th Avenue 6 Maywood Harrison Street and 1 st Avenue 7 Maywood Bataan Drive and 2 nd Avenue 8 Forest Park Lehmer Street and Beloit Avenue 9 Forest Park Lehmer Street and Marengo Drive 10/11/12 Oak Park Harrison Street and Maple Avenue 16 Oak Park Ridgeland Avenue and I-290 21 Oak Park Flournoy Street and Austin Boulevard 24 Chicago Flournoy Street and Central Avenue 28 Chicago Congress Street and Denvir Avenue 29 Chicago Van Buren Street and Seeley Avenue

Noise Barrier Visualizations Location Map

Existing 1 Wedgewood Drive & Bristol Avenue Westchester

With Noise Wall 1 Wedgewood Drive & Bristol Avenue Westchester

Existing 2 Harrison Street & 21 st Avenue Bellwood

With Noise Wall 2 Harrison Street & 21 st Avenue Bellwood

Existing 3 Bataan Drive & 18 th Avenue Maywood

With Noise Wall 3 Bataan Drive & 18 th Avenue Maywood

Existing 4 Bataan Drive & 15 th Avenue Broadview

With Noise Wall 4 Bataan Drive & 15 th Avenue Broadview

Existing 5 Bataan Drive & 8 th Avenue Maywood

With Noise Wall 5 Bataan Drive & 8 th Avenue Maywood

Existing 6 Harrison Street & 1 st Avenue Maywood

With Noise Wall 6 Harrison Street & 1 st Avenue Maywood

Existing 7 Bataan Drive & 2 nd Avenue Maywood

With Noise Wall 7 Bataan Drive & 2 nd Avenue Maywood

Existing 8 Lehmer Street and Beloit Ave Forest Park

With Noise Wall 8 Lehmer Street and Beloit Ave Forest Park

Harlem Ave Ramp Without noise wall 9 Lehmer Street & Marengo Drive Forest Park

Harlem Ave Ramp With noise wall 9 Lehmer Street & Marengo Drive Forest Park

Harlem Ave Ramp Without noise wall 10 Harrison Street & Maple Avenue Oak Park

Harlem Ave Ramp With noise wall 10 Harrison Street & Maple Avenue Oak Park

Harlem Ave Ramp Without noise wall 11 Harrison Street & Maple Avenue Oak Park

Harlem Ave Ramp With noise wall 11 Harrison Street & Maple Avenue Oak Park

Harlem Ave Ramp Without noise wall 12 Harrison Street & Maple Avenue Oak Park

Harlem Ave Ramp With noise wall 12 Harrison Street & Maple Avenue Oak Park

Without Noise Wall 16 Ridgeland Avenue & I 290 Oak Park

With Noise Wall 16 Ridgeland Avenue & I 290 Oak Park

Without Noise Wall 21 Flournoy Street & Austin Boulevard Oak Park

With Noise Wall 21 Flournoy Street & Austin Boulevard Oak Park

Existing 24 Flournoy Street & Central Avenue Chicago

With Noise Wall 24 Flournoy Street & Central Avenue Chicago

Existing 28 Congress Street & Denvir Avenue Chicago

With Noise Wall 28 Congress Street & Denvir Avenue Chicago

Existing 29 VanBuren Street & Seeley Avenue Chicago

With Noise Wall 29 VanBuren Street & Seeley Avenue Chicago