FY Transportation Improvement Program Basic Project List (in Thousands)

Similar documents
FY Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded

Changes in TIP projects Draft vs. Final Draft

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

±34 ACRES - LAKE AVENUE

±2.47 ACRES AT THE VILLAGE AT MERIDIAN EXCLUSIVE LISTING MERIDIAN, ADA COUNTY, IDAHO

±158 INDUSTRIAL ACRES

Listing Summary. Land Listings. December Land with Trophy Bass Pond on Private Duck Hunting Preserve. Private Access. 20 Minutes from Caldwell.

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Listing Summary. Land Listings. April Land with Trophy Bass Pond on Private Duck Hunting Preserve. Private Access. 20 Minutes from Caldwell.

November 21, 2012 Barbara Kelleher, (954)

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Stormwater Interpretive Signage

Springettsbury Township. Road Improvement Projects

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

CITY OF COACHELLA CAPITAL IMPROVEMENT PROGRAM TOTAL PROJECTS REVENUE SUMMARY TABLE ES-1

FY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

FDOT Treasure Coast Traffic Impact Report

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

October 31, 2014 Chuck McGinness, (954)

Need County Priority Needs Identification Major Projects/Emerging Taking Care of the System (TCOS) 1=High 2=Medium 3=Low

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

2018 Service Changes Ada County

FDOT Treasure Coast Traffic Impact Report

Airport Planning Area

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)

APPENDIX H Transportation Projects Considered for Cumulative Impact Analysis

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Palm Beach County Traffic Report July 13 through July 20, 2012

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

Guide to. Road Construction Projects

Progress Report for Projects of Regional Significance

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

May 16, 2014 Chuck McGinness, (954) BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014

Wichita Falls MPO - MTP Project List 1 of 6

Transportation TRANSPORTATION PROJECTS

State Route 8 Corridor. Northern Summit County s Path to Success

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County

2009 Regional Solicitation Selected Projects*

Progress Report for Projects of Regional Significance

Additional Economic Development Strategy submissions- Klickitat County

THE RICHMOND REGION Transportation Priority Projects

Palm Beach County Traffic Report August 24 through August 31, 2012

NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

Bridge - Off State System

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

Bridge - Off State System

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

Highways: Interstate. Highways: State Highways

Major Projects Overview

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019

City of Grand Island Tuesday, December 12, 2017 Council Session

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

SCOPING INFORMATION PACKET

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

MoDOT Southwest District

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

Summary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2017)

DOWNTOWN BRT ALTERNATIVE - 19th AVE

Ohio Department of Transportation Construction Update

Projects Ready for Authorization to Advertise

El Dorado County / Tahoe Roadwork Schedule

TAYLOR 40 MERIDIAN ROAD & AMITY MERIDIAN, IDAHO

GO 10 is planning to switch I 10 Eastbound traffic lanes after Sunland Park. The switch is set for Sunday, April 2. Details continue to develop.

Northeast Corridor Transportation Update

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects

Site Location and Setting

Completion: August 2011 LS #321 Design LS #8

GOODALE TRAIL PROPERTY

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

All closures this week happen at night, including full closures of Mesa and I-10

I-10 will close overnight Sunday through Thursday next week. Crews continue to make progress on Sunland s new bridges and ramps.

Strategies to keep people and goods moving in and through Seattle. SR 99 Closure and the Seattle Squeeze

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

CVRPC FY 13 Project Priorities (Bridge, Roadway, Bike & Ped., Park & Ride) - 3/29/11

5.1 Traffic and Transportation

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required.

Fuller/Fuller Heights Road Improvements

2 Construction Program

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

TBARTA: 2015 Master Plan and Tampa Bay Express Project

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

El Dorado County / Tahoe Roadwork Schedule Sunday through Saturday September 9 September 15, 2012

SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER

Transportation 2040 as amended in 2015 Appendix N: Regional Capacity Projects

Fuller Road/Fuller Heights Road Improvements

MEMORANDUM. DATE: February 1, 2007

PUBLIC INFORMATION SESSION #2

STAFF REPORT. MEETING DATE: February 7, 2008 AGENDA ITEM: 6

Transcription:

FY2010-2014 Transportation Improvement Program Basic Project List (in Thousands) Project Name Key # Year Project Cost 16th Avenue North, 7th Street North to Garrity Boulevard GU09308 2011 $592 21st Avenue and Franklin Road Intersection, Phase III, Caldwell 11233 2010 $50 21st Avenue and Franklin Road Intersection, Phase IV, Caldwell 11584 2009 ($645) 21st Avenue, Chicago Street to Franklin Road 09991 2009 $9 36th Street Bike/Pedestrian Bridge, Garden City 11925 2010 $721 8th Street Sidewalks, Cherry Lane to Camellia Lane, ACHD 10489 2010 $15 ACHD Thin Lift Overlay Projects 11922 2010 $3,220 ACHD Thin Lift Overlay Projects, Phase 2 12208 2010 $1,709 Airport/Overland Realignment Study, Nampa 09990 2010 $244 Amity Road, Chestnut Street to Kings Corner 10541 2012 $6,870 Boise School District Coordinator, SR2S, FY2011 12058 2011 $50 Bowmont Road, SH 45 to Kuna Mora Road 10556 2012 $3,413 Caldwell Biking - Walking Trail System 09438 2010 $270 Cherry Lane Railroad Crossing, Nampa 11591 2011 $390 Communities in Motion Update 12061 2014 $200 Commuteride Vans, ACHD 12210 2010 $446 COMPASS Planning - FY2011 12274 2010 $331 Curtis Road Signal System Upgrade, ACHD 12250 2010 $290 District 3 Regions 1 and 3 Sealcoats - FY2009 11525 2010 $1,791 Eagle Road, Victory Road to Ridenbaugh Canal RD203-07 2011 $1,548 Fairview Avenue Pavement Rehabilitation #2 (Cole/Milwaukee) RD200-02b PD $4,456 Fairview Avenue, Cloverdale Road to Five Mile Road RC0127 PD $6,350 Fairview Avenue, Eagle Road (SH 55) to Cloverdale Road RC0130 PD $6,230 Fairview Avenue, Five Mile Road to Maple Grove Road RC0131 PD $7,188 Fairview Avenue, Locust Grove Road to SH 55 (Eagle Road) RC0133 PD $6,260 Fairview Avenue, Meridian Road to Locust Grove Road RC0135 PD $6,840 Farmway Road, Railroad Crossing H319 2012 $245 Federal Aid Overlay Arterials and Collectors - FY2009 09503 2009 $30 Federal Aid Overlay Arterials and Collectors - FY2010 10537 2010 $2,503 Federal Aid Overlay Arterials and Collectors - FY2011 10559 2011 $725 Federal Aid Overlay Arterials and Collectors - FY2012 11065 2012 $1,120 Federal Aid Overlay Arterials and Collectors - FY2013 11581 2013 $552 Federal Aid Overlay Arterials and Collectors - FY2014 12050 2014 $985 Five Mile Road, Franklin Road to Fairview Avenue 11582 2013 $11,279 Franklin Road and Black Cat Road Intersection H335 2014 $3,900 Franklin Road and Cloverdale Road Intersection 08698 2010 $5,265 Franklin Road, Black Cat Road to Ten Mile Road RC0152 PD $7,180 Franklin Road, Ten Mile Road to Linder Road RC0165 2012 $4,778 Page 1 of 6

Franklin Road, Touchmark Way to Five Mile Road (08698) 12062 2011 $7,821 Greenhurst Road and Powerline Road Intersection, Nampa 09508 2005 ($15) Greenhurst Road and South Side Boulevard Intersection, Nampa 09535 2005 $2 Historic Warm Springs Boulevard Landscape 09437 2010 $303 Homedale Road, Beet Road to Farmway Road, Canyon County 09983 2010 $688 Household Travel Survey, Phase 1 09827 2011 $162 Household Travel Survey, Phase 2 09828 2012 $300 I-84, 10th Street Interchange to Franklin Road Interchange, Caldwell 11970 2010 $2,425 I-84, 11th Ave to Garrity 11974 2010 $13,513 I-84, 11th Ave Underpass, Nampa 11977 2010 $5,201 I-84, Broadway Avenue Interchange Ramp Improvements 11971 2010 $515 I-84, Cloverdale Road Underpass, Boise 09964 2011 $580 I-84, Cole Road to Orchard Road Widening 09819 2010 $8,960 I-84, Franklin Boulevard Overpass Rebuild 10940 2010 ($435) I-84, Garrity Interchange 10915 2010 $4,495 I-84, Garrity Interchange to 11th Avenue 10916 2010 $31,229 I-84, Garrity Interchange to 11th Avenue 10916 2011 $500 I-84, Garrity Interchange to Meridian Interchange, Design Phase 10459 2010 ($397) I-84, Garrity Interchange to Meridian Interchange, Storm Water Ponds (10459) 11902 2010 $1,438 I-84, Gowen Railroad Bridge Eastbound, Boise 12029 2013 $4,750 I-84, Gowen Railroad Bridge Westbound H347 2014 $4,500 I-84, Gowen Road to Eisenman Road Interchange, Boise 09814 2010 ($303) I-84, Karcher Interchange to Five Mile Road, Environmental Study 10002 2010 ($70) I-84, Meridian Road Interchange 11589 2013 $1,370 I-84, Orchard Interchange 09817 2010 ($19) I-84, Orchard Street to Vista Avenue Widening 09820 2010 $10,312 I-84, Regina to Cleft Eastbound 11045 2012 $1,973 I-84, Ten Mile Interchange 09815 2010 ($10,997) I-84, Ten Mile Interchange Landscaping 11932 2010 $852 I-84, Vista Avenue to Broadway Avenue Widening 09823 2010 $22,587 I-84, Vista Interchange 09818 2010 $322 I-84, Wye Interchange Storm Retention Pond H316 2013 $855 Intersection of Cemetery Road and SH 44, Middleton 09513 2010 $907 Intersection of Chicago Street and 21st Avenue, Caldwell 08075 2008 ($9) Intersection of Star Road and Franklin Road 09989 2012 $1,418 Kuna Overlays, ACHD 12229 2010 $675 Meridian Road and Main Street, Franklin Road to Cherry/Fairview Avenue RD205-07 2013 $10,369 Meridian Road and Main Street, I-84 to Franklin Road RD205-06 2009 $200 Metropolitan Planning - FY2010 10698 2010 $1,001 Metropolitan Planning - FY2011 11191 2011 $1,001 Metropolitan Planning - FY2012 11199 2012 $1,001 Page 2 of 6

Metropolitan Planning - FY2013 11590 2013 $1,001 Metropolitan Planning Transit - FY2010 11846 2010 $246 Metropolitan Planning Transit - FY2011 11847 2011 $228 Metropolitan Planning Transit - FY2012 11848 2012 $246 Metropolitan Planning Transit - FY2013 11849 2013 $246 Middleton Road Pavement Rehabilitation, Canyon County H345 PD $1,304 Midland Road Pavement Rehabilitation, Ustick Road to US 20/26 12047 PD $999 Nampa Bus Fleet, Replacement Vehicles 12278 2010 $1,255 Nampa Downtown Traffic Signal Interconnect 12225 2010 $1,200 Nampa School District, SR2S, FY2011 12057 2011 $25 Northern Ada County Sidewalk Repair and ADA Accessibility, ACHD 11924 2010 $510 Northern Ada County Sidewalk Repair and ADA Accessibility, ACHD, Phase 2 12207 2010 $755 Notus Road, SH 19 to Red Top Road Pavement Preservation 11944 2010 $419 Onboard Transit Survey, COMPASS 12060 2014 $50 Overland Road, Ten Mile Road to Linder Road RC0261 2011 $303 Parkcenter Boulevard Bridge, East River Crossing MA203-02 2009 $520 Pavement Striping, Ada County - FY2011 10526 2011 $274 Pavement Striping, Ada County, FY2012 12025 2011 $284 Pedestrian Countdown Heads, ACHD 12219 2010 $780 Pioneer Corridor Bicycle/Pedestrian Improvements 10488 2010 $448 Railroad Crossing on Pinto Road West of Caldwell H322 2011 $58 Rideshare, ACHD's Rideshare Program, Ada County - FY2010 10540 2010 $220 Rideshare, ACHD's Rideshare Program, Ada County - FY2011 10560 2011 $220 Rideshare, ACHD's Rideshare Program, Ada County - FY2012 11066 2012 $220 Rideshare, ACHD's Rideshare Program, Ada County - FY2013 11580 2013 $220 Rideshare, ACHD's Rideshare Program, Ada County - FY2014 12059 2014 $220 Rideshare, ACHD's Rideshare Program, Ada County - PD TMA30 PD $220 Rideshare, ACHD's Rideshare Program, Canyon County - FY2010 10539 2010 $55 Rideshare, ACHD's Rideshare Program, Canyon County - FY2011 10538 2010 $55 Rideshare, ACHD's Rideshare Program, Canyon County - FY2012 11234 2012 $55 Rideshare, ACHD's Rideshare Program, Canyon County - FY2013 11235 2013 $55 Rideshare, ACHD's Rideshare Program, Canyon County - FY2014 11586 PD $55 Roosevelt Street Sidewalk, Boise SR2S, FY2011 12056 2011 $68 Set Aside for STP-TMA Cost Increases CL11 2011 $0 SH 16, Intersection of Floating Feather Road 09483 2010 $439 SH 16, SH 44 (State Street) to US 20/26 (Chinden Boulevard) River Crossing 11236 2010 $146 SH 16, SH 44 (State Street) to US 20/26 (Chinden Boulevard) River Crossing 11236 2011 $108,200 SH 16, Willow Creek Bridge 12030 2011 $2,400 SH 21, Mores Creek Bridge 08669 2010 $4,620 SH 44 (State Street) and Ballentyne Road Intersection 11578 2013 $300 SH 44, Corridor Preservation, I-84 Junction in Canyon County to Eagle Road 07827 2013 $3,488 Page 3 of 6

SH 44, Intersection of SH 44 and Old Highway 30, West of Middleton 11055 2012 $690 SH 55 (Eagle Road), Fairview Avenue to SH 44 12044 2011 $9,440 SH 55 (Eagle Road), I-84 Eastbound Ramps to Fairview Avenue 10527 2010 $3,444 SH 55, Intersection Karcher and Lake Avenue, Canyon County H351 2014 $3,750 SH 55, Intersection Karcher Road & Middleton Road, Nampa 11053 2011 $3,430 SH 55, Intersection Karcher Road & Middleton Road, Nampa 11053 2014 $2,262 SH 55, Overhead Message Board to Horseshoe Bend 11903 2010 $130 SH 55, Snake River Bridge to Pride Lane, Canyon County 11046 2012 $1,480 SH 69, Intersection at Columbia Road, Kuna 11054 2010 $300 SH19 Railroad Crossing East of Greenleaf H321 2011 $165 Sidewalk Northeast Down Boise near St. Luke's and Elk's Hospitals, ACHD, Phase 12209 2010 $152 Sidewalk Northeast Downtown Boise near St. Luke's and the Elk's Hospitals, ACHD 11926 2010 $544 South Cemetery Road, SH 44 to Willow Creek, Middleton 12048 PD $2,331 South Orchard Road, Railroad Crossing H320 2012 $260 Southside Boulevard, Nampa SR2S FY2010 11889 2010 $100 Three Cities River Crossing, Environmental Study 08821 2010 $50 Three Cities River Crossing, US 20/26 to SH 55 Corridor Preservation 09189 2010 $2,914 Three Cities River Crossing, US 20/26 to SH 55 Corridor Preservation 09189 2014 $1,050 Traffic Signal Timing Corridor, Ada County 12254 2010 $281 Transit - ADA Bus Stop Improvements 11923 2010 $98 Transit - ADA Buses Ada County - FY2009 11788 2011 $614 Transit - Boise State University Maintenance Facility - FY2008 11350 2010 $873 Transit - Bus and Support Vehicles, Equipment, and Preventative Maintenance - FY T303 2011 $1,250 Transit - Bus Purchase, Boise Good Samaritan 11347b 2010 $36 Transit - Capital Enhancements - FY2011 T301 2011 $14 Transit - Capital Lease - FY2010 11367 2011 $281 Transit - Capital Lease - FY2011 11373 2011 $282 Transit - Capital Lease - FY2012 12179 2012 $573 Transit - Capital Vehicle - FY2010 11379 2010 $170 Transit - Capital Vehicle - FY2011 11386 2011 $896 Transit - Capital Vehicle - FY2012 12168 2012 $1,250 Transit - Capital, Safety and Security - FY2010 11366 2011 $64 Transit - Capital, Safety and Security - FY2011 11372 2011 $14 Transit - Capital, Safety and Security - FY2011 11378 2010 $135 Transit - Capital, Safety and Security - FY2011 11385 2011 $34 Transit - Capital, Safety and Security - FY2012 12178 2012 $41 Transit - Capital, Safety, and Security - FY2012 12167 2012 $196 Transit - Demand Response Operations - FY2010 11368 2011 $144 Transit - Demand Response Operations - FY2010 11382 2011 $369 Transit - Demand Response Operations - FY2011 11374 2011 $130 Transit - Demand Response Operations - FY2011 11389 2011 $387 Page 4 of 6

Transit - Demand Response Operations - FY2012 12171 2012 $394 Transit - Demand Response Operations - FY2012 12174 2012 $160 Transit - Demonstration Vehicle Sharing Project, Canyon County 11585 2010 $164 Transit - Facility Construction (176 and 652) - FY2006 (PT02) 11392 2010 $2,243 Transit - Facility Construction (176 and 652) - FY2009 10809 2010 $3,231 Transit - Fixed Line Operations - FY2009 12166 2010 $2,350 Transit - Fixed Line Operations - FY2010 11369 2011 $722 Transit - Fixed Line Operations - FY2011 11375 2011 $651 Transit - Fixed Line Operations - FY2012 12175 2012 $778 Transit - Intrastate Bus Service 11345 2010 $312 Transit - Job Access Reverse Commute (JARC) - FY2008 and FY2009 11364 2010 $271 Transit - Job Access Reverse Commute (JARC) - FY2010 11383 2010 $151 Transit - Job Access Reverse Commute (JARC) - FY2011 11390 2011 $147 Transit - Job Access Reverse Commute (JARC) - FY2012 12172 2012 $156 Transit - Job Access Reverse Commute (JARC) Administration - FY2011 T304 2011 $13 Transit - New Freedom Initiative Administration - FY2011 T305 2011 $8 Transit - New Freedoms Initiative - FY2008 and FY2009 11365 2010 $142 Transit - New Freedoms Initiative - FY2010 11384 2010 $87 Transit - New Freedoms Initiative - FY2011 11391 2011 $147 Transit - New Freedoms Initiative - FY2012 12173 2012 $98 Transit - Planning - FY2008 and FY2010 11370 2010 $93 Transit - Planning - FY2010 11380 2010 $153 Transit - Planning - FY2011 11376 2011 $141 Transit - Planning - FY2011 11387 2011 $134 Transit - Planning - FY2012 12169 2012 $213 Transit - Planning - FY2012 12176 2012 $100 Transit - Preventive Maintenance - FY2009 12164 2010 $2,149 Transit - Preventive Maintenance - FY2010 11371 2010 $428 Transit - Preventive Maintenance - FY2010 11381 2011 $1,734 Transit - Preventive Maintenance - FY2011 11377 2011 $386 Transit - Preventive Maintenance - FY2011 11388 2011 $1,825 Transit - Preventive Maintenance - FY2012 12170 2012 $1,451 Transit - Preventive Maintenance - FY2012 12177 2012 $459 Transit - Treasure Valley, Idaho Transit Facilities - FY2008 11789 2010 $360 Transit - Treasure Valley, Idaho Transit Facilities - FY2009 12204 2011 $594 Transit - Vans and Pedestrian Facility, ACHD - FY2011 T302 2011 $1,063 Transit - Vans, Park and Ride, and Facility - FY2008 11349 2010 $614 Transit - Vans, Pedestrian Facility and Park & Ride - FY2010 12165 2010 $239 Transit - Vans/Park and Ride - FY2009 11787 2011 $1,731 Transit - Vehicles, Facility Upgrade, Equipment - FY2008 11351 2010 $922 Transit - Voucher Program, LINC 11347a 2010 $110 Page 5 of 6

Transit - VRT Intercounty Bus Service Expansion - Large Vehicle 11583 2014 $375 UPRR East Lateral Canal Bridge, Nampa AF08 2013 $5,475 US 20/26, Broadway Bridge, Boise 11588 PD $16,440 US 20/26, Corridor Preservation, Caldwell to Boise 07826 2012 $2,616 US 20/26, Junction I-84 to SH 44 (Eagle Road) 11905 2010 $1,161 US 20/26, Ridenbaugh Canal to Junction I-84 09480 2010 $736 US95, Wilder to Parma 11566 2012 $2,490 Ustick Road ITS, ACHD 12255 2010 $271 Ustick Road, Meridian Road to Locust Grove Road RD202-37 PD $5,138 All Values in Thousands, Project Cost Represents Total Amount Programmed in Current TIP Page 6 of 6