UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 16 P-1 Line #15

Similar documents
UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 16 P-1 Line #15

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 P-1 Line #18

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 11 P-1 Line #74

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 19 P-1 Line #2

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base. Quantity Total Obligation Authority

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO

UNCLASSIFIED FY 2013 OCO. FY 2013 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED FY 2017 OCO. FY 2017 Base. FY 2017 Base FY 2017 OCO. Total Obligation Authority

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 15 P-1 Line #6

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 9 P-1 Line #14

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 P-1 Line #6

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO. Total Obligation Authority

UNCLASSIFIED. FY 2013 Base FY 2013 OCO

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 P-1 Line #5

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 19 P-1 Line #15

UNCLASSIFIED FY FY 2015 Base FY 2015 OCO

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 11 P-1 Line #25

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #15

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 15 P-1 Line #6

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 11 P-1 Line #7

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 9 P-1 Line #22

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base. Total Obligation Authority

UNCLASSIFIED. FY 2013 Base FY 2013 OCO

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 14 P-1 Line #44

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 20 P-1 Line #2

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 P-1 Line #26

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2013 Base FY 2013 OCO

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base. Quantity

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 27 P-1 Line #12

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 15 P-1 Line #17

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 26 P-1 Line #24

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 19 P-1 Line #62

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 21 P-1 Line #1

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 38 P-1 Line #9

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 14 P-1 Line #5

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #15

Department of Defense Fiscal Year (FY) 2018 Budget Estimates

Department of Defense Fiscal Year (FY) 2019 Budget Estimates

Department of Defense Fiscal Year (FY) 2015 Budget Estimates

Department of Defense Fiscal Year (FY) 2016 President's Budget Submission

Department of Defense Fiscal Year (FY) 2017 President's Budget Submission

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 39 P-1 Line #54

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 24 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #55

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 P-1 Line #55

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Unit Cost ($ M) Qty (Each)

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #21

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #121

A&H Project Proposal 2017

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M)

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #35

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 P-1 Line #15

Thales on the Civil Aerospace market

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #57

Risk (Harm) EXISTING CONTROLS Risk Rating with existing controls?

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Rental Shell Scheme P

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 21 P-1 Line #19

23-24 Public Day. 9/21-22 Business Day. Rental Shell Scheme. Package Booth (3x3m) Turnkey Booth.

Transcription:

II xhibit -40, udget ine Item ustification: 2016 ir orce ate: ebruary 2015 ppropriation / udget ctivity / udget ub ctivity: 3010: ircraft rocurement, ir orce / 04: ther ircraft / 5: ther ircraft -1 ine Item umber / itle: 1 / Q-9 I ode (=ervice eady, =ot ervice eady) : rogram lements for ode Items: 0205219 ther elated rogram lements: 0304260, 0305206, 0305219 ine Item /I ode: 424 esource ummary Item /I ode(s): rior ears 2014 2015 2016 ase 2016 2016 otal 2017 2018 2019 2020 o omplete rocurement Quantity (nits in ach) 240 20 24 29-29 24 21 3 - - 361 ross/weapon ystem ost ($ in illions) 3,730.580 349.217 385.219 552.528 13.500 566.028 496.457 513.061 301.378 143.768 84.636 6,570.344 ess dvance rocurement ($ in illions) - - - - - - - - - - - - et rocurement (1) ($ in illions) 3,730.580 349.217 385.219 552.528 13.500 566.028 496.457 513.061 301.378 143.768 84.636 6,570.344 lus dvance rocurement ($ in illions) - - - - - - - - - - - - otal bligation uthority ($ in illions) 3,730.580 349.217 385.219 552.528 13.500 566.028 496.457 513.061 301.378 143.768 84.636 6,570.344 (he following esource ummary rows are for informational purposes only. he corresponding budget requests are documented elsewhere.) Initial pares ($ in illions) 303.325 21.976 76.629 134.393-134.393 171.179 132.500 114.849 68.089 107.428 1,130.368 lyaway nit ost ($ in illions) 11.656 14.474 13.970 15.606-16.043 17.411 20.568 37.422 46.954-7.261 ross/weapon ystem nit ost ($ in illions) 15.544 17.461 16.051 19.053-19.518 20.686 24.431 100.459 - - 18.200 escription: Q-9 eaper procurement includes all components of the Q-9 weapon system. he basic Q-9 eaper system consists of the aircraft, sensors, a round ontrol tation (), communications equipment, weapon kits, support equipment, simulator and training devices, eadiness pares ackages (), technical data/training, and personnel required to operate, maintain, and sustain the system. he system is designed to be modular and open-ended. ission-specific equipment is employed in a plug-and-play mission kit concept allowing specific aircraft and control station configurations to be tailored to fit mission needs. he Q-9 eaper aircraft is a single-engine, turbo-prop emotely iloted ircraft () designed to operate over-the-horizon at medium-to-high altitude for long endurance sorties. he aircraft is being designed primarily to prosecute critical emerging ime-ensitive-argets (s) as a radar, lectro-ptical/infra-ed (/I), and laser desginator-based attack asset with on-board hard-kill capability (hunter-killer) while performing Intelligence, urveillance, econnaissance and arget cquisition (I ). In the hunter-killer role, the aircraft will employ fused multi-spectral sensor information to find, fix, and track ground targets and assess post-strike results using utomatic arget ueing (), arget ocation ccuracy (), etric ensor and other capabilities. he functions as the aircraft cockpit and can control the aircraft from either within ine-of-ight () or eyond ine-of-ight () via a combination of satellite relay and terrestrial communication architectures. he is either mobile to support forward operating locations or fixed at a facility to support emote plit perations (). he has the capability to perform mission planning functions; provides a means for manual and/or autonomous command and control; allows personnel to launch, recover, and monitor aircraft, payloads, and system communications status; secure data links to receive payload sensor data and command links; monitor threats to the aircraft; display common operational picture information; and provide support functions. dditionally, a aunch and ecovery () allows for servicing, systems checks, maintaining, launching, and recovering aircraft under control for hand-off to a mobile or fixed. he will continue to evolve and upgrade its capabilities to keep pace with Q-9 system capabilities, oncept of perations (), and the missions they perform. ear-term upgrades include new IX processors, high definition monitors, and ergonomic improvements. uture planned upgrades include integrating improved human-machine interfaces, open systems architecture, improved crew habitability, and multiple aircraft control. uture configurations will leverage the nmanned erospace ystem () ommand and ontrol (2) Initiative (I) government-owned open system standard to enable improved capabilities for situational awareness and multi-mission management monitoring and oversight. lyaway cost subtotal includes round ontrol tations (), round ata erminals (s), and redator rimary atellite inks (s) which are not procured in the same quantities as aircraft. hus, the unit flyaway cost will fluctuate from year to year as different quantities of s, s, and s are procured. otal I 1 - Q-9 II ir orce age 1 of 16-1 ine #15 olume 1-159

II xhibit -40, udget ine Item ustification: 2016 ir orce ate: ebruary 2015 ppropriation / udget ctivity / udget ub ctivity: 3010: ircraft rocurement, ir orce / 04: ther ircraft / 5: ther ircraft -1 ine Item umber / itle: 1 / Q-9 I ode (=ervice eady, =ot ervice eady) : rogram lements for ode Items: 0205219 ther elated rogram lements: 0304260, 0305206, 0305219 ine Item /I ode: 424 Item /I ode(s): Q-9s are procured sole-source with eneral tomics-eronautical ystems Incorporated (-I). -I is responsible for the aircraft and, he aytheon ompany for the - lectro-ptical Infra- ed (-I) sensor, and 3 ommunications for the perator imulator and satellite communication () infrastructure components. his program has associated esearch evelopment est and valuation funding in 0205219 Q-9 eaper. unding for this exhibit contained in 0205219. Q-9 is ode because, although the majority of projected procurement is complete, it has not yet completed a ull ate roduction () decision. I& for lock 1 was completed in arch 2009. & for lock 5 is currently scheduled for completion in ebruary 2016 which will be followed by an In-rocess eview in lieu of in eptember 2016. formal will not be completed due to the de facto production decision provided by continued funding beyond ow ate Initial roduction. I 1 - Q-9 II ir orce age 2 of 16-1 ine #15 olume 1-160

II xhibit -40, udget ine Item ustification: 2016 ir orce ate: ebruary 2015 ppropriation / udget ctivity / udget ub ctivity: 3010: ircraft rocurement, ir orce / 04: ther ircraft / 5: ther ircraft -1 ine Item umber / itle: 1 / Q-9 I ode (=ervice eady, =ot ervice eady) : rogram lements for ode Items: 0205219 ther elated rogram lements: 0304260, 0305206, 0305219 ine Item /I ode: 424 Item /I ode(s): xhibits chedule rior ears 2014 2015 2016 ase 2016 2016 otal itle* xhibits I Quantity / otal ost (ach) / ($ ) Quantity / otal ost (ach) / ($ ) Quantity / otal ost (ach) / ($ ) Quantity / otal ost (ach) / ($ ) Quantity / otal ost (ach) / ($ ) Quantity / otal ost (ach) / ($ ) Q-9-5, -5a, -21 240 / 3,730.580 20 / 349.217 24 / 385.219 29 / 552.528 - / 13.500 29 / 566.028 otal ross/weapon ystem ost 240 / 3,730.580 20 / 349.217 24 / 385.219 29 / 552.528 - / 13.500 29 / 566.028 xhibits chedule 2017 2018 2019 2020 o omplete otal itle* xhibits I Quantity / otal ost (ach) / ($ ) Quantity / otal ost (ach) / ($ ) Quantity / otal ost (ach) / ($ ) Quantity / otal ost (ach) / ($ ) Quantity / otal ost (ach) / ($ ) Quantity / otal ost (ach) / ($ ) Q-9-5, -5a, -21 24 / 496.457 21 / 513.061 3 / 301.378 - / 143.768 - / 84.636 361 / 6,570.344 otal ross/weapon ystem ost 24 / 496.457 21 / 513.061 3 / 301.378 - / 143.768 - / 84.636 361 / 6,570.344 *itle represents 1) the umber / itle for Items; 2) the umber / itle [I] for mmunition; and/or 3) the umber / itle (odification ype) for odifications. ote: otals in this xhibit -40 set may not be exact or add due to rounding. ustification:. Q-9 eaper aircraft & overnment urnished quipment () - 16 funding will procure 29 Q-9 eaper aircraft and associated ulti-pectral argeting ystems- (-) /I ensors, ynx ynthetic perture adars (), Hellfire aunchers and ails and other.. roduction upport - 16 funding included in roduction upport consists of ngineering hange rders () urgent services, and non-recurring production costs associated with diminishing manufacturing sources, reliability and maintenance (&) safety enhancements, and higher level initiatives directed by the ir orce.. redator rimary atellite ink () - 16 funding includes communication, including terminals and amplifiers, to support. equipment is required to support for the weapon system. Quantities in 16 are for (4) ixed ite erminals (). ue to fluctuations in quantities associated with and s, only quantities are included.. ther overnment osts () - 16 funding for s includes direct mission support and rogram anagement dministration (). includes program office costs such as anagement Information ystem (I) support, travel, training, security, and facility management. In addition, costs for dvisory and ssistance ervices (&) for program management, logistics, integration and test, and administration support services are included.. upport quipment - 16 funding includes upport quipment to include peculiar and common support equipment required to support the maintenance and operations of the Q-9 weapon system.. raining evice/imulator - 16 funding will procure rief/ebrief tations and local area network () cabinets to support aircrew training. redator ission ircrew raining imulators () quantities are various configurations of Instructor perator tations (I) with mission coordination capabilities, rief/ebrief tations and cabinets to support aircrew training. ue to fluctuations in quantities and associated unit costs, only quantities for I are included.. 16 request is for four fixed round ontrol tations to increase ombat ir atrol capacity. I 1 - Q-9 II ir orce age 3 of 16-1 ine #15 olume 1-161

II xhibit -5, ost nalysis: 2016 ir orce ate: ebruary 2015 ppropriation / udget ctivity / udget ub ctivity: 3010 / 04 / 5 I ode (=ervice eady, =ot ervice eady) : esource ummary rior ears 2014 2015-1 ine Item umber / itle: 1 / Q-9 2016 ase 2016 /I ode: Item umber / itle [I]: - / Q-9 2016 otal 2017 2018 2019 2020 o omplete rocurement Quantity (nits in ach) 240 20 24 29-29 24 21 3 - - 361 ross/weapon ystem ost ($ in illions) 3,730.580 349.217 385.219 552.528 13.500 566.028 496.457 513.061 301.378 143.768 84.636 6,570.344 ess dvance rocurement ($ in illions) - - - - - - - - - - - - et rocurement (1) ($ in illions) 3,730.580 349.217 385.219 552.528 13.500 566.028 496.457 513.061 301.378 143.768 84.636 6,570.344 lus dvance rocurement ($ in illions) - - - - - - - - - - - - otal bligation uthority ($ in illions) 3,730.580 349.217 385.219 552.528 13.500 566.028 496.457 513.061 301.378 143.768 84.636 6,570.344 (he following esource ummary rows are for informational purposes only. he corresponding budget requests are documented elsewhere.) Initial pares ($ in illions) 303.325 21.976 76.629 134.393-134.393 171.179 132.500 114.849 68.089 107.428 1,130.368 ross/weapon ystem nit ost ($ in illions) 15.544 17.461 16.051 19.053-19.518 20.686 24.431 100.459 - - 18.200 otal ote: ubtotals or otals in this xhibit -5 may not be exact or add, due to rounding. ost lements lyaway - lyaway nd Item ost ecurring ost Q-9 eaper ircraft nit ost ($ ) rior ears 2014 2015 2016 ase 2016 2016 otal (ach) otal ost ($ ) nit ost ($ ) (ach) otal ost ($ ) nit ost ($ ) (ach) and ( ) 9.654 240 2,316.930 12.430 20 248.605 13.772 24 330.536 14.483 29 420.021 - - - 14.483 29 420.021 roduction upport - - 119.711 - - 38.759 - - 3.439 - - 10.572 - - - - - 10.572 ixed round ontrol tation and ( ) 2.590 61 157.999 - - - - - - 3.170 6 19.020 3.170 4 12.680 3.170 10 31.700 obile round ontrol tation and ( ) 2.377 1 2.377 - - - - - - - - - - - - - - - ual round ontrol tation and ( ) 3.230 8 25.839 - - - - - - - - - - - - - - - round ata erminals ( ) 0.395 120 47.381 - - - - - - - - - - - - - - - redator rimary atellite ink () 4.101 31 127.126 - - 2.107 - - 1.309 - - 2.965 - - - - - 2.965 ubtotal: ecurring ost - - 2,797.363 - - 289.471 - - 335.284 - - 452.578 - - 12.680 - - 465.258 ubtotal: lyaway - lyaway nd Item ost - - 2,797.363 - - 289.471 - - 335.284 - - 452.578 - - 12.680 - - 465.258 upport - upport nd Item ost ther overnment osts () - - 147.212 - - 24.200 - - 30.950 - - 60.502 - - 0.820 - - 61.322 Initial pares/eployment upport Kits - - 600.934 - - - - - - - - - - - - - - - otal ost ($ ) nit ost ($ ) (ach) otal ost ($ ) nit ost ($ ) (ach) otal ost ($ ) nit ost ($ ) (ach) otal ost ($ ) I 1 - Q-9 II ir orce age 4 of 16-1 ine #15 olume 1-162

II xhibit -5, ost nalysis: 2016 ir orce ate: ebruary 2015 ppropriation / udget ctivity / udget ub ctivity: 3010 / 04 / 5 I ode (=ervice eady, =ot ervice eady) : ote: ubtotals or otals in this xhibit -5 may not be exact or add, due to rounding. ost lements nit ost ($ ) -1 ine Item umber / itle: 1 / Q-9 /I ode: Item umber / itle [I]: - / Q-9 rior ears 2014 2015 2016 ase 2016 2016 otal (ach) otal ost ($ ) nit ost ($ ) (ach) otal ost ($ ) nit ost ($ ) (ach) upport quipment - - 150.409 - - 16.515 - - 17.100 - - 29.291 - - - - - 29.291 raining evice/imulator 1.576 22 34.662 1.586 12 19.031 - - 1.885 - - 10.157 - - - - - 10.157 roduction hutdown - - 0.000 - - - - - - - - - - - - - - - ubtotal: upport - upport nd Item ost - - 933.217 - - 59.746 - - 49.935 - - 99.950 - - 0.820 - - 100.770 ross/weapon ystem ost 15.544 240 3,730.580 17.461 20 349.217 16.051 24 385.219 19.053 29 552.528 - - 13.500 19.518 29 566.028 otal ost ($ ) nit ost ($ ) (ach) otal ost ($ ) nit ost ($ ) (ach) otal ost ($ ) nit ost ($ ) (ach) otal ost ($ ) ost lements lyaway - lyaway nd Item ost ecurring ost Q-9 eaper ircraft nit ost ($ ) 2017 2018 2019 2020 o omplete otal ost (ach) otal ost ($ ) nit ost ($ ) (ach) otal ost ($ ) nit ost ($ ) (ach) and ( ) 14.992 24 359.807 15.859 21 333.034 18.743 3 56.228 - - - - - - 11.261 361 4,065.161 roduction upport - - 9.118 - - 8.356 - - 2.202 - - - - - - - - 192.157 ixed round ontrol tation and ( ) 3.570 13 46.416 3.678 24 88.268 3.788 24 90.922 3.902 24 93.656 4.020 20 80.393 3.349 176 589.354 obile round ontrol tation and ( ) - - - - - - - - - - - - - - - 2.377 1 2.377 ual round ontrol tation and ( ) - - - - - - - - - - - - - - - 3.230 8 25.839 round ata erminals ( ) - - - - - - - - - - - - - - - 0.395 120 47.381 redator rimary atellite ink () - - 2.527 - - 2.278 - - 0.335 - - 0.252 - - - 4.481 31 138.899 ubtotal: ecurring ost - - 417.868 - - 431.936 - - 149.687 - - 93.908 - - 80.393 - - 5,061.168 ubtotal: lyaway - lyaway nd Item ost - - 417.868 - - 431.936 - - 149.687 - - 93.908 - - 80.393 - - 5,061.168 upport - upport nd Item ost ther overnment osts () - - 55.735 - - 50.867 - - 27.395 - - 34.464 - - 4.243 - - 436.388 Initial pares/eployment upport Kits - - - - - - - - - - - - - - - - - 600.934 upport quipment - - 22.130 - - 21.628 - - 4.748 - - 0.295 - - - - - 262.116 raining evice/imulator - - 0.724 - - 8.630 - - 14.333 - - 15.101 - - - 3.074 34 104.523 otal ost ($ ) nit ost ($ ) (ach) otal ost ($ ) nit ost ($ ) (ach) otal ost ($ ) nit ost ($ ) (ach) otal ost ($ ) I 1 - Q-9 II ir orce age 5 of 16-1 ine #15 olume 1-163

II xhibit -5, ost nalysis: 2016 ir orce ate: ebruary 2015 ppropriation / udget ctivity / udget ub ctivity: 3010 / 04 / 5 I ode (=ervice eady, =ot ervice eady) : ost lements nit ost ($ ) -1 ine Item umber / itle: 1 / Q-9 /I ode: Item umber / itle [I]: - / Q-9 2017 2018 2019 2020 o omplete otal ost (ach) otal ost ($ ) nit ost ($ ) (ach) otal ost ($ ) nit ost ($ ) (ach) roduction hutdown - - - - - - - - 105.215 - - - - - - - - 105.215 ubtotal: upport - upport nd Item ost - - 78.589 - - 81.125 - - 151.691 - - 49.860 - - 4.243 - - 1,509.176 ross/weapon ystem ost 20.686 24 496.457 24.431 21 513.061 100.459 3 301.378 - - 143.768 - - 84.636 18.200 361 6,570.344 emarks: Q-9 ircraft and overnment urnished quipment () unit cost increases in 13 due to lock 5 aircraft being procured. he 15 unit cost increase is based on the procurement of a new ulti-pectral argeting ystem- 4 ensor. round ontrol tation () & - he functions as the aircraft cockpit and can control the aircraft from either within ine-of-ight () or eyond ine-of-ight () via a combination of satellite relay and terrestrial communciation architectures. s are used primarily to support emote plit perations () from ontinental nited tates locations. lock 50 procurement begins in 16. lyaway cost subtotal includes, round ata erminals (), and redator rimary atellite ink () which are not procured in the same quantities as aircraft. hus, the flyaway cost will fluctuate from year to year as different quantities of s, s, and s are procured. otal ost ($ ) nit ost ($ ) (ach) otal ost ($ ) nit ost ($ ) (ach) otal ost ($ ) nit ost ($ ) (ach) otal ost ($ ) ( ) indicates the presence of a -5a I 1 - Q-9 II ir orce age 6 of 16-1 ine #15 olume 1-164

II xhibit -5a, rocurement History and lanning: 2016 ir orce ate: ebruary 2015 ppropriation / udget ctivity / udget ub ctivity: 3010 / 04 / 5 ost lements ontractor and ocation -1 ine Item umber / itle: 1 / Q-9 ethod/ype or unding ehicle ocation of ward ate ate of irst elivery Item umber / itle [I]: - / Q-9 (ach) nit ost ($ ) pecs vail ow? ate evision vailable Q-9 eaper ircraft and ( ) 2010 -I / oway, / Wright atterson an 2011 ov 2011 24 10.405 ov 2010 ec 2009 Q-9 eaper ircraft and ( ) 2011 -I / oway, / Wright atterson ec 2011 ar 2013 48 10.564 ep 2011 ay 2010 Q-9 eaper ircraft and ( ) 2012 -I / oway, / Wright atterson ep 2012 eb 2014 48 9.909 un 2012 ay 2010 Q-9 eaper ircraft and ( ) 2013 -I / oway, / Wright atterson ct 2013 ug 2015 36 12.134 ul 2013 pr 2012 Q-9 eaper ircraft and ( ) 2014 -I / oway, / I Wright atterson an 2015 ov 2016 20 12.430 ov 2014 ec 2012 Q-9 eaper ircraft and ( ) 2015 -I / oway, / I Wright atterson ec 2015 ct 2017 24 13.772 ep 2015 an 2013 Q-9 eaper ircraft and ( ) 2016 -I / oway, / Wright atterson ug 2016 un 2018 29 14.483 ay 2016 ar 2015 Q-9 eaper ircraft and ( ) 2017 -I / oway, / Wright atterson un 2017 pr 2019 24 14.992 ar 2017 ep 2015 Q-9 eaper ircraft and ( ) 2018 -I / oway, / Wright atterson eb 2018 ec 2019 21 15.859 ec 2017 ug 2016 Q-9 eaper ircraft and ( ) 2019 -I / oway, / Wright atterson ec 2018 ct 2020 3 18.743 ov 2017 ep 2017 ixed round ontrol tation and ixed round ontrol tation and ixed round ontrol tation and 2010 -I / oway, / Wright atterson ec 2011 an 2013 7 1.729 ct 2010 eb 2011 2011 -I / oway, / Wright atterson ug 2012 an 2013 13 1.889 ay 2012 pr 2011 ( ) 2013 -I / oway, / Wright atterson ep 2015 ov 2016 8 3.631 un 2015 ct 2014 ixed round ontrol tation and - un 2016 ( ) 2016 -I / oway, / Wright atterson un 2016 ec 2017 6 3.170 ar 2016 un 2015 ixed round ontrol tation and - un 2016 ( ) 2016 -I / oway, / Wright atterson un 2016 un 2018 4 3.170 ar 2016 un 2015 ixed round ontrol tation and ( ) 2017 -I / oway, / Wright atterson un 2017 ec 2018 13 3.570 ar 2017 un 2016 ixed round ontrol tation and ( ) 2018 -I / oway, / Wright atterson un 2018 ct 2019 24 3.678 ar 2018 un 2017 ixed round ontrol tation and ( ) 2019 -I / oway, / Wright atterson un 2019 ct 2020 24 3.788 ar 2019 un 2018 ixed round ontrol tation and ( ) 2020 -I / oway, / Wright atterson un 2020 ct 2021 24 3.902 ar 2020 un 2019 obile round ontrol tation and ual round ontrol tation and ual round ontrol tation and 2011 -I / oway, / Wright atterson ug 2012 ul 2013 1 3.205 ay 2012 pr 2011 2011 -I / oway, / Wright atterson ug 2012 ec 2012 5 5.269 ay 2012 pr 2011 2013 -I / oway, / Wright atterson ep 2015 ec 2016 3 3.232 un 2015 ct 2014 Issue ate I 1 - Q-9 II ir orce age 7 of 16-1 ine #15 olume 1-165

II xhibit -5a, rocurement History and lanning: 2016 ir orce ate: ebruary 2015 ppropriation / udget ctivity / udget ub ctivity: 3010 / 04 / 5 ost lements ontractor and ocation -1 ine Item umber / itle: 1 / Q-9 ethod/ype or unding ehicle ocation of ward ate ate of irst elivery Item umber / itle [I]: - / Q-9 (ach) nit ost ($ ) pecs vail ow? ate evision vailable round ata erminals ( ) 2008 -I / oway, / Wright atterson ep 2010 ct 2011 60 0.321 un 2010 eb 2010 round ata erminals ( ) 2012 -I / oway, / Wright atterson ar 2012 ov 2015 35 0.364 ec 2010 ul 2011 round ata erminals ( ) 2013 -I / oway, / Wright atterson pr 2014 ep 2016 25 0.406 an 2014 ov 2012 Issue ate ( ) indicates the presence of a -21 I 1 - Q-9 II ir orce age 8 of 16-1 ine #15 olume 1-166

II xhibit -21, roduction chedule: 2016 ir orce ate: ebruary 2015 ppropriation / udget ctivity / udget ub ctivity: 3010 / 04 / 5 # I Q-9 eaper ircraft and rior ears eliveries: 84 1 2010 (1) 1 2011 (2) -1 ine Item umber / itle: 1 / Q-9 ost lements (nits in ach) iscal ear 2010 iscal ear 2011 Q I 1 2009 1 Item umber / itle [I]: - / Q-9 alendar ear 2010 alendar ear 2011 24-24 - - - - - - - - - 24 48-48 48 1 2012 48-48 48 1 2013 36-36 36 1 2014 20-20 20 1 2015 24-24 24 1 2016 29-29 29 1 2017 24-24 24 1 2018 21-21 21 1 2019 3-3 3 ixed round ontrol tation and rior ears eliveries: 33 2 2013 8-8 8 2 2017 13-13 13 2 2018 24-24 24 2 2019 24-24 24 2 2020 24-24 24 ixed round ontrol tation and - un 2016 rior ears eliveries: 33 2 2016 6-6 6 2 2016 4-4 4 round ata erminals 3 2008 (3) 60-60 - - - - - - - - - - - - - 60 3 2012 35-35 35 3 2013 25-25 25 I 1 - Q-9 II ir orce age 9 of 16-1 ine #15 olume 1-167

II xhibit -21, roduction chedule: 2016 ir orce ate: ebruary 2015 ppropriation / udget ctivity / udget ub ctivity: 3010 / 04 / 5 # I Q-9 eaper ircraft and rior ears eliveries: 84 1 2010 (1) 1 2011 (2) -1 ine Item umber / itle: 1 / Q-9 ost lements (nits in ach) iscal ear 2012 iscal ear 2013 Q I 1 2011 1 Item umber / itle [I]: - / Q-9 alendar ear 2012 alendar ear 2013 24-24 - 24-48 - 48 - - - - - - - - - - - - - - - 12 36 1 2012 48-48 - - - - - - - - - - - - - 48 1 2013 36-36 36 1 2014 20-20 20 1 2015 24-24 24 1 2016 29-29 29 1 2017 24-24 24 1 2018 21-21 21 1 2019 3-3 3 ixed round ontrol tation and rior ears eliveries: 33 2 2013 8-8 8 2 2017 13-13 13 2 2018 24-24 24 2 2019 24-24 24 2 2020 24-24 24 ixed round ontrol tation and - un 2016 rior ears eliveries: 33 2 2016 6-6 6 2 2016 4-4 4 round ata erminals 3 2008 (3) 60-60 60-3 2012 35-35 - - - - - - - - - - - - - - - - - - - 35 3 2013 25-25 25 I 1 - Q-9 II ir orce age 10 of 16-1 ine #15 olume 1-168

II xhibit -21, roduction chedule: 2016 ir orce ate: ebruary 2015 ppropriation / udget ctivity / udget ub ctivity: 3010 / 04 / 5 # I Q-9 eaper ircraft and rior ears eliveries: 84 1 2010 (1) 1 2011 (2) -1 ine Item umber / itle: 1 / Q-9 ost lements (nits in ach) iscal ear 2014 iscal ear 2015 Q I 1 2013 1 Item umber / itle [I]: - / Q-9 alendar ear 2014 alendar ear 2015 24 24 - - 48 12 36 36 1 2012 48-48 - - - - 1 5 3 6 4 3 3 3 2 2 2 3 3 1 3 3 1-1 2013 36-36 - - - - - - - - - - - - - - - - - - - - - - 2 2 32 1 2014 20-20 - - - - - - - - - 20 1 2015 24-24 24 1 2016 29-29 29 1 2017 24-24 24 1 2018 21-21 21 1 2019 3-3 3 ixed round ontrol tation and rior ears eliveries: 33 2 2013 8-8 - 8 2 2017 13-13 13 2 2018 24-24 24 2 2019 24-24 24 2 2020 24-24 24 ixed round ontrol tation and - un 2016 rior ears eliveries: 33 2 2016 6-6 6 2 2016 4-4 4 round ata erminals 3 2008 (3) 60 60 - - 3 2012 35-35 - - - - - - - - - - - - - - - - - - - - - - - - 35 3 2013 25-25 - - - - - - - - - - - - - - - - - - 25 I 1 - Q-9 II ir orce age 11 of 16-1 ine #15 olume 1-169

II xhibit -21, roduction chedule: 2016 ir orce ate: ebruary 2015 ppropriation / udget ctivity / udget ub ctivity: 3010 / 04 / 5 # I Q-9 eaper ircraft and rior ears eliveries: 84 1 2010 (1) 1 2011 (2) -1 ine Item umber / itle: 1 / Q-9 ost lements (nits in ach) iscal ear 2016 iscal ear 2017 Q I 1 2015 1 Item umber / itle [I]: - / Q-9 alendar ear 2016 alendar ear 2017 24 24 - - 48 12 36 36 1 2012 48 48 - - 1 2013 36 4 32 2 2 2 2 2 2 2 2 2 2 - - - - - - - - - - 3 3 3 3-1 2014 20-20 - - - - - - - - - - - - - 3 3 3 3 3 3 2-1 2015 24-24 - - - - - - - - - - - - - - - - - - - - - - 24 1 2016 29-29 - - - - - - - - - - - - - - 29 1 2017 24-24 - - - - 24 1 2018 21-21 21 1 2019 3-3 3 ixed round ontrol tation and rior ears eliveries: 33 2 2013 8-8 - - - - - - - - - - - - - 1 1 1-1 - - 1 1 1 1-2 2017 13-13 - - - - 13 2 2018 24-24 24 2 2019 24-24 24 2 2020 24-24 24 ixed round ontrol tation and - un 2016 rior ears eliveries: 33 2 2016 6-6 - - - - - - - - - - - - - - - - 6 2 2016 4-4 - - - - - - - - - - - - - - - - 4 round ata erminals 3 2008 (3) 60 60 - - 3 2012 35-35 - 1-2 4 5 4 4 4 4 4 3-3 2013 25-25 - - - - - - - - - - - 1 5 4 3 4 4 4 - I 1 - Q-9 II ir orce age 12 of 16-1 ine #15 olume 1-170

II xhibit -21, roduction chedule: 2016 ir orce ate: ebruary 2015 ppropriation / udget ctivity / udget ub ctivity: 3010 / 04 / 5 # I Q-9 eaper ircraft and rior ears eliveries: 84 1 2010 (1) 1 2011 (2) -1 ine Item umber / itle: 1 / Q-9 ost lements (nits in ach) iscal ear 2018 iscal ear 2019 Q I 1 2017 1 Item umber / itle [I]: - / Q-9 alendar ear 2018 alendar ear 2019 24 24 - - 48 12 36 36 1 2012 48 48 - - 1 2013 36 36 - - 1 2014 20 20 - - 1 2015 24-24 3 3 3 3 3 3 3 3-1 2016 29-29 - - - - - - - - 3 3 3 3 3 3 3 3 3 2-1 2017 24-24 - - - - - - - - - - - - - - - - - - 3 3 3 3 3 3 6 1 2018 21-21 - - - - - - - - - - - - - - - - - - - - 21 1 2019 3-3 - - - - - - - - - - 3 ixed round ontrol tation and rior ears eliveries: 33 2 2013 8 8 - - 2 2017 13-13 - - - - - - - - - - - - - - 1 1 1 1 1 1 1 1 1 2 2 2 2018 24-24 - - - - - - - - - - - - - - - - 24 2 2019 24-24 - - - - 24 2 2020 24-24 24 ixed round ontrol tation and - un 2016 rior ears eliveries: 33 2 2016 6-6 - - 1 1 1 1 1 1-2 2016 4-4 - - - - - - - - 1 1 1 1 - round ata erminals 3 2008 (3) 60 60 - - 3 2012 35 35 - - 3 2013 25 25 - - I 1 - Q-9 II ir orce age 13 of 16-1 ine #15 olume 1-171

II xhibit -21, roduction chedule: 2016 ir orce ate: ebruary 2015 ppropriation / udget ctivity / udget ub ctivity: 3010 / 04 / 5 # I Q-9 eaper ircraft and rior ears eliveries: 84 1 2010 (1) 1 2011 (2) -1 ine Item umber / itle: 1 / Q-9 ost lements (nits in ach) iscal ear 2020 iscal ear 2021 Q I 1 2019 1 Item umber / itle [I]: - / Q-9 alendar ear 2020 alendar ear 2021 24 24 - - 48 12 36 36 1 2012 48 48 - - 1 2013 36 36 - - 1 2014 20 20 - - 1 2015 24 24 - - 1 2016 29 29 - - 1 2017 24 18 6 3 3-1 2018 21-21 - - 3 2 3 2 3 2 2 2 1 1-1 2019 3-3 - - - - - - - - - - - - 1 1 1 - ixed round ontrol tation and rior ears eliveries: 33 2 2013 8 8 - - 2 2017 13 11 2 1 1-2 2018 24-24 1 1 2 2 2 2 2 2 2 2 2 2 2-2 2019 24-24 - - - - - - - - - - - - 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2020 24-24 - - - - - - - - - - - - - - - - 24 ixed round ontrol tation and - un 2016 rior ears eliveries: 33 2 2016 6 6 - - 2 2016 4 4 - - round ata erminals 3 2008 (3) 60 60 - - 3 2012 35 35 - - 3 2013 25 25 - - I 1 - Q-9 II ir orce age 14 of 16-1 ine #15 olume 1-172

II xhibit -21, roduction chedule: 2016 ir orce ate: ebruary 2015 ppropriation / udget ctivity / udget ub ctivity: 3010 / 04 / 5 # I Q-9 eaper ircraft and rior ears eliveries: 84 1 2010 (1) 1 2011 (2) -1 ine Item umber / itle: 1 / Q-9 ost lements (nits in ach) iscal ear 2022 iscal ear 2023 Q I 1 2021 1 Item umber / itle [I]: - / Q-9 alendar ear 2022 alendar ear 2023 24 24 - - 48 12 36 36 1 2012 48 48 - - 1 2013 36 36 - - 1 2014 20 20 - - 1 2015 24 24 - - 1 2016 29 29 - - 1 2017 24 24 - - 1 2018 21 21 - - 1 2019 3 3 - - ixed round ontrol tation and rior ears eliveries: 33 2 2013 8 8 - - 2 2017 13 13 - - 2 2018 24 24 - - 2 2019 24 22 2 2-2 2020 24-24 1 1 2 2 2 2 2 2 2 2 2 2 2 - ixed round ontrol tation and - un 2016 rior ears eliveries: 33 2 2016 6 6 - - 2 2016 4 4 - - round ata erminals 3 2008 (3) 60 60 - - 3 2012 35 35 - - 3 2013 25 25 - - I 1 - Q-9 II ir orce age 15 of 16-1 ine #15 olume 1-173

II xhibit -21, roduction chedule: 2016 ir orce ate: ebruary 2015 ppropriation / udget ctivity / udget ub ctivity: 3010 / 04 / 5 roduction ates (ach / onth) ef # ame - ocation or 2016 1-8-5 or 2016 X or 2016-1 ine Item umber / itle: 1 / Q-9 rior to ct 1 fter ct 1 Initial fg rocurement eadtime (onths) otal fter ct 1 rior to ct 1 Item umber / itle [I]: - / Q-9 fter ct 1 eorder fg otal fter ct 1 1 -I - oway, - - 48 - - - - 9 11 22 33 2 -I - oway, - - 12 - - - - 9 9 18 27 3 -I - oway, - - - - - - - - - - - emarks: Q-9 eaper ircraft: his effort will procure lock 5 Q-9 eaper aircraft and associated - lectro-ptical/infra-ed (/I) sensors, ynx ynthetic perture adar () sensors, and Hellfire launchers and rails. he technical orders availability issues have been resolved and software has been fielded. ll 11 lock 1 and lock 5 aircraft have been delivered. ix (6) 12 lock and eight (8) lock 5 aircraft have yet to deliver; two (2) 12 lock 5 have been delivered. he eight (8) month delivery break due to lock 5 development schedule impacts was resolved by the re-phase of 12 lock 1 and lock 5 aircraft to support the ccelerated xtended ange. 13 roduction effort for 24 lock 5 aircraft awarded ct 13. he last 13 aircraft (ongressional add of twelve (12) lock 5 aircraft) is out of sequence with the 14 lock 5 aircraft. his is due to the 14 ppropriations language directing "...to procure no fewer than the full number of Q-9 aircraft in this ct as a single production lot." he program office developed a contracting strategy which allowed for combining 13 ongressional add (qty 12) aircraft and 14 ppropriated (qty 20) aircraft to leverage a quantity discount and cost savings at thirty-two (32) aircraft. delay in award drives a re-phase of 14 aircraft. "" in the elivery chedule indicates the ontract ward ate. ote: ue to space limitations, quantities in the xhibit -21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).if the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). ootnotes: (1) rior ear contracts with undelivered assets have all deliveries occurring before ct 2013 loaded in the month of first delivery. (2) rior ear contracts with undelivered assets have all deliveries occurring before ct 2013 loaded in the month of first delivery. (3) rior ear contracts with undelivered assets have all deliveries occurring before ct 2013 loaded in the month of first delivery. I 1 - Q-9 II ir orce age 16 of 16-1 ine #15 olume 1-174