Sudan PBN Implementation Plan PBN SG/2

Similar documents
Sudan PBN Implementation Plan PBN SG/3

Preparation for ASBU B1 (PBN)

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

TWELFTH AIR NAVIGATION CONFERENCE

(RN R A N V A V & & RN R P N

34 th Airline/ATS Safety Forum

Status of PBN implementation in France

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)


International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8)

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS

PBN Airspace Concept. ATS requirements

UK Implementation of PBN

MID Region Air Navigation Strategy

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018

Presented by: Trinidad and Tobago

Flight Procedure Design and Cartography

Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July Saudi Arabia

DSNA NAVIGATION STRATEGY

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)

Implementation of PBN in Armenian airspace

ASBU ACTIONS UNDERTAKEN BY THE ALGERIAN CIVIL AVIATION AUTHORITY IN AIR NAVIGATION FIELD

What is Flexible Use of Airspace (FUA)?

ICAO framework for LPV

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile

French DSNA approach to CNS rationalization & evolution

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

Draft PBN Implementation Plan Papua New Guinea

PBN Implementation inside Italian Airspace Status update Summer 2013

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

NANSC VISSION AND MISSION. NANSC CNS/ATM Roadmap FUTURE ASBU. 3 Future works. alignment 3/13/2014

PLAN. 1. Generalities 2. Current Situation 3. Future Strategy + Actions required 4. Conclusion. Ministry of transport 2013

Performance Based Navigation Implementation in Thailand

APAC PBN UPDATE Slide 1 of xx

Myanmar s CNS/ATM Development Master Plan

Título ponencia: Introduction to the PBN concept

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

PBN Implementation inside Italian Airspace

SAMPLE TEMPLATE APPENDIX 3.5C-1

PBN Implementation in the UK

Evolving and improving landing networks with EGNOS

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

PBN Implementation Plan - Fiji Version 1 19 January 2010

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

SOUTH AFRICA. Performance Based Navigation (PBN) Roadmap

Home LIST OF ACRONYMS

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

NEW CALEDONIA PBN PLAN

TWELFTH AIR NAVIGATION CONFERENCE

PBN and Procedure Design training

2012 Performance Framework AFI

European Aviation Safety Agency

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

TABLE OF CONTENTS 1.0 INTRODUCTION...

PBN Implementation Plan Tonga

RNAV - RNP. July 2010

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

TANZANIA CIVIL AVIATION AUTHORITY. TANZANIA Performance Based Navigation Implementation Plan

NATA 2018 AGM & CONFERENCE

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

Air Navigation Bureau ICAO Headquarters, Montreal

Performance Based Navigation Implementation Plan SINGAPORE. December Published by Civil Aviation Authority of Singapore

NEW FPL Transition Phase & Implementation Stages

Performance Based Navigation Operational End-State 2023

International Civil Aviation Organization. Global and Regional Developments related to ATM GLOBAL AND REGIONAL DEVELOPMENTS RELARED TO ATM

Second Meeting of the Air Navigation System Implementation Group (ANSIG/2)

RACOON PROJECT Daniele Teotino - ENAV. RACOON Project Manager Head of SESAR JU Activity Coordination

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen

Russian Federation ATM modernization program

Appendix E NextGen Appendix

AIR NAVIGATION PLAN REGIONAL PERSPECTIVE Performance Framework Workshop. ICAO NACC Office

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

Learning Objectives. By the end of this presentation you should understand:

EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA

Performance Based Navigation Implementation Plan Revised 2017 New Zealand

ICAO PBN Symposium Montreal - October Captain Johnny Woods Head of Flight Operations & Chief Pilot

UK Performance-based Navigation (PBN) Implementation Status

Honeywell.com PBN Concepts Krakow, Poland

TWELFTH AIR NAVIGATION CONFERENCE

Colombian PBN implementation: El Dorado case study

Performance Based Navigation (PBN) Implementation Plan Republic of Mauritius

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

The support of an European ANSP

INTERNATIONAL CIVIL AVIATION ORGANIZATION

ICAO Regional Seminar on Performance - Based Navigation (PBN) Nairobi, Developments and Benefits. 4 December 2008.

Performance Based Navigation (PBN) Implementation Plan Ethiopia

Patrizio Vanni (Project Coordinator)

Performance Framework for MID Region Air Navigation Planning and Implementation MEAUSE SURVEYS. (Presented by IATA and CANSO) SUMMARY

TRINIDAD AND TOBAGO PIARCO FIR/NATIONAL ASBU PLAN

Transcription:

Sudan PBN Implementation Plan PBN SG/2 Shram El Sheikh, Egypt,22-25 FEB 2016

Outline Introduction International Aerodromes Domestic Aerodromes Challenges Sudan airspace restructure Sudan current ATS route Target from new structure Roadmap for the Sudan airspace project Sudan ATS Surveillance System Activities during the Project Conclusion

Introduction Instrument Flight Procedure project Start in 2012 by a signing contract with ENAC/CGX Aero (French company)

Introduction Establish procedure design unit IAP for 13 aerodromes 7 Airports Completed 4 Airports in progress 2 Airports remaining SIDs and STARs for 13 aerodromes CCO and CDO for 13 aerodromes

International Aerodromes There are 4 international airports : Khartoum (HSSS) airport ILS approach R/W 36 CAT 2 ILS approach R/W 18 Cat 2 (suspended) VOR/DME approach R/W 36 & 18 VOR approach only for R/W 36&18 RNAV approach (LNAV only) for R/W36 &18 SIDs & STARs RNAV 1 Approval in progress

International Aerodromes There are 4 international airports : Port Sudan (HSPN) airport ILS approach R/W 35 CAT 1 VOR/DME approach R/W 35 & 17 RNAV approach (LNAV only) for R/W35 &17 SIDs & STARs RNP 1 Approval in progress

International Aerodromes There are 4 international airports : Nyala (HSNN) airport VOR/DME approach R/W 22 & 04 RNAV approach (LNAV only) for R/W04 &22 SIDs & STARs RNP 1 Approval in progress

International Aerodromes There are 4 international airports : El Obied (HSOB) airport VOR/DME approach R/W 01 & 19 RNAV approach (LNAV only) for R/W01 & 19 SIDs & STARs RNP 1 Approval in progress

Domestic Aerodromes There are 9 domestic airports: El genana (HSSG) Airport: VOR/DME approach R/W 04 & 22 RNAV approach (LNAV only) for R/W05 & 23 SIDs & STARs RNP 1 Approval in progress

Domestic Aerodromes There are 9 domestic airports: El fasher (HSFS) Airport: VOR/DME approach R/W 05 & 23 RNAV approach (LNAV only) for R/W05 & 23 SIDs & STARs RNP 1 Approval in progress

Domestic Aerodromes There are 9 domestic airports: Marawai(HSMN) Airport: ILS approach R/W 02 & 20 CAT 3 VOR/DME approach R/W 02 & 20 RNAV approach (LNAV only) for R/W02 & 20 SIDs & STARs RNP 1 Approval in progress

Data Collection Data Validation Conceptual Design Validation with all partners Detailed procedure design Ground Validation Approval & Publication Final review

Domestic Aerodromes There are 9 domestic airports: Kasala(HSKA) Airport: VOR/DME approach R/W 02 & 20 RNAV approach (LNAV only) for R/W02 & 20 SIDs & STARs RNP 1 Conceptual Design

Domestic Aerodromes There are 9 domestic airports: El damazin(hsdz) Airport: RNAV approach (LNAV only) for R/W17 & 35 Only RNP APCH (No NAVAIDs) SIDs & STARs RNP 1 Conceptual Design

Domestic Aerodromes There are 9 domestic airports: Kadugli(HSKA) Airport: RNAV approach (LNAV only) for R/W06 & 24 Only RNP APCH (No NAVAIDs) SIDs & STARs RNP 1 Conceptual Design

Domestic Aerodromes There are 9 domestic airports: Dongola(HSDN) Airport: VOR/DME approach R/W 02 & 20 RNAV approach (LNAV only) for R/W02 & 20 SIDs & STARs RNP 1 Conceptual Design

Data Collection Data Validation Conceptual Design Validation with all partners Detailed procedure design Ground Validation Approval & Publication Final review

Domestic Aerodromes Remaining 2 Airports: El daien(hsdi) and Zalengi (HSZN) IAP and SIDs & STARs will be carried out by the end of 2017

Remarks Baro-VNAV procedures will be designing for Khartoum, Port Sudan, El fasher, El obied, El genana, Nyala and Marwari by the end of 2016.

Challenges Approval Process Data collection and construction works for some airports.

SIDs and STARs will be connected with ATS routes

SUDAN AIRSPACE The second step is redesign of the Sudan airspace This step represents a significant work that must be carried by SCAA with the assistant of CGX AERO and DSNA services ( The French Aeronautical Expertise)

Sudan Current Situation RNAV Current status in Sudan (routes) The following RNV routes are established within Khartoum Airspace: Route UM863 as RNAV route linking the Gulf states with West Africa Route UT124 as RNAV route linking East Africa with Europe

Sudan Current Situation RNAV Current status in Sudan (routes) Routes UQ584 as RNAV route linking the Gulf with West Africa down South America Route UT535 linking Juba with East Africa. Route UT139 as RNAV 10 linking east Africa with West Africa. Route UT142 linking East Africa with the North West Africa.

Sudan current ATS route

Target Design safe and efficient new structure for Sudan FIR compliant with: National PBN road map ICAO MID & AFI plan ASBU Methodology National and international requirements Manage growth and evolution of the traffic up to 2025

Target Manage HADJ period Reduce ATC workload Increase the airspace capacity Improve the safety and efficiency of operations Reduce the flying time for crossing Sudan FIR

Roadmap 3 main elements Experienced team A methodology A calendar (6 to 8 months)

Roadmap - A methodology STAGE 1 - ANALYSIS Data Collection Strategy definition STAGE 2 DESIGN STUDY Airspace design activities Experimentation STAGE 3 IMPLEMENTATION Operational implementation Sensitization

Remarks Upper airspace will be RNAV routes. Lower airspace will be conventional routes Flexible routes will be consider above flight level 390

Sudan ATS Surveillance System The Surveillance System in Sudan include the following: 6 MSSR antennas PORT SUDAN DONGOLA KHARTOUM EL OBEID AL FASHER AD-DAMAZIN

Sudan ATS Surveillance System The Surveillance System in Sudan include the following: 11 ADS-B sites KHARTOUM ATBARA ATROUN (not integrated) NYALA KADULI( not integrated) MARRAW KASSALA (not integrated) OBIED PORT SUDAN (not integrated) FASHERR (not integrated) ELDAMAZIN (not integrated) DONGLA (not integrated)

Activities during the Project Knowledge transfer to SCAA During the period of the project there are three workshops on PBN will be conducted by CGX in Khartoum for: ATCOs Pilots Civil aviation staffs in related fields

Conclusion The new design would have a cross- border impact, but it has positive effect for all airlines flying over HSSS FIR so that we need support from: All neighboring countries ICAO MID/AFI offices CANSO and ITATA

Thanks for your attention