Grove Field Airport Environmental Assessment

Similar documents
BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Public Meeting No. 2

CHAPTER 3 ALTERNATIVES CONSIDERED

Chapter 4.0 Alternatives Analysis

Preliminary Findings of Proposed Alternative


1) Rescind the MOD (must meet the standard); 2) Issue a new MOD which reaffirms the intent of the previous MOD; 3) Issue a new MOD with revisions.

Appendix D Airfield Ongoing Projects Alternatives

Airport Design-3 Geometric Design

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

DRAFT MASTER PLAN UPDATE

ORCAS ISLAND AIRPORT MASTER PLAN

Grants Pass Airport Master Plan & Airport Layout Plan Update

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Lake Tahoe Airport Master Plan

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application

Punta Gorda Airport Master Plan Update

AIRPORT MASTER PLAN UPDATE

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan

Study Committee Meeting. September 2015

Table of Contents. Overview Objectives Key Issues Process...1-3

PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long

Chapter Three AIRPORT FACILITY REQUIREMENTS/ALTERNATIVES

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Chapter 4. Development Alternatives

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Addendum - Airport Development Alternatives (Chapter 6)

General Aviation Master Plan Update

Norfolk International Airport

IDENTIFICATION AND EVALUATION OF ALTERNATIVES ST. PETERSBURG-CLEARWATER INTERNATIONAL AIRPORT

Public Information Meeting. September 2015

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3

Chapter Four ALTERNATIVES

Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, Shannon Eibert, C&S Companies

A. CONCLUSIONS OF THE FGEIS

Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM

print materials visit information on free live seminars, online courses, and

Chapter 4 Airport Facility Requirements

Winona Runway Shift Project

4. Safety Concerns Potential Short and Medium-Term Improvements

Master Plan Update Technical Advisory Committee Meeting

Alternatives Analysis EXECUTIVE SUMMARY

MASTER PLAN CONCEPT 1 DRAFT

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Yolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #4 March 19, 2018

CHAPTER FOUR AIRPORT ALTERNATIVES

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

Hartford-Brainard Airport Potential Runway Closure White Paper

4.0 AIRFIELD CAPACITY & FACILITY REQUIREMENTS

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

AIRPORT WITH NO RUNWAYS IS A MALL

Runway Safety Margin Enhancement Project. Ann Arbor Municipal Airport Matt Kulhanek Director-Facilities Management

2015 PURDUE ROAD SCHOOL March 11, 2015

II. Purpose and Need. 2.1 Background

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

6.1 INTRODUCTION 6.2 AIRSIDE ALTERNATIVES NORTH PERRY AIRPORT MASTER PLAN UPDATE RUNWAY LENGTH REQUIREMENTS SECTION 6: ALTERNATIVES ANALYSIS

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017

Chapter 8.0 Implementation Plan

What is an Airport Master Plan?

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

8.0 AIRPORT LAYOUT PLANS

FINAL SUMMARY REPORT

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10

Runway Safety Margin Enhancement Project. Matt Kulhanek Director Facilities Management

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

General Dick Stout Field: 2010 General Aviation Airport Runway 18/36 3,410 x Hangars 65 Based Aircraft St. George 177 Based A/C Cedar d City 65

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

chapter 5 Recommended Master Plan Concept airport master plan MASTER PLAN CONCEPT

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

Provincial Railway Technical Standards

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES

AWP ACIP DATA SHEET. $100,000 $5,263 $105,263 Access Road Project

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES

STUDY WORK GROUP MEETING No. 3. November 29, 2016

Aviation, Rail, & Trucking 6-1

5.0 ALTERNATIVES ANALYSIS

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

Chapter One INVENTORY

State of the Airport Robert S. Bowen, Executive Director October 18, 2018

Collier County Airport Authority. Joint Automated Capital Improvement Program

CHAPTER 6 IDENTIFICATION AND EVALUATION OF ALTERNATIVES

Public Notice July 14, 2017

Navigation - Runways. Chap 2, Nolan

CATCODE ] CATCODE

Transcription:

Grove Field Airport Environmental Assessment Advisory Committee Meeting #2 December 9, 2008 Port of Camas-Washougal Conference Room 6:00 7:30 PM

Agenda: Welcome and Overview Dave Ripp, Director, Port of Camas/Washougal October 7 th EAAC Meeting Overview Rainse Anderson, Project Manager, WHPacific Project Alternatives: Affected Environment Rainse Anderson, Project Manager, WHPacific and Laura Jackson, Environmental Specialist, Corvid Consulting Open Discussion All

October 7 th EAAC Meeting Overview Project Overview and History EAAC Roles and Responsibilities Environmental Assessment Process Results of Field Investigations Open Discussion

Runway/Taxiway Separation* Runway Length* Runway Width* Delp Road Relocation *Alternatives from Airport Layout Plan Narrative

Runway/Taxiway Separation Alternative 1: No Action Alternative This would perpetuate the current runway/taxiway centerline separation deficiency. Alternative 2: Build Alternative 1 Shift the taxiway to the north to gain 150-foot runway centerline to taxiway centerline separation distance. This alternative would require purchase of private property and relocation of private homes and hangars. Alternative 3: Build Alternative 2 Maintain the current taxiway configuration and shift the runway to the south to achieve 150-foot runway centerline to taxiway centerline separation distance. No property acquisition would be required.

Runway Length Alternative 1: No Action Alternative This alternative would not correct the Airport safety concerns. Alternative 2: Build Alternative 1 Maintain current runway length of 2,620 feet. Install edge lighting on portions of runway that are displaced so that full runway length is available for night time operations.

Runway Length, Cont. Alternative 3: Build Alternative 2 Extend runway in its present location 450 feet to the west to achieve a runway length of 3,070 feet. This length will accommodate 95% of small aircraft with less than 10 passenger seats. This alternative would require relocation of Delp Road and the acquisition of adjacent off-airport property. Assumes no action on runway/taxiway separation. Alternative 4: Build Alternative 3 Shift runway 75 feet to the south to achieve recommended runway centerline to taxiway centerline separation distance of 150 feet and extend runway 450 feet to the west to achieve a runway length of 3,070 feet. This alternative would also require relocation of Delp Road and the acquisition of adjacent off-airport property.

Existing Conditions

Runway Width Alternative 1: No Action Alternative The no action alternative would not widen the runway, and would not correct the design deficiency. Alternative 2: Build Alternative 1 Maintain current width of 40 feet until runway pavement has reached the end of its useful life. When a pavement overlay is necessary, widen runway to 60 feet. Assumes no runway shift or extension. Alternative 3: Build Alternative 2 Widen runway to 60 feet at same time as runway extension. Alternative 4: Build Alternative 3 Widen runway to 60 feet at same time as runway shift and extension.

Delp Road Relocation Design Standards Clark County Design Criteria For Rural Access Roads Design Criteria Local Access Minimum R/W (ft) 50 Lane Width (ft) Two 10 lanes Paved Shoulders 2 (2 ) Roadway Width (include shoulders) (ft) 24 Design Speed (MPH) 30 Maximum Grade (%) 15 Maximum Centerline Radius (ft) 150 Maximum Length (ft) N/A Intersection Minimum Spacing (ft) 150 Design Volume (ADT) 2000 Typical # Houses 200 Sidewalks (both sides) Curb and Gutter Required N/A Minimum Intersection Radii (ft) 25

Delp Road Relocation Typical Cross Section

Delp Road Relocation Alternative 1: No Action (assumes no action on runway length) The runway length deficiency and OFA penetrations would persist with this alternative

Delp Road Relocation Alternative 2: Relocate Delp Road to the Northwest (Build Alternative 1) Delp Road would diverge from its current alignment south of Port property. It would converge back with the existing Delp Road at a 45 degree angle and would cross the stream in a new location.

Delp Road Relocation Alternative 2: Relocate Delp Road to the Northwest (Build Alternative 1)

Delp Road Relocation Alternative 3: ALP Alignment (Build Alternative 2) This alignment would diverge from current alignment south of Port property and extend north to intersect 252 nd Street.

Delp Road Relocation Alternative 3: ALP Alignment (Build Alternative 2)

Delp Road Relocation, Cont. Alternative 4: Relocate Delp Road on Port-owned property (Build Alternative 3) This alternative would relocate Delp Road onto port property; no impact to the stream crossing.

Delp Road Relocation Alternative 4: Relocate Delp Road on Port-owned property (Build Alternative 3)

Delp Road Relocation, Cont. Alternative 5: Relocate Delp Road to the North (Build Alternative 4) Delp Road would diverge from its current alignment on Port property. It would intersect 252 nd Street. The only variance between Alternative 5 and Alternative 3 is the southerly alignment.

Delp Road Relocation Alternative 5: Relocate Delp Road to the North (Build Alternative 4)

Delp Road Relocation, Cont. Alternative 6: Tunnel under runway and taxiway (Build Alternative 5) Alternative 5 would consist of constructing a tunnel under the extended runway and taxiway system. No realignment of Delp Road would occur.

Delp Road Relocation Alternative 6: Tunnel under runway and taxiway (Build Alternative 5)

Delp Road Relocation Vehicular Underpass

Delp Road Relocation, Cont. Alternative 7: Dead end Delp Road on both sides of runway (Build Alternative 6) This alternative would close Delp Road north and south of the airport.

Delp Road Relocation Alternative 7: Dead end Delp Road on both sides of runway (Build Alternative 6)

Alt 1: No Action Property Acquisition 0 Wetland Impact/New Stream Crossing Delp Road Relocation Comparison Table Alt. 2: Build Alt. 1 - (may take homes) Alt. 3: Build Alt. 2 - (no homes taken) Alt. 4: Build Alt. 3 Alt. 5: Build Alt. 4 Alt. 6: Build Alt. 5 Tunnel Alt. 7: Build Alt. 6 Terminate 0-0 0 0 - - 0-0 0 Meets FAA Standards - + + + + + + Allows for expansion of airport Allows expansion of road - + + - - + + + + + - - - - Traffic Operations 0 - + 0 + 0 - Cost None Unknown Unknown Unknown Unknown Very High Low Notes: + = Positive Feature - = Negative Feature 0 = No change from present condition