UNCLASSIFIED. FY 2017 Base FY 2017 OCO

Similar documents
UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) FY 2012 OCO

UNCLASSIFIED. UNCLASSIFIED Page 1 of 5. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: AIRCRAFT CERTIFICATION FY 2012 OCO

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #35

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 24 P-1 Line #55

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #57

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #55

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 18 P-1 Line #56

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 18 P-1 Line #12

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #121

Presidential Aircraft Recapitalization

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 21 P-1 Line #19

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 31 P-1 Line #41

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base

Department of Defense DIRECTIVE

Safety Enhancement SE ASA Design Virtual Day-VMC Displays

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

OVERVIEW OF THE FAA ADS-B LINK DECISION

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 33 P-1 Line #94

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 P-1 Line #15

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #21

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)

Surveillance and Broadcast Services

Report to Congress Aviation Security Aircraft Hardening Program

RAAC/15-WP/14 International SUMMARY REFERENCES. A Safety

OPNAVINST B N98 15 Apr Subj: NAVAL AVIATION POLICY FOR AIRCRAFT AVIONICS SAFETY SYSTEMS

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

City Council Report. Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

Department of Legislative Services Maryland General Assembly 2009 Session

From AIS To AIM. Agenda. Agenda. Jack Hsu Mark Varellas

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT

U.S. NAVY CNS/ATM Program Status

Safety Enhancement SE 226 Cargo Hazardous Material Fires Enhanced Protection of Occupants and Aircraft

European ATM Development The Big Idea

Generic OpSpec A332 - DRAFT

Cost-effective, flexible avionics for today s missions and future challenges. Flight2 integrated avionics system. UPGRADES FOR LEGACY C-130s

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

9/16/ CHG 213 VOLUME 3 GENERAL TECHNICAL ADMINISTRATION CHAPTER 61 AIRCRAFT NETWORK SECURITY PROGRAM

Silver Line Operating Plan

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 151 P-1 Line #32

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Unit Cost ($ M) Qty (Each)

REPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO)

Aero Design Battery Shop

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 30 P-1 Line #36

REPORT 2014/065 INTERNAL AUDIT DIVISION. Audit of air operations in the United. Nations Assistance Mission in Afghanistan

ACAS on VLJs and LJs Assessment of safety Level (AVAL) Outcomes of the AVAL study (presented by Thierry Arino, Egis Avia)

RNP AR APCH Approvals: An Operator s Perspective

Approach 15 Australasian PBN Forum. Flight Deck Equipage to Enable CNS/ATM

Various Counties MINUTE ORDER Page 1 of I

ARINC Project Initiation/Modification (APIM)

October 1, NC Department of Transportation. Division of Aviation. A Plan for the Joint Legislative Transportation Oversight Committee

DOD STATEMENT OF INTENT

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Hereafter there are some examples on how parts of a test campaign should typically be classified. In case of any doubt contact the Agency:

Name of Customer Representative: Raul Conrads (Chilean Air Force aka FACH) Phone Number: +56 (9)

Air Force Test Center 96 TW

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge

Roadmapping Breakout Session Overview

Unmanned Aircraft Systems (UAS) and the FAA Modernization and Reform Act of 2012

Federal Aviation Administration. ADS-B Data Usage. Chris Parfitt Manager, Avionics Branch Aircraft Maintenance Division FAA Flight Standards Service

Windmills & Airspace Can We Work Together?

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016

MD HELICOPTERS, INC.

FROM: Donald J. Polmann, Director of Science and Engineering ( New Water Plan - Quarterly Report - Approve Submittal to SWFWMD

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)

The Information Paper of the. Milestones of Roadmap Development International Communion and Promotion Overview of China's PBN Implementation Roadmap

Glossary and Acronym List

Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December

EQUIP General Aviation Equipage Work Group Briefing. Date: November 28, 2017

Transcription:

Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY 2018 FY 2019 FY 2020 FY 2021 To Program Element 0.000 0.000 33.962 15.599 0.000 15.599 90.697 191.779 137.512 85.000 Continuing Continuing 675248: C-130H Avionics Modernization Program (AMP) Increment 1 675250: C-130H Avionics Modernization Program (AMP) Increment 2 0.000 0.000 33.962 8.421 0.000 8.421 15.697 13.104 7.212 0.000 0.000 78.396 0.000 0.000 0.000 7.178 0.000 7.178 75.000 178.675 130.300 85.000 Continuing Continuing Note This program, BA 07 PE 0401115F, project 675250, C-130H Avionics Modernization Program (AMP) Increment 2, is a new start. Project 675248 was renamed from "C-130H Viability and Airspace Access Program (VAAP) Increment 1" to "C-130H Avionics Modernization Program (AMP) Increment 1" starting in FY17. A. Mission Description and Budget Item Justification The funding was reduced by $50.484M to account for the availability of prior year execution balances. The C-130H is a medium sized tactical transport aircraft providing multi-purpose theater support throughout the globe. The C-130H fleet supports several diverse Air Force roles, including but not limited to tactical and inter-theater airlift and airdrop support, Arctic resupply, special operations support, aeromedical evacuation, aerial spraying, firefighting duties, and natural disaster and humanitarian relief missions. C-130H AMP Increment 1 addresses modifications to meet airspace compliance mandates and safety requirements. RDT&E efforts will cover design, integration, developmental test, Type 1 training and C-130H aircrew and maintenance training systems and courseware development efforts. C-130H AMP Increment 2 includes digital avionics upgrades (e.g. Flight Management System, improved navigation), cockpit modernization (e.g. glass/engine flight displays) and resolves select obsolescence and Diminishing Manufacturing Source (DMS) issues. RDT&E efforts will cover design, integration, developmental test, Type 1 training and C-130H aircrew and maintenance training systems and courseware development efforts. This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full-rate production and anticipate production funding in the current or subsequent fiscal year. Air Force Page 1 of 14 R-1 Line #223 Volume 3b - 561

Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development B. Program Change Summary ($ in Millions) Previous President's Budget 0.000 33.962 58.905 0.000 58.905 Current President's Budget 0.000 33.962 15.599 0.000 15.599 Adjustments 0.000 0.000-43.306 0.000-43.306 Congressional General Reductions 0.000 0.000 Congressional Directed Reductions 0.000 0.000 Congressional Rescissions 0.000 0.000 Congressional Adds 0.000 0.000 Congressional Directed Transfers 0.000 0.000 Reprogrammings 0.000 0.000 SBIR/STTR Transfer 0.000 0.000 Other Adjustments 0.000 0.000-43.306 0.000-43.306 Change Summary Explanation FY17 includes a reduction of $50.484M from "C-130H AMP Increment 1" to account for the availability of prior year execution balances. Additionally, FY17 includes $7.178M for "C-130H Avionics Modernization Program (AMP) Increment 2" new-start. These two actions resulted in a total reduction of $43.306M in FY17. Air Force Page 2 of 14 R-1 Line #223 Volume 3b - 562

Exhibit R-2A, RDT&E Project Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) 675248: C-130H Avionics Modernization Program (AMP) Increment 1 675248 / C-130H Avionics Modernization Program (AMP) Increment 1 FY 2018 FY 2019 FY 2020 FY 2021 To 0.000 0.000 33.962 8.421 0.000 8.421 15.697 13.104 7.212 0.000 0.000 78.396 Quantity of RDT&E Articles - - - - - - 4 - - - Note Project 675248 was renamed from "C-130H Viability and Airspace Access Program (VAAP) Increment 1" to "C-130H Avionics Modernization Program (AMP) Increment 1" starting in FY17. A. Mission Description and Budget Item Justification The C-130H AMP Increment 1 program performs modifications to meet airspace compliance and safety mandates; the mod includes automatic dependent surveillancebroadcast (ADS-B) Out, enhanced Mode S, 8.33 khz radios, and cockpit voice recorder/digital flight data recorder (CVR/DFDR). RDT&E efforts will cover design, integration, developmental test, Type 1 training and C-130H aircrew and maintenance training systems and courseware development efforts (including MODE 5 effort for the trainers). The C-130H AMP Increment 1 program modifies 172 aircraft (166x C-130Hs and 6x LC-130Hs) consisting of H3s, H2.5s, H2s and H1s; and includes 127 Air National Guard aircraft, and 45 Air Force Reserve aircraft. The modification effort will have up to 4 prototype aircraft representative of variations in the mission designs and required for accomplishment of the C-130H AMP Increment 1 Engineering and Manufacturing Development (EMD) phase. The remaining aircraft will be modified in the production phase. B. Accomplishments/Planned Programs ($ in Millions) Title: C-130H AMP Increment 1 Description: Refined and completed the requirements definition phase of the program, followed by integration planning, and the Engineering and Manufacturing Development (EMD) phase activities. 0.000 33.962 8.421 0.000 8.421 FY 2015 Accomplishments: N/A FY 2016 Plans: Air Force Page 3 of 14 R-1 Line #223 Volume 3b - 563

Exhibit R-2A, RDT&E Project Justification: PB 2017 Air Force : February 2016 B. Accomplishments/Planned Programs ($ in Millions) Documentation development, Request for Proposal (RFP) development and release, source selection and ramp up of Engineering and Manufacturing Development (EMD) phase activities. Plans: Continuation of EMD including Milestone B,, Preliminary and Critical Design Reviews. Plans: N/A 675248 / C-130H Avionics Modernization Program (AMP) Increment 1 Accomplishments/Planned Programs Subtotals 0.000 33.962 8.421 0.000 8.421 C. Other Program Funding Summary ($ in Millions) Line Item FY 2018 FY 2019 FY 2020 FY 2021 To APAF: BA05: Line Item # C13000: 0.000 70.000 0.000 0.000 0.000 56.968 59.764 21.401 10.516 0.000 218.649 C-130H Avionics Modernization Program (AMP) Increment 1 Remarks C-130H AMP Increment 1 Procurement funding begins in FY18; however, the program also received a congressional add of $70M APAF in FY16. Additionally, the original C-130 AMP (mod # 8517) received a congressional add of FY15 $35.8M APAF in FY15; based on the FY15 NDAA language, the AF is able to execute a portion of this funding for the C-130H AMP Increment 1 program. D. Acquisition Strategy C-130H AMP Increment 1 acquisition strategy (30 Sept 2015) is to conduct a full and open competitive source selection for ADS-B Out and Enhanced Mode S followed by a Federal Acquisition Regulation (FAR) Part 15 contract award. Current efforts are primarily defining the program requirements and pre-contract efforts in preparation for the Engineering and Manufacturing Development (EMD) source selection. The current schedule reflects EMD contract to be awarded in 2nd quarter FY17. d on congressional approval, the AF started C-130H AMP Increment 1 in FY15, with the following FY15 activities: Market research, acquisition strategy planning, and documentation development. E. Performance Metrics Please refer to the Performance Budget Overview Book for information on how Air Force resources are applied and how those resources are contributing to Air Force performance goals and most importantly, how they contribute to our mission. Air Force Page 4 of 14 R-1 Line #223 Volume 3b - 564

Exhibit R-3, RDT&E Project Analysis: PB 2017 Air Force : February 2016 Product Development ($ in Millions) Category Item C-130H AMP Increment 1 EMD C-130H AMP Increment 1 Trainers/Training Government Furnished Property 675248 / C-130H Avionics Modernization Program (AMP) Increment 1 To C/Various TBD : TBD 0.000 0.000 25.162 Mar 2017 0.000 0.000 0.000 Continuing Continuing 40.375 C/TBD TBD : TBD 0.000 0.000 0.000 3.421 Mar 2017 0.000 3.421 Continuing Continuing 16.521 MIPR TBD : TBD 0.000 0.000 0.800 Mar 2017 0.000 0.000 0.000 0.000 0.800 0.800 Subtotal 0.000 0.000 25.962 3.421 0.000 3.421 - - 57.696 Support ($ in Millions) Category Item To Subtotal - - - - - - - - - Test and Evaluation ($ in Millions) Category Item C-130H AMP Increment 1 Development Flight Test Management Services ($ in Millions) Category Item C-130H AMP Increment 1 PMA - contractor Services C-130H AMP Increment 1 PMA - Government To MIPR TBD : TBD 0.000 0.000 0.000 0.000 0.000 0.000 Continuing Continuing 2.700 Subtotal 0.000 0.000 0.000 0.000 0.000 0.000 - - 2.700 To Various Not Specified : TBD 0.000 0.000 6.000 Feb 2016 4.000 Feb 2017 0.000 4.000 Continuing Continuing 14.000 Various Not Specified : TBD 0.000 0.000 2.000 Feb 2016 1.000 Feb 2017 0.000 1.000 Continuing Continuing 4.000 Subtotal 0.000 0.000 8.000 5.000 0.000 5.000 - - 18.000 Air Force Page 5 of 14 R-1 Line #223 Volume 3b - 565

Exhibit R-3, RDT&E Project Analysis: PB 2017 Air Force : February 2016 Remarks 675248 / C-130H Avionics Modernization Program (AMP) Increment 1 To Project s 0.000 0.000 33.962 8.421 0.000 8.421 - - 78.396 Air Force Page 6 of 14 R-1 Line #223 Volume 3b - 566

Exhibit R-4, RDT&E Schedule Profile: PB 2017 Air Force : February 2016 675248 / C-130H Avionics Modernization Program (AMP) Increment 1 Milestone B EMD s Design/Integration Preliminary Design Review Critical Design Review Developmental Testing Functional Configuration Audit Milestone C Force Development Evaluation (FDE) Physical Configuration Audit (PCA) FY 2018 FY 2019 FY 2020 FY 2021 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Air Force Page 7 of 14 R-1 Line #223 Volume 3b - 567

Exhibit R-4A, RDT&E Schedule Details: PB 2017 Air Force : February 2016 Schedule Details 675248 / C-130H Avionics Modernization Program (AMP) Increment 1 Start End Events Quarter Year Quarter Year Milestone B 2 2017 2 2017 EMD s 2 2017 2 2017 Design/Integration 2 2017 2 2018 Preliminary Design Review 3 2017 3 2017 Critical Design Review 4 2017 4 2017 Developmental Testing 2 2018 4 2018 Functional Configuration Audit 3 2018 3 2018 Milestone C 4 2018 4 2018 Force Development Evaluation (FDE) 3 2018 4 2018 Physical Configuration Audit (PCA) 4 2018 4 2018 Air Force Page 8 of 14 R-1 Line #223 Volume 3b - 568

Exhibit R-2A, RDT&E Project Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) 675250: C-130H Avionics Modernization Program (AMP) Increment 2 675250 / C-130H Avionics Modernization Program (AMP) Increment 2 FY 2018 FY 2019 FY 2020 FY 2021 To 0.000 0.000 0.000 7.178 0.000 7.178 75.000 178.675 130.300 85.000 Continuing Continuing Quantity of RDT&E Articles - - - - - - - 2 1 1 Note This program, BA 07 PE 0401115F, project 675250, C-130H Avionics Modernization Program (AMP) Increment 2, is a new start. A. Mission Description and Budget Item Justification The C-130H AMP Increment 2 upgrades the C-130H fleet with comprehensive avionics and cockpit modernization which replaces aging unreliable equipment and adds combat capability enhancements. It also addresses select obsolescence and diminishing manufacturing sources (DMS) issues. RDT&E efforts include design, integration, developmental test, Type 1 training, and C-130H aircrew and maintenance training systems and courseware development efforts. The C-130H AMP Increment 2 program modifies 172 aircraft (166x C-130Hs and 6x LC-130Hs) consisting of H3s, H2.5s, H2s and H1s; and includes 127 Air National Guard aircraft, and 45 Air Force Reserve aircraft. The modification effort will have 4 prototype aircraft required for accomplishment of the Engineering and Manufacturing Development (EMD) phase, with the remaining 168 being production aircraft. The prototype aircraft represent each type of C-130H configuration listed above. B. Accomplishments/Planned Programs ($ in Millions) Title: C-130H Avionics Modernization Program (AMP) Increment 2 Description: Refine and complete the requirements definition phase of the program, followed by integration planning and the Engineering and Manufacturing Development (EMD) phase activities. 0.000 0.000 7.178 0.000 7.178 FY 2015 Accomplishments: N/A FY 2016 Plans: N/A Plans: Air Force Page 9 of 14 R-1 Line #223 Volume 3b - 569

Exhibit R-2A, RDT&E Project Justification: PB 2017 Air Force : February 2016 B. Accomplishments/Planned Programs ($ in Millions) EMD activities including market research, documentation development, Request for Proposal (RFP) issuance, Source Selection and Milestone B preparation. Plans: N/A 675250 / C-130H Avionics Modernization Program (AMP) Increment 2 Accomplishments/Planned Programs Subtotals 0.000 0.000 7.178 0.000 7.178 C. Other Program Funding Summary ($ in Millions) Line Item FY 2018 FY 2019 FY 2020 FY 2021 To APAF: BA05: Line Item # C13000: 0.000 0.000 0.000 0.000 0.000 0.000 0.000 117.613 197.750 Continuing Continuing C-130H Avionics Modernization Program (AMP) Increment 2 Remarks The C-130H Avionics Modernization Program (AMP) Increment 2 procurement funding begins in FY20. D. Acquisition Strategy C-130H AMP Increment 2 acquisition strategy intends to conduct a full and open competitive source selection followed by contract award. Current efforts are primarily defining the program requirements and pre-contract efforts in preparation for the Engineering and Manufacturing Development (EMD) source selection. The current schedule reflects EMD contract to be awarded in 2nd quarter FY18. E. Performance Metrics Please refer to the Performance Budget Overview Book for information on how Air Force resources are applied and how those resources are contributing to Air Force performance goals and most importantly, how they contribute to our mission. Air Force Page 10 of 14 R-1 Line #223 Volume 3b - 570

Exhibit R-3, RDT&E Project Analysis: PB 2017 Air Force : February 2016 Product Development ($ in Millions) Category Item C-130H AMP Increment 2 EMD 675250 / C-130H Avionics Modernization Program (AMP) Increment 2 To C/TBD TBD : TBD, GA 0.000 0.000 0.000 0.000 0.000 0.000 Continuing Continuing 460.256 Subtotal 0.000 0.000 0.000 0.000 0.000 0.000 - - 460.256 Support ($ in Millions) Category Item To Subtotal - - - - - - - - - Test and Evaluation ($ in Millions) Category Item C-130H AMP Increment 2 Development Testing Management Services ($ in Millions) Category Item C-130H AMP Increment 2 PMA or Services To C/TBD TBD : TBD, GA 0.000 0.000 0.000 0.000 0.000 0.000 Continuing Continuing 27.600 Various Not Specified : TBD, OH Subtotal 0.000 0.000 0.000 0.000 0.000 0.000 - - 27.600 To 0.000 0.000 0.000 7.178 Feb 2017 0.000 7.178 Continuing Continuing 28.297 Subtotal 0.000 0.000 0.000 7.178 0.000 7.178 - - 28.297 To Project s 0.000 0.000 0.000 7.178 0.000 7.178 - - 516.153 Air Force Page 11 of 14 R-1 Line #223 Volume 3b - 571

Exhibit R-3, RDT&E Project Analysis: PB 2017 Air Force : February 2016 Remarks 675250 / C-130H Avionics Modernization Program (AMP) Increment 2 To Air Force Page 12 of 14 R-1 Line #223 Volume 3b - 572

Exhibit R-4, RDT&E Schedule Profile: PB 2017 Air Force : February 2016 675250 / C-130H Avionics Modernization Program (AMP) Increment 2 Milestone B EMD Design/Integration Preliminary Design Review Critical Design Review Design/Integration Training Development Development Testing Functional Configuration Audit Milestone C FY 2018 FY 2019 FY 2020 FY 2021 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Air Force Page 13 of 14 R-1 Line #223 Volume 3b - 573

Exhibit R-4A, RDT&E Schedule Details: PB 2017 Air Force : February 2016 Schedule Details 675250 / C-130H Avionics Modernization Program (AMP) Increment 2 Start End Events Quarter Year Quarter Year Milestone B 1 2018 1 2018 EMD 2 2018 2 2018 Design/Integration 2 2018 4 2020 Preliminary Design Review 4 2018 4 2018 Critical Design Review 2 2019 2 2019 Design/Integration Training Development 2 2018 4 2020 Development Testing 4 2020 2 2021 Functional Configuration Audit 3 2021 3 2021 Milestone C 3 2021 3 2021 Air Force Page 14 of 14 R-1 Line #223 Volume 3b - 574