Beach Management Hayling Island. Marc Bryan - Coastal Engineer Havant, Portsmouth and Gosport Coastal Partnership

Similar documents
SOUTH HAYLING BEACH MANAGEMENT PLAN Executive Head Of Planning & Built Environment

^ox, 7. Environment Agency. Hayling Island North Strategy *. M ^, v. * > -.

DAMAGE ASSESSMENT OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC

The reasons why coastal management is needed in Minehead:

MANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY

2011 Nags Head Beach Nourishment Project Update. Tim Kana & Haiqing Kaczkowski

The area involved 17th annual report

CHAPTER 241. SAND BYPASSING TO "PLAYA DE CASTILLA" (HUELVA SPAIN) Jose Fernandez (1) Gregorio Gomez Pina (2) Angel Mufloz (3)

The area involved 19th annual report

WORKSHEET 24: Sand dunes - Conservation and management

The area involved 20th annual report

Lidar Imagery Reveals Maine's Land Surface in Unprecedented Detail

Coastal Trends Report. North-East Norfolk and North Suffolk (Subcell 3b - Kelling to Lowestoft) RP006/N/2008 April 2008

Defending the coast at Dawlish Warren

ANNUAL GENERAL MEETING OF NORTH EAST HAYLING RESIDENTS ASSOCIATION HELD AT NORTH HAYLING RECREATION HALL, HAYLING ISLAND

DOVER WESTERN DOCKS REVIVAL (DWDR) NEWSLETTER. Spring 2016

UAS to GIS Utilizing a low-cost Unmanned Aerial System (UAS) for Coastal Erosion Monitoring

Minerals & Waste Management Opportunity

Port of Durban. Entrance Channel Widening & Deepening Project Completion Function. 31 March 2010

West of Wales Shoreline Management Plan 2 Section 4. Coastal Area E. February 2011 Consultation 9T9001

Geomorphology. Glacial Flow and Reconstruction

EFFECT OF THE COASTAL CONSERVATION DUE TO BEACH NOURISHMENT OF TOTORI SAND DUNE COAST

PLANNING COMMISSION MEETING MINUTES October 25, :00 p.m.

Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas

Introduction to Map 14: Fionn-phort to Caol Ila

Gwynedd Council Pwllheli Harbour maintenance dredging strategy Updated strategy report

JOB DESCRIPTION FBO Manager

Specification for Grip blocking using Peat Dams

Remote Sensing into the Study of Ancient Beiting City in North-Western China

Kirkcaldy Sea Wall Improvements. Non-technical Summary. For illustration purposes only to give an indicative representation of the scheme.

Collyers Farm. Lickfold West Sussex

Verdley Edge Henley Hill, Haslemere, Surrey. People Property Places

IMPORTANT DEFINITIONS DEFINITIONS FROM TOPO MAPS

Maximising Beneficial Reuse through the use of a Novel Dredging Contract

Chile Earthquake 2010

A Brief History of the Town of Palm Beach Coastal Protection Program. Beach nourishment occurred in Palm Beach as far back as the 1940s.

The Northeast: America's Gateway to the World

The Physical Geography of Long Island

THE ICs INTERNATIONAL BRISBANE AREA AQUA PARK PROPOSAL

Les Chemins de Fer du Sud de la France, Ligne de Central Var. History of the Line to 1925

The Galveston Seawall

Wheatlands House, Fleet Hill, Finchampstead, Berkshire

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance

A high resolution glacier model with debris effects in Bhutan Himalaya. Orie SASAKI Kanae Laboratory 2018/02/08 (Thu)

Overview of Highway 37 Project. Napa County Board of Supervisors December 20, 2016

March 2, The Honorable Mayor Williams D. Sessoms, Jr. Members of City Council. Subject: Coastal CIP Presentation to City Council - March 6, 2018

Chapter 10. Damage to Ports and Coastal Facilities

RURAL LAND RESOURCES Case study area 1- the erosional features of the Dorset Coast.

MORAY COAST TRAIL - Notes on multi-use access

Cambridge International Examinations Cambridge International General Certificate of Secondary Education

GUIDANCE ON CIVIL AVIATION AUTHORITY (CAA) PLANNING CONSULTATION REQUIREMENTS. 2 August Introduction

HENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September Chock Lane Traffic Calming scheme Monitoring Report

Overview of Highway 37 Project. Novato Rotary November 4, 2016

Pen y Chain to Trwyn Cilan

9 Tithe Barn Close. Aldwick Bay Estate, Aldwick, West Sussex, PO21 4EY. humberts.com

Hurricane Irma: Palm Beach County Coastal Storm Damage Assessment

MORGAN CREEK GREENWAY Final Report APPENDICES

THE GREAT MAN-MADE RIVER PROJECT

St. Augustine Port, Waterway & Beach District. St. Augustine Inlet 2013 draft Inlet Management Plan. March 19, 2013

DEFINITIONS DEFINITIONS 2/11/2017 REQUIREMENTS AND LIMITATIONS OF DRONE USE IN FORENSIC ACCIDENT RECONSTRUCTION

Edisto Beach Renourishment and Groin Lengthening Project. Tim Kana Coastal Science & Engineering

LOW DOWN ON THE HIGH UP: USING DRONES FOR LAND CONSERVATION

LAND AT WORSLEY ROAD NEWPORT, ISLE OF WIGHT

National Rail Passenger Survey: User Guidance Report. Autumn 2013 (wave 29)

Work Zone. Steve Hubbard: Lane Construction Safety Training Manager. Michael Grey: Rea Contracting Project Superintendent

Steep House, Lower Steep House & Old Portmellon Cottage. Portmellon Nr Mevagissey South Cornwall

APPENDIX A. Condition Survey of Pavements Concrete Mixture Proportions Used in Pavements Deicer Usage on Pavements Core Locations and Core Catalog

The major parties key coastal policy initiatives

THE STUDY FOR COASTAL EROSION AND FLOOD CONTROL MANAGEMENT IN THE REPUBLIC OF SEYCHELLES FINAL REPORT

Sustainable development: 'Lanzarote and the Biosphere strategy'. LIFE97 ENV/E/000286

CLYDE MAP 6: ERSKINE HARBOUR to north of DOVE COTTAGE

Alternative Highest & Best Use Analysis Boutique Hotel

Dove Rock PLAIDY CORNWALL

Appendix I: Metadatabase and Bibliographic Database

KKC can provide the total solution from Data capturing to Consulting

our newsletters, please do let us know by contacting Katie Orchin on or

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Conservatory Roof Structural Information Guide

2014 UPDATE TO THE 2010 REPORT ADAPTING TO COASTAL FLOODING IN THE YARMOUTH AREA IN THE 21 ST CENTURY

NAUTILUS SOUTHAMPTON ROAD, PORTSMOUTH PO6 4RY

Sizing up Australia s eastern Grey Nurse Shark population

Environmentally Sensitive Maintenance for Dirt & Gravel trails TRAIL MIX. TRAIL MIX: aggregate for trails

PARCS UPDATE #10 AUGUST 6, 2010

Attachment G STREAM IMPACTS. Ridge Road Extension Alternatives Analysis

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

The Croft LOWER ASHTON, EXETER, DEVON

LOUGHBOROUGH INLET. Jason Zroback. Direct Line: (604) TOLL FREE:

Review of Highcliffe Shopping Centre

Access Statement for Birling Gap

A FIELDWALKING PROJECT AT HOLLINGBURY, BRIGHTON. by JOHN FUNNELL

Common Ground Drainage Channel Diversion. Design Report

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:

General Aviation Economic Footprint Measurement

USGS Methods of Collecting High Water Marks (HWMs)

1. Permittee: Department of Public Works and Government Services, Charlottetown, Prince Edward Island.

Northeast Stoney Trail In Calgary, Alberta

BEST & FINAL OFFERS INVITED BY FRIDAY 10th JUNE 2016

Mountain Valley Pipeline, LLC Mountain Valley Pipeline Project Docket No. CP

THE SOLENT S PREMIER CENTRE OF EXCELLENCE FOR AVIATION, AEROSPACE, MARINE, ENGINEERING AND ADVANCED MANUFACTURING.

A detached period home with loch views. rhu house by tarbert, argyll, pa29 6yf

Transcription:

Beach Management Hayling Island Marc Bryan - Coastal Engineer Havant, Portsmouth and Gosport Coastal Partnership

Beach Management Hayling Island The Problem 1985 Beach Nourishment How we Recycle Historic Recycling Volumes Recycling Areas Extraction Sites Deposition Planning, Consents & Licences Vegetated Shingle Method of Measurement Bill Items Funding Beach Management Plan Health and Safety

THE PROBLEM 1946 Aerial photograph 1946 Mosaic created by the Channel Coastal Observatory from RAF photography supplied by the National Monuments Record

THE PROBLEM 2005 Image courtesy of CCO

THE PROBLEM 1920-30 Postcard showing mixed sand & shingle beach at Eastoke & early settlement behind.

THE PROBLEM MID 1940 s Development of Eastoke A line was drawn in the sand as defences began to be constructed

THE PROBLEM 1970 Beach eroded. Early seawalls were undermined and replaced with bigger seawalls.

THE PROBLEM 1978 Major repairs required as once again seawall is at risk of undermining.

THE PROBLEM PRE 1985 The beach levels dropped further still, leaving sand and soon the clay bed.

THE PROBLEM PRE 1985 Storm event Pre-1985. One of many causing substantial flooding & property damage.

THE PROBLEM PRE 1985 Substantial flooding of Eastoke

510,000 cubic metres of shingle Cost ~ 4,000,000 1985 Beach Nourishment

Beach Management on Hayling Island Beach Nourishment Beach Recycling

BEACH NOURISHMENT

HOW DO WE RECYCLE THE BEACH?

HISTORICAL BEACH RECYCLING VOLUMES Year Volume (m 3 ) Year Volume (m 3 ) 1987 45,780 2001 23,925 1988 25,075 2002 20,006 50,000 1989 33,158 2003 21,351 1991 18,637 2004 22,853 1993 28,884 2005 21,290 1994 22,572 2006 10,764 1995 15,800 2007 14,580 1996 24,392 2008 22,163 1997 20,256 26,000 2009 22,648 75,000 25,000 65,000 1998 20,062 2010 38,890 1999 20,328 2011 51,462 2000 20,400 Beach Nourishment - Recharge

RECYCLING AREA Drift Divide

EXTRACTION SITES Open Beach Open Beach: - Accounts for about 50% of material recycled each year (23,000m3 in 2011). - Small scraping of material over a large area. - Cusps of accreted material. - Well sorted, course material.

EXTRACTION SITES - Revetments Inn on the Beach and Coastguard Revetments: Accounts for about 10% of material recycled each year (5000m3 in 2011). Well sorted very course material thrown up during winter storms. Easy extraction but long haul distance (over 3km).

EXTRACTION SITES The Ness The Ness : Accounts for about 40% of material recycled each year (24,000m3 in 2011). Natural area of accretion inside Chichester Harbour Entrance. High fines content. Short haul distance, difficult extraction.

DEPOSITION Quantities required in each Groyne bay derived from pre operation topographic surveys. Managed on site to achieve correct distribution of material available. Bladed on site to achieve design profile. Courser Material used as a capping layer.

BEACH PROFILE Profile Location: 5a00301 7 6 5 Elevation (maodn) 4 3 2 1 0-1 0 20 40 60 80 100 120-2 -3 Chainage (m) 05/04/2011 (Post-Operation) 17/02/2011 (Pre-Operation) DESIGN PROFILE

PLANNING, CONSENTS and LICENCES New 10 year Planning Permission (2009-2019) Removal of restrictions on extraction quantities at the Ness. (Working with CHC) Other Licences: -No FEPA Licence required -Essential Maintenance -No new deposits -CHC Works Licence -HCC Permission

HEALTH and SAFETY Speed Limit 10mph Signage/Fencing at access points Haul Route Cones Banksmen HBC Counting Staff

VEGETATED SHINGLE Pre and Post Vegetated Shingle GPS Surveys Haul Routes marked out based on Vegetation locations Vegetated Shingle Reports West Sussex Vegetated Shingle Project Guidelines Working areas at Ness agreed with HCC

METHOD OF MEASUREMENT Drop Tests: Joint Measure Random measures Volume of a cone V = 1/3 π r^2 h V = 1/3 x π x 3.1^2 x 1.5 = 15.09m3 Counting Staff record each truck load deposited. Volumes calculated using this method compare well to truck manufacturers specifications and volumetric analysis of pre and post operation GPS surveys.

BILL ITEMS The contract is let annually on the basis of a re-measurable Bill of Quantities. X900.1 Extraction from below MLW Haul distance under 2.5km Typical present day rate ~ 2.30/m3 X900.2 Extraction from above MLW Haul distance under 2.5km Typical present day rate ~ 2.10/m3 X900.3 Extraction from above MLW Haul distance over 2.5km Typical present day rate ~ 3.00/m3 X900.4 Provide and place 20-40mm single size gravel aggregate Typical present day rate ~ 27.00/m3

CURRENT FDGiA FUNDING Year Approved Budget 2007/2008 70,000 2008/2009 133,000 2009/2010 139,000 2010/2011 145,000 2011/2012 151,000 TOTAL 638,000

NEW BEACH MANAGEMENT PLAN Currently writing a new Beach Management Plan South Hayling BMP rather than just Eastoke Better management of the frontage as a whole Liaison with numerous landowners Hayling Golf Club, HCC, HISC

Questions?