Mechanized River Valley Access Public Engagement Report. April 2015

Similar documents
BOAT DOCKS AND LAUNCHES. Public Engagement Report July 2015

Terwillegar Park Footbridge and West End Trails Public Engagement Progress Report. August 2014

RIVER ACCESS STRATEGY

Overview. ONE Properties

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017

AAPA 2017 COMMUNICATION AWARDS CATEGORY: OVERALL CAMPAIGN

Ministry of Parks, Culture and Sport. Plan for saskatchewan.ca

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

Welcome to the future of Terwillegar Park a Unique Natural Park

Resort Municipality Initiative Annual Report 2015

A BOAT RAMP TO NOWHERE

Operating Principles Tourism Dawson Creek will operate on the following operating principles:

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018.

NOTE: YOU MAY COMPLETE THIS SURVEY ONLINE (USING THIS DOCUMENT TO VIEW MAPS AND GRAPHICS) AT:

X Respond to staff direction

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

GUNGAHLIN TOWN CENTRE

DIRECTOR, ENVIRONMENT, FLEET, & SOLID WASTE UPDATE: REGIONAL RIDESHARE PROGRAM RECOMMENDATION

Chapter 1 Introduction

Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development

A SMARTER HOTEL INVESTMENT

Ted Stevens Anchorage International Airport

Strategic Plan Mt Eden Village Inc T: W: mounteden.co.nz E:

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Task Force on Harbourfront Developments on Hong Kong Island

SANDY BAY RETAIL PRECINCT STREETSCAPE REVITALISATION - PALM TREES AND BANNER POLES - RESPONSE TO PETITION

The Corporation of the City of Kawartha Lakes Council Report

Applewood Heights Community Open House

Thank you for this third opportunity to comment on the proposed revisions to the Coconino National Forest Management plan.

Submission to. Southland District Council on. Draft Stewart Island/Rakiura Visitor Levy Policy and Bylaw

COUNCIL AGENDA REPORT

Committee. Presentation Outline

With the first portion of this process complete, we anticipate the general timeline for the remainder of the process to be:

City of Fremantle. Joel Levin, Aha! Consulting INTRODUCTION 2 BACKGROUND 3

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

A Master Plan is one of the most important documents that can be prepared by an Airport.

MEDIA RELEASE JUST GROUP ACHIEVES FIRST HALF PROFIT INCREASE OF 25.2%

CITY OF MELBOURNE 10 Year Financial Plan People s Panel Report. 8 November 2014

Aviation, Rail, & Trucking 6-1

The Future of the Road to Revolutions. A Battle Road Scenic Byway Public Forum November 9, 2010

Arts, Creative & Cultural Innovations Committee Meeting. held at City of Penticton Committee Room A 171 Main Street, Penticton, B.C.

Draft Strategic Plans for Coillte s eight Business Area Units ( )

CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011

LOOKING WEST 2007 Segment 5: Urban Quality of Life and Urban Growth

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Three Sisters Campground Redevelopment

Chapter 1: Introduction Draft

THE TORONTO OUTDOOR ADVENTURE SHOW

The Government s Aviation Strategy Transport for the North (TfN) response

Appendix 7 Local Green Spaces - Detailed Evidence

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE EXISTING SETTING EXPANDING PARKLAND

Chapter 1: Introduction

Mercer Island Town Center Stakeholder Meeting E. June 10, 2015

MEDIUM SIZE STADIUM STRATEGY

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Metrolinx Board of Directors. President, Union Pearson Express Date: September 22, 2015 UP Express Quarterly Board Report

THE ALBERTA GAZETTE, SEPTEMBER

TERMINAL DEVELOPMENT PLAN

4.2 Regional Air Navigation/Safety Developments and Achievements. Group (NAM/CAR ANI/WG) INTEGRATION OF UNMANNED AIRCRAFT SYSTEMS (UAS)

RESPONSE BY THE NATIONAL AIRLINES COUNCIL OF CANADA (NACC) AND THE AIR TRANSPORT ASSOCIATION OF CANADA (ATAC)

St. John s Park Redevelopment Master Plan Public Engagement Report

Revision of the Hunters Hill Development Control Plan (DCP) Chapter 4

1. Please tell us about new features, functions or information that you made available on the new website for the first time?

Crown Corporation BUSINESS PLANS FOR THE FISCAL YEAR Trade Centre Limited. Table of Contents. Business Plan

Thank you for this second opportunity to comment on the proposed revisions to the Coconino National Forest Management plan.

2016 Regional Transportation Alternatives Program (TAP) Grant Application

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

PROPOSAL FOR RECLASSIFICATION, BOUNDARY AMENDMENT AND DRAFT CONCEPT PLAN FOR SASKATOON MOUNTAIN NATURAL AREA. Frequently Asked Questions

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Appendix A: Summary of findings drawn from an analysis of responses to the questionnaire issued to all households in Trimley St Martin

Review of 2009 Camping Season

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

Item No Halifax Regional Council April 10, 2018

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions

Rural NSW needs a bottom-up strategy to create a better tourism experience.

Conexus is committed to innovation and bringing financial services to market with speed. We have a long history of innovation, including:

COMMUNICATIONS DEPARTMENT (Lisa Belsanti, Director) (Joshua Schare, Public Information Officer)

8.01 MEMORA DUM. Mayor and Council. Steven Lan, P.Eng., Director of Engineering. March 31, Pattullo Bridge Replacement Update /PBR

Submission to. Queenstown Lakes District Council. on the

New free City connector bus service

Consultation on Town Quay Mooring Redevelopment Proposals

ANC Airport Community Outreach Plan

109 GARNEAU OFFICE FOR LEASE STREET I EDMONTON I AB HIGHLIGHTS

FINCH HYDRO CORRIDOR TRAIL PROJECT

M56. New Junction 11a Summary of the consultation report

Brand New Prestigious Main Floor Retail Space

[REGIONAL LAND TRANSPORT PROGRAM AND REGIONAL FUEL TAX SUBMISSION ]

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Economic Development and Tourism

Commerce Committee 2010/11 financial review of the New Zealand Tourism Board Additional written questions

RAY YENKANA Willowbrook Cr, Dawson Creek BC Canada $2,847,000

Transcription:

Mechanized River Valley Access Public Engagement Report April 2015

Table of Contents Background... 1 Stakeholder Consultation... 3 What We Heard... 4 Conclusion... 7

Background The North Saskatchewan River Valley is North America s largest urban park with a total area of more than 7,200 hectares (approximately 18,000 acres). With more than 160 kilometres of maintained pathways and 20 major parks, the River Valley offers citizens unparalleled opportunities to connect to nature, get outside and to go play. The City of Edmonton has partnered with the River Valley Alliance (RVA) on River Valley Connections, which is the next significant step in creating a world-class, connected river valley park. Once complete, the project will increase access to and connectivity throughout the river valley. River Valley Alliance The River Valley Alliance (RVA) is a non-profit group formed by the seven Alberta Capital Region municipalities bordering the North Saskatchewan River. Their mission is to protect, preserve and enhance the river valley park system from Devon to Fort Saskatchewan. A 16-member board of directors governs the RVA with representatives from each member municipality. Its three primary goals are: To coordinate river valley planning and development within the seven member municipalities. Ensure plans respond to and balance the social, recreational, environmental, and economic needs of Capital Region residents. Raise funds to bring these plans to reality. In 2012, the RVA announced $90 million in capital funding for 18 capital region projects to improve public access to, and connectivity within the regional river valley park system. Of the total amount, $72.9 million has been allocated by the RVA for projects within Edmonton. 1

Funding breakdown The River Valley Alliance (RVA) provides $48.6 million in funding to the City of Edmonton for River Valley Capital Projects. The RVA funds are sourced from the Government of Canada ($24.3 million) and the Government of Alberta ($24.3 million). The Government of Alberta provided an additional $22.6 million and the City of Edmonton contributed $1.7 million to the projects. 1 River Valley Connections In total, $72.9 million in funding has been allocated towards a number of projects, which are grouped into five initiatives. The five initiatives are: 1. Terwillegar Park Footbridge: This 262-metre long footbridge link Terwillegar Park in the southwest to River Valley Oleskiw on the north side of the river. 2. West End Trails: This initiative will add approximately five kilometres of primary (paved) and secondary (gravel) trails to the river valley main spine trail in Terwillegar Park and River Valley Oleskiw. 3. East End Trails: This initiative will develop approximately 16 kilometers of trails in east Edmonton. 4. Boat Launches and Docks: Three boat launches and seven docks will be added throughout the river valley for public use. 5. Mechanized River Valley Access and Touch the Water: These two initiatives will help increase access to the river valley from the downtown core and will enhance connections to the trail system and the North Saskatchewan River. 1 Revised document August 2015- clarified information on funding. 2

Mechanized River Valley Access Since 2012, several options have been discussed with City Council to determine how best to implement a mechanized access feature into the river valley. The City has been studying the feasibility for a mechanized access project that will connect the downtown core to the North Saskatchewan River valley. Based on this study, the City is recommending the construction of a funicular. Funiculars are cable-propelled systems that haul a car over an inclined track. In addition to the funicular, the project will include an outdoor elevator, an innovative urban staircase and other design features including viewpoints and lookouts. The project will allow people to walk from our vibrant downtown to connect with nature within minutes. The funicular was selected from among a number of types of mechanized systems that have been built in urban environments to transport people between higher and lower elevations. Funiculars: Safely transport groups of wheelchairs, cyclists, pedestrians and others up and down the river valley bank. Have less maintenance and operational requirements than outdoor escalators and gondolas. Are not susceptible to strong winds. Have a smaller footprint, which allows them to fit in the limited space at the top of the bank. Provide full accessibility, unlike chairlifts and escalators. Are more economical than other fully accessible systems. The total budget for the Mechanized River Valley Access project is $24 million. 3

Stakeholder Consultation A public open house was held at City Hall on April 8, 2015, between 11:00 a.m. and 2:00 p.m. and between 4:00 p.m. and 8:00 p.m. City of Edmonton staff and project contractors were available to answer questions from members of the public. The open house was attended by approximately 200 people. Display boards and comment forms were available in City Hall from April 7 to April 10, 2015. An online survey was also conducted to obtain feedback. The survey was available from April 7 to April 26, 2015. Both the open house and the online survey were advertised through a public service announcement, online ads, print publications, and through the City of Edmonton s social media accounts and website. Additionally, a road sign was placed near the existing staircase at the proposed project site to further promote the online survey. Five hundred and thirty nine (539) responses were received from both the open house and online survey. What We Heard Participants of the open house and the online survey were asked a single, open-ended question about the project: The Mechanized River Valley Access initiative aims to connect Edmonton s downtown to the existing river valley trail system. The project will include innovative urban design that will facilitate access to the river valley and allow people to travel from our vibrant downtown to connect with nature within minutes. The City has been studying the feasibility for a mechanized access project that will connect the downtown to the river. Two alignments have been explored. The City s consultants are recommending the east alignment. What are your thoughts? Although the responses received were diverse, several key themes emerged from the completed questionnaires. These were: 4

Overall support for the initiative A majority (approximately 2/3) of the 539 responses indicated support for the initiative. Edmontonians are passionate about the river valley and many of those who participated in the survey were pleased to see the City taking initiatives to assist individuals of all abilities to access and enjoy Edmonton s river valley. Several commenters identified themselves as wheelchair users, bicyclists, or parents with strollers who believe the mechanized access would increase their ability to use and enjoy the amenities within the river valley. Many commenters also felt the funicular could act as a destination point and potential tourist attraction in the river valley. Several respondents made reference to their positive experiences with funiculars in other cities around the world. Concern about costs Although most of the feedback was supportive, a number of comments objected to construction of the project due to the estimated construction costs, even despite the available grant money. These respondents feel that if returned to the funding partners, the money could be reallocated to areas they believe to be of greater importance, such as street maintenance, debt reduction or lowering taxes. A number of comments from those opposed to the project also raised concerns about the ongoing maintenance and operational costs associated with the funicular. They believe these costs could be quite high, and may ultimately be higher than the initial construction costs. Some believe that users could be charged a nominal fee for using the funicular as a way to recoup these operating costs. Preference for the east alignment Of the respondents that expressed a preference between the two proposed alignments, a strong majority is in favour of the east alignment. This preference is based on two main factors: 5

A preferred destination: Most of the comments in favour of the east alignment cited a preference for this alignment because the urban staircase and outdoor elevator would terminate in the river valley and would allow users immediate access to the trail system. Preferential viewpoints: Respondents also expressed preference for the views and viewpoints offered by the east alignment rather than those offered by the west alignment. A small number of individuals indicated a preference for the west alignment. These respondents felt the destination point in the traffic circle would allow for an easier connection to the transit system as well as to the pedestrian river crossing. It is important to note that many of the commenters that expressed a preference for an alignment did not necessarily support the overall initiative. Many respondents believe the initiative will ultimately be built and thus provided their preference. Maintain access to the existing staircase during construction Several comments asked the City to ensure access to the existing staircase during the construction period. Safety concerns A number of individuals expressed safety concerns about the alignments. It was noted that the landing area of the east alignment will be quite dark during the winter months, potentially creating a safety hazard. Concerns were also raised about the proximity of the west alignment to a major roadway. Other responses expressed concern about the possibility for vandalism and the prevalence of drug use in the river valley. 6

Desire to ensure accessibility Many commenters were very positive about the impact of the funicular on accessibility to the river valley. However, they noted that currently, neither of the proposed destination points are used or accessed by people with reduced mobility. They asked the City not to ignore the accessibility of the area surrounding the funicular. A desire to preserve the natural look of the river valley A small number of commenters expressed concern about the impact of the project on the natural aspects of the river valley. The concerns generally fell into two categories: concerns about the environmental impact of building the mechanized access and concerns about the impact on the natural look and feel of the river valley. Parking concerns A number of respondents raised concerns about the availability of parking near the site of the proposed funicular. These respondents believe that a lack of parking could lead either to congestion near the funicular or low user numbers due to restricted access to the area. A desire for commercial development near the Mechanized River Valley Access A number of individuals asked the City to consider allowing the development of a smallscale, locally-owned and non-chain restaurant or coffee shop. While several of the comments recognized that part of the river valley s charm lies in its undeveloped nature, the proximity to the downtown core and the relatively high level of disturbance in this area of the river valley are factors that would lend well to this type of development in this location. Conclusion On the whole, Edmontonians are quite supportive of the Mechanized River Valley Access initiative and many are excited about the prospect of this unique addition to the amenities available in the river valley. They believe that a funicular would help to increase access to the river valley for people of all abilities as well as cyclists, parents 7

with strollers and others who can t use the existing staircase. They also strongly prefer the proposed east alignment to the proposed west alignment due to its destination along the river valley trail system rather than near the Grierson Hill road interchange. The input received from this public engagement will help inform and guide the design of the project. The City anticipates that additional public and stakeholder engagement activities will occur at later stages of the project. More information on the status of this project, as well as the other River Valley Connections initiatives can be found online at edmonton.ca/rivervalleyprojects. All inquiries related to the Mechanized River Valley Access initiative can be directed to Rob Marchak Director Strategic Projects, at rob.marchak@edmonton.ca. 8