Hancock. Hancock. Hancock County Population 54,558. Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles HCP 1 81 HCP 2 34

Similar documents
FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

Maine s Top 50 Transportation Challenges and the Improvements Needed to Address Them

Projected Advertisement Date

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

Additional Economic Development Strategy submissions- Klickitat County

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director

1) AMENDMENTS TO THE ROCKINGHAM ZONING BYLAW MAPS:

FDOT Treasure Coast Traffic Report through

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

Current Corridor Characteristics

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

State Route 8 Corridor. Northern Summit County s Path to Success

Need County Priority Needs Identification Major Projects/Emerging Taking Care of the System (TCOS) 1=High 2=Medium 3=Low

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

FDOT Treasure Coast Traffic Impact Report

Most people notice when ODOT builds something

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

Culpeper District. Albemarle County Monthly Report. September 2012

Palm Beach County Traffic Report July 13 through July 20, 2012

Springettsbury Township. Road Improvement Projects

Changes in TIP projects Draft vs. Final Draft

PennDOT Interstate Work next week March 30-April 3:

Connect Oregon IV Final Review Committee Final Recommendation

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Culpeper District. Albemarle County Monthly Report December 2011

Acadia National Park. Visitor Study. The Visitor Services Project

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)

Creating Connections in Niagara Region

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION

5.1 Traffic and Transportation

CONFIRMED BENCHMARKS UPDATED JUNE 26, 1991

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Gulf Coast MPO Obligated Projects

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management

Blackwoods Scenic Byway Corridor Committee Meeting

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

Program Project Name Project Description

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014

Hospital Link Project Project Update September 2015

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

NEW JERSEY DEPARTMENT OF TRANSPORTATION

TRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

Whittier Bridge Project

Construction Update. Local Officials Briefing March 2016

TRAFFIC ALERT FOR SEPTEMBER 17-21, 2018 Highway Work Zones in the Staunton District

Clackamas County Development Agency

Segment 2: La Crescent to Miller s Corner

Hospital Link Project Project Update Winter 2018

The north half of Section 18, Township 37 North, Range 6 East, Second Principal Meridian, Jefferson Township, Elkhart County, Indiana; also,

TRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

New Orleans Municipal Yacht Harbor

4. Safety Concerns Potential Short and Medium-Term Improvements

El Dorado County / Tahoe Roadwork Schedule Sunday through Saturday September 9 September 15, 2012

FY Transportation Improvement Program Basic Project List (in Thousands)

Highways: Interstate. Highways: State Highways

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

Attachment D: PHOTO LOG CITY OF ARCATA RAIL-WITH-TRAIL CONNECTIVITY PROJECT

Capital Improvement Program Fiscal Year

The Vision for the San Juan Islands Scenic Byway

FDOT Treasure Coast Traffic Impact Report

Non-Motorized Transportation

APPENDIX A. Favorite Places in Wiscasset chosen by participants

MaineDOT Work Plan Calendar Years

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

2.8 SUB-REGIONAL ISSUES

FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION

You MUST follow the routes below to successfully spectate the race and meet your runner at the finish line in Southwest Harbor:

Awards of Excellence for 2016 Presented January 26, 2017 in Baltimore, Maryland

NEW JERSEY DEPARTMENT OF TRANSPORTATION

Non-motorized Trail Plan & Proposal. August 8, 2014

SAN RAFAEL City Council January 20, 2015

DATE COURSE TITLE LOCATION HOURS. February 27 Flow & Dynamics with Fluids, Hydraulics, and Pneumatics...Augusta *6 Sponsored by Motion Industries

INGHAM COUNTY TRAILS AND PARKS TASK FORCE MEETING 2

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

I-94 East Corridor Performance

KEWEENAW COUNTY ROADS WITH SEASONAL RESTRICTIONS

Ohio Department of Transportation Construction Update

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

Stephens State Park Trails

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3

Major Projects Overview

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007

City of Grand Island Tuesday, December 12, 2017 Council Session

TRANSPORT CANADA S NATIONAL TRADE CORRIDORS FUND. PNWER November 2018

2009 Regional Solicitation Selected Projects*

Capital Prioritization

Crossing the Keweenaw Waterway in an Emergency with a U.S Army Floating Bridge

Transcription:

Hancock Hancock County Population 54,558 T3 ND Oqiton Twp Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles T41 MD 81 HCP 2 34 T39 MD T40 MD 141 HCP 4 62 215 Total -5 533 T32 MD Great Pond T34 MD T35 MD Amherst Aurora T28 MD Mariaville Osborn T22 MD Dedham Otis Waltham Eastbrook T16 MD Bucksport Orland Fletchers Landing Twp Hancock Franklin T9 SD T10 SD T7 SD Verona Sullivan Island Surry Hancock Penobscot Lamoine Gouldsboro Castine Bar Harbor Winter Harbor Brook sv ille Deer Is le Brooklin Blue Hill Tremont Southw est Harbor Mount Desert Hancock Stoningto n Swans Island

Hancock ID/Year Municipality Scope Name Description Funding 018770.00 Amherst, Aurora Mill And Fill Route 9 Beginning 0.22 of a mile east of Smith Road in Amherst and extending easterly 3.18 miles. $1,121,000 018775.00 Aurora, Osborn, T22 MD, T28 MD 1 1/4" Overlay Route 9 Beginning 0.24 of a mile west of Richardson Road in Aurora and extending easterly 8.13 miles. $3,283,200 018663.00 Drainage Beginning at Mount Desert Street and extending southerly 0.19 of a mile. $150,000 018758.00 Marine Marine Buildings Ferry Terminal Down Payment-Acquisition of the Ferry Terminal. $1,125,000 018759.00 Marine Marine Buildings Ferry Terminal Final payment - Ferry Terminal Acquisition. $2,375,000 018776.00 Drainage Beginning at Eden Street and extending easterly 0.48 of a mile. $130,000 019197.00 Reconstruction Beginning 0.57 of a mile west of Sand Point Road and extending easterly 4.80 miles. $18,020,000 Beginning at the Eagle Lake Road and extending 0.48 of a mile to Main Street. $22,267 West Street Extension Beginning at and extending westerly 0.46 of a mile. $21,339 018196.00, Signing Acadia Byway Installation of Interpretive Signs in three locations on the Acadia All American Road. $27,500 47

018197.00, Signing Acadia Byway Gateway, Wayfinding and Information Signs on the Acadia All American Road. $65,000 017712.00 Bridge Improvement-PE Only Falls Bridge (# 5038) over the tidal basin. Located 0.70 of a mile south of Route 172. $315,000 018611.00 Beginning at and extending southerly 2.46 miles. $107,391 018728.00 Bridge Improvement-PE Only Route 15/172/176 Village Bridge (# 2893) over Mill Stream. Located 0.04 of a mile northeast of Water Street. $200,000 018777.00 Highway Improvement-PE Only Beginning at town line and extending northerly 2.09 miles. $200,000 Route 172 Beginning at Route 176 and extending northerly 2.16 miles. $87,213 Route 177 Beginning at Beech Hill Road and extending easterly 0.97 of a mile. $44,998 WR 30305 Bridge and Structural Maintenance Route 176 Grouting stone abutments and repairing steel rail on East Bridge (# 3668), which carries Route 176 over McHeard Cove in. $22,000 WR 30346 Bridge and Structural Maintenance Rehabilitating rails and fascia on Village Bridge (# 2893), which carries over Mill Stream in. $33,000 018844.00, 3, Mount Desert,, Mariaville, Deer Isle, Orland, Penobscot Guard Rail Installation And Replacement Various Locations Replacement of old cable guardrail with w-beam and standard end treatments. Various segments - Rte 15 in Deer Isle, Rte 102 in Mt Desert, Rtes 172 & 175 in, Rte 175 in Orland, Rte 180 in, Rte 181 in Mariaville, Rte 199 in Penobscot. $300,000 48

018547.00, Penobscot, Orland Highway Beginning at Hinckley Hill Road and extending northerly 7.44 miles. $4,380,000 019417.00 Brooklin Bicycle-Pedestrian Trail, On-Road Beginning 0.14 of a mile north of Naskeag Road and extending southerly 0.26 of a mile. $160,000 020516.00 Brooklin Large Culvert Large culvert (# 46688) located 0.10 of a mile south of Flye Point Road. $300,000 Brooksville Route 176 Beginning at extending southerly 10.02 miles. $464,828 Brooksville, Penobscot, Beginning at Brooksville - town line and extending northerly 5.75 miles. $266,743 018812.00 Bucksport Large Culvert Replacement Route 46 Large culvert (# 264890) located 0.37 of a mile east of Heritage Park Road. $150,000 WR 30368 HCP 2 Bucksport Repairing the headwall of an existing large culvert (# 913596) on, located 0.61 of a mile southerly of the intersection of the McKinnon Road and. $66,000 018816.00 Deer Isle Guard Rail Installation And Replacement Install w-beam guardrail beginning 0.28 of a mile west of Hardy Hill Road and extending westerly 0.48 of a mile. $250,000 020498.00 Deer Isle, Bridge Substructure Deer Isle-Sedwick Bridge (# 3257) over Eggemoggin Reach. Located on the Deer Isle - town line. $2,339,763 WR 30397 Deer Isle, Stonington Ditching in various locations beginning near Pearl Drive on in Deer Isle and extending in a southerly direction to Stonington Village. $100,000 49

WR 30408 Deer Isle, Stonington Sunset Road Ditching and replacing culverts in various locations on the Sunset Road from the intersection of to the Stonington town line and continuing on the Burnt Cove Road to Stonington Village. $43,000 WR 30148 Eastbrook, Franklin, Waltham Route 200 Removing high shoulders, ditching and replacing culverts on Route 200 (Franklin Road), beginning at the intersection of Franklin Road and Eastbrook Road and extending northerly 12 miles to the intersection of Cave Hill Road and Waltham Road in Waltham. $155,000 018568.00 Rail Rail/Highway Crossings Signal (Rail/Highway Xing) Downeast Scenic Railroad Install signal system and lights at High School crossing. $190,000 019196.00 Reconstruction Route 1A Beginning 0.35 of a mile north of Route 179 and extending southerly 1.36 miles, includes realignment of Route 179 safety improvements. $5,155,000 019413.00 Bicycle-Pedestrian Trail, On-Road Bicycle-Pedestrian - PE Only Route 1A Engineering for Bicycle and Pedestrian Safety : Located on Route 1A, and connecting Birch Avenue to Church Street. $15,500 020232.38 HCP 4 Highway Route 230 Municipal Partnership Initiative. Beginning at Beechland Road and extending northerly 0.28 of a mile. $737,000 020378.00 Mill And Fill Route 1 Beginning 0.10 of a mile north of North Bend Road and extending northerly 4.29 miles. $1,175,000, Fletchers Landing Twp, Waltham, Mariaville, Osborn, Aurora Route 179 Beginning at Old Mill Road in and extending northerly 22.18 miles. $1,028,931, Otis, Clifton Route 180 Beginning at Bridgetwin Road in and extending northerly 18.35 miles. $851,721 018612.00, Route 230 Beginning 0.03 of a mile south of Beechland Road in ellsworth and extending southerly 12.33 miles. $538,266 50

WR 30252, Route 230 Removing high shoulders, ditching and replacing culverts on Bayside Road, beginning at the intersection of Beechland Road and extending 12 miles southerly to the intersection of Road and Oak Point Road in. $239,000 WR 30129 Franklin, Hancock Route 182 Ditching, shoulder grading and replacing culverts, beginning at Route 1 in Hancock and extending in a northerly direction 6 miles to the Blackwoods Road in Franklin. $78,000 WR 30201 Franklin, Waltham Custodial Maintenance Route 200 Cutting and chipping brush on the Eastbrook Road, beginning at the intersection of Franklin Road and extending in a northerly direction to the Waltham Road. $25,000 019415.00, 4 Gouldsboro Bicycle-Pedestrian Trail, On-Road Route 186 Beginning 0.03 of a mile north of Route 195 and extending southerly 0.22 of a mile. $295,875 018377.00 Gouldsboro, Hancock, Sullivan, Winter Harbor Scenic Schoodic Scenic Byway This project will enhance rest areas and scenic turnouts on the Schoodic National Scenic Byway with new activities and interpretive panels designed to engage youth traveling with their families. $63,440 018612.00 Hancock, Franklin, T9 SD, T10 SD, Cherryfield Route 182 Beginning 0.23 of a mile northeast of Firehouse Lane and extending easterly 17.53 miles. $1,018,908 020496.00 Mariaville Bridge Replacement Route 181 Goodwin Bridge (# 3562) over West Branch Union River. Located 0.02 of a mile northeast of River Road. $2,870,000 022631.00 HCP 6 Mariaville Bridge Replacement Dority Farm Road Tannery Brook Bridge (# 0455) over Tannery Brook. Located 0.60 of a mile south of Route 181. $500,000 018359.00 Mount Desert Highway Improvement-PE Only To determine solution to erosion near Stanley Brook from underdrain outfall from. $311,622 022699.00 Mount Desert Traffic Signals Route 102 Replace signal at Sound Drive and add northbound right turn lane. $375,000 51

020416.00 Orland 3/4" Overlay Beginning 0.07 of a mile north of Cedar Swamp Road and extending northerly 0.66 of a mile. $142,570 020499.00 Orland Bridge Deck Replacement Route 1 Narramissic Bridge (# 5892) over Narramissic River. Located 0.04 of a mile east of Narramissic Drive. $1,400,000 Penobscot, Blue Hill Route 177 Beginning at in Penobscot and extending easterly 3.54 miles. $164,221 018867.00 Marine Piers, Floats And Fenders Reconstruction Town Landing Wharf Replace and widen pier connection, cribbing support, and float work. $93,600 WR 30217 Bridge and Structural Maintenance Replacing wearing surface, filling the scuppers and installing two drains on the Benjamin River Bridge (# 3216), which carries over Benjamin River and is located 0.28 of a mile easterly of the intersection of Route 172 in Brooklin. $75,000 018611.00, Blue Hill Route 172 Beginning 0.13 of a mile south of Cemetery Road in and extending northerly 5.15 miles. $224,823, Blue Hill Beginning at Ridge Road in and extending northeasterly 2.65 miles. $99,739 018809.00, Penobscot, Brooksville Roadside Route 176 Ledge removal at various locations between Mines Road in and extending northerly 3.51 miles. $35,000 022630.00 HCP 6 Stonington Bridge Improvement-PE Only Oceanville Road Oceanville Bridge (# 3696) over Oceanville Thoroughfare. Located 1.54 miles east of. $100,000 018611.00 Stonington, Deer Isle, Beginning at School Street in Stonington and extending northerly 11.71 miles. $511,200 52

018611.00 Stonington, Deer Isle Sunset Road Beginning at in Stonington and extending northerly 6.97 miles. $304,275 018612.00 Sullivan, Franklin, Eastbrook Route 200 Beginning at Route 1 in Sullivan and extending northerly 12.80 miles. $558,784 022579.00 HCP 2 Sullivan, Gouldsboro Mill And Fill Route 1 Beginning 0.13 of a mile north of Punkinville Road in Sullivan and extending easterly 8.01 miles. $2,949,000 018756.00 Surry Environmental (Misc.) Patten Stream Patten Stream rehabilitation with Department of Marine Resources. $115,000 Surry, North Bend Road Beginning at Route 172 in Surry and extending northerly 3.86 miles. $179,066 019305.00 Tremont Bridge Replacement Road Clark Bridge (# 3663) over Marshall Brook. Located 0.14 of a mile northwest of Flat Iron Road. $1,700,000 Tremont Shore Road Beginning at Route 102A and extending southerly 0.45 of a mile. $20,876 Tremont, Mount Desert Pretty Marsh Road Beginning at Route 102 in Tremont and extending northerly 12.42 miles. $576,164 017163.02 2017 Public Transportation Acadia Gateway Center FTA Partial construction funding of Acadia Gateway Center (AGC) Phase 2 and 3 - Construction of the Intermodal Facility and Welcome Center. $3,800,000 017357.20 Scenic Located at Hancock County Airport Sea Plane Ramp area. $246,000 53

018534.29 Marine Piers, Floats And Fenders Hancock County Airport Design new float system at the Sea Plane Base. $220,000 018710.00 Aviation Airport Buildings Hancock County- Safety and infrastructure improvements that may include site analysis, environmental assessment, permitting and design for Snow Removal Equipment Building at the Hancock County - Airport (BHB). $1,030,000 018710.16 Aviation Airport Buildings Hancock County- Safety and infrastructure improvements that may include construction of the Snow Removal Equipment Building at the Hancock County - Bar Harbor Airport (BHB). $1,133,000 018710.17 2017 Aviation Apron Hancock County- Safety and infrastructure improvements that may include the design and construction of the Itinerant Apron at the Hancock County - Airport (BHB). $1,030,000 018871.00 Public Transportation Operating Assistance Rural Transit Operating Operating Assistance for Federal Lands Access Program Funding. $578,000 020571.00 New traffic signal at Route 204. $881,316 Traffic Signals 022623.00 Verona Island, Prospect Bridge Wearing Surface Replacement Route 1 Penobscot Narrows Bridge (# 6421) over Penobscot River. Located on the Prospect - Verona Island town line. $450,000 014197.11 Winter Harbor Scenic Route 186 Schoodic Scenic Byway. Phase II - Construct sidewalks, signage, and pedestrian facilities. $71,826 54