Jakabaring Green Sports City Successful Completion of 2MW Solar Plant In Palembang, South Sumatra Supported by Financing Program for JCM Model Projects Sharp Energy Solutions Corporation July 24 th, 2018
Sharp in Indonesia Local Production/Local Services We developed our business in close with the market since 1970 Company name: PT. Sharp Electronics Indonesia (SEID) Foundation and starting sales business in 1 April 2005 *Company name changed since 1 May 2015. Sharp - Solar / Energy Management PV Module Core Technology + Energy Management System Crystalline Silicon Technology: 59 years of Experience 1959 1963 1967 1970 1981 2008 2010 ~2018 Start R&D of Crystalline PV cells * As of April 2010 Start mass production of Crystalline PV cells Start R&D of Space-use Start mass production of Space-use PV cells Start operation in Katsuragi factory PV cells More than 2,800 installations in Japan* Equipped with more than 160 satellites* Start operation in Sakai factory IEEE milestone recognition
Background of the Project South Sumatra Government will host a part of Asian Games in 2018 at Jakabaring Sport City, Palembang Initiation by South Sumatra Government Green Sports City PDPDE, selected by South Sumatra Government Sharp, Technology Provider Joint development and construction by PDPDE and Sharp JCM Subsidy for the Project PPA with PLN
Outline of 2MW Solar Plant South Sumatra Government will host Asian Games in 2018 at Jakabaring Sports City 1. Plant Capacity : 2MWac/1.6MWdc 2. Expected Power Generation: 1,922MWh/year 3. Expected CO2 Reduction: 912 ton (0.474 ton/mwh) Air Port Project site 1.6MW Solar Power Plant Palembang Palembang Jakarta Green Sports City Green Sports City Map data 2017Google GI Jakabaring Substation
Structure of the Project PLN South Sumatra Government Ministry of the Environment of Japan/ Global Environment Foundation Centre PPA Land, Permission Host country project partner Persahaan Daerah Pertambangan Dan Energi PDPDE International Consortium Equipment supply Generation Subsidy Representative entity Sharp Energy Solutions Corporation CO2 credit for 17 years Land Permit/license Investment Construction O&M PV module Mounting structure Sharp Solar Solution Asia (Thailand) Inverter/Combiner box/ monitoring system JCM MRV
Layout of the Project Generation -System size: 1,653.12kWdc/2,000kWac -Module type: Poly-crystalline 315W -Number of PV modules: 5,248 pcs -Direction: North -Inclination: 10 degree
Project View Generation
MRV Monitoring point Monitoring item Current, Power, Junction box Inverter house To the grid Switch gear PV array DC Step-up transformer Watt meter in switch gea PV module back sheet temperature measure Monitoring item Sun irradiation, temperature Data signal A C AC Inverter Internet Remote monitoring of the data Sun irradiation measure Sensors Weather monitoring box Data logger at site Data signal Monitoring system Data signal
Construction, joint work by Indonesia and Japan(1/2) Generation
Construction, joint work by Indonesia and Japan(2/2) Generation
Inauguration Ceremony on June 30 th, 2018 Governor of South Sumatera introduced concept of Green Sport City/Green infrastructure of Jakabaring Sport City for Asian Games 2018.
MRV Progress of the JCM Project Cycle Development of the MRV methodology Approval of the MRV methodology PDD submission Validation Public comment Project registration Verification CO2 credit issuance application February 2018 Coordinated by IGES Expected to be in August 2018 Expected to be in October 2018 Expected to be around June to August 2019 Expected to be in September 2019 FY 2017 Local Stake Holder Consultation until validation. FY 2018 Public comments until project registration. FY 2019 Verification until CO2 credit issuance application Public comments Project registration Making monitoring report Making credit issuance application form Making SDIP Application to CO2 credit issuance Administration to open JCM credit account
Actual records until June 2018 MWH The solar power plant has been operating successfully and already supplied approx. 12% better power to customers. 190 180 170 160 150 220 tons of CO2 reduction was already realized. 140 130 120 40 20 4 月 5 月 6 月 April May June (*After 但し 4 月 10 10 April 日以降 COD ) *Exclude ( ラマダン期日を除く lebaran holidays )
Further opportunities Solar power plant, as one of the distributed power source, will be welcomed at each island in Indonesia.