City of Monett, Missouri. Pride and Progress. Airport Master Plan Update. for the Monett Municipal Airport

Similar documents
Merritt Island Airport

Table of Contents. Overview Objectives Key Issues Process...1-3

Airport Master Plan Update

AIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

Austin-Bergstrom International Airport Master Plan Update

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

General Aviation Master Plan Update

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

Public Review Draft South County Airport Master Plan Report. County of Santa Clara San Martin, California

Appendix C AIRPORT LAYOUT PLANS

3 INTRODUCTION. Chapter Three Facility Requirements. Facility Requirements PEAKING CHARACTERISTICS

CHAPTER 1 EXECUTIVE SUMMARY

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Regular Board Meeting August 4, 2015

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Chapter 1 Introduction and Project Overview

Yakima Air Terminal/McAllister Field Airport Master Plan Update

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

General Aviation Master Plan Update Peter O. Knight Airport Public Meeting #1 September 24, Peter O. Knight Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

RNO Master Plan Approved Alternatives, Financial Analysis, and Facilities Implementation Plan

Chapter 8.0 Implementation Plan

Chapter 1 Introduction and Project Overview

Business Plan INTRODUCTION AIRPORT ENTERPRISE FUND OVERVIEW. Master Plan Guiding Principles

Draft Palo Alto Airport Master Plan Report County of Santa Clara, California October 2005

AIRSIDE CAPACITY AND FACILITY REQUIREMENTS

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

CHAPTER 1: INTRODUCTION

AIRPORT PLANNING, DEVELOPMENT AND LAND ACQUISITION

Chapter 4 Airport Facility Requirements

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

STUDY WORK GROUP MEETING No. 3. November 29, 2016

Bremerton National Airport Airport Master Plan Project Update February 12, 2013

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Introduction DRAFT March 9, 2017

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Study Design Outline. Background. Overview. Desired Study Outcomes. Study Approach. Goals (preliminary) Recession History

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

2015 PURDUE ROAD SCHOOL March 11, 2015

TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan

MASTER PLAN UPDATE GRANT NUMBER

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Ted Stevens Anchorage International Airport

Burke Lakefront Airport (BKL) Master Plan Update

CHAPTER 3 ALTERNATIVES CONSIDERED

Ted Stevens Anchorage International Airport

Westover Metropolitan Airport Master Plan Update


RESOLUTION NO

Nantucket Memorial Airport Master Plan Update

Airport Master Plan 1

APPENDIX X: RUNWAY LENGTH ANALYSIS

Master Plan Update Technical Advisory Committee Meeting

CHAPTER 2 AVIATION ACTIVITY FORECAST

APPENDIX D MSP Airfield Simulation Analysis

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

Forecast and Overview

Forecast of Aviation Activity

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

MONTROSE REGIONAL AIRPORT

New Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together

EXHIBIT A SCOPE OF SERVICES For an AIRPORT MASTER PLAN STUDY AND AIRPORT LAYOUT PLAN (ALP) UPDATE For LAWRENCE MUNICIPAL AIRPORT LAWRENCE, KANSAS

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

3.1 CRITICAL AIRCRAFT

Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM

Florida Department of Transportation Aviation Office GUIDEBOOK FOR AIRPORT MASTER PLANNING

AIRPORT MASTER PLAN UPDATE

Collier County Airport Authority. Joint Automated Capital Improvement Program

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017

Current Airport Roles

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

DRAFT MASTER PLAN UPDATE

Lake Tahoe Airport Master Plan

Technical Advisory Committee Meeting February 29, 2016

CHAPTER 1 BACKGROUND AND PROPOSED ACTION

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

STUDY WORK GROUP MEETING No. 4. July 12, 2017

Airport. Improvement Program (AIP) Overview. Federal Aviation Administration. Texas Aviation Conference Ben Guttery, Texas ADO April 2017

Planning, Development and Environment Committee

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

Chapter 9: Financial Plan Draft

FORECASTING FUTURE ACTIVITY

Chapter 2 FINDINGS & CONCLUSIONS

Las Vegas McCarran International Airport. Capacity Enhancement Plan

Finance and Implementation

AIRPORT LAYOUT PLAN FOR FRIEDMAN MEMORIAL REPLACEMENT AIRPORT - SITE 12 FRIEDMAN MEMORIAL AIRPORT AUTHORITY INDEX OF SHEETS SHEET TITLE

Transcription:

City of Monett, Missouri Airport Master Plan Update for the Monett Municipal Airport Pride and Progress

Airport Inventory Monett Municipal Airport (HFJ) Master Plan Update MoDOT Project Number: 08-098B-1 MoDOT DISCLAIMER The preparation of this document was financed, in part, through a State Block Planning Grant from the Missouri Department of Transportation (MoDOT), Aviation Section. The contents of this document do not necessarily reflect the views or policy of the MoDOT, Aviation Section or the U.S. Department of Transportation, Federal Aviation Administration (FAA). Acceptance of this document by the MoDOT, Aviation Section does not in any way constitute a commitment on the part of the State of Missouri to participate in any development concept depicted herein nor does it indicate that the proposed development is environmentally acceptable in accordance with applicable public laws. 1. Terwilliger, B. J. (Producer & Director). (2005). One Six Right-The Romance of Flying [DVD]. VNY Documentary, LLC. 2. Cover photo copyright & used with permission from Thomas and Connie Batie, Springdale, AR. The airport runway is the most important main street in any town. Norm Crabtree, former aviation director of Ohio( 1 ) Page 1.1

Chapter One existing conditions INTRODUCTION Page 1.1 BACKGROUND INFORMATION Page 1.1 AIRFIELD FACILITIES Page 1.4 TERMINAL AREA FACILITIES Page 1.9 SUPPORT FACILITIES Page 1.11 INTERMODAL ACCESS Page 1.13 LOCAL AIRPORTS AND AIRSPACE CHARACTERISTICS Page 1.14 AIRPORT ENVIRONS & LAND USE Page 1.16 SOCIOECONOMIC CONDITIONS Page 1.17 GENERAL AVIATION ACTIVITY Page 1.20 CLIMATIC CONDITIONS Page 1.22 WIND ANALYSIS Page 1.23 AIRPORT ECONOMIC BENEFIT Page 1.26 EXISTING CONDITIONS SUMMARY Page 1.27 Chapter Two DEMAND ForecasTs INTRODUCTION Page 2.1 DATA SOURCES Page 2.1 CONDITIONS AND ASSUMPTIONS Page 2.2 DEMAND FORECAST APPROACH Page 2.3 GENERAL AVIATION FORECASTS Page 2.4 BASED AIRCRAFT FORECASTS Page 2.5 PREFERRED BASED AIRCRAFT DEMAND AND FLEET MIX Page 2.6 ANNUAL OPERATIONAL DEMAND Page 2.8 OPERATIONAL FLEET MIX DEMAND Page 2.10 ANNUAL INSTRUMENT APPROACH DEMAND Page 2.12 ULTIMATE CRITICAL AIRCRAFT Page 2.13 DEMAND FORECAST SUMMARY Page 2.14 Chapter THREE FACILITY REQUIREMENTs INTRODUCTION Page 3.1 PEAKING CHARACTERISTICS Page 3.1 AIRFIELD AND AIRSPACE REQUIREMENTS Page 3.3 Page TOC.1

AIRFIELD AND AIRSPACE FACILITY REQUIREMENTS SUMMARY Page 3.9 TERMINAL AREA REQUIREMENTS Page 3.10 TERMINAL AREA FACILITY REQUIREMENTS SUMMARY Page 3.18 SUPPORT FACILITY REQUIREMENTS Page 3.20 SUPPORT FACILITY REQUIREMENTS SUMMARY Page 3.22 UTILITY REQUIREMENTS Page 3.22 OTHER FACILITY REQUIREMENTS Page 3.22 TRIGGER POINTS FOR FACILITY EXPANSION Page 3.24 Chapter Four Development Alternatives INTRODUCTION Page 4.1 GOALS AND OBJECTIVES FOR FUTURE DEVELOPMENT Page 4.1 ALTERNATIVE DEVELOPMENT CONCEPTS Page 4.2 AIRFIELD EXPANSION ALTERNATIVES Page 4.5 TERMINAL AREA EXPANSION ALTERNATIVES Page 4.9 DEVELOPMENT ALTERNATIVES SUMMARY Page 4.13 Chapter Five environmental Overview INTRODUCTION Page 5.1 Environmental Impact CATEGORIES Page 5.1 Environmental Overview summary Page 5.13 Chapter Six Airport Layout Plans INTRODUCTION Page 6.1 airport Layout DRAWING Page 6.1 Airspace Drawing Page 6.3 Inner portion of the Approach Surface Drawing(s) Page 6.4 Runway Centerline Profile DRAWING Page 6.4 Terminal Area DRAWING Page 6.4 Land Use DRAWING Page 6.6 Airport Property Map Page 6.6 40:1 Departure Surface Drawing Page 6.7 Chapter Seven capital improvement program INTRODUCTION Page 7.1 Page TOC.2

capital improvement program PHASING Page 7.1 project scheduling Page 7.1 Modot capital improvement PROGRAM Page 7.2 capital improvement program cost ESTIMATES Page 7.2 capital improvement program SUMMARY Page 7.5 Chapter eight financial program INTRODUCTION Page 8.1 capital improvement funding SOURCES Page 8.1 Airport revenue sources to fund capital improvements Page 8.4 cash flow ANALYSIS Page 8.7 cash flow RECOMMENDATIONS Page 8.8 Tables Table 1.1 Published IAPs Page 1.8 Table 1.2 Airfield Facilities Summary Page 1.8 Table 1.3 Hangar Facilities Page 1.11 Table 1.4 Fuel Farm Facilities Page 1.12 Table 1.5 Utilities and Service Providers Page 1.13 Table 1.6 Local Airports Page 1.14 Table 1.7 Historic Population Statistics Page 1.18 Table 1.8 Projected Population Statistics Page 1.18 Table 1.9 Per Capita and Median Household Income Page 1.19 Table 1.10 Labor Force Statistics Page 1.20 Table 1.11 Operational Activity Summary Page 1.21 Table 1.12 Existing Critical Aircraft- Cessna Citation Encore (560 Series) Page 1.22 Table 1.13 All-Weather, VFR and IFR Wind Coverage Page 1.24 Table 1.14 HFJ Economic Benefits Summary Page 1.26 Table 2.1 Forecast of Based Aircraft Summary, 2009-2029 Page 2.5 Table 2.2 Preferred Total Based Aircraft and Fleet Mix Summary, Page 2.7 2009-2029 Table 2.3 Annual Operational Summary, 2009-2029 Page 2.8 Table 2.4 Air Taxi Operations, 2009-2029 Page 2.9 Page TOC.3

Table 2.5 Operational Fleet Mix Summary, 2009-2029 Page 2.10 Table 2.6 Annual Instrument Approaches, 2009-2029 Page 2.12 Table 2.7 Ultimate Critical Aircraft- Cessna Citation X (750 Series) Page 2.13 Table 2.8 Demand Forecast Summary, 2009-2029 Page 2.14 Table 3.1 PMAD Operational Demand, 2009-2029 Page 3.2 Table 3.2 Peak Hour Passenger Demand, 2009-2029 Page 3.2 Table 3.3 Existing and Ultimate Runway Dimensional Standards Page 3.4 Table 3.4 Runway Length Requirements, 2009-2029 Page 3.5 Table 3.5 Airfield/Airspace Facility Requirements Summary, 2009-2029 Page 3.10 Table 3.6 Terminal Building Requirements, 2009-2029 Page 3.13 Table 3.7 Auto Parking Requirements, 2009-2029 Page 3.14 Table 3.8 T-Hangar Requirements, 2009-2029 Page 3.15 Table 3.9 Clear Span Hangar Requirements, 2009-2029 Page 3.17 Table 3.10 Public Apron Area/Tie-Down Requirements, 2009-2029 Page 3.19 Table 3.11 Terminal Area Facility Requirements Summary, 2009-2029 Page 3.20 Table 3.12 Fuel Storage Requirements, 2009-2029 Page 3.21 Table 3.13 Support Facility Requirements Summary, 2009-2029 Page 3.23 Table 3.14 Facility Development Trigger Point Summary, 2009-2029 Page 3.25 Table 5.1 Environmental Impact Categories Summary Page 5.13 Table 7.1 Phase I (0-5 Year) ACIP Cost Summary Page 7.3 Table 7.2 Phase II & Phase III ACIP Cost Summary Page 7.4 Table 7.3 20-Year ACIP Total Development Costs Page 7.5 Table 8.1 AIP Eligible and Ineligible Projects Page 8.2 Table 8.2 Revenue and Expenditures Summary, FY2005-FY2009 Page 8.9 Exhibits Exhibit 1.1 HFJ Location & Vicinity Page 1.2 Exhibit 1.2 Airfield Facilities and Airport Layout Page 1.5 Exhibit 1.3 Terminal Area Facilities Page 1.10 Exhibit 1.4 Local Airports & Airspace Characteristics Page 1.15 Page TOC.4

Exhibit 1.5 All Weather Windrose Page 1.25 Exhibit 2.1 Preferred Based Aircraft Projections (2009-2029) Page 2.7 Exhibit 2.2 Annual Operational Summary (2009-2029) Page 2.8 Exhibit 2.3 Air Taxi Operational Summary (2009-2029) Page 2.9 Exhibit 2.4 Operational Fleet Mix Summary (2009-2029) Page 2.11 Exhibit 3.1 Part 77 Imaginary Airspace Surfaces Page 3.11 Exhibit 3.2 IMC Windrose Page 3.12 Exhibit 4.1 Preferred Airfield Alternative Page 4.8 Exhibit 4.2 Interim Airfield Alternative Page 4.10 Exhibit 4.3 Preferred Terminal Area Alternative Page 4.12 Exhibit 5.1 Preferred Airfield Alternative- Noise Exposure Map (2029) Page 5.3 Exhibit 7.1 Airport Layout Drawing- Phased Development Plan Page 7.7 APPENDICes Appendix A Environmental Overview Agency Responses Page TOC.5