CURRENT STATUS OF ELABORATION OF MAPS FOR CLIMATIC AND SEISMIC ACTION: Country report of MONTENEGRO

Similar documents
Chart 1 and 2. Number of registered and for the first time registered road motor vehicles and trailers in 2013

The third quarter 2013

CENSUS OF AGRICULTURE 2010 FIRST RESULTS FOR AGRICULTURAL HOLDINGS

Structure of families in Montenegro

Energy efficiency project for municipality Bijelo Polje, Montenegro

Responsibilities and activities of both institutions, now under the same name, have remained unchanged.

Industry and occupation of population in Montenegro

Survey on arrivals and overnight stays of tourists, total 2017

Helicopter Price List 2017

Tourist arrivals and overnight stays in collective accommodation 1 July 2017 (p)

Scorecard of Municipalities Montenegro 2011

studio SYNTHESIS architecture&design STRATEGIC ENVIRONMENTAL ASSESMENT FOR THE TRANSPORT DEVELOPMENT STRATEGY FOR MONTENEGRO

Introduction. resources based on the contractual services.

OVERVIEW OF THE STATUS OF PROJECTS IN THE FIELD OF ENVIRONMENT AND PUBLIC INFRASTRUCTURE. June 2011

CV Milan Božić. Personal data Surname and name Božić Milan Date of birth 08/07/1964 Title of qualification B.Sc. in geology department of geotechnics

IV International Symposium Agrosym /AGSY D THE RATIO OF REGIONAL AND RURAL DEVELOPMENT IN MONTENEGRO. Abstract

Upon arrival to Rijeka Crnojevica lunch is organized in a local restaurant.

THE PRIVATISATION PLAN FOR

INVESTMENT PROJECTS AND OPPORTUNITIES IN MONTENEGRO

DESTINATION MANAGEMENT COMPANY

ISSO CHAMPIONSHIPS 2013 The Shotokan and Shitoryu karate styles competition

Country report: Kosovo

3RD SEETAC ANNUAL MINISTERIAL MEETING AND SEEIF

MONTENEGRO IN FIGURES

Birth masculinity in the Western Balkans

18th Balkan Championship for Cadets, Juniors and U21. BULETIN No.1. 1 P a g e

Ancora Destination Management Company MONTENEGRO

MONTENEGRO Guided Tour Guide cycling with group 270 km/168 mi 7 nights / 8 days

RAZVOJ NGA MREŽA U CRNOJ GORI

INVESTMENT PROJECTS IN MONTENEGRO

IRRIGATION IN AGRICULTURE AND CLIMATE CHANGE. Agrotech, 2017

Geographic Names Standardization Policy for Montenegro

COMMISSION IMPLEMENTING DECISION. of adopting a

MONTENEGRO H E R C E G N O V I BULLETIN no.2

IPA CBC. Serbia Montenegro. Date: Cross-border programme

Cross border Programme. Serbia Montenegro

Welcome. a country of pristine nature and medieval towns, clear water and clearer air

ANNEX 2 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE

Type: Nature, Scenic Drive, Charming Village, National parks

MJESEČNI STATISTIČKI PREGLED MONTHLY STATISTICAL REVIEW

Republika e Kosovës Republika Kosova-Republic of Kosovo Qeveria-Vlada-Government KOSOVO GEOLOGICAL SURVEYS

We are authentically from

MONTENEGRO Investment Opportunities

REPUBLIC OF MONTENEGRO Government of the Republic of Montenegro Directorate for the development of small and medium sized enterprises

INTRODUCTION ENVIRONMENTAL PROTECTION PROGRAMME ENERGY PROGRAMME

ACHIEVING THERMAL COMFORT AND SUSTAINABLE URBAN DEVELOPMENT IN ACCORDANCE WITH THE PRINCIPLES... QUAESTIONES GEOGRAPHICAE 36(4) 2017

Government of Montenegro. Ministry of Transport and Maritime Affairs. Podgorica, April 2013

BULLETIN. Balkan Children Championships Herceg Novi,Montenegro. 20th Balkan Children

EUROPEAN CHARTER FOR REGIONAL OR MINORITY LANGUAGES

TA-MON-02 FS. 400 kv Overhead Line Lastva Grbaljska - Pljevlja. Environmental and Social Impact Assessment Report -- Non-Technical Summary --

Projects for RE population implemented by Help. 31. May Hotel Princess, Bar

Hotels of your choice Luxurious coach Attractive Excursions National restaurants. Experienced guides

TA-MON-02 FS. 400 kv Overhead Line Lastva Grbaljska - Pljevlja. Environmental and Social Impact Assessment

Slobodan Živaljević. Đoka Miraševića 24, Blok 9, Podgorica, Montenegro +382 (0) (0)

Seismic Intensity Map of Ex SFRY

Government of Montenegro Ministry of Transport and Maritime Affairs

Shorex Opportunities MONTENEGRO

ŠKOLSKA 2016/2017 GODINA STUDENTI II, III, IV, V, VI GODINE STUDIJA BODOVNA LISTA

Secrets of the North-East

Women`s Court-feminist approach to justice Quarterly report for the period of April-June 2012

MONTENEGRO INVESTMENT AND BUSINESS OPPORTUNITIES

Seismic Microzonation in Hurghada City (EGYPT)

EQUIDAS. The M6.5, Nov 17th 2015, Lefkada earthquake Reconaissance Report. Christos Giarlelis, Christos Mpoutsoras Structural Engineers

Itinerary: Programme Day 1: 18th May 2016 (Wednesday) Budva Accomodation

AGRITECH th December 2017, Podgorica

Slovačka, Podgorica Montenegro. Replace with type of IM service. Sex female Date of birth 27/09/1981 Nationality Montenegrin

Annual Report Center for Protection and Research of Birds FOR NATURE AND PEOPLE

DENSITY OF POPULATION AND SPATIAL DISTRIBUTION OF RURAL POPULATION IN THE COASTAL REGION OF MONTENEGRO

Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of

Track the Roots. Montenegro-Mediterranean 8 day hiking tour Self-Guided

Ivana Ćipranić, born Nikolić

Travel agency Adria Line, 13 Jul 1, Budva, Montenegro Tel: +382 (0) , +382 (0) , Fax: +382 (0)

Navigare Yachting's 7-day suggested sailing route Dubrovnik Montenegro Dubrovnik

THE SEARCH OF SATISFACTION OF TOURISTS IN ORDER TO IMPROVE THE QUALITY OF MONTENEGRO TOURISM

Protection of Ulcinj Saline

Natura Cooperation. No. 1, July We present. Networks of environmental NGOs in Serbia and in Montenegro. Opportunities

MONTENEGRO EXPLORER 7 days

THE BELIEFS AND ATTITUDES OF TOURISTS ABOUT THE (DIS) ADVANTAGES OF MONTENEGRIN TOURISM

Protection and Sustainable Use of the Dinaric Karst Transboundary Aquifer System MONTENEGO COUNTRY REPORT

Montenegro Case Study

11th EUROPEAN KARATE CHAMPIONSHIPS FOR REGIONS June , Herceg Novi, Montenegro

Montenegro ports MAP & COORDINATES. 1. Port of Bar N, E. 2. Port of Zelenika - Herceg Novi N, E

Democratisation, Development Cooperation and Civil Society

Standard Summary Project Fiche centralised programmes Project Fiche: 5

Sailing Route Dubrovnik Montenegro Dubrovnik

Contents. On the Road 4. Western Balkans Highlights 5. Destination Western Balkans 18. Getting Started 19. Itineraries 25. Snapshots 29.

DURMITOR ORIENTEERING CHALLENGE

A checklist of the leeches (Annelida: Hirudinea) of Montenegro

Bosnia - Herzegovina - Montenegro Croatia - Cycling Bosnia and Montenegro Bike Tour 2019 Guided 9 days / 8 nights

str 1. Osnovni podaci o mjernoj kampanji str 4. Rezultati mjerenja str. 16. Prilog 1 Tabela preporučenih vrijednosti str. 17. Prilog 2 Mjerne rute

Cross-border region Drina - Tara

WELCOME.

Wild Beauty. Introduction. Perspectives for Contributions

Biljana Lazovic University of Montenegro Biotechnical Faculty Podgorica

History that Connects East and West: Learning through Entangled Legacies in History Education and Cultural Heritage

Montenegro s Best Kept Secret

Montenegro Investment Possibilities February 2018, Zagreb

Driving instructions to Kotor Vista and Kotor Muo from Dubrovnik airport

SUMMER IN MONTENEGRO TIVAT

SERBIA BOSILEGRAD. Theme covered: Effective participation Affected minorities: Bulgarians

Transcription:

ELABORATION OF MAPS FOR CLIMATIC AND SEISMIC ACTIONS FOR STRUCTURAL DESIGN IN THE BALKAN REGION CURRENT STATUS OF ELABORATION OF MAPS FOR CLIMATIC AND SEISMIC ACTION: Country report of MONTENEGRO Prof. Branislav Glavatović, PhD in Geophysics, Prof. Srđan Janković, PhD in Civil Engineering, Prof. Radomir Zejak, PhD in Civil Engineering, Mrs. Ljiljana Šoškić, ISME technical secretary

CONTENTS 1) ACTIVITIES SO FAR - overview 2) SEISMIC ACTION seismic zones and reference pga question on low and very low seismicity seismic response spectra 3) CLIMATIC MAPS

ISME/TK 002: Eurocodes main activities so far IPA twinning project on Eurocodes (2012-2013); Action plan for Eurocodes adoption and implementation (adopted by Government of Montenegro in January 2014) ; New law on spatial planning and building is finished in draft form. EUROCODES ADOPTION EN 1990 - published as MEST EN 1990: 2013 in Montenegrin MEST EN 1990:2013/NA:2013 published in Montenegrin Eurocodes parts EN 1991-1, EN 1991-3 and EN 1991-5, as well as its National Annexes, were prepared by EC WG1 and provided to ISME to realize technical text editing. Eurocodes part EN 1998-1 with National Annex was prepared, adopted and published at the end of 2014.

SEISMIC ACTION SEISMIC HAZARD - REFERENCE PGA: a gr 475 years return period (10% in 50y), soil type A Spatially smoothed seismicity method combined with fault source method in a logic tree approach was used for final seismic hazard maps elaboration

SEISMIC HAZARD - REFERENCE PGA: a gr 95 years return period (10% in 10y), soil type A

SEISMIC ZONES Seizmic zone Acceleration (parts of g) * Zone I 0.10 Zone II 0.11-0.20 Zone III 0.21-0.30 Zone IV 0.31-0.40 * g = 9.81 m/s 2 For every city specific reference PGA a gr has been determined for the return period T=475 years in case of soil type A a gr (g) a gr (m/s 2 ) City Seismic zone Andrijevica III 0.127 Seismic 1.25 Bar City a I 0.371 zone 3.64 gr (g) a gr (m/s 2 ) Seismic Berane City III Martinići 0.104 II 1.02 0.209 2.05 zone Bezuje III Mateševo 0.137 III 1.34 Šipačno 0.133 1.30 III 0.157 1.54 Bijela III 0.127 1.25 Medun II 0.222 2.18 Bijelo Polje IV 0.086 0.84 Sotonići I 0.351 3.44 Međurečje III 0.145 1.42 Bogetići III 0.192 1.88 Štitari II 0.278 2.73 Mojkovac IV 0.097 0.95 Botun II 0.274 2.69 Morinj I Stubica 0.320 3.14 III 0.183 1.80 Brajići I 0.344 3.37 Budva I Murino 0.352 III 3.45 Sutomore 0.131 1.29 I 0.367 3.60 Buronje II Nikšić 0.270 III 2.65 Sveti 0.172 Stefan 1.69 I 0.352 3.45 Čanj I Njeguši 0.363 I 3.56 0.326 3.20 Tivat I Čarođe III Novo Selo 0.171 II 1.68 0.236 2.32 0.337 3.31 Cetinje I Očinići 0.314 I 3.08 Ubli 0.332 3.26 II 0.211 2.07 Čevo II Orahovac 0.266 I 2.61 Ulcinj 0.309 3.03 I 0.375 3.68 Danilovgrad II Otilovići 0.220 IV 2.16 Utjeha 0.074 0.73 I 0.379 3.72 Đenovići I Pavino Polje 0.326 IV 3.20 0.078 0.77 Velimlje II 0.225 2.21 Dobrakovo IV Petnjica 0.085 IV 0.83 0.093 0.91 Drenoštica III 0.198 1.94 Velje Duboko III 0.139 1.36 Petrovac I 0.358 3.51 Goransko III 0.138 1.35 Plav III Veruša 0.143 1.40 III 0.157 1.54 Gradac IV 0.088 0.86 Pljevlja IV Vilusi 0.077 0.76 II 0.261 2.56 Grahovo II 0.261 2.56 Plužine III 0.133 1.30 Gusinje Virpazar I 0.346 3.39 III 0.160 1.57 Herceg Novi I Pobori 0.323 I 3.17 Vladimir 0.349 3.42 I 0.383 3.76 Kličevo III PODGORICA 0.177 II 1.74 0.243 2.38 Vranjina I 0.328 3.22 Kolašin III Podhum 0.124 II 1.22 0.285 2.80 Kotor I Presjeka 0.336 III Žabljak 3.30 0.183 1.80 III 0.105 1.03 Krnjice I Radanovići 0.373 I 3.66 0.350 3.43 Kruče I Ravni 0.380 III 3.73 0.133 1.30 Kržanja III Rijeka 0.197 1.93 Kujava II Crnojevića 0.208 IV 2.04 0.316 3.10 Limljani I Risan 0.360 I 3.53 0.309 3.03 Liverovići III Rožaje 0.159 IV 1.56 0.096 0.94 Šavnik III 0.126 1.24 a gr (g) a gr (m/s 2 )

Horizontal elastic spectral response for: Earthquakes of Type 1 (Ms 5.5, or ML 5.8), 40 strong motion histories in case of stronger earthquakes in Montenegro, Records on soil type A.

Horizontal elastic spectral response for: Earthquakes of Type 2 (Ms < 5.5, or ML < 5.8), 732 strong motion histories in case of weaker earthquakes in Montenegro, Recorded on soil type A. 90 % of records in case of earthquakes with ML < 4.5

Comparisons of horizontal elastic spectral response shapes: recommended vs. calculated shapes As the data base of strong motion records is still relatively small, for now we decided to keep recommended shapes.

Vertical elastic response spectra for: Earthquakes of Type 1 (Ms 5.5, or ML 5.8), 20 strong motion records, Records on soil type A.

Vertical elastic response spectra for: Earthquakes of Type 2 (Ms < 5.5, or ML < 5.8), 221 strong motion records, Records on soil type A. Again small number of records with ML > 4.5

SOIL CLASIFICATION: General classification was accepted, but detailed explanation of soil type was determined - appropriate to the regional geological characteristics of the territory of Montenegro

Question on low and very low seismicity { EN98-1: 3.2.1(4) and 3.2.1(5)} There are no areas characterized as very low or low seismicity in Montenegro 3.2.2.5(4)P Design spectra for the case of horizontal component of seismic action, is defined as: Value of 0.2 was adopted as lower factor β for design spectra - as recommended in EN98-1 At the end of 2014 National Annex for Eurocode EN1998-1 (nmest EN 1998-1 2014) was adopted by the Technical Committee of the Montenegrin Institute for Standards and now is available for the implementation.

EDUCATION For Montenegrin Chamber of engineers the education of members is one of the most important tasks. Since 2006, the Chamber organized and financially supported numerous activities related to the implementation of Eurocodes: through seminars, round tables, conferences, lecturing, publishing related educational materials, etc. According to the Action Plan of the Montenegrin Government on implementation of Eurocodes, Chamber of Engineers was appointed as the institution responsible for education of engineers in Eurocodes implementation. We will continue with organizing educational seminars in next two years.

CLIMATIC MAPS Climatic data were processed and climatic maps prepared, but still in raw form. It is expected that National Annex for EN 1991 will be finalized and prepared for adoption until the end of this year Average snow height Wind direction