US 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD

Similar documents
WELCOME US 83 Public Meeting

US 83 Relief Route. City of La Joya City of Peñitas Hidalgo County. November 15, 2012

US 380 FEASIBILITY STUDY

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

PUBLIC SCOPING MEETING APRIL 2018

I-35 Reconstruction Project

WELCOME TO THE OPEN HOUSE

Basic Project Information

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

SR 934 Project Development And Environment (PD&E) Study

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017

LBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. Agenda.

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Project Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information

Classification and Management Planning (CAMP) Washington State Parks and Recreation Commission

Welcome to Dayton Parkway Interchange Open House. November 26, 2018

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY

White Mountain National Forest Saco Ranger District

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

Northwest Corridor LRT Line to Irving/DFW

Texas Department of Transportation Corpus Christi District. Corpus Christi Harbor Bridge

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

South Bay Metro Green Line Extension

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

City of Solvang SUNNY FIELDS SPUR TRAIL STUDY

--DRAFT INTRODUCTION. Transportation Land Development Environmental S e r v i c e s

Official Minutes of MARION COUNTY BOARD OF COUNTY COMMISSIONERS. May 8, 2018

DHS Consolidation at St. Elizabeths Master Plan Amendment. Transportation Interstate 295 / Malcolm X Avenue Interchange

White Mountain National Forest Saco Ranger District

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

APPENDIX K RURAL ENVIRONMENTAL CLEARANCE PROJECTS

PUBLIC INFORMATION SESSION #2

SUPER VACANT LAND REAL ESTATE OPPORTUNITIES

Fairfax County Parkway Widening Fairfax County

U.S. 33 Ravenswood Connector

Texas Transportation Institute The Texas A&M University System College Station, Texas

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

CatExes vs. EAs When and How to Prepare

MAIN POINTS OF PRESENTATION BY RUTH BONSIGNORE, JON FEINSTEIN AND TONY GRANDE, VHB

Northwest Corridor LRT Line to Irving/DFW

Northaven Trail Phase 2 Initial Project Overview

HARBOR BRIDGE PROJECT COMMUNITY ADVISORY BOARD MEETING MINUTES April 5, 2018

PROGRESS PARK CONNECTOR

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Roadside Management Manual

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Design Public Hearing for the Existing and Proposed Bridge Crossings on Aden Road (Rte 646) over the Norfolk Southern RR, Nokesville, Virginia

1803 West Hwy 160 Monte Vista, CO (719) TTY (719)

Public Open House. Chief Peguis Trail Project

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia

Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019

LAND FOR SALE SUBDIVISION LAND: SFR DEVELOPMENT LAND OF ±100 HOMES Ave 13 1/2, Madera, CA PROPERTY FEATURES

David Johnson. Tom, Attached please find the final scoping letter and figures for your review. David

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

Michigan s Engineering Safety Program for Local Roadways

TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES

The Transportation Corridor Overlay District

PALMER TOWNSHIP BOARD OF SUPERVISORS GENERAL BUSINESS MEETING NOVEMBER 29, 2011

Route 29 Solutions Projects

TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712

DOWNTOWN BRT ALTERNATIVE - 19th AVE

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5

MSK HIGHWAY 80 & DEAN FOREST RD PRICING: $649,000. Commercial Parcel. Chuck Mitchell (912)

ALBANY-HUDSON ELECTRIC TRAIL FEASIBILITY STUDY. Final Report OCTOBER 2011

Great Development Opportunity

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

Grade Crossings in High Speed Rail Corridors

APPENDIX A: Planning Consistency Checklist

1.2 Corridor History and Current Characteristics

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need

Marti Donley; Daniel Reese; Rodney White UPC FFY14 TIP AMD pdf

The Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m.

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting

Rockin River Ranch State Park

Version TEXAS DEPT OF TRANSPORTATION. Rail Division. TRIMS User s Guide

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

TRINITY RIVER CORRIDOR

Chapter 1: Introduction Draft

FHWA Actions on Past Interstate Requests that were approved by the USRN were presented and conditions were lifted. FHWA Approval Date

Chapter 1: Introduction

Special Committee on U. S. Route Numbering May 24, 2016 Waterloo Des Moines, Iowa Meeting Minutes

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM

ROADWAY INVENTORY. The biggest and badest

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1

Sundance Square. Liberty Hill, Texas 78642

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

Clam Harbour Provincial Park

Preliminary Site Evaluation

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

I-70/I-71 Project Public Meeting Presented By

Lanie Fleischer Chester Creek Trail Improvements Public Meeting #2. February 4, 2014

Pattullo Bridge Replacement Project

Former Middle School Site Green Space & Brecksville Road Streetscape. March 27, 2018

Transcription:

US 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD PUBLIC MEETING JUNE 8, 2017

Talk Text Crash 2

AGENDA TECHNICAL PRESENTATION (Roma Area Engineer Eduardo Gracia, P.E.) PROJECT SCHEDULE PUBLIC COMMENTS ADJOURN 4

PURPOSE OF PUBLIC MEETING Encourage communication with public Provide project information Part of the environmental process Develop a record of public inputs and participation 5

FM 457 Bridge Replacement Project Se ofrece servicios de traducción están disponibles. Si necesita escuchar esta información en español, levante la mano para ser atendido 6

OTHER WAYS TO MAKE COMMENTS Submit a written comment form tonight Make a verbal comment to the court reporter Mail or drop off written comments to: TxDOT Roma Area Office ATTENTION: US 83 2654 US HWY 83 Roma, TX 78584 Fax comments to 956-702-6110 Email comments to Robin.Gelston@txdot.gov Visit www.txdot.gov and search US 83 from Starr-Zapata County Line to view this presentation and provide comments online. Comments must be received or postmarked by June 23, 2017 7

PROJECT LIMITS (Length 10.5 miles) From 0.255 mi. north of Starr/Zapata County to 0.09 mi. north of Loma Blanca Road. Segment 1: 0.255 Mi. north of Starr/Zapata county line to 0.31 miles north of FM 2098 Segment 2: 0.31 miles south of Placido Rd. to 0.09 miles north of Loma Blanca Road 8

Project Need and Purpose Project Need: Significant increase in heavy truck traffic Upgrades needed as this corridor is part of the Texas Trunk System Project Purpose: Improve capacity Upgrade facility to meet the Texas Trunk System Maintain access to communities 10

Project Details Project Scope Proposed four- lane divided rural highway Proposed highway will be built within proposed 300- foot ROW Construct bridges at FEMA flood zones Future major intersection at FM 2098 with turnarounds and proposed 450- foot ROW Crossovers at approximate quarter mile spacing 11

Project Details Project Impacts Potential impact to rare and endangered plants Potential impact to 5 waters of the U.S. No impacts to wetlands Approximately 20 parcels (157 Acres) of ROW Estimated 2 commercial relocations (ABC Ballroom and vacant adjacent building) Potential partial ROW on residential lots One archeological site remains to be evaluated One grave site to be relocated in coordination with next of kin 12

Project History Public Involvement: Public Meetings in Zapata, Texas March 30, 1999 April 9, 2000 Open House and Public Workshops in Zapata, Texas May 24, 2000 June 8, 2000 Project put on hold in 2007 due to funding.a finding of no significant Impact (FONSI) was not obtained from FHWA Additional funding in 2010,TxDOT constructed several Super 2 projects on US 83,which added intermittent passing lanes to an existing two- lane facility 13

US 83 Existing Typical Section (Two-Lane segment) 100-280 Existing ROW 50 overall width of existing roadway typical sections two-11 outside shoulder two-12 vehicle travel lane 4 buffer 14

US 83 Existing Typical Section (Five - Lane segment) 100-280 Existing ROW 80 overall width of existing roadway typical sections two-8 outside shoulder four-12 vehicle travel lane 16 continous left turn lane 15

US 83 Proposed Typical Section (4-Lane continuous ) 130-160 Existing ROW 38 overall width of new roadway typical sections 84 typical section : two-10 outside shoulder four-12 vehicle travel lane 16 continuous left turn lane 16

US 83 Proposed Typical Section (Prop.84 ) 130-160 Existing ROW 17

US 83 Proposed Typical Section (Rural 4-Lane Divided) 300 proposed ROW 38 overall width of new roadway typical sections 4 inside shoulder Two-12 vehicle travel lane 10 outside shoulder With a 63 to 88 wide grassy median 18

US 83 Proposed Typical Section (Rural 4-Lane Divided) 300 ROW 19

US 83 Proposed Typical Section (FM 2098 North Intersection) 450 ROW Two 38-foot wide roadbeds at access roads in south and north directions: 4 inside shoulder Two-12 vehicle travel lane 10 outside shoulder With a 163 to 188 wide grassy median. 20

US 83 Proposed Typical Section (FM 2098 North Intersection) 450 ROW 21

PROJECT SCHEDULE* US 83 Ongoing Public Involvement Schematic Summer 2017 Environmental Clearance Fall 2017 Final Design Fall 2018 Acquire ROW Spring 2019 Utilities Spring 2021 Letting Spring 2021 Begin Construction Summer 2021 *This project schedule and dates are preliminary. 22

PUBLIC COMMENT PERIOD Step up to the microphone stand State your full name Give your comments on the project. Limit statement to 3 minutes. 23

OTHER WAYS TO MAKE COMMENTS Submit a written comment form tonight Make a verbal comment to the court reporter Mail or drop off written comments to: TxDOT Roma Area Office ATTENTION: US 83 2654 US HWY 83 Roma, TX 78584 Fax comments to 956-702-6110 Email comments to Robin.Gelston@txdot.gov Visit www.txdot.gov and search US 83 from Starr-Zapata County Line to view this presentation and provide comments online. 24

NEXT STEPS Compile and consider community input from tonight s public meeting and comment period Finalize project design details Prepare and finalize environmental documentation 25

HAVE ADDITIONAL QUESTIONS? Romualdo Mena, P.E. TxDOT Project Manager Office: 956-702-6246, Thank you for your participation. 26