Step by Step Set Up Guide

Similar documents
Alien Flier Zip Line Products Installation/Owner s Manual

Alien Flier Zip Line Products Installation/Owner s Manual

User s Manual Trampoline 8

Antenna Tower Positioning System

AND LOAD CANOPY RACK SPECIFICATIONS

OPERATOR INSTRUCTION MANUAL INCLUDING REPAIR PARTS FOR MODULAR GENERAL PURPOSE TENT SYSTEM (MGPTS) TYPE I

DO NOT use Alien Flier Zip Line Products until you have read and fully understand the SAFETY WARNINGS below!

Installation Guide Cable

DOWN MANUAL. Aeros Ltd. St. Post-Volinskaya, 5 Kiev, UKRAINE

Carbon Lite Volleyball system ( Either in packages or components ordered separately )

S-SERIES 10x10 SETUP INSTRUCTIONS

BowDown. MiniMuM Crossbar spread 24 (61CM) Steel Hook (2X) Buckle Strap (2X) Plastic Tube (2X) Plain Strap (2X) SHORT BLACK T-BOLT (2x) BOWDOWN (2x)

/ Tool and Equipment Safety Tether System (T.E.S.T.S)

All of these configurations are from one 2005 Blue Ultralite Trayman. Just slide the straps up and over your shoulders and they will slip into place.

UTV SNOW FORCE TM PUSH TUBE KIT OWNER S MANUAL

ANY HAMMOCK CARRIES INHERENT RISK AND ACCIDENTS MAY OCCUR. USE WITH CAUTION.

NEWMAR SERVICE SCHOOL

Important! Read all of these instructions before assembling or riding the glider. For questions or help please call Glide Bikes at

Clevis Style G80 Heavy Duty Tiedowns. Clevlok Style G80 & G100 Heavy Duty Tiedowns

PL500A Platform Extension

Insruction manual Dukki

INSTALLATION INSTRUCTIONS

F a l l P r o t e c t i o n E x p e r t s. Subject: Buckle Specifications and Operations

Installation and User s Manual 12 x 10 MOTORIZED AWNING

2 Tripod System User Guide

Operating Instructions

quick and easy installation guide

X-SERIES 10x10 SETUP INSTRUCTIONS

BERYL Service Guide. Travel Adjust OTT Change

Assembly instructions for Eurotramp trampolines Series: Ultimate, Grand Master Exclusiv, Grand Master, Master

UTV BLADE MOUNT HARDWARE

Installation Instructions Part # 2784 Awning

SAFETY GUIDELINES FOR DIY TENTS

HANDLES AND CONTROL CABLES

BR B Bike Rack Instructions

Operating Instructions

ROOFTOP CARGO BAG (FRONT OF VEHICLE) HOOK (x4) ATTACHMENT STRAP (x4)

RAFTER VI. Installation and Operation CAREFREE WITH AUTOMATIC AWNING SUPPORT. RV Accessory PRODUCT OVERVIEW

USER MANUAL BMU WORKCAGE. CONFORM TO THE MACHINE DIRECTIVE 2006/42/EC and to EN1808 (1999)

Roller Bar End Cap (w/round Drive Shaft) Replacement Instructions for Vista and Motorized Awnings * Helpers needed *

Tarp Return. Questions? Contact Customer Or Parts Diagrams see Parts and Diagrams section on web at

LBH18BPK. Instruction Sheet

PR-429BF-600M. Bell 429 Blade Fold Kit Operations Manual

ReTurn7600. SWL: 205kg/450lbs. SystemRoMedic TM. User manual English. Manual no: 721 Ver

Otter Pro XT Cabin Installation and Set-Up Instructions

INSTALLATION INSTRUCTIONS

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V

INSTALLATION INSTRUCTIONS

DO NOT USE WITH CROSSBAR SPREAD LESS THAN 24.

Installation Guide: Round Trampoline

OWNER'S MANUAL. ospreypacks.com CLIMBING / MOUNTAINEERING MUTANT SERIES

FLEX KEY ASSEMBLY. ..._ o RAFTER ARM TUBE MAIN ARM TUBE CAP NUT CLAW HINGE

TUCSON PATIO AWNING INSTALLATION MANUAL

Otter Pro X-Over Lodge Installation and Set-Up Instructions

--- BIG LEAGUE BATTING CAGE ---

INSTANT GARAGE MODEL NO: CIG81224 ASSEMBLY INSTRUCTIONS PART NO: ORIGINAL INSTRUCTIONS

Kontrol Kube Advanced Owners Manual

Installation Instructions

MYRIAD Banner Stand is a trademark of Skyline Exhibits. Patent Pending PN32294-B. MYRIAD Banner Stand

Aftermarket Installation Manual

Motorized Oasis Awning RTS Motor Cord Replacement Instructions *Helpers Needed*

Solera Classic Awning OEM INSTALLATION MANUAL

INSTRUCTION MANUAL ALEKO RETRACTABLE AWNING

Solar Power Shade INSTRUCTION MANUAL

GEAR GUIDE CABELA S SET NUMBER:

10' x 20' MAX AP CANOPY EXTENSION KIT Assembly Instructions

Please read this manual carefully before your first flight.

LM601 Landmark Permanent Blind

Thanks for shopping with Improvements! 10 Solar Lighted Gazebo Item #531753

Table of Contents. Introduction to the AquaTrak AquaTrak Parts List Tank Frame Assembly Pulley System Assembly...

CAPRI PLUS. Instruction Manual. 28' x 38' Including sidewall and connector instructions.

Congratulations! WARNING! READ USER MANUAL FIRST! USE AT YOUR OWN RISK!

OWNER'S MANUAL. ospreypacks.com VERTICAL ENDEAVORS VARIANT SERIES

User Guide. Tripod. flowtech 75 Tripod. Part No. V

Product instruction manual Ream Cutting Systems RE3943, RE3946, RE3947, RE3971, RE3952E

General Canopy Folding and Packing Instructions for H-X Series Personnel Parachute Canopies. Manufactured by Butler Parachute Systems, Inc.

Urea/Adblue Hose Reel

FEATHER-LITE ROOF TOP TENT SET-UP GUIDE

PACKING INSTRUCTIONS for the Strong Enterprises. Military Tandem Tether Bundle MTTB. Canopy Part No

COMBI CRATE MODEL NO: 7000/7001/7002/7003

4812 HEAVY BAG STAND OWNER S MANUAL

4.2 Assembly Instructions

RUPHIS Blade Clamp. Instruction Manual

300 ft. 5/8 Hose wagon

A A A T E C H N O L O G Y

Rhino-Rack SUNSEEKER II Awning 2.0 metres (32109)

INSTALLATION INSTRUCTIONS AND OWNER'S MANUAL AWNINGS. For trailers & motor homes with straight sides TOOLS REQUIRED

Rhino-Rack SUNSEEKER II Awning

33100 LH - Batwing Awning RH - Batwing Awning

RESCUE SUPPORT SYSTEMS TRIPOD CONVERSION KIT PN

functionality with the necessary maintenance tools stored in a convenient built in tool box, as well as parallel handles for

DC 700 Series Hose Reel - September 2010

Installation & Operation Manual VHM Variable Height Series Arms with Fixed Angle Front End

INSTRUCTION SHEET DETHATCHER KIT. STS-422LX LPSTS-42JD Assembly Installation Operation Repair Parts L-1660-D. Visit us on the web!

NOTICE: Once used, this shelter cannot be returned to the store. If you have a warranty claim, please contact Clam Corporation directly.

Advantage Plus TIM-3600 Series Reel

BigStack. Minimum Crossbar spread 24 For factory racks: Check fitlist notes, or Yakima.com for your vehicle s crossbar spread.

Safety Tips. Welcome. Contents. Care & Maintenance

General Purpose Shelter

IMPORTANT INFORMATION DO NOT DISCARD

Transcription:

lite Step by Step Set Up Guide 1 lifting lug Secure lifting lugs to a certified lifting sling. Stand and stabilize escape system under work platform. Position module with round lunette ring facing work platform. Measure escape height from snubbing floor base to ground to ensure unit is within its allowable working height range for the Foxxhole Lite System being used. 4 static spine line x retension straps suspension strap Remove chute transport X retension straps (2) and store in accessories bag. Loosen but do not remove upper chute suspension tie down strap. Unravel the following: 1. Static Spine line (Blue rope found at top of chutes exit above hammock cradle) 2. Tugger line (found on underside of chutes exit). Ensure lines are not fouled. 2 Ensure module is stabilized by personnel in all operations. Remove one clevis from one lifting lug to allow for removal of top, front and back protective covers. Store all removed covers in a safe place. Replace and secure lifting sling clevis on to lifting lug. 5 lunette pintle hook Conduct interim safety meeting to address safety concerns, job functions, fall arrest and overhead lifting safety. No personnel shall be positioned directly under work area while lifting. Lift module with rig tugger line or picker assembly. Ensure lines are not fouled or attach them to other equipment during lifting. Position Lunette ring into open pintle hook at base of docking platform. Close and secure with locking pin. 3 swivel lug From accessories bag remove 2 anchoring turnbuckles. Install the open jaw of turnbuckle on to swivel lugs on the launch frame entrance. Attach turnbuckles with grade 8 bolts, lock washers and nuts supplied and securely wrench tighten. 6 Slant module frame away from docking platform to a 35º-45º degree angle from the entrance. Drop down the transition floor to cover pintle assembly. Ensure proper fit and secure in position.

7 rig anchor post With module positioned and install the free ends of the two turnbuckles fitted with pipe clamps to rig anchor posts. Tighten locking bolt on swivel lugs located on module frame assembly. 10 11.0 m 9.5 m 6.0 m 3 stage hammock 2 stage hammock Measurement from base of platform OPTIONAL INSTALLATION locking bolt Height measurement M-8+ design only: Auxilary static line extension for secondary and triple stage hammock deployment 8 5.0 meter air space Required lease equipment stand off from chute 9 safety chain 15 0 30 0 Snubbing Floor 15 0 5.0m 5.0m Ground Anchor Area Chute deployment working angles TOP VIEW Adjust turnbuckles to suit intended direction of drive on anchor. Turnbuckles may be lengthened or shortened to allow for up to 15 degrees left or right of centre line form exit. Install mid rail safety chains on module frame. From accessories bag Loop safety chains through D ring on each outer front side of module. Secure to work platform safety railings or other engineered structure. Adjust for tension by reducing or increasing links and secure chain loop with quick link. Determine if Static Spine line extension is required due to height of working platform. (Platform above 8.0 m to 9.5 m requires 1 extension on M-8 +, see section Static Spine line extension below.) Static Spine line connection: Fully extend turnbuckle on drive on anchor. Attach blue static spine line using carabineer to red weldless on turnbuckle. Walk anchor directly away until maximum tension can be place to Static Spine line by hand. Ensure suitable firm anchoring conditions exist on desired anchor placement on ground. Lower drive on anchor to ground while maintaining tension to Static Spine line. Static Spine line extension instalation: Remove carabineer from end of blue static spine line and attach stage extension rope from accessories bag to self locking safety hook permanently attached to original end of static spine line. Re-attach carabineer to new end of extension to Static Spine. Return to Static Spine line connection above. 11 drive on anchor Minimum 80% of vertical distance With caution stabilize drive on anchor, while front end of adequate anchoring vehicle of 3/4 ton diesel pickup or larger. Carefully directed driver to position tire in recess in middle of drive on anchor. Place vehicle in park or engage in low gear for a standard transmission. Engage park brake and remove keys to lock out location.

12 15 Angle of descent of Static Spine line from 35 to 60 degrees Tighten turnbuckle to desired Static Spine line tension (blue rope) approximately 200 lbs tension. (Firm resistance when pulled by hand.) Static Spine line should now be installed with a 35-60 degree angle of decent dependant on height. hammock support celvis static spine line tensioning chain Unravel required cradle hammock (Stage1: 6.0-8.0 m, Stage 2: 8:1-9.5 m, (Stage 3:optional system 9.6-11.0 m)). ENSURE THE FOLLOWING: 1. Run yellow web loops (6) at end of the hammock cradle over clevis U body assembly to secure closure of hammock cradle. 2. Ensure Static Spine line (blue rope) has been run through the cente of hammock cradle support clevis to suspend hammock on Static Spine line. 3. Ensure Tensioning chain is installed on clevis bolt thru chain connecting link on end of chain and secure. 13 rope brake deployment/retraction line tugger line Unravel Deployment/retraction rope from top side of module. (Rope runs through rope brake). Attach end of rope to lifting unit (Rig tugger winch or picker unit) with locking hook assembly. Pull directly upwards until line is fully extended. (Do not put tension in rope). Remove chute suspension tie down strap, store in accessories bag. Ease off rope brake. Allow lifting line to be lowered to deploy chute body down spine line till chute is hanging full extended. Relieve all tension in deployment line. Note: Auxiliary chute tugger line attached to lower section of chute exit may be required to be pulled from ground level to free up chute if binding. 16 tensioning 17 chain red weldless ring Install carabineer thru desired link of chute tensioning chain and attach carabineer to Red weldless ring. Heaviest worker to lay in hammock cradle to ensure a minimum of 10-12 inches of clearance from feet of worker within cradle hammock to ground below. Should adjustment be required for taking up slack, re run carabineer to shorten chain to chute hammock. Note: Chute system is designed specifically to be suspended on Blue Static Spine line on spiral ring assembly. Tension placed on 10-12 clearance hammock cradle and chute body by winch or mechanical means is by no means recommended. Do not remove, alter or substitute required escape system components or operations. Ensure Static Spine line has sufficient tension to allow for proper chute and evacuee suspension. Failure to do this may interfere with the safe operation of the escape chute. Visible metal support rings at end of chute body should be at a 90 degree angle to Static Spine line for a visual check for proper suspension of applied chute tension. 18 Carry out re-inspection to confirm all components are secured and ready to be placed in service. After confirmation, place unit in service and carry out daily inspections as per recommendations in Foxxhole Lite Operations Manual.

lite Chute Entry & Sliding Position Office 403 265-1866 Fax 403 265-1877 24 hour cell 403 850-7226 www.foxxhole.com 1. Step to front of chute entrance and firmly grab hand grasp at 10 and 2 o clock position. 2. Place one leg at a time step into chute, and lower your body to stretch out fully to assume initial sliding position. 3. While you release from the hand grasp to start your descent down the chute it is very important to simultaneously make your lower body ridged and lift your heels approximately 6 inches off the chutes surface by lifting your now straight legs as you point the tip of your toes backwards toward your head. (Do not bend your legs or let your feet come in contact with the chutes surface.) 4. Place your arms above your shoulders and place your hands against the back of your head with your elbows up for the entire decent. Ensure Foxxhole Lite module is handled by qualified personnel in all operations. Treat this escape unit as a PPE device. Ensure proper PPE and fall arrest equipment are being used in all set up operations that require it. Be proactive in your own personal safety, failure to do so may result in your own injury or loss of your life. USE OF WORK BOOTS WITH AGGRESSIVE THREAD SOLES IS NOT RECOMMENDED. Should any instructions be unclear, please refer to Foxxhole Operations Manual or contact Foxxhole Escape Systems Inc. prior to use of escape system. The operator and user must have complete understanding of set up and operation of the safety device prior to use.

9 8 1 7 10 11 6 12 2 4 3 5 13 Foxxhole Lite Accessories List 15 1 Accessories Bag 2 Hammock Tensioning Chain 3 Carabineer for Tension Chain 4 Hammock support clevis 5 Red Weldless Anchoring Ring 6 Anchor Tension Turnbuckle 7 Drive on Anchor 8 Launch Frame Anchoring Turnbuckles (2) 9 Spare Bolts for Turnbuckles (2) 10 Tugger Line 11 Static Spine line c/w carabineer and safety hook 12 Static Spine line extensions (2 or 3 stage) 13 Mid Safety Railing Chains and locking links (2) X retention tie down straps (2) 15 Chute suspension tie down strap (1)