Corridor Management Committee Meeting. April 2, 2014

Similar documents
Southwest LRT Alignment Video Narration

Extending TRACKS. Design and engineering effort nears completion. Animation shows how light rail will operate in Hopkins

Meeting Summary. 1. Welcome and Review of Meeting Summary

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010

Experience the Southwest Corridor

CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES

DEMOGRAPHICS AND EXISTING SERVICE

THREE RIVERS PARK DISTRICT

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS

TORONTO TRANSIT COMMISSION REPORT NO.

CHAPTER 1 TRANSIT MARKET AREAS AND EXISTING SERVICE

Community Development Committee

SCOPING INFORMATION PACKET

Creating Connections in Niagara Region

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

Meeting Summary. 1 June 5, 2017 CAC Meeting Summary

First rail. August 2011

METRO Green Line ridership has already exceeded expectations in its first month.

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

5.1 Traffic and Transportation

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

TORONTO TRANSIT COMMISSION REPORT NO.

Freeway Volume-Crash Summary

Building the transportation network we need for the future in Niagara Region

Committee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No.

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP).

1.2 Corridor History and Current Characteristics

Metropolitan Parks and Open Space Commission Subject District(s), Member(s): Policy/Legal Reference: Staff Prepared/Presented: Division/Department:

Northeast Corridor Transportation Update

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

Cell: (408) Release MA June 25, 2012

Committee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No.

Welcome. Green Line in Your Community

TAB LIAISON REPORT The TAB had not met since the 10/24/16 Transportation Committee meeting, so there was nothing to report.

APPENDIX A Route Maps and Schedules

Penny for Pasco Renewal. FY2014/15 thru FY2024/25

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

Dufferin Jog Elimination Project

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

CITY OF CHASKA PEDESTRIAN MOVEMENT / TRAILS PLAN FINAL CHAPTER 7 PEDESTRIAN MOVEMENT / TRAILS PLAN. Page 1 of 19, Chapter 7

Mission Statement. Spur 601 Project Highlights

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

ACTION TRANSMITTAL

Aviation, Rail, & Trucking 6-1

Business Item No

TORONTO TRANSIT COMMISSION REPORT NO.

5101 Shady Oak Road. Shady Oak Road. Lake Views

FHWA Actions on Past Interstate Requests that were approved by the USRN were presented and conditions were lifted. FHWA Approval Date

2009 Regional Solicitation Selected Projects*

Hennepin County 2040 Bicycle Transportation Plan. Appendix D. Full list of planned bikeway system corridors

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Section 4(f)/6(f) Determination Technical Report for Park and Recreational Lands

5101 Shady Oak Road MINNETONKA, MN. Shady Oak Road. Lake Views

Arvidson, Adam R. Adam,

2. RESOLUTION TO CLOSE MEETING

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

Gophers and Vikings Service

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

Active Living Partners. Trails. Hennepin County. Bloomington. Brooklyn Park. Crystal. Excelsior. Golden Valley. Hopkins. Independence.

Union Station Rail Corridor East

Update Report - Etobicoke Creek and South Mimico Creek Trails

Segment 2: La Crescent to Miller s Corner

Transportation Supporting Dulles Airport

About the Foothill Gold Line

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study

Report to the Strategic Development Committee

Item # 28. Chief Capital Management Officer Report. November 20, 2008

A number of goals were identified during the initial work on this Big Lake Transportation Plan.

FEASIBILITY CRITERIA

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

25 th Avenue Grade Separation. Community Meeting November 13, 2018

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

MUNICIPAL TRANSPORTATION AGENCY City and County of San Francisco. BRIEF DESCRIPTION: Approving traffic and parking modifications itemized below

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014

Lake Erie Commerce Center Traffic Analysis

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

Baker/Carver Regional Trail master plan public review draft

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

Head to University Avenue and save!

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

Part Three : COMMUNITY PLAN AREAS AND SPECIAL STUDY AREAS SACRAMENTO 2030 GENERAL PLAN. Introduction

Draft for approval by TCC on 2/3, TAQC on 2/9 and ARC Board on 2/22. Regional Trail Plan. Mike Alexander, Director, Center for Livable Communities

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

A RESOLUTION NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EL PASO THAT:

The Light Rail System Safety & Grade Crossing Equipment

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

Transportation TRANSPORTATION PROJECTS

Raytown: overview. map. Santa Fe, Oregon, and California National Historic Trails KANSAS CITY KANSAS CITY. 38 Trail alignments: Raytown.

REQUEST FOR PLANNING COMMISSION ACTION

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Basic Project Information

MARTA & City of Atlanta Sales Tax Referendums. Public Hearings May 25 & 26, 2016 June 1 & 2, 2016

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Update on Trinity Trails. Presented by: Richard Zavala, Director Park and Recreation Department February 7, 2017

Construction Staging Adelaide Street West

Transcription:

Corridor Management Committee Meeting April 2, 2014 1

Today s Topics Welcome Approval of Minutes Resolutions Response to March 26 CMC Questions Staff Recommendation on Project Scope and Budget Public Testimony CMC Discussion and Recommendation Adjourn 2

Commissioner Dorfman and Beth El Synagogue Resolutions 3

Response to March 26 CMC Questions 4

Staff Recommendation on Project Scope and Budget 5

Staff Recommendation Technical Issue #1: Retain Mitchell Road Station in Eden Prairie Technical Issue #21: Shallow LRT Tunnels over Channel in Kenilworth Corridor with a 2019 Opening 6

Eden Prairie Alignment to Mitchell Road 7

Southwest Station in Eden Prairie 8

Shallow LRT Shallow LRT Tunnels withtunnels Bridge Over Channel 9

Kenilworth Shallow LRT Tunnel at South End 10

Kenilworth Shallow LRT Tunnels with LRT Bridge Over Channel 11

Kenilworth Shallow LRT Tunnels with LRT Bridge Over Channel 12

Kenilworth Shallow LRT Tunnels with LRT Bridge Over Channel 13

Recommended Project Budget SWLRT Budget: $1.673B - $1.683B Cost Drivers: 16 stations, 15.8 miles of LRT with Mitchell Road Station serving as the westernmost station Shallow LRT tunnels in Kenilworth Corridor with LRT bridge over channel Advancing construction one year/opening 2019 14

Municipal Consent Schedule and Key Milestones 15

Project Scope and Budget 4/2 Corridor Management Committee Public Testimony Recommendation on Scope and Budget 4/2 Met Council Committee of the Whole Informational Item 4/9 Met Council Public Testimony Adopt Scope and Budget 16

Municipal Consent Process Met Council Submits Municipal Consent Plans to Cities and County At least 30 days Met Council / Hennepin County Regional Railroad Authority Hold Joint Open House and Public Hearing Week Of: May 12, 2014 Within 45 days Cities/County Approve Plans within 45 Days of the Met Council/Hennepin County Regional Railroad Authority Joint Open House and Public Hearing Apr 10, 2014 Cities hold Open House and Public Hearing after 30 Days of Met Council Plan Submittal Deadline: June 29, 2014 Starting Week Of: May 19, 2014 17

SWLRT Key Milestones: April 2014 Project Milestone April 2014 METRO Green Line Opening June 14, 2014 Met Council Approval Q2 2014 Municipal Consent Q2 2014 Final Engineering Q2/Q3 2015 Full Funding Grant Agreement Q2/Q3 2016 Revenue Operation 2019 18

Public Testimony 19

Public Testimony Names will be called by sign-up order Please state your name and if representing a group, your group s name Individuals will have up to 3 minutes Groups will have up to 5 minutes 20

CMC Discussion and Recommendation 21

More Information Online: www.swlrt.org Email: SWLRT@metrotransit.org Twitter: www.twitter.com/southwestlrt 22

Southwest Corridor Management Committee Resolution April 2, 2014 WHEREAS: 1. Hennepin County Regional Railroad Authority served as the lead agency of the Southwest Light Rail Transit (Green Line Extension) project since the 1980 s; and 2. The Metropolitan Council established the Corridor Management Committee (CMC) in 2010 to advise the Council in the design and construction of the Southwest Light Rail Transit (SWLRT) project; and 3. Commissioner Gail Dorfman served on the CMC as a representative of the Hennepin County Regional Railroad Authority; and 4. Commissioner Dorfman has championed the development of the SWLRT project through serving on the CMC and as Chair of Hennepin County s Southwest Steering Committee; and 5. Commissioner Dorfman is a champion of creating balanced regional transportation system that serves residents through walking, biking, driving and transit; and 6. Commissioner Dorfman served as the Hennepin County Commissioner for the 3rd District which encompasses southwest Minneapolis and all of the City of St. Louis Park since March 1999; and 7. Commissioner Dorfman will continue to promote the public good by serving as Executive Director of St. Stephen s Human Services; one of the largest providers of services to the homeless in the Twin Cities metropolitan area. NOW, THEREFORE: BE IT RESOLVED, that the Corridor Management Committee thanks Commissioner Gail Dorfman for her service on the CMC and her commitment to the Southwest LRT project; and BE IT FURTHER RESOLVED, that the Corridor Management Committee congratulates and wishes Commissioner Gail Dorfman the best in her future endeavors.

April 2, 2014 Southwest LRT Corridor Management Committee Resolution WHEREAS: 1. Community partners have played a vital role in the development of Southwest LRT. 2. The project has seen a critical need for larger meeting facilities with appropriate accommodations arising for the Corridor Management Committee (CMC) meetings. 3. Beth El Synagogue is situated in a central location near the proposed Southwest LRT line making meetings more convenient and accessible for CMC members and the public. 4. Beth El Synagogue accommodates the CMC and its guests by making changes to their normal operations, so that Southwest LRT meetings run smoothly. 5. Beth El Synagogue accommodates additional meeting dates with short notice. 6. Staff time for meeting set-up, pre-event coordination and logistics is donated by Beth El Synagogue 7. Beth El Synagogue Facilities Director Peggy Kerska consistently goes above and beyond expectations in her responsiveness, professionalism, kindness, flexibility, and attention to detail. THEREFORE: BE IT RESOLVED, that the Corridor Management Committee extends its thanks and appreciation to the staff, clergy, and congregation of Beth El Synagogue for graciously hosting Southwest LRT meetings.

April 2, 2014 Option 1 DRAFT ATTACHMENT A Southwest LRT Project Scope Technical Issue #1 Eden Prairie Alignment Comp Plan Town Center Station with a 160 stall surface park and ride (on property to be leased) ending at Mitchell Road Station via Technology Drive with a 440 stall parking structure at Southwest Station and a 900 stall parking structure at Mitchell Road Station. Southwest Transit express and local bus operations remain. Technical Issue #2 9 Mile Creek Crossing Alignment includes an LRT bridge over Flying Cloud Drive, avoiding impacts to charter school and minimizing property impacts. Technical Issue #3 Golden Triangle Station Golden Triangle Station platform located north of 70 th Street and includes a 271 stall park and ride surface lots east and south of the station platform (on property to be leased). Technical Issue #4 Shady Oak Road and TH 212 Crossings LRT crosses Shady Oak Road and TH212 on a single bridge from the Golden Triangle Station to the west side of TH 212, accommodating City of Eden Prairie s interchange improvements at Shady Oak Road/TH 212. Technical Issue #5 City West Station and TH 62 Crossing City West Station platform located at grade adjacent to United Health Group development and TH 62 and includes a 165 stall surface park and ride. Includes a cut and cover tunnel under TH 62 from City West into the Opus development. Technical Issue #6 Opus Station Opus Station platform located south of Bren Road West on the east side of Bren Road East with a 98 stall surface park and ride (on property to be leased). Includes trail connections to the platform from both adjacent roadways. Technical Issue #7 Opus Hill/Minnetonka-Hopkins Bridge Alignment runs along Opus Hill (between Bren Road West and Smetana Road) minimizing wetland impacts and realigns the intersection of Smetana and Feltl Roads. Includes 3,200 long, 120 - span prestressed beam bridge over the wetlands south of the Canadian Pacific Bass Lake Spur Rail alignment and over the CP line towards K-Tel Road. 1

April 2, 2014 Option 1 DRAFT ATTACHMENT A Technical Issue #8 Shady Oak Station Shady Oak Station platform located north of the Minnesota River Bluffs LRT Regional Trail with a 500 stall surface park and ride and minimizing property impacts. Extends 17 th Avenue from Excelsior Boulevard south into the park and ride and to the station. Technical Issue #9 PEC-West & PEC East Interface Interface point between West and East segments located 100 east of 11 th Avenue in Hopkins. Technical Issue #10 Downtown Hopkins Station Downtown Hopkins Station platform located east of 8 th Avenue. Bus stop and layover on Excelsior Boulevard. No park and ride at station. Technical Issue #11 Excelsior Boulevard Crossing LRT bridge over Excelsior Boulevard and extended to allow for LRT alignment to be placed on the southerly portion of the corridor with CP Bass Lake Spur freight tracks located north of the LRT tracks and the Cedar Lake LRT Regional Trail located north of the CP tracks. Technical Issue #12 Blake Station Blake Station platform located west of Blake Road on the southern portion of the corridor. Includes a 477 stall structured park and ride south of the station with potential joint development. Includes access to the park and ride structure from Excelsior Boulevard via Pierce Avenue. Technical Issue #13 Louisiana Station Louisiana Station platform located east of Louisiana Avenue and north of Oxford Street. LRT crossing of Louisiana Avenue is grade separated on a new LRT bridge structure. Includes a 268 stall surface park and ride utilizing the properties acquired for the station platform and tracks. Technical Issue #14 Wooddale Station Wooddale Station platform located just east of Wooddale Avenue on the southern portion of the corridor. No park and ride at station. Technical Issue #15 TH 100 Crossing Freight bridge relocated from the southern portion of the corridor to the north of the LRT tracks. New double track LRT bridge constructed on the southern portion of the corridor utilizing existing freight bridge abutments. Trail bridge remains on the northern portion of the corridor. 2

April 2, 2014 Option 1 DRAFT ATTACHMENT A Technical Issue #16 Beltline Station Beltline Station platform located east of Beltline Boulevard on the southern portion of the corridor. Includes a 541 stall surface park and ride east of Beltline Boulevard north of the platform. Bus stop and layover located within surface park and ride area. Includes grade separated trail over freight and LRT east of the station. Technical Issue #17 West Lake Station West Lake Station platform located south of the West Lake Street Bridge. Bus stop located on the West Lake Street bridge and additional bus stop and layover located on Abbott Avenue/Chowen Avenue east of station platform. No park and ride at station. Vertical circulation is included from both sides of the bridge to the station platform level. Technical Issue #18 Kenilworth Corridor LRT alignment within two shallow LRT tunnels from West Lake Street bridge to a point south of the Kenilworth Channel and from a point north of the Channel to a point approximately 1,000 north of 21 st Street. The gap between the south and north tunnels includes an LRT bridge structure over the Kenilworth Channel. Cedar Lake Parkway and 21 st Street have freight tracks and trail at-grade as exists today. 21 st Street Station is eliminated. Technical Issue #19 Bassett Creek Valley Corridor Penn Station platform located south of I-394 with vertical circulation and a pedestrian walkway from Penn Avenue. Includes a grade separated trail connection to the North Cedar Lake Regional Trail. No park and ride at station. Van White Station located under newly constructed Van White Boulevard Bridge with vertical circulation to connect to the east side of the bridge. Bus stop and layover provided south of platform with access to Linden Avenue and Van White Boulevard at I-394. No park and ride at station. Technical Issue #20 Royalston Station Royalston Station platform located south of 5 th Avenue North on the east side of Royalston Avenue. LRT alignment includes at-grade crossings at both Glenwood Avenue and Holden Street intersection with a bridge over 7 th Street North to connect with the Interchange Project. No park and ride at station. Technical Issue #21 Freight Rail Co-location Freight rail is on the CP Bass Lake Spur with a horizontal alignment shift that places the freight rail track north of the LRT tracks from a point east of the crossing at Excelsior Boulevard to West Lake Station. Removal of the north half of the Skunk Hollow switching wye and a new freight rail southerly connection from eastbound CP Bass Lake Spur to the southbound CP MN&S Spur are included. The freight rail 3

April 2, 2014 Option 1 DRAFT ATTACHMENT A alignment matches existing conditions through the Kenilworth Corridor except for a horizontal alignment shift between Cedar Lake Parkway and the Burnham Road bridge. Freight track is on a new bridge structure over the Channel and is shifted approximately 40 feet to the west of the existing freight track. LRT alignment is within two shallow LRT tunnels in the Kenilworth Corridor and on a bridge structure over the Kenilworth Channel. Technical Issue #23 Operation & Maintenance Facility Facility located in Hopkins south of 5 th Street and east of the LRT alignment. The facility is also bounded by the CP Bass Lake Spur to the south and 15 th Avenue to the east. The site design limits property impacts and offers redevelopment opportunities. 4