Aberdeen Exhibition and Conference Centre

Similar documents
Annual Review Managing Director s review. Our Team. Henry Boot Developments 2017

DEVELOPMENT MAP 2017/18

Bartlett Square Welcome. Investment Framework. London Airport Ltd

Greenwich Peninsula Investor and Analyst Day 12 March 2013 Quintain Estates and Development PLC

Muse Developments helps Morgan Sindall Group's results

Annual Review

2006 Preliminary Results. 7 March 2007

Harrogate Road, Eccleshill, BD2 3NS

grade A space grade a location FOR SALE TO LET

Business Park Luton. High quality business space available within an attractive parkland setting

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Gateway. Leeds. A new national centre for logistics & manufacturing. TO LET Ready for immediate development M1/J45 LEEDS LS9 0PS

MERIDIAN DELTA LTD BRIEFING DOCUMENT

Enterprise Way. The new Airport City link road. June 2017 Progress Update

40 ACRE HIGH PROFILE DEVELOPMENT SITE

Welcome & Introduction. Steve Sawyer, Executive Director Manor Royal Business District

LONGBRIDGE WEST COMMERCIAL COFTON PARK PARK VIEW RESIDENTIAL 66 MILLION BOURNVILLE COLLEGE. teaching 3,500 students in a range of industries

Kier Group plc. Preliminary results presentation. 14 September 2006

grade A space grade a location FOR SALE TO LET

BUSINESS PARK. Distribution. Manufacturing. Office. Retail. Leisure THE PARK WITH A POINT WIGAN S NEWEST BUSINESS PARK

Richard Starkey CFO Crosby Lend Lease Investor Roadshow UK / US May 2006

Northern Powerhouse Developments

Great Portland Estates Trading Update Strong Operational Performance

FREEHOLD FOR SALE Residential Development Opportunity. Manor and Tindal Sites, Bierton Road, Aylesbury, HP20 1HU

November Track Record BERICOTE. Developing across the UK

DEXUS Property Group (ASX: DXS) ASX release

Steve Winterflood. i54 - Manufacturing, Export Led, Major Investment outside of London

LEEDS. INNOVATIVE INFRASTRUCTURE DELIVERY Creating a catalyst for regeneration and unlocking investment opportunities. Leeds Railway Station

The dawn of one of the region s best connected industrial & logistics developments.

WIGAN PIER. Exciting new retail and leisure development, at the heart of the regeneration of the Wigan Pier Quarter QUARTER

The dawn of one of the region s best connected industrial & logistics developments.


Analyst Site Visit. 10 th November 2004

IPSWICH MEANS BUSINESS

SUFFOLK PARK BURY ST EDMUNDS IP32 7QB NEW INDUSTRIAL AND LOGISTICS PARK. BUILD-TO-SUIT OPTIONS FROM 50, ,000 sq ft suffolk-park.

Build to suit 20,000 sq ft 600,000 sq ft Distribution and Industrial units Junction 28, M1 45 acre site

LIVE. WORK. PLAY. STATUS OF DEVELOPMENT SPRING Produced for information by the City of Markham

Bolton Council Invest in Bolton. Welcome INVEST IN

Falcon Quarter Offers an opportunity to acquire a unique town centre development in Huntingdon, Cambridgeshire.

WELSH ROAD NORTHERN GATEWAY DEESIDE ACRE PRIME DEVELOPMENT SITE NAV: CH5 2RD

SUFFOLK PARK BURY ST EDMUNDS IP32 7QB NEW INDUSTRIAL AND LOGISTICS PARK. BUILD-TO-SUIT OPTIONS FROM 50, ,000 sq ft suffolk-park.

QUEENS CENTRAL RETAIL & LEISURE OPPORTUNITIES OVER 200,000 SQ FT RETAIL + LEISURE + COMMERCIAL QUEEN STREET PRESTON PR1 4HZ

Create your future at Hillington Park

About Us. 3 Dagenham Dock

317a & 400 Hoe Street, Walthamstow, E17 9AA

PPP DATABASE Strategic Service-Delivery Partnerships for local authority ICT, corporate and technical services in Britain.

Development Finance Explained

SHS secures modular construction contracts worth S$28 million in New Zealand

A place for everyone. Brand new office, retail and leisure opportunities; welcome to the most exciting mixed-use development in the north east.

Property company specialising in mixed use investment and development. visit

Freehold Car Dealership Investment FORD, VICARAGE LANE, BLACKPOOL, FY4 4ES

ONE PARK SQUARE TO LET LONGBRIDGE BIRMINGHAM B31 2TW COMING SOON. longbridgebirmingham.co.uk. HEADQUARTER OFFICES Up to 86,000 sq ft

FULL PLANNING PERMISSION FOR NEW BUILD UNITS UP TO 2,304 SQ M (24,798 SQ FT) WITH MEZZANINE CAPABILITY

LISBON STREET, LEEDS LISBON STREET, LEEDS DEVELOPMENT OPPORTUNITY

Mine Production and Shipping

ASCOT SUBURB PROFILE

UNION STREET ABERDEEN AB11 6BB RETAIL INVESTMENT OPPORTUNITY

For Sale. Hunts Court, Corporation Street, Taunton, Somerset. Leisure Investment Opportunity

Caloundra South overview Ben Allen, General Manager Sustainable Communities

TO LET AVAILABLE Q3 2016

Xchanging Block C, Fulwood Park, Caxton Road, Fulwood, Preston PR2 9NZ

Convention Centre Proposal. Have your say before we make a final decision later this year.

Virtual Freehold Leisure Investment Kiss Gyms, Paramount Building, Princes Street, Swindon, SN1 2SD

Sedgley Park. George Street, Mountheath Park, Prestwich M25 9WS. > Home. Site Description. Site Plan. Gallery. Enquiries

ENABLING PROJECTS TOWN PLANNERS RESIDENTIAL AND MIXED USE SCHEMES

DONINGTON COURT UNIT 2A DONINGTON COURT PEGASUS BUSINESS PARK CASTLE DONINGTON DE74 2UZ

ICN Gateway Breakfast (SA) Jon Whelan A/Manager Project Delivery 9 July 2015

RED BOX QUARTER BLACKPOOL S RETAIL, LEISURE & RESTAURANT DESTINATION

M6 CORRIDOR. Strategic Infrastructure Prospectus

symmetry park Aston Clinton / A41 PHASE 1 M25 / J20 UNDER CONSTRUCTION READY Q NEW INDUSTRIAL / WAREHOUSE BUILDINGS

Design and Build. New Industrial Warehouse Opportunities. Up to 1 million sq ft (92,903 sq m)

194,196 & 198 COMMERCIAL ROAD PORTSMOUTH

A GREAT PLACE TO INVEST. wearedoncaster.co.uk

West of England. Priority Places Requiring Public Investment

PRINCEGATE HOUSE DONCASTER, DN1 3EN. Well Located Strategic Investment/Development Opportunity with Short Term Government Income

PARK CRESCENT LUTON LONDON. The best of both worlds.

NEW LOGISTICS / MANUFACTURING / DESIGN & BUILD OPPORTUNITIES UP TO 450,000 SQ FT APPROX. ON 39 ACRES

FOR SALE Land at Mill Lane, Taplow, Buckinghamshire, SL6

NEW BUILD AND DESIGN & BUILD OPPORTUNITIES UP TO 155,000 SQ FT

Enterprise and Business Scrutiny Panel

ON BEHALF OF CENTRAL BEDFORDSHIRE COUNCIL DEVELOPMENT OPPORTUNITY DOWNING VIEW, 1-3 LORING ROAD, DUNSTABLE LU6 1DZ

A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement

Property Investment Guide: Leicester

30 YEARS: A GENERATION OF REGENERATION ONE PARK SQUARE HQ OFFICES AT LONGBRIDGE UP TO 86,000 SQ FT

investment ProSPeCTuS 2016 SuMMary

230,000 89,000. Build to suit 20,000 sq ft 600,000 sq ft Distribution and industrial units. Junction 28, M1 45 acre site.

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government

Press Release Regulated Information. Trading Update

Site ha (3.53 acres) Site ha (4.08 acres) To M56 & Chester

Dransfield Properties Marshall s Yard Gainsborough. Transforming a Lincolnshire Market Town

PETROSEA RESULTS FOR THE PERIOD ENDED 30 SEPTEMBER 2017

FOR SALE CAR SHOWROOM INVESTMENT

Opportunity for up to 2 million sq ft for Offices, Research & Development, Warehousing, Production and sustainable uses

Leicester. Leicester. Commercial Park. 95,978 sq ft of warehouse / distribution space

PCAL Case Study Retail Areas: Rouse Hill Town Centre

Message from the Managing Director... r...

Queensland Budget. August 2017

Fellow of the Royal Institution of Charted Surveyors (FRICS) since Member of the Royal Institution of Charted Surveyors (MRICS) since 1986

87-91 Albion Street & 23 Butts Court, Leeds LS1 6AG. Prime Mixed use Investment with Asset Management Opportunities

EVENT CENTRE / ARENA COMPLEX

Transcription:

Aberdeen Exhibition and Conference Centre

Aberdeen Exhibition and Conference Centre 2 Progress to date and future projects David Anderson Managing Director

Aberdeen Exhibition and Conference Centre 3 Our activity We operate nationally via our six regional offices including our newly opened Birmingham office. Our multi-sector activity continues within the industrial & logistics, office, retail & leisure and residential sectors, primarily on a demand led basis. A high proportion of our schemes are joint ventures with both public bodies and private landowners. The majority of our projects are pre-let and / or forward funded. Our retained investment property portfolio is currently valued at 130 million, generating an annual rental return of over 7% p.a.

Aberdeen Exhibition & Conference Centre 4 Current and future projects Our current projects have a total estimated GDV of 900 million including 360,000 sq ft of industrial schemes at Markham Vale, Derbyshire, Luton and Southend. Residential led projects in York, Manchester, Skipton and Huddersfield are delivering over 1,000 units. 315,000 sq ft of new pre-let and D&B schemes agreed in 2018 to date with a GDV of over 35m million. 8 new near term development projects secured over the last 12 months including 100,000 sq ft office development in Manchester and JVs controlling over 680 acres of employment land in Wakefield, Sunderland, Enfield, Taunton, Walsall and Preston. These schemes are capable of delivering over 8 million sq ft of space with a GDV of over 1 billion.

Aberdeen Exhibition and Conference Centre 5 Montagu 406 Enfield 20 Year 50:50 JVC with London Borough of Enfield 29 acre existing employment site predominantly in the ownership of LBE Phased redevelopment providing c.650,000 sq ft of new industrial space Completed investment to be managed and retained by the JVC Initial development of 70,000 sq ft targeted for early 2019 Forecast GDV 130 million+

Aberdeen Exhibition and Conference Centre 6 IAMP North East JV with Sunderland City and South Tyneside Councils 370 acre employment site with the ability to deliver up to 4 million sq ft Adjacent to Nissan and targeted at the Nissan supply chain 40m LEP infrastructure funding with phase one commencing Q3 2018 Potential GDV of up to 450 million

Aberdeen Exhibition and Conference Centre 7 Nexus Business Park Taunton 20 year drawdown option agreement Located at Junction 25 of the M5 motorway 146 acres gross with 65 acres of net developable land Allocated for industrial, business, showroom and ancillary uses Highways England funded infrastructure commences Q4 2018

Aberdeen Exhibition and Conference Centre 8 Nick Harris Director

Aberdeen Exhibition and Conference Centre 9 How did we get from here...

Aberdeen Exhibition and Conference Centre 10...to here?

Aberdeen Exhibition and Conference Centre 11

Aberdeen Exhibition and Conference Centre 12 Aberdeen City Council s (ACC) development partner procurement process 19 June 2012 OJEU notice issued 20 July 2012 PQQ submission date 3 September 2012 Shortlisted bidders conference 4 September onwards Dialogue period begins 12 October 2012 Invitation to participate in dialogue 28 March 2013 Invitation to submit a detailed solution 26 August 2013 Final tender 6 January 2014 Formally announced as preferred development partner 4 March 2015 ACC approved the 333m spend on new facility 4 July 2016 Site purchased and contractor mobilised to commence construction

Aberdeen Exhibition and Conference Centre 13 AECC at The Rowett

Aberdeen Exhibition and Conference Centre 14 AECC at The Bridge of Don

Aberdeen Exhibition and Conference Centre 15

Aberdeen Exhibition and Conference Centre 16 Primary Site Emergency/Egress Subterranean Space Anaerobic Digestion Plant Secondary Access/Egress Surface Car Park Business Space (Class 4)/ Leisure (Class 11) Business Space (Class 4)/ Leisure (Class 11) Burn Parkland Energy Centre AECC Building Secondary Access/Egress Central Square Hotels (Class 7) Overspill Car Park/ Recreational Area

Aberdeen Exhibition and Conference Centre 17 Design evolution

Aberdeen Exhibition and Conference Centre 18 Phase 1 Development AECC, Energy Centre (& Anaerobic Digestion Plant), Hotel 1 (Hilton by Hilton), Hotel 2 (Aloft by Starwood/Marriot) & all infrastructure works. Phase 2 Development 10 year development agreement on 30 acre business park adjacent to new AECC. 10 year development agreement on 45 acre original AECC site now has planning permission for 521 residential units. Both activated upon completion of new AECC development.

Aberdeen Exhibition and Conference Centre 19 Nigel Munro Regional Project Manager

Aberdeen Exhibition & Conference Centre 20 Contractor Procurement Two stage design and build route. In depth contractor involvement in the design process, buildability and value engineering advice. Open book approach to the sub-contract tenders. Contractor works with the client team and so less chance of unpleasant surprises down the line. Large fixed element. Final price based on more design.

Aberdeen Exhibition and Conference Centre 21 Project overview 270m Infastructure AECC 10m 148m Subterranean 35m Construction value Hotel 1 34m Hotel 2 18m Energy Centre 25m Total 270m

Aberdeen Exhibition & Conference Centre 22 Construction challenges Limited RRI access pre-construction Extensive demolition Utility diversion Ground conditions and weather Resources Delivering on programme

Aberdeen Exhibition & Conference Centre 23 Construction challenges Earthworks Topsoil strip 150,000m 3 Cut / fill 400,000m 3 Screening 50,000m 3 Crushing 10,000m 3 Modification/stabilisation 100,000m 3 Imported capping 30,000m 3

Aberdeen Exhibition & Conference Centre 24 Resources Oil industry factor but diminished Geographical location Affordable accommodation Peak labour anticipated of 650 Actual peak July 2018 of 780 achieved because: Well run site Good facilities Profitable work Accommodation allowances made Prestige of the project

Aberdeen Exhibition & Conference Centre 25 July 2018 Despite the challenges the project is on programme. A S O N D J F M A M J J A High level of confidence that PC will be on or before the target. Works to complete. Shell Internal Fit Out Energy Centre PC Hotels Hard and Soft Landscaping Snag/Test/Commission