GALVESTON DISTRICT Dredging Schedules

Similar documents
USACE GALVESTON DISTRICT PROJECT UPDATE

MARCH 2014 HYDROGRAPHIC REPORT

SAME/SBA CONFERENCE. Col. Christopher W. Sallese Commander, Galveston District U.S. Army Corps of Engineers April 11, 2012

GALVESTON DISTRICT O&M NAVIGATION MISSION & RESPONSE TO HURRICANE HARVEY

2012 Texas Water Conservation Association Meeting

TEXAS PORTS Value to the Nation

U.S. Army Corps of Engineers Wilmington District

MOBILE DISTRICT 2018 DREDGING PROGRAM

SAND TIGER SHARK (SoC)

Engineering With Nature Geographic Project Mapping Tool (EWN ProMap)

SAN FRANCISCO DISTRICT FY 2018 NAVIGATION PROGRAM

Jason J. Hull, P.E. Director of Engineering. Port Freeport 1100 Cherry Street Freeport, Texas

30 November Randall G. Hintz Chief, Operations Support Branch Operations Division. US Army Corps of Engineers BUILDING STRONG

Sabine Neches Waterway: Smiths Bluff to Beaumont Turning Basin

Baltimore Harbor & Channels, Maryland and Virginia

Manson Construction Co.

State of the Waterway 2017

Texas Port Profiles Updated March 2017

Panama Canal Stakeholder Working Group Meeting

Inner Harbor Navigation Canal Lock. Victor A. Landry III Operations Manager, GIWW New Orleans District U.S. Army Corps of Engineers

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015

Riverine Sand Mining/Scofield Island Restoration (BA-40)

Terminal Symposium February Houston Traffic

DREDGED MATERIAL DISPOSAL HISTORY AVOCA ISLAND LAKE

Norfolk District North Atlantic Division

Norfolk District North Atlantic Division

Operations and Maintenance Funding Allocation via Navigation Systems Optimization

Bigger, Deeper, Wider

State of the Waterway 2017

Louisiana BUILDING STRONG

PORT OF CORPUS CHRISTI BUILDING FOR THE FUTURE

NEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA. Christopher Hamilton May

Physical Oceanographic Real-Time System (PORTS ) Funding Model

The Mississippi River Commission. History of the Management of the Mississippi River. US Army Corps of Engineers BUILDING STRONG

Presented to: City of Petaluma City Council

Waterway Access and the Atlantic Intracoastal Waterway in Florida

Appendix N MAINTENANCE DREDGING STATEMENT OF NEED & PERMIT COMPLIANCE. North Thousand Islands Management Plan Appendices

State Five Year Tonnage Trend. Shipping Tons Receving Tons Within Tons Total Tons

Updated: Feb. 15, 2011

2. The EPA provided the following information regarding EPA s activities in Newark Bay during the meeting:

SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012

St. Augustine Port, Waterway & Beach District. St. Augustine Inlet 2013 draft Inlet Management Plan. March 19, 2013

ACEC/MW and ACEC/MD. Maryland Port Administration. Steve Johnson. June 6, 2017

Water Resources Update after NCGA Long Session

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

Funding for Inland Waterways

The History & Management of the Atlantic Intracoastal Waterway in Florida

Port Terminal Railroad Association Prepared for Transportation Sustainability

TGS CEDAR PORT INDUSTRIAL PARK

Cleveland Harbor Dredged Material Management

Great Lakes Navigation System Dredging Update

NC Dredge Studies NCBIWA Spring Conference April 23, 2018

NC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018

Ohio Freight Conference Great Lakes Commercial Navigation

Preservation & Restoration of the Houston Region s Green Fabric: The Role of the Harris County Flood Control District

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

Waterways Council November 10, 2017

BENEFICIAL USE OF DREDGED MATERIAL DISPOSAL HISTORY HOUMA NAVIGATION CANAL, LA

DIVISION BULLETIN NO. 2

The Potential Impacts of the Panama Canal Expansion on Texas Ports Final report PRC 17-78

Delivering the Goods: Ports in the South

26 HOUSTON HISTORY Vol.12 No.1

www: vermilionparishpolicejury.com

John Wood Chairman. Port of Brownsville

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

Abandoned Vessel & Structure Removal Program

Great Lakes Navigation System Dreding Update

Southwest Agribusiness Consulting, Inc.

Proposed Cherry Grove Canals Dredging Project

STATUS OF THE COALITION. Chuck May, Chair Pro Tem

TOTAL DOMESTIC TRADE RANK TOTAL FOREIGN TRADE

Board of Trustees of the Galveston Wharves June 23, 2008 Meeting

PRESENTATION ON CAIRNS SHIPPING DEVELOPMENT PROJECT

Great Lakes Navigation System Buffalo District

Buffalo District Navigation Program Overview

Superstorm Sandy: State of New Jersey Waterway Debris Removal Project. ~For Official Use Only~

PORT OF MATAMOROS ADMINISTRACIÓN PORTUARIA INTEGRAL DE TAMAULIPAS, S.A. DE C.V. H. MATAMOROS, TAMAULIPAS.

Great Lakes Navigation System

REMARKS: All depths are in reference to Mean Low Water (MLW). Channel Length is in nautical miles.

March 2, The Honorable Mayor Williams D. Sessoms, Jr. Members of City Council. Subject: Coastal CIP Presentation to City Council - March 6, 2018

BOARD OF TRUSTEES OF THE GALVESTON WHARVES Tariff Circular No. 6

Great Lakes Navigation System Buffalo District

Port of Kalama, New Approach to Maintenance Dredging

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

DIVISION BULLETIN NO. 2

BOARD OF TRUSTEES OF THE GALVESTON WHARVES Tariff Circular No. 6

Economic Impacts of Beach Nourishment in Texas

Philadelphia Regional Port Authority. Channel Deepening Briefing to the Delaware Valley Goods Movement Task Force Our Port Our Legacy

Port Everglades Overview

Great Lakes Dredged Material Management

INNOVATIVE MARINE DESIGNS PND ENGINEERS, INC. January 14, 2016

Galveston County. Population: 322,225 (2015 est.) Access to 2 deep water ports. Location of a world class industrial complex

Great Lakes Navigation System

Mr. Jeff Keever Deputy Executive Director Virginia Port Authority May 2, 2012

The U.S. Waterway System 2014 TRANSPORTATION FACTS & INFORMATION

Figure 7. Dragline at Cape Coral, Figure 8. Cape Coral oblique aerial photograph, 1959.

HARBORS & NAVIGATION COMMITTEE AND QPI MEETING SEP 27 28, 2018

Great Lakes Navigation

2011 Great Lakes Waterways Conference

Transcription:

GALVESTON DISTRICT Dredging Schedules Christopher Frabotta Chief, Navigation Branch Southwestern Division - Galveston District November 2, 2016 Galveston District Dredging Meeting Custodians of the Texas Coast US Army Corps of Engineers

GALVESTON DISTRICT FACTS ü Texas #2 in Nation in Maritime Commerce ü Texas Ports moved 538M+ tons at $320B in 2014 ü Galveston District Ports National Rank ü Houston (2) ü Beaumont (4) ü Corpus Christi (6) ü Texas City (15) ü Port Arthur (20) ü Freeport (32) ü Matagorda (48) ü Galveston (52) ü Brownsville (67) Galveston District Dredging Meeting ü Victoria (70) Custodians of the Texas Coast ü Gulf Intracoastal Waterway (3) ü GIWW-TX 73M+ tons at $43B in 2014 ü 21.8% Nation s Import/Export/Domestic Tonnage üus 23.9% of Nation s Total Export tonnage Army Corps of Engineers übuilding 29.6% of Nation s Total Import tonnage STRONG 50,000 square miles

GALVESTON VIGATION OM FUNDING FY-16 Execution President s Budget $110,404,000 FY-16 Allocation $151,869,000 Carry-in $ 21,837,000 Available to Obligate $173,706,000 Obligated ~$161,000,000 Percent Execution ~93% FY-17 Funding Outlook President s Budget $107,815,000 Carry-in $ 13,727,000 Total Anticipated $121,542,000

GALVESTON DISTRICT INITIATIVES Continue Hydrographic Survey Webpage All six (6) Deep Draft Navigation Complexes now online Gulf Intracoastal Waterway & Tributaries also online Implement of Vertical Datum Conversion Sabine-Neches Waterway Set-Back Policy Restore TCOON Functionality to 30 Stations Bring new Sentinel Stations online Re-Space & Deploy new GIWW Mooring Buoys

Galveston District Hydrographic Survey Website http://www.swg.usace.army.mil/missions/navigation.aspx 5

Galveston District Hydrographic Survey Website 6

Galveston District Hydrographic Survey Website 7

GALVESTON DISTRICT INITIATIVES Continue Hydrographic Survey Webpage All six (6) Deep Draft Navigation Complexes now online Gulf Intracoastal Waterway & Tributaries also online Implement of Vertical Datum Conversion Sabine-Neches Waterway Set-Back Policy Restore TCOON Functionality to 30 Stations Bring new Sentinel Stations online Re-Space & Deploy new GIWW Mooring Buoys

Galveston District Vertical Datum Conversion 9

GALVESTON DISTRICT INITIATIVES Continue Hydrographic Survey Webpage All six (6) Deep Draft Navigation Complexes online Gulf Intracoastal Waterway & Tributaries online Implement Vertical Datum Conversion Sabine-Neches Waterway Set-Back Policy Restore TCOON Functionality to 30 Stations Bring new Sentinel Stations online Re-Space & Deploy new GIWW Mooring Buoys

TEXAS COASTAL OCEAN OBSERVATION NETWORK

TEXAS COASTAL OCEAN OBSERVATION NETWORK

FY17 CONTRACT SCHEDULES SABINE-NECHES WATERWAY

SABINE-NECHES WATERWAY PORT ARTHUR CAL,TURNING BASIN, JUNCTION AREA AND TAYLORS BAYOU Port Arthur Turning Basins 9 Port Arthur Junction Area 8 Dredging Depth: Sabine-Neches Waterway Port Arthur Canal, Turning Basin, Junction Area and Taylors Bayou 42 ft. Required Depth 400-1200 ft. Varies 1,387,000 cubic yards Silt/Clay Placement Area: PA 8 and PA 9 Distance to Place Area: Type of Equipment: Contractor: 1.5-2 Miles Avg. Pipeline RLB & Mike Hooks Contract Amount: $5,782,500 Est. Start Date October 2016 Est. Completion Date February 2017

SABINE-NECHES WATERWAY OUTER BAR AND BANK CHANNEL 4 3 2 1 Dredging Depth: Placement Area: Distance to Placement Area: Type of Equipment: Contractor: Sabine Neches Waterway Outer Bar and Bank Channel 44 ft. Required Depth 800 ft. Varies 3,153,000 cubic yards Silt/Clay Offshore 3 Mile Avg. Hopper Manson Construction Contract Amount: $5,189,300 Est. Start Date October 2016 Est. Completion Date December 2016

SABINE-NECHES WATERWAY NECHES RIVER Sabine-Neches Waterway Neches River Dredging Depth: Placement Area: Distance to Placement Area: Type of Equipment: Env. Window: Reason for Window: 42 ft. Required Depth ~200 ft Varies 500,000 cubic yards Silt Various Upland PAs 1-2 Miles Pipeline Est. Start Date: April 2017 Est. Completion Date: August 2017

FY17 CONTRACT SCHEDULES GALVESTON-TEXAS CITY-HOUSTON

GALVESTON HARBOR Galveston Inner Harbor Dredging Depth: 41-46 ft. Required Depth 1000 ft. Varies Pelican Island PA San Jacinto PA Placement Area: 3,443,000 cubic yards Silt Offshore Distance to Place Area: 8 Miles Avg. Type of Equipment: Hopper Dredge Contractor: Dutra Group Contract Amount: $13,739,100 Est. Start Date September 2016 Est. Completion Date January 2017

HOUSTON SHIP CHANNEL MORGAN S POINT TO EXXON & BARBOURS TERMIL Houston Ship Channel Morgan s Point to Exxon & Barbours Terminal Dredging Depth: 49 ft Required Depth Varies Varies 2,498,000 cubic yards Silt Placement Area: Alexander Distance to Place Area: 1 Mile Avg. Type of Equipment: Pipeline Contractor RLB Contracting Contract Amount: $6,543,800 Est. Start Date: August 2016 Est. Completion Date: May 2017

HOUSTON SHIP CHANNEL BAYPORT FLARE AND RED FISH REEF TO MORGAN Dredging Depth: Placement Area: Dist. to Place Area: Type of Equipment: Contractor: Houston Ship Channel Bayport Flare and Redfish Reef to Morgan Point (include Bayport Bend E.) 47 ft. Required Depth 530 ft. Varies 2,382,000 cubic yards Sand/Silt Mid-Bay PA 1-4 miles Pipeline Weeks Marine Contract Amount $15,692,500 Est. Start Date: November 2016 Est. Completion Date: April 2017

HOUSTON SHIP CHANNEL BAYPORT SWEEP & BAYPORT FLARE BEND EASING La Porte Spilman Is. Atkinson Is. 16 15 14 Dredging Depth: Houston Ship Channel Bayport Flare 47 ft. Required Depth Varies Varies cubic yards Silt / Clay Placement Area: PA14, M7-10 Distance to Place Area: Type of Equipment: Contractor: 1-5 Mile Avg. Pipeline Dredge WEEKS Marine Contract Amount: $32,147,330 Est. Start Date: April 2016 Est. Completion Date: April 2017

HOUSTON SHIP CHANNEL SPILMAN ISLAND PA DEWATERING Lost Lake Peggy Lake Goat Island Type of Work: Placement Area: Houston Ship Channel Spilman Island PA Dewatering Dewatering Silt/Clay Spilman Island Spilman Island PA Dewatering Alexander Island Spilman Island Distance to Place Area: Type of Equipment: Contractor: Marsh Buggy/ Excavation Equipment Affolter Contracting Contract Amount: $2,374,082 Est. Start Date: October 2016 Est. Completion Date: April 2017

Filter-Bed Glendale House-Stimson Tracts HOUSTON SHIP CHANNEL ROSA ALLEN CONTAINMENT DIKE RAISE Type of Work: Placement Area: Houston Ship Channel Rosa Allen Containment Dike Raise Levee Raising Silt/Clay Rosa Allen PA Rosa Allen Containment Dike Raise Contractor: Type of Equipment: Contractor: Dragline/Earthmoving equipment Affolter Contract Amount: $2,593,045 Est. Start Date November 2016 Est. Completion Date September 2017

HOUSTON SHIP CHANNEL SIMS BAYOU TO TURNING BASIN Dredging Depth: Placement Area: Distance to Place Area: Type of Equipment: Env. Window: Reason for Window: Houston Ship Channel Sims Bayou to Turning Basin 39.5 ft. and 42 ft. Required Depth 300-250 ft. Varies TBD cubic yards Silt House Tract; West Clinton 3 Miles Average Pipeline Dredge Est. Start Date: February 2017 Est. Completion Date: November 2017

TEXAS CITY CHANNEL MAIN CHANNEL AND TURNING BASIN Dredging Depth: Texas City Channel Main Channel and Turning Basin 48 ft. Required Depth 400-1200 ft. Varies 1,400,000 cubic yards Silt/Sand Placement Areas: SPPA 3, 4, 5 Distance to Place Area: 1 Mile Avg. Type of Equipment: Pipeline Env. Window: Reason for Window: Est. Start Date: March 2017 Est. Completion Date: July 2017

GALVESTON ENTRANCE CHANNEL AND HSC - BOLIVAR ROADS TO REDFISH Morgan s Point Galveston Harbor - Galveston Entrance Channel and Houston Ship Channel - Bolivar Roads to Redfish Dredging Depth: Placement Area: 48-50 ft. Required Depth 800-1000 ft. Varies 2,500,000 cubic yards Varies Offshore Distance to Place Area: 1-8 Mile Avg. Type of Equipment: Hopper Env. Window: Reason for Window: Est. Start Date: March 2017 Est. Completion Date: September 2017

HOUSTON SHIP CHANNEL LOST LAKE PA DEWATERING Lost Lake Dewatering Green s Bayou PA Lost Lake Type of Work: Placement Area: Houston Ship Channel Lost Lake PA Dewatering Dewatering Silt/Clay Goat Island Distance to Place Area: West & East Jones Peggy Lake Alexander Island PA Type of Equipment: Env. Window: Reason for Window: Marsh Buggy/ Excavation Equipment Est Start Date: April 2017 Est. Completion Date: April 2018

HOUSTON SHIP CHANNEL PEGGY LAKE PA DEWATERING Houston Ship Channel Peggy Lake PA Dewatering Type of Work: Dewatering Lost Lake Green s Bayou PA Placement Area: Silt/Clay Goat Island Distance to Place Area: Peggy Lake Dewatering Peggy Lake Type of Equipment: Marsh Buggy/ Excavation Equipment West & East Jones Alexander Island PA Env. Window: Reason for Window: Est. Start Date: June 2017 Est. Completion Date: October 2017

HOUSTON SHIP CHANNEL ALEXANDER ISLAND PA DEWATERING Houston Ship Channel Alexander Island Dewatering Peggy Lake Alexander Island Type of Work: Dewatering Alexander Island PA Dewatering La Porte Spilman Island Atkinson Is. 16 Placement Area: Distance to Place Area: Type of Equipment: Silt/Clay Alexander Island PA Marsh Buggy/ Excavation Equipment 15 Env. Window: Reason for Window: 14 Est. Start: November 2017 Est. Completion: November 2018

HOUSTON SHIP CHANNEL SPILMAN ISLAND PA CONTAINMENT DIKE RAISE Lost Lake Peggy Lake Goat Island Type of Work: Placement Area: Houston Ship Channel Spilman Island PA Containment Dike Raise Levee Raising Silt/Clay Spilman Island Alexander Island Spilman Island Distance to Place Area: Type of Equipment: Env. Window: Reason for Window: Dragline/Earthmoving equipment Est. Start Date: September 2017 Est. Completion Date: September 2018

HOUSTON SHIP CHANNEL HOUSE TRACT AND CLINTON PA CONTAINMENT DIKE RAISE Filter-Bed Glendale House-Stimson Tracts Type of Work: Placement Area: Distance to Place Area: Houston Ship Channel House Tract & Clinton Containment Dike Raise Levee Raising Silt/Clay House Tract & Clinton Type of Equipment: Env. Window: Reason for Window: Dragline/Earthmoving Equipment Estimated Start Date: October 2017 Est. Completion Date: October 2018

FY17 CONTRACT SCHEDULES FREEPORT HARBOR

FREEPORT HARBOR ENTRANCE CHANNEL Brazos Harbor Turning Basin and Channel Stauffer Channel Upper (De-Authorized) Brazosport Turning Basin Turning Basin Surfside Freeport Harbor Entrance Channel 1 Quintana 7 85 Dredging Depth: Placement Area: Distance to Place Area: 47-49 ft. Required Depth 600 ft. Varies 2,517,000 cubic yards Sand/Silt Offshore 2.5 Mile Avg. 88 1-A Type of Equipment: Contractor: Hopper Manson Construction Contract Amount: $7,629,200 Buffer Zone Start Date: September 2016 Limits of Discharge Completion Date: October 2016

FREEPORT HARBOR ENTRANCE CHANNEL Brazos Harbor Turning Basin and Channel Stauffer Channel Upper (De-Authorized) Brazosport Turning Basin Turning Basin Surfside Freeport Harbor Entrance Channel 1 Quintana 7 85 Dredging Depth: Placement Area: Distance to Place Area: 47-49 ft. Required Depth 600 ft. Varies 2,600,000 cubic yards Sand/Silt Offshore 2.5 Mile Avg. 88 1-A Type of Equipment: Env. Window: Hopper Reason for Window: Buffer Zone Est. Start Date: July 2017 Limits of Discharge Est. Completion Date: September 2017

GALVESTON DISTRICT VIGATION Questions/Comments? http://www.swg.usace.army.mil/missions/navigation.aspx