Airport Simulation Technology in Airport Planning, Design and Operating Management

Similar documents
Simulation Study on Runway Threshold Stagger and Utilization Pattern of Closely Spaced Parallel Runways

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

APPENDIX D MSP Airfield Simulation Analysis

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Future airport concept

Yakima Air Terminal/McAllister Field Airport Master Plan Update

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

Airport Monopoly and Regulation: Practice and Reform in China Jianwei Huang1, a

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

A Simulation Approach to Airline Cost Benefit Analysis

Depeaking Optimization of Air Traffic Systems

Analysis of the impact of tourism e-commerce on the development of China's tourism industry

Appendix C AIRPORT LAYOUT PLANS

CHAPTER 1: INTRODUCTION

Integrated Optimization of Arrival, Departure, and Surface Operations

Forecast and Overview

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Addendum - Airport Development Alternatives (Chapter 6)

Research on Controlled Flight Into Terrain Risk Analysis Based on Bow-tie Model and WQAR Data

Performance Evaluation of Individual Aircraft Based Advisory Concept for Surface Management

PRAJWAL KHADGI Department of Industrial and Systems Engineering Northern Illinois University DeKalb, Illinois, USA

1) Rescind the MOD (must meet the standard); 2) Issue a new MOD which reaffirms the intent of the previous MOD; 3) Issue a new MOD with revisions.

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

An Econometric Study of Flight Delay Causes at O Hare International Airport Nathan Daniel Boettcher, Dr. Don Thompson*

Westover Metropolitan Airport Master Plan Update

Evaluating the Robustness and Feasibility of Integer Programming and Dynamic Programming in Aircraft Sequencing Optimization

SIMULATION MODELING AND ANALYSIS OF A NEW INTERNATIONAL TERMINAL

A GEOGRAPHIC ANALYSIS OF OPTIMAL SIGNAGE LOCATION SELECTION IN SCENIC AREA

Advanced Flight Control System Failure States Airworthiness Requirements and Verification

Impact of Landing Fee Policy on Airlines Service Decisions, Financial Performance and Airport Congestion

A RECURSION EVENT-DRIVEN MODEL TO SOLVE THE SINGLE AIRPORT GROUND-HOLDING PROBLEM

Simulation of Departure Terminal in Soekarno-Hatta International Airport

CASE STUDY The New Guayaquil International Airport

Comparison on the Ways of Airworthiness Management of Civil Aircraft Design Organization

Defining and Managing capacities Brian Flynn, EUROCONTROL

EN-024 A Simulation Study on a Method of Departure Taxi Scheduling at Haneda Airport

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)

AIRPORT MASTER PLAN UPDATE

RNP AR APCH Approvals: An Operator s Perspective

SIMMOD Simulation Airfield and Airspace Simulation Report. Oakland International Airport Master Plan Preparation Report. Revised: January 6, 2006

DRAFT. Airport Master Plan Update Sensitivity Analysis

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

Study on Self Bag Drop System for Airport Baggage Handling System Simulation

I R UNDERGRADUATE REPORT. National Aviation System Congestion Management. by Sahand Karimi Advisor: UG

Airfield Capacity Prof. Amedeo Odoni

The Information Paper of the. Milestones of Roadmap Development International Communion and Promotion Overview of China's PBN Implementation Roadmap

Update of the Airport Master Plan. Initial Runway & Land Use Alternatives

CHAPTER 1 EXECUTIVE SUMMARY

TERMINAL DEVELOPMENT PLAN

Research on Design Assurance System with the Development of CAAC s Design Organization Management

Opportunity and Function of Airport in Lowcost Aviation Development

Time-Space Analysis Airport Runway Capacity. Dr. Antonio A. Trani. Fall 2017

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

BNA Master Plan Update Community Advisory Committee Meeting No. 5

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES

Future Airport Concept (Increasing the Airport Capacity)

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

INCREASING AIRPORT OPERATION SAFETY BASED ON UPDATED OR ENHANCED AIRPORT PAVEMENT MARKINGS: A CASE STUDY PAPER

Analyzing Risk at the FAA Flight Systems Laboratory

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

Difference Analysis between Safety Management System and Airworthiness Management System in Civil Aircraft Design and Manufacture Organization

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

Appendix 6.1: Hazard Worksheet

Sunshine Coast Airport Master Plan September 2007

UC Berkeley Working Papers

ScienceDirect. Aircraft parking stands: proposed model for Indonesian airports

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

The Improvement of Airline Tickets Selling Process

Crosswind-based wake avoidance system approved by the FAA for operational use. Clark Lunsford (MITRE) & Dr. Edward Johnson May 15-16, 2013

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:

CHAPTER 4: ALTERNATIVES

Implementing a Perimeter Taxiway at Dallas Fort Worth International Airport: Evaluation of Operating Policy Impacts

AIRSIDE CAPACITY AND FACILITY REQUIREMENTS

Merritt Island Airport

Airport Systems: Planning, Design, and Management

Evaluation of Strategic and Tactical Runway Balancing*

Flight Regularity Administrative Regulations

Flight Arrival Simulation

Paradigm SHIFT. Eurocontrol Experimental Centre Innovative Research June, Laurent GUICHARD (Project Leader, ATM) Sandrine GUIBERT (ATC)

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

Agenda: SASP SAC Meeting 3

INTEGRATE BUS TIMETABLE AND FLIGHT TIMETABLE FOR GREEN TRANSPORTATION ENHANCE TOURISM TRANSPORTATION FOR OFF- SHORE ISLANDS

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

Las Vegas McCarran International Airport. Capacity Enhancement Plan

Abstract. Introduction

Figure 3.1. Foreign Airport Assessment Aid

Simulation of disturbances and modelling of expected train passenger delays

Chapter 1 Introduction and Project Overview

Research on Pilots Development Planning

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

G. Glukhov The State Scientific Research Institute of Civil Aviation, Mikhalkovskaya Street, 67, building 1, Moscow, Russia

Transcription:

Applied and Computational Mathematics 2018; 7(3): 130-138 http://www.sciencepublishinggroup.com/j/acm doi: 10.11648/j.acm.20180703.18 ISSN: 2328-5605 (Print); ISSN: 2328-5613 (Online) Airport Simulation Technology in Airport Planning, Design and Operating Management Xiong Li 1, *, Xiaoqing Chen 2 1 Planning and Design Institute, China Airport Construction Group Corporation, Beijing, China 2 Aviation Industry Development Research Center of China, Beijing, China Email address: * Corresponding author To cite this article: Xiong Li, Xiaoqing Chen. Airport Simulation Technology in Airport Planning, Design and Operating Management. Applied and Computational Mathematics. Vol. 7, No. 3, 2018, pp. 130-138. doi: 10.11648/j.acm.20180703.18 Received: June 10, 2018; Accepted: July 4, 2018; Published: July 19, 2018 Abstract: The promotion and application of airport simulation technology can help improve the soft power of China's civil aviation, and achieve the scientific assessment and refined decision-making for airport planning, construction and operating programs. This paper first sorted out the concepts and types of airport simulation, namely airport airside ground operating simulation, terminal area and airway airspace simulation, terminal building internal process simulation and airport landside curbside traffic simulation, highlighting its relevant applications in airport planning, design and operating management. Taking airport airside ground operating simulation as an example, the application of simulation technology to airport operating capacity of parallel runways was introduced. Finally, the problems and developments of airport simulation technology were discussed in depth. Keywords: Airport Simulation, Airfield, Airport Planning and Design, Operating Management 1. Introduction Large airport runways are diverse in structure, complex in taxiway, terminal, land side transport and terminal area airspace. Traditional planning and design methods and operating management experience are difficult to achieve effective decision-making and quantitative analysis on the problems encountered in airport construction and operating management [1]. In Europe and American countries with developed civil aviation, airport simulation technology has been widely used in airport planning and design and daily operating management. It is of great significance to the comparison, selection and optimization of airport construction plans and the improvement of operating management models. At present, airport simulation technology is still in the promotion stage in China, lacking general cognition. This paper first briefly described the types of the technology, highlighting its relevant applications in airport planning, design and operating management, and then conducted a discussion on the problems in its development. 2. Types of Airport Simulation According to different research objects, the airport simulation can be divided into four types, namely airport airside ground operating simulation, terminal area and airway airspace simulation, terminal building internal process simulation and airport landside curbside traffic simulation. In addition, there are also simulations for service vehicles, baggage systems, controller workloads, and integrated transportation connection and transfer in the airfield. (1) Airport airside ground operating simulation The research scope of the airport airside ground operating simulation mainly involves the analysis of the operating efficiency of aircrafts in the runway-taxiway-station site system inside the airfield, and the evaluation of the flight delay level, taxiing time, take-off & landing efficiency, and the ground operating capacity of an airport, etc. [2, 3], as shown in figure 1.

Applied and Computational Mathematics 2018; 7(3): 130-138 131 Figure 1. Airside ground operating simulation. (2) Terminal area and airway airspace simulation The research scope of terminal area and airway airspace simulation mainly involves the analysis of the flight efficiency of aircrafts in the arrival and departure route network inside the terminal area and in the route network under large-scale airspace, and the evaluation of the terminal area airspace capacity, the route network loading capacity, route conflict point analysis, and airspace optimal design, etc. [4], as shown in figure 2.

132 Xiong Li and Xiaoqing Chen: Airport Simulation Technology in Airport Planning, Design and Operating Management Figure 2. Terminal area and airway airspace simulation. (3) Terminal building internal process simulation The research scope of the terminal building internal process simulation mainly involves the analysis of the service level and efficiency of arrival, departure and transfer processes in the terminal building, the evaluation of the proper quantity and staffing of key facilities such as check-in counters, customs and security checkpoints, the comparison of and selection among different terminal building layout plans and service procedures in passenger traffic efficiency and walking distance, etc. as shown in figure 3. Figure 3. Terminal building internal process simulation.

Applied and Computational Mathematics 2018; 7(3): 130-138 133 (4) Airport landside curbside traffic simulation The research scope of airport landside curbside traffic simulation mainly involves the evaluation of the landside traffic efficiency in airports, curbside congestion and the smoothness of traffic, as well as the comparison and selection of the impacts of different facilities and operating modes on landside traffic in airports, as shown in figure 4. Figure 4. Airport landside curbside simulation. 3. Application in Airport Planning and Design In airport planning and design, the research of simulation focuses on the evaluation, comparison and selection, and further optimization and adjustment of airport ground or airspace planning and design programs. Airport simulation research can be divided into three levels according to the depth of the research: rough simulation, moderate simulation, and refined simulation. In the stage of planning and design, simulation is mainly at rough and moderate levels. For core issues that the principal focuses on, refined simulation may be considered. According to different stages of airport planning and design, such as site selection, overall planning, feasibility study, and preliminary design, airport simulation research has different emphases. In the stage of site selection, basic plans of the number and configuration of runways are emphasized, and rough simulations on airside ground operation and terminal area airspace are generally used. In the stage of overall planning, the airport's long- and near-term planning plans and their corresponding target capacity are emphasized, and moderate simulations on airside ground operation and terminal area airspace are usually performed. In the stage of feasibility study, the relevant content of the current construction plan is emphasized and accurate estimates are performed on the construction costs. Therefore, the current planning program can be combined to carry out moderate simulations on airside ground operation, terminal area airspace, terminal building internal process, and airport landside curbside traffic. In the stage of preliminary design, the planning and design programs for the airfield, terminal area, landside and airspace are relatively stable, so targeted and localized refined simulations can be further conducted to test, improve and optimize design programs. 4. Application in Airport Operating Management Compared with the application in the stage of airport planning and design, the application of simulation technology in the operating management stage of Chinese airports is relatively weak [5]. With only a few large airports have a complete simulation model for the current operating situation,

134 Xiong Li and Xiaoqing Chen: Airport Simulation Technology in Airport Planning, Design and Operating Management and keep long-term maintenance and regular updates, such as the internal process simulation model established by Beijing Capital International Airport for its T3 terminal. Foreign large and busy airports usually have complete simulation models and employ professional consulting companies for long-term maintenance, such as Atlanta Airport and Chicago O'Hare International Airport. When an airport needs to improve service processes, increase or decrease service facilities, or try out new technologies, a simulation model will first be built to preview the plan, study and judge the efficiency gains and benefits it can bring, and then make refined decision-making, so as to reduce the potential investment and management risks triggered by the blind start of the project. The Technical Specification for Airport Flight Time Capacity Evaluation issued by Air Traffic Management Administration Office of CAAC in January 2017 is worth learning and promoting. This Specification clearly put forward that simulation technology should be used during the adjustment and evaluation of the capacity of terminal area, runways and terminal buildings in an airport, thus to determine the final flight time capacity of the airport [6]. This fully embodies the important role of simulation in airport operating management, as well as the refined and scientific development of airport operating management. 5. Example Analysis of Airside Ground Operating Simulation This paper operates Simmod Plus 7.6 to make a simulation analysis of the operational efficiency in different operational patterns of parallel runways. Simmod, one dynamic and comprehensive airport simulation micro-software firstly proposed by FAA in 1978, through the continuous upgrading and perfection, has become one of the most applied airport and airspace simulation software [7]. Given that this paper focally analyzes the capacity and efficiency of airport runways system, the simulation modeling will put aside the restrictive factors of airspace, taxiway and apron. Based on the analysis of the configuration of the typical parallel runway, 4 simulation models (simu-400, simu-760, simu920 and simu-1525, as shown in figure 5) are established in this paper, and each model is considered in the following two situations: runway crossing and bypass-taxiing. Figure 5. Two runways spacing 400m, 760m, 920m and 1525m

Applied and Computational Mathematics 2018; 7(3): 130-138 135 In instrument flight rules, the separation of continuously take-off is controlled at 60~120 seconds according to the difference between front and follow aircraft type. For the flights continuously landing, the landing separation is mainly controlled by wake turbulence separation, as shown in table 1. Table 1. Aircraft wake turbulence separation. Front Heavy Follow Middle Light Heavy 8 km 6 km 6 km Middle 10 km 6 km 6 km Light 12 km 10 km 6 km The model adopts the flight schedule, for only taking off or landing runway, peak time arrangement of flight 60 sorties per hour; for mixed operational runway per hour for 30 take-off and landing flights, respectively. The flight schedule far exceeds the maximum current single runway capacity, its purpose is to calculate the limit capacity of the parallel runways. This paper assumes that the ratio of heavy and middle aircraft is P h =20%, P m =80%, respectively. In the course of runway crossing, the average taxiing speed is set to 12km/h, and the pilot reaction time is 8-10 seconds. Take the runway spacing 400m model as an example (simu-400), after running the simulation model, the video demonstration is shown in figure 6. Figure 6. Simulation model demonstration (simu-400). The parallel runway capacity obtained by the above simulation model is the ultimate capacity, or saturation capacity. The runway capacity limit means without considering the continuous demand delay under the runway system in unit time (1 hours) can serve the largest aircraft movements. The continuous demand refers to ready for take-off or landing aircraft flow existing, the phenomenon appears less in the actual operation, so the ultimate capacity reflects the service ability of theoretical maximum runway system [8-11]. The simu-400, simu-760, simu920 and simu-1525 four simulation models are run 5 times respectively, and the average value of the simulation results was calculated. Finally, the ultimate capacity of the parallel runway is obtained as shown in figure 7. Take-off, landing and total flights in runway crossing and bypass-taxiing conditions are analyzed. On the basis of the ultimate capacity of parallel runways, the factual operation capacity can be obtained. The factual operation capacity is defined as the unit of time (1 hours), corresponding to an acceptable level of flight delays (usually

136 Xiong Li and Xiaoqing Chen: Airport Simulation Technology in Airport Planning, Design and Operating Management the average delay time of 4 minutes / flight), aircrafts taking off or landing can be serviced by 85%~90% of the ultimate capacity. In this paper, according to the factual operation capacity of 90% ultimate capacity calculation, the actual running capacity of double runway is shown in table 2.

Applied and Computational Mathematics 2018; 7(3): 130-138 137 Figure 7. Simulation results of 4 models. Table 2. Double parallel runways actual operating capacity. Runway Distance (m) Ultimate capacity actual running capacity Runway crossing Non- crossing Runway crossing Non- crossing 400 44 52 40 47 760 64 73 58 66 920 69 76 62 68 1525 75 82 68 74 By analyzing the simulation results of the above is not difficult to see that the runway spacing 1525m, two runways, about 74 movements per hour; when the runway spacing is 400m, the capacity of about 47 movements per hour, if we consider the runway crossing, its capacity is only 40 movements per hour. In the case of setting bypass taxiway or no runway crossing, the factual operation capacity of the dual runway system can be increased by about 13%. Under the simu-760 operating mode, the runway system capacity is more than 40% of the simu-400 operation mode. Simu-920 mode of operation compared with simu-760 mode, the capacity change is small, an increase of about 3~7%. 6. Analysis of Current Problems The application of airport simulation technology in China is gradually being promoted, and its role and benefits are gradually emerging. Although the future is bright, at this stage, it still faces many problems that constrain the further sound development of simulation technology. (1) Collection and sharing of airport operating data The core principle of airport simulation is to simulate future or current operating scenarios with a math model. Whether a scenario is well simulated depends on the parameter and assumption settings of the model. Therefore, large amounts of actual operating data should be collected, organized and analysed before simulation. In reality, however, it is not easy to obtain such operating data. There are four main causes for this: (a) Lacking systematically recorded and organized key data due to insufficient attention in operating data management. (b) Without cross-departmental data integration, a complete flight-passenger-vehicle operating data chain is difficult to form. The continuous operating data of an object are usually in the charge of different management departments such as airports, airlines or air traffic control. (c) Some operating data have vague concepts and are recorded in different format standards. (d) A sharing platform and a searching mechanism for operating data have not been established yet. (2) Active participation of frontline operating personnel Airport simulation involves many aspects of airport operation, and researchers are difficult to independently complete a refined simulation merely with limited surveys or data analyses. Therefore, the active participation and in-depth cooperation of frontline operating personnel are the key to a successful refined simulation. Frontline operating personnel usually include air traffic controllers, pilots, ground commanders, and various service personnel in terminal buildings. (3) Objectivity and limitations of simulation results The simulation results are directly affected by the parameters input. Therefore, people who are in charge of a simulation should perform the simulation with a professional and responsible attitude toward programs and the industry, and reflect objective simulation results, avoiding interference from the owner or other factors. In addition, simulation is not equivalent to reality. Airport simulation should give a maximum reflection of the impacts of key factors on the operation of the program, but it cannot cover all factors, especially the interference of random uncontrollable factors. Therefore, for simulation results, we should not be dogmatic but should make rational judgments

138 Xiong Li and Xiaoqing Chen: Airport Simulation Technology in Airport Planning, Design and Operating Management and comprehensive analyses. (4) Verification and post-evaluation of simulation projects Currently, there are many entities and organizations carrying out simulations in the fields of airport planning and design and airport capacity evaluation. These entities and organizations include planning and design units in the civil aviation, consulting and evaluation companies, colleges and universities, and foreign aviation consulting companies, with uneven power in simulation research. Therefore, it is imperative to establish an effective and simple project verification mechanism to make objective and fair verification on the evaluation results and conclusions obtained from simulation. In addition, there is little progress in the post-evaluation of simulation projects. Post-evaluation on the one hand is conducive to verifying the rationality of the simulation results and making a timely and proper revision of the simulation results; on the other hand, it can help guide and optimize future simulations, summarizing lessons learned and promoting the sound development of airport simulation research. (5) Development of simulation software in China At present, commercial airport simulation software programs are all developed by foreign companies. Although some domestic universities have carried out the programming of some airport simulation software programs, these programs are only for academic research, and they are neither conditioned for commercial promotion nor verified by sizeable practical operating. From the perspective of grasping the core competitiveness of civil aviation technology, it is suggested that at a proper time, colleges and universities, airport planning units, airport management units, air traffic control, airlines, and software development organizations should come together to build a research team and to jointly develop China's own airport simulation software products. 7. Conclusion The promotion and application of airport simulation technology are of great significance to both the comparison, selection and optimization of airport construction plans and the improvement of airport operational management models. The technology will help improve China's soft power in civil aviation development. The application of simulation technology in airport planning and design has achieved a relatively wide consensus, but in other areas of civil aviation, it still lacks sufficient recognition and wide application. Therefore, it is necessary to accelerate the promotion and application of the technology, in order to achieve the scientific evaluation, comparison and selection, and refined decision-making in airport and airspace planning, construction, operating and management. Acknowledgements This work was supported by China civil aviation security ability building funds (15J511)--Research on application of simulation technology in civil airport planning and design. References [1] G Guiming, Y Dongyuan, Application and development of computer simulation research on airport system, Computer Simulation, 2002, vol. 19, no. 1, pp. 14-16. [2] L Xiong, L Dongbin, W Dongxuan, Airport capacity analysis for typical parallel runways based on simulation method, Journal of Computer Applications, 2012, vol. 32, no. 9, pp. 2648-2651. [3] W Haoning, G Yanchi, M Tong, L Xiong, Apron taxiway operation mode and simulation evaluation in Beijing new airport, Journal of Transportation Systems Engineering and Information Technology, 2016, vol. 16, no. 3, pp. 214-220. [4] G Wei, H Chaowei, Research on capacity evaluation for Chongqing TMA, Journal of Civil Aviation Univ. of China, 2010, vol. 28, no. 5, pp. 1-4. [5] Z Yuxiang, X Chunjing, An airplane boarding model and its optimization, Computer Simulation, 2009, vol. 26, no. 9, pp. 243-246. [6] Air Traffic Management Office of CAAC, Technical specification for airport time capacity assessment, AP-93-TM-2017-01, 2017, pp. 3-12. [7] A Huang, D Schleicher, G Hunter, Future flight demand generation tool, AIAA 4th Aviation Technology, Integration and Operations (ATIO) Forum, 2004, Chicago, USA, pp. 146-150. [8] X. Chen, Research on capacity evaluation and optimization methods at airport airside, Nanjing: Nanjing University of Aeronautics & Astronautics, 2007, pp. 6-18. [9] K. Li, Study of approach procedure to closely spaced parallel runways, Nanjing: Nanjing University of Aeronautics & Astronautics, 2005, pp. 8-21. [10] Z Gu, Study on instrument operation modes for closely spaced parallel runways of Hongqiao airport, Journal of Civil Aviation University of China, 2010, vol. 28, no. 5, pp. 21-24. [11] L Xiong, L Dongbin, W Dongxuan, Utilization pattern of closely spaced parallel runways and simulation of operational efficiency, International Conference on Progress in Informatics and Computing, 2015, Nanjing, China, pp. 158-162.