Project Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information

Similar documents
Fairfax County Parkway Widening Fairfax County

Design Public Hearing for the Existing and Proposed Bridge Crossings on Aden Road (Rte 646) over the Norfolk Southern RR, Nokesville, Virginia

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT. Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

Dulles Toll Road Rate Setting Process

Rural Rustic Road Program

McCORMICK QUARRY BRIDGE EAST SHORE EXPRESSWAY BRIDGE WITOLD H. KLOCZKOWSKI, P.E. PROJECT MANAGER COMMONWEALTH ENGINEERS & CONSULTANTS, INC.

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

SECTION 106 ACTIVITIES ANNUAL REPORT

Report to the Dulles Corridor Advisory Committee

I-95/395 HOV/Bus/HOT Lanes Project Overview

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

SECTION 106 ACTIVITIES ANNUAL REPORT

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

REPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

Elected Officials and Media Briefing I-395 Express Lanes Northern Extension

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

Commonwealth Avenue Bridge Deck Replacement Project. Legislative and Stakeholder Briefing. April 13, 2017

General Aviation Master Plan Update

CHAPTER 1: INTRODUCTION

RECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES

Route 29 Solutions Projects

Daisy Dean Trail 628/619 ATV Trail Construction

Project Planning, Compliance, and Funding

I-66 Inside the Beltway Feasibility Study

Update on Route 1 Efforts

Why are the underground fuel tanks being removed and replaced with above ground tanks?

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

October 18, Terry Hartwick Director, North Little Rock Parks and Recreation 2700 Willow Street North Little Rock, AR 72114

Preferred Alternative Summary

G Street Undercrossing. City Council Meeting Date: November 3, 2008

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

SR 934 Project Development And Environment (PD&E) Study

Addendum - Airport Development Alternatives (Chapter 6)

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018.

SANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

Fairfax County Transportation Advisory Commission (TAC)

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Part 150 Noise Compatibility Program Checklist

N. Central St. & W. Jackson Ave. Streetscape Projects

WELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District. HB 599 Ratings Overview NVTA - January 22, 2015

Memorandum. Federal Aviation Administration. Date: June 19, Richard Doucette, Environmental Protection Specialist. From: To:

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

Austin-Bergstrom International Airport Master Plan Update

BNA Master Plan Update Public Meeting No. 2

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM

Pardon Our Dust Public Information Meeting

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

Public Information Center August 12, 2010

Virginia Department of Transportation s Rural Rustic Road Program

Virginia Department of Transportation Rural Rustic Road Program Manual

Department of Public Works P.O Box 4186, San Rafael, CA / Fax: 415/

Proposed Dulles Toll Road Rate Adjustments

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

State Project Reconstruction I-84

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015

US 83 Relief Route. City of La Joya City of Peñitas Hidalgo County. November 15, 2012

BNA Master Plan Update Community Advisory Committee Meeting No. 5

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

WELCOME US 83 Public Meeting

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager

Texas Department of Transportation Corpus Christi District. Corpus Christi Harbor Bridge

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS


Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

Chapter 1 Introduction and Project Overview

Culpeper District. Albemarle County Monthly Report. September 2012

395 Express Lanes Project Update

Transportation Supporting Dulles Airport

The Dulles Loop. Route 606. Route 28. Route 50

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Transportation TRANSPORTATION PROJECTS

Two townships received top

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

Pre-Construction Public Meeting July 2017

Kelly Field at Port San Antonio Airport Master Plan

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Report to the Strategic Development Committee

Project Deliverable 4.1.3d Individual City Report - City of La Verne

Basic Project Information

1.2 Corridor History and Current Characteristics

Unstable Slope Management Program for FLMAs. Presented by: Douglas A. Anderson, LG, LEG FHWA - WFL - Engineering Geologist

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

Transcription:

Get Involved VDOT representatives will review and evaluate any information received as a result of the public information meeting. The comment sheet in this brochure is provided to assist in making your comments. You may leave the sheet or any other written comments in the comment box, or mail/ email your comments. Comments must be postmarked, emailed or delivered to VDOT by April 26, 2018 to be included in the public hearing record. Contact Information Primary Contact: Brian Morrison, P.E. brian.morrison@vdot.virginia.gov Gary Runco, P.E. gary.runco@r@vdot.virginia.gov Structure & Bridge Structure & Bridge Mail comments to Mr. Brian Morrison at the address below or email meetingcomments@vdot.virginia.gov. Please include Hunter Mill Road Over Colvin Run Bridge Replacement in the subject line. Project information shared here, including a summary of comments received during the comment period, will be available at www.virginiadot.org/projects and at VDOT s Northern Virginia District Office. 4975 Alliance Drive Fairfax, VA 22030 4975 Alliance Drive Fairfax, VA 22030 703-259-2606 703-259-3341 www.virginiadot.org Public Information Meeting Welcome to the Virginia Department of Transportation s (VDOT) public information meeting on plans to replace the weight-restricted one-lane Hunter Mill Road (Route 674) bridge over Colvin Run with a new two-lane bridge in Reston. We look forward to your active participation. This meeting is being held to provide an opportunity for citizens and organizations to give VDOT comments and/or suggestions on the proposed project. VDOT strives to ensure that all members of the community have the opportunity Public Information Meeting Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County Monday, April 16, 2018 6:30 p.m. to 8:30 p.m., Presentation 7 p.m. Forest Edge Elementary School 1501 Becontree Lane Reston, VA 20190 to participate in public decisions on transportation projects and programs affecting them. VDOT representatives are present to discuss the project and answer your questions. A comment sheet is included in this brochure and your input is encouraged. All written comments received on this project will be reviewed by the design team, summarized and made available on the VDOT project website. Andrew Beacher, P.E. andrew.beacher@vdot.virginia.gov Preliminary Engineering 4975 Alliance Drive Fairfax, VA 22030 703-259-2239 Project Overview Purpose: Replace the weight-restricted one-lane Hunter Mill Road bridge Jennifer McCord jennifer.mccord@vdot.virginia.gov Communications 4975 Alliance Drive Fairfax, VA 22030 703-259-1779 over Colvin Run with a two-lane bridge to improve safety and operations TTY/TDD Dial 711 Location: Hunter Mill Road over Colvin Run 2018 Commonwealth of Virginia Improvements: Expand bridge to two lanes with four-foot-wide shoulders, including a new concrete bridge Bridge replacement in Fairfax County deck and abutments State: 0674-029-358, P101, R201, B643 UPC: 110499 Federal: STP-BR09 (295)

Project Description This project will improve safety and operations by replacing the weight-restricted, one-lane Hunter Mill Road (Route 674) bridge over Colvin Run with a new two-lane bridge that will have four-foot-wide shoulders. The existing bridge, built in 1974, averages 7,200 vehicles per day; traffic is projected to increase to 11,000 vehicles per day by 2043. Planned improvements include: Widening the bridge to allow one lane in each direction and four-foot-wide shoulders New concrete bridge deck and abutments Upgraded bridge railings Eliminating vehicle weight restrictions Repaving the road just north and south of the bridge Aesthetic treatment of the bridge walls to blend Estimated Project Cost Preliminary Engineering $700,000 Construction $2.2 million Right of Way Acquisition and Utility Relocation $100,000 Total Cost $3 million *Funded with state and federal State of Good Repair funds used for maintenance of structures and bridges Anticipated Schedule Public Information Meeting April 16, 2018 Comment period ends April 26, 2018 Design Public Hearing Fall 2018 Begin construction Spring 2021 Existing Bridge with the surrounding area and maintain the historic character of Hunter Mill Road Civil Rights VDOT ensures nondiscrimination and equal employment in all programs and activities in accordance with Title VI and Title VII of the Civil Rights Act of 1964. If you need more information or special assistance for persons with disabilities or limited English proficiency, contact VDOT s Civil Rights Division at 703-259-1775 or TTY/TDD 711. Environmental Review In accordance with the National Environmental Policy Act (NEPA) and 23 CFR 771, a Programmatic Categorical Exclusion will be prepared under an agreement with the Federal Highway Administration (FHWA). VDOT will coordinate the appropriate federal, state and local agencies as part of the environmental review and approval process. Right of Way Preliminary right of way impacts presented on the displays are conceptual in nature and may change as the design is refined. The property owners will be informed of the exact location of the easements during the right of way acquisition process and prior to construction. A representative from VDOT s Environmental Section is available to discuss the environmental review process and to answer any related questions. Information about right of way purchase is discussed in VDOT s brochure, Right of Way and Utilities: Guide for Property Owners and Tenants. Copies of this brochure are available here from VDOT personnel. After this meeting, information regarding right of way may be obtained from the right of way contact listed on the back of this brochure.

Public Information Meeting Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County Monday, April 16, 2018 6:30 p.m. to 8:30 p.m., Presentation 7 p.m. www.virginiadot.org Forest Edge Elementary School 1501 Becontree Lane Reston, VA 20190 COMMENT SHEET State: 0674-029-358, P101, R201, B643 UPC: 110499 Federal: STP-BR09 (295) All comments are subject to public disclosure. Name (optional): Address (optional): Email (optional): 1. Do you support this project? Yes No Yes, with the following suggestions: 2. What are your major concerns that you would like to see considered in the design of this project? 3. Please provide us with any additional information or suggestions that will improve the completion of this project. 4. How did you hear about this meeting? Newspaper Social Media Website Other Please leave this comment sheet at the designated location, mail your comments (postmarked by April 26, 2018) to the addressee on the reverse side, or email them to meetingcomments@vdot.virginia.gov. Please include Hunter Mill Road Over Colvin Run Bridge Replacement in the email subject line.

Fold Line Postal Service will not deliver without a stamp Mr. Brian Morrison, P.E. Virginia Department of Transportation Northern Virginia District 4975 Alliance Drive Fairfax, VA 22030 Fold Line

Hunter Mill Road over Colvin Run Bridge Replacement April 16, 2018 Brian Morrison, P.E. Project Coordinator (703) 259 2606 Brian.Morrison@vdot.virginia.gov

Purpose & Agenda Purpose Review the preliminary design for a new bridge on Hunter Mill Road over Colvin Run with community stakeholders & obtain feedback in preparation for advancing the design towards a Public Hearing Agenda SGR Program Bridge Condition Design Criteria Proposed Design Construction Traffic Alternatives Schedule & Costs Questions/Comments

State of Good Repair (SGR) In 2015, House Bill 1887 was passed and incorporated into the Code of Virginia ( 33.2-369). Known as State of Good Repair (SGR), the program provides funding for deteriorated pavements and structurally deficient bridges. The funds are used to address repairs on bridges deemed structurally deficient on the National Bridge Inventory and deteriorated pavement on interstate and primary highways. * A bridge that has been deemed structurally deficient does not imply that it s likely to collapse or is unsafe, but there are elements of the bridge that need to be monitored and/or repaired.

Bridge Condition Deck Condition Rating - 5 (Fair) Superstructure Condition Rating - 3 (Serious) Substructure Condition Rating - 6 (Satisfactory) Condition Rating Scale 0-9

Design Criteria The bridge span length will be 40-0. Existing bridge is 30-0 The bridge section will carry two 11-0 lanes and 4-4 shoulders as recommended in the 2006 Hunter Mill Road Traffic Calming Study. The bridge opening will be sized to pass a 10-year flood level & satisfy floodplain criteria. Bridge railing will be open to minimize the dam effect on the floodplain for flooding above the 10-year flood level. Hunter Mill Road (Average Daily Traffic 7900 vpd) will be open to traffic during construction and traffic will be phased using a one-lane configuration. Incorporate aesthetic features compatible with the scenic and historic character of Hunter Mill Road. Proposed two-lane bridge improves roadway geometrics, functionality, and safety over the current one-lane configuration and will not be weight restricted. Design Year (2043) Average Daily Traffic 11,000 vpd.

Proposed Design 640 feet

Typical Sections 7

Concrete Beams EXISTING

Construction Traffic Alternatives (Full Closure with Detour) Requires a detour in both directions. o o Existing distance from Point A to B = 2 miles Detour length from point A to B = 4 miles Estimated construction duration = 8 months

Construction Traffic Alternatives Phased Construction Maintains one alternating lane of traffic throughout construction similar to existing conditions Estimated construction duration = 12 months $400,000 more than detour option

Speed Reduction Measures

Environmental and Cultural Resources Summary Project meets National Environmental Policy Act criteria for a Programmatic Categorical Exclusion in accordance with 23 CFR 771.117

Schedule and Costs Schedule Public Information Meeting - April 16, 2018 End of Public Information Meeting Comment Period - April 26, 2018 Design Public Hearing - Fall 2018 Advertise for Construction - Winter 2020/21 Begin Construction - Spring 2021 Complete Construction - Summer 2022 Cost Estimate Engineering - $700,000 Right-of-Way and & Utility Relocation - $100,000 Construction - $2.2 Million Total - $3 Million

QUESTIONS & COMMENTS Send comments via email no later than April 26 th to: Brian Morrison, P.E. NOVA District Senior Structural Engineer (703) 259 2606 Brian.Morrison@vdot.virginia.gov www.virginiadot.org/projects