KSFO RNAV TO GLS DEMONSTRATION

Similar documents
RNP AR and Air Traffic Management

FAA GBAS Program Update January 29, 2010

Airplane Navigation Capabilities

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Pat Reines Avionics Support for GBAS and Performance Based Navigation (PBN)

Updates to Procedures at St. John s International Airport

Poland Ground Based Augmentation System (GBAS) Seminar AGENDA. GBAS Overview (Honeywell: Pat Reines)

Honeywell.com PBN Concepts Krakow, Poland

RNP Solutions in Australia Australia s PBN Transition brings Opportunities for Active Noise Abatement.

Near Term Potential for System Capacity Gains from RNP and RNAV Procedures

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

Navigation at the. Federal Aviation Administration Crossroads

Air Navigation Bureau ICAO Headquarters, Montreal

Decisions on which type of approach to use vary with each airline, and sometimes even for each flight. aero quarterly qtr_02 10

Boeing Air Traffic Management Overview and Status

Overview of NextGen Institute Project

Los Angeles Noise Mitigation. Captain Dan L. Delane FedEx Express Fleet Check Airman 13 November 2013

ENABLING GREENER FLIGHT TRAJECTORIES. David Bowen Chief of ATM SESAR JU

Continuous Descent? And RNAV Arrivals

COMMUNITY NOISE MITIGATION SUGGESTIONS

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

CDA Continuous Descent Approach

Required Navigation Performance at Alaska Airlines

(RN R A N V A V & & RN R P N

LFPG / Paris-Charles de Gaulle / CDG

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Final Approach Operations Symposium

Federal Aviation Administration DCA. By: Terry Biggio, Vice President Air Traffic Services Date: June 18, Federal Aviation Administration

Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation

Section 5. Radar Separation

ICAO Activities. IFPP work on the Manual for Continuous Descent Operations. Federal Aviation Administration

Contextual note SESAR Solution description form for deployment planning

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator

Noise Programs & NextGen Briefing. Stan Shepherd, Manager Airport Noise Programs

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

NOISE ABATEMENT PROCEDURES

(Presented by the United States)

NextGen and ASPIRE Environmental Initiatives

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017

QUIETER OPERATIONS A GUIDE FOR PILOTS AND CONTROLLERS

SOURDINE II EU- 5FW project on Noise Abatement Procedures. Overall view. Ruud den Boer / Collin Beers Department: ATM & Airports

Atlanta NextGen PBN Activities

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

CHAPTER 9 RUNWAYS AND AIRFIELD DEVELOPMENTS

ILS APPROACH WITH B737/A320

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

UPDATE ON THE 6 IDEAS (1-4) NAV CANADA

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

Continuous Descent Arrivals (CDA) Workshop #2

Benefits Assessment for Tailored Arrivals

Crosswind-based wake avoidance system approved by the FAA for operational use. Clark Lunsford (MITRE) & Dr. Edward Johnson May 15-16, 2013

SFO Tailored Arrivals Environmental Analysis

NextGen Priorities: Multiple Runway Operations & RECAT

Atlantic Interoperability Initiative to Reduce Emissions AIRE

Development of Flight Inefficiency Metrics for Environmental Performance Assessment of ATM

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

FLIGHT OPERATIONS PANEL

Next Generation Air Transportation System. Edward L. Bolton, Jr. Assistant Administrator for NextGen 17 November 2015

Think the solution, experience the change

NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

Sustainable Aviation & Airports AOA Operations and Safety Conference, June 2014 Jonathon Counsell, SA Chair, Head of Environment, British Airways

Wake Turbulence Standards

Captain Jeff Martin Senior Director Flight Operations Southwest Airlines

Making the World A better place to live SFO

GREENER SKIES OVER SEATTLE INITIATIVE

Boeing 787 Dreamliner Flight Deck Safety, Comfort, Efficiency

ENRI International Workshop on ATM/CNS

A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures

MetroAir Virtual Airlines

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

New York Aviation Management Association Conference

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

Buchanan Field. Airport Planning Program. FAR Part 150 Meeting. September 28, Master Plan FAR Part 150 Noise Study Strategic Business Plan

LAX Community Noise Roundtable Work Program A1 Review of SoCal Metroplex Proposed Procedures and Suggestions for Comment Letter.

Procedure Design Concepts for Logan Airport Community Noise Reduction

RNP In Daily Operations

ADVANCED SURVEILLANCE IN ONE INTEGRATED PACKAGE

Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures

Surveillance and Broadcast Services

Operational Authorization Process for ILS Precision Runway Monitor (PRM) and Simultaneous Offset Instrument Approach (SOIA)

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

2007 Instrument Procedures Handbook; Chapter 5 Approach

Navigation - Runways. Chap 2, Nolan

Paul Clayton Air New Zealand

Taking your Pro Line 21 King Air into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR KING AIR

Noise Abatement Arrival Procedures at Louisville International Airport. Prof. John-Paul Clarke Georgia Institute of Technology

European Aviation Safety Agency


Flight Inspection for High Elevation Airports

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

Environmental benefits of continuous descent approaches at Schiphol Airport compared with conventional approach procedures

Transcription:

Delta Air Lines - Noah Flood GLS GLS DTT 1.9 DTT 1.9 GLS1 GLS1 KSFO RNAV TO GLS DEMONSTRATION

Key Components Three Key Components 1. Global Navigation Satellite System A. GPS/Galileo/GLONASS 2. Ground Based Augmentation System A. FRA/SYD/EWR/IAH 3. GLS Equipped Aircraft A. Airbus A320/A320NEO, A330, A350 and A380 Optional B. Boeing - 737MAX, 747-8, 777X, 787 Baseline 737NG Optional

What is GBAS? :: Airport-Based Elements Airport-Based Elements GPS/Galileo/GLONASS Aircraft Position Corrected position and path Position Corrected position and path Receivers (4) Terminal VHF Antenna

What is GLS? :: Aircraft Equipage Needed to Fly Approach Aircraft Equipage FCC (2) Control Surfaces Navigation Control Panel (2) GPS Antennas (2) DEU (2) Dual VOR/LOC Antenna HUD ADIRUs (2) got GLS? Multi-Mode Receiver (2) FMCS

RNP to GLS Approach

GLS BENEFITS Benefits Eliminate ILS hold short lines No False or Mirror glideslopes No bending localizer Service Volume increased to 23 NM Dmax Increased Reliability Reduce TCAS RAs Reduce Fuel Burn Reduce Carbon Emissions Reduce Noise!!!!

Three Phase Introduction GLS Introduction - 3 Phases Phase I Overlay current ILS approaches Allow Pilots and Controllers to achieve comfort level Phase II Increase Glidepath (up to 3.25 degrees) Reduce fuel burn/noise/carbon emissions Phase III Advanced Concepts Demonstrated at KSFO got GLS? Updated: April 1, 2014

KSFO GBAS Demonstration SFO Challenges Noise Abatement Terrain Airspace Constraints Weather Frequent Reduced Visibility Runway Configuration 2 Sets of parallel runways 750 feet apart

KSFO GBAS Demonstration SFO Demonstration of Phase 3 Advanced Concepts Reduce Noise, Fuel Burn, and Carbon Emissions & Add Precision Approaches

SIMULTANEOUS OFFSET INSTRUMENT APPROACHES SFO 28L/R got GLS?

SIMULTANEOUS OFFSET INSTRUMENT APPROACH 28L/R

Noise/Wake Turbulence Mitigation Displaced Threshold & Angular Separation Copyright 2015 Boeing All Rights Reserved got GLS?

VIEW FROM THE OFFICE SFO 28R got GLS?

GLS V 28R CLOSELY SPACED PARALLEL OPERATIONS got GLS?

CLOSELY SPACED PARALLEL OPERATIONS Copyright 2015 Boeing All Rights Reserved

San Francisco RNP to GLS Demonstration Final Report RNAV to GLS Final Report Copyright 2015 Boeing All Rights Reserved

NOISE REDUCTION 19R OPTIMIZE GROUND TRACK OPTIMIZE GROUND TRACK Copyright 2015 Boeing All Rights Reserved got GLS?

NOISE REDUCTION 19R OPTIMIZE VERTICAL PATH OPTIMIZE VERTICAL PATH

RNAV to GLS 19R CONSTANT DESCENT APPROACH FLY OPTIMIZED APPROACH FLAPS 5 Approaching COTE2 FLAPS 2/180 KTS/IDLE GEAR DOWN/FLAPS 15 at 2000 FT AFE CONSTANT DESCENT APPROACH Minimize Speedbrakes Delay Configuring Procedural Separation Permits Simultaneous Operations at KSFO and KOAK

NOISE REDUCTION IMPACT Noise Impact of Ground Track/Vertical Path Copyright 2015 Boeing All Rights Reserved

Constant Descent Approach GLS R 19R Copyright 2015 Boeing All Rights Reserved

Three Key Components SUMMARY OF 19R RNP TO GLS BENEFITS Arrival Route to 19R Distance [nm] Estimated Fuel Burn [lbs] CO 2 Emissions [lbs] Long Vector 40.3 980 3092 Short Vector 36.3 792 2319 GLS R 19R 20.5 424 1338 Savings with GLS R 19R compared to the Long Vector 19.8 nm 556 lbs fuel 1754 lbs CO 2 Existing Procedure to Runway GLS R 19R Baseline Long Vector Baseline Short Vector Delta Distance [nm] Delta Fuel Burn [lbs] Delta CO 2 Emissions [lbs] Noise Exposure [people] +19.8 +556 +1,754 +249,200 +15.8 +368 +981 +282,300 Copyright 2015 Boeing All Rights Reserved

Delta Air Lines Next Steps Airports Install GBAS Airlines GLS Equipped Aircraft ATM Build CDAs and Initiate At Higher Altitudes Air Traffic Controllers Accept GLS approaches Pilots Accept and Fly GLS approaches got GLS? Updated: April 1, 2014

Thank You! Benefits Reduced maintenance/flight inspection costs and impacts - Results in increased availability of GLS approaches - Less disruption to Ops Any Questions? C.E. Noah Flood Project Pilot GBAS/GLS Flight Operations Delta Air Lines +1 540-687-0076 cell Noah.Flood@delta.com got GLS?

KSFO GBAS Demonstration Table 11

Flying GLS Approaches

Three Key Components

Flying GLS Approaches got GLS?