GNSS/RNAV Non- Radar Longitudinal Separation in the Caribbean

Similar documents
INTERNATIONAL CIVIL AVIATION ORGANIZATION FOURTH MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CENTRAL CARIBBEAN

AERONAUTICAL INFORMATION CIRCULAR

International Airlines Safety Concerns in the Caribbean region.

Automation Interface Update North American, Caribbean and Central America

Presented To: NAM/CAR/SAM Regions Air Traffic Services Inter-Facility Data Communication (AIDC) Implementation Meeting

ASSEMBLY 39TH SESSION

WEST ATLANTIC ROUTE SYSTEM (WATRS) PLUS AIRSPACE REDESIGN AND SEPARATION REDUCTION INITIATIVE. (Presented by United States of America) SUMMARY

SWIM Transition of TFMS and ATFM in the Caribbean. Eurocontrol Collaborative ATFM Workshop - Madrid March 9, 2016

PBN Implementation CAR/NAM Regions

When replying please quote: Ref.: NT-NS2-35, N E.OSG - NACC February 2016

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

(Presented by Secretariat) EXECUTIVE SUMMARY

THE BAHAMAS FLIGHT INFORMATION REGION (FIR) (Presented by Bahamas) SUMMARY

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

RELEASE RECORD. Version Date Author Notes Dec 2006 SK Initial Release

3.3 Specific Developments in Air Navigation CNS AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) (Presented by the United States of America) SUMMARY

COM Failure - Piarco ACC

ICAO provisions on data link implementation

3 DECEMBER 2012 UPDATE GULF OF MEXICO 50 NM LATERAL SEPARATION / RNAV ROUTES PROJECT OPERATIONAL POLICY AND PROCEDURES

Presentation. Feasibility of the Establishment of a Single Airspace within the Caribbean

San Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR)

LARGE HEIGHT DEVIATION ANALYSIS FOR THE WESTERN ATLANTIC ROUTE SYSTEM (WATRS) AIRSPACE CALENDAR YEAR 2016

Second Seminar on RVSM Implementation in the CARS/SAM Regions

Proposal for the updating of the FASID ATM Evolution Tables

Federal Aviation Administration Operations in the New York Center Oceanic CTA/FIR

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

DC-ANSP Linking The Western Hemisphere

ICAO Activities. IFPP work on the Manual for Continuous Descent Operations. Federal Aviation Administration

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

FLIGHT STANDARDS SERVICE LESSON PLAN

Burlington ATCT Standard Operating Procedures

ADVANCED TECHNOLOGIES AND OCEANIC PROCEDURES (ATOP) SYSTEM. Presented by the United States of America SUMMARY

VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012

APPENDIX C AIDC REGIONAL PLAN AND OF THE AIDC POINTS OF CONTACT (POC) Table A: General Information

PASCO Signs Wave Window Agreement

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

3.6 Surveillance Data Exchange Activities. (Presented by the United States of America) SUMMARY

Oceanic Control Policies Rev /2012. Air Traffic Control

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

Section 5. Radar Separation

IFR SEPARATION WITHOUT RADAR

SECTION 6 - SEPARATION STANDARDS

New ICAO Runway Safety Provisions

Letter of Agreement. Between Jacksonville ARTCC and Virtual United States Navy Effective Date: Sept 1, 2008

Chapter 1 General Information

SEATTLE AIR ROUTE TRAFFIC CONTROL CENTER SEATTLE GLIDER COUNCIL LETTER OF AGREEMENT. EFFECTIVE: June 1, 2015

E/CAR/NTG/3 GUADELOUPE October 22 nd, 2014

Required Navigation Performance (RNP) in the United States

VIRTUAL AIR TRAFFIC SIMULATION NETWORK NORTH AMERICA REGION - USA DIVISION vzkc KANSAS CITY ARTCC

Airspace Complexity Measurement: An Air Traffic Control Simulation Analysis

Enhancing capacity beyond infrastrucutre

AMOs approval and global recognition Status update

ATM Collaboration & Data Sharing

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

ATC PROCEDURES WORKING GROUP. Transition Level

Performance Based Communication and Surveillance in the ICAO North Atlantic Region. PBCS in NAT HLA

Update to Doc 8335 Manual of Procedures for Operations Inspection, Certification and Continued Surveillance

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

Título ponencia: Introduction to the PBN concept

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT

WATRS PLUS ROUTE STRUCTURE REDESIGN & SEPARATION REDUCTION OPERATIONAL POLICY AND PROCEDURES

ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011

APPLICATION OF SEPARATION MINIMA NORTH ATLANTIC REGION

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

North Atlantic Initiatives

The NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.

HOUSTON AIR ROUTE TRAFFIC CONTROL CENTER VATSIM United States Division. Letter of Agreement. Revised: July 25, 2004 Effective: July 25, 2004

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

U.S. India Aviation Cooperation Program. Air Traffic Management Training Program Update March 2009

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva

Standard Operating Procedures (SOPs) for UAE Centre (OMAE)

International Standard Operations Procedures (SOP) Network: Eastern Caribbean Aeronautical Fixed Services (E/CAR/AFS) Network

GENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3

Wake Turbulence Evolution in the United States

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

Separation Methods and Minima

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

EUR/SAM corridor airspace concept

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments

IVAO Flight Operations Department Indonesia (ID) Division Procedures

International Civil Aviation Organization UNDP/ICAO Regional Project RLA/98/003 Transition to the CNS/ATM Systems in the CAR and SAM Regions

Regional air navigation planning and implementation performance framework: Review of programmes and projects

PBN and airspace concept

Challenges in the Airspace Safety Monitoring

24-26 March 2014 Cairo, Egypt. Policies & Standards. Session #3 Presentation #2

Legal regulations in transport policy

LETTER OF AGREEMENT. Between

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI

ACI-NA Conference NextGen at NAV CANADA. John Crichton President and Chief Executive Officer October 11, 2009

Flight Operations Inspector Manual

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

NACC/WG/4 WP/16 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures

5.7 Other Air Navigation Matters THE BAHAMAS FLIGHT INFORMATION REGION (FIR) (Presented by Bahamas EXECUTIVE SUMMARY

ERIE ATCT STANDARD OPERATING PROCEDURES

Oakland Air Route Traffic Control Center, Northern California Terminal Radar Approach Control, and Pacific Soaring Council LETTER OF AGREEMENT

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)

Transcription:

GNSS/RNAV Non- Radar Longitudinal Separation in the Caribbean For: By: ICAO/IATA/CANSO PBN Harmonization, Modernization, and Implementation Meeting Steve Pinkerton, Oceanic/Offshore Air Traffic Standards and Procedures Date: 7-9 December 2016

Overview Review of current separation standards Potential longitudinal separation reductions Summary 2

Houston ARTCC Current longitudinal separation minima Monterey ACC- 10 NM radar 10 minutes Mach Number Technique (MNT) 5 minutes faster in front by M 0.06 or greater Merida ACC- 10 minutes MNT 5 minutes faster in front by M 0.06 or greater Potential longitudinal separation reductions Procedural issues clarified to allow for reduced GNSS/RNAV non-radar longitudinal separation Will require LOA discussions with Houston, Monterey & Merida Estimated time for implementation of reduced separation 4-6 months 3

Miami ARTCC Current longitudinal separation minima Havana ACC 10-20 NM radar 10 minutes non-radar or 40 NM MUHA to KZMA with coordination Larger separation minima typically associated with traffic management initiatives Port-au-Prince ACC 10 minutes with MNT Santo Domingo ACC 10 NM radar 10 minutes non-radar New York ARTCC 10 minutes with MNT 15 minutes all others San Juan CERAP 5 NM radar 4

Miami Center (cont.) Potential longitudinal separation reductions Havana ACC Current radar procedures in effect Very robust- non-radar separation very rare Port-au-Prince ACC» No current discussions on non-radar longitudinal separation Draft LOA revision sent to MTEG for review Miami still coordinating with MTEG Timeline- TBD New York ARTCC Procedural issue with rules in FAA Air Traffic Procedures manual Currently being resolved through procedure change» Expected publication- Fall 2017 Timeline- First Quarter CY 2017 with Notice prior to Fall publication Santo Domingo ACC Non-radar operations generally limited to mid-shift during low traffic No current discussions on non-radar longitudinal separation planned 5

San Juan CERAP Current longitudinal separation minima New York ARTCC, Piarco ACC, Maquetia ACC, Curacao ACC, Santo Domingo ACC, St. Maarten Approach 10 minutes with MNT 15 minutes all others Aircraft below FL200 require 20 minutes Miami ARTCC 5 NM radar separation In areas of non-radar below FL200, 10 minutes 6

San Juan CERAP (cont.) Potential longitudinal separation reductions New York ARTCC, Piarco ACC, Maquetia ACC, Curacao ACC Procedures issue with airspace definition Nearing resolution Requirements issue Utilization of ICAO PANS-ATM Chapter 5 requires direct pilot controller voice communication» Areas along common boundaries with these facilities have limited frequency coverage» Work to analyze cause and address is underway» Timeline- TBD St. Maarten Approach Procedures issue with airspace definition nearing resolution International agreement required by FAA Work underway to finalize agreement for FAA air-to-ground communication equipment at St. Maarten; radar data sharing may also be possible Site survey for communication equipment completed Installation/certification of equipment with expected implementation in 2 years 7

San Juan CERAP (cont.) Potential longitudinal separation reductions (cont.) Santo Domingo ACC Manual radar handoff procedure LOA drafted Under review by San Juan CERAP Collaborative Working Group Expected implementation of manual radar handoffs- April 2017 Automated radar handoffs Requires Automated Data Exchange Stage III» TBD 8

Summary A number of areas for potential non-radar GNSS/RNAV separation being evaluated Procedures being reviewed and modified to support Technical requirements and international agreements under development or review LOA discussions and required safety work being conducted 9

Questions/Comments? 10