UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 21 P-1 Line #1

Similar documents
UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 P-1 Line #5

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 15 P-1 Line #6

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 19 P-1 Line #2

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 15 P-1 Line #6

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 9 P-1 Line #14

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #15

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED FY 2017 OCO. FY 2017 Base. FY 2017 Base FY 2017 OCO. Total Obligation Authority

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 9 P-1 Line #22

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 P-1 Line #6

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 20 P-1 Line #2

UNCLASSIFIED FY 2013 OCO. FY 2013 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 11 P-1 Line #7

UNCLASSIFIED FY FY 2015 Base FY 2015 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

Department of Defense Fiscal Year (FY) 2019 Budget Estimates

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base. Quantity Total Obligation Authority

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 11 P-1 Line #74

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2013 Base FY 2013 OCO

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 27 P-1 Line #12

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. FY 2016 Base FY 2016 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO. Total Obligation Authority

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 11 P-1 Line #25

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base. Total Obligation Authority

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base. Quantity

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 19 P-1 Line #15

Department of Defense Fiscal Year (FY) 2016 President's Budget Submission

UNCLASSIFIED. FY 2013 Base FY 2013 OCO

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 16 P-1 Line #15

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 26 P-1 Line #24

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 14 P-1 Line #44

UNCLASSIFIED. FY 2013 Base FY 2013 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 16 P-1 Line #15

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 15 P-1 Line #17

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 38 P-1 Line #9

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 14 P-1 Line #5

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 P-1 Line #18

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 P-1 Line #26

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 19 P-1 Line #62

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #15

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

Department of Defense Fiscal Year (FY) 2018 Budget Estimates

Department of Defense Fiscal Year (FY) 2015 Budget Estimates

Department of Defense Fiscal Year (FY) 2017 President's Budget Submission

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 39 P-1 Line #54

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53

ATPCO RECORD LAYOUT DATE

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 27 P-1 Line #2

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Department of Defense DIRECTIVE

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 31 P-1 Line #2

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

SECTION B AIRWORTHINESS CERTIFICATION

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #21

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M)

A&H Project Proposal 2017

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Risk (Harm) EXISTING CONTROLS Risk Rating with existing controls?

A&H Project Proposal 2017

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #35

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO)

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Unit Cost ($ M) Qty (Each)

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 24 P-1 Line #55

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

BILFINGER SE NUCLEAR ENERGY PROJECTS: WE MAKE IT WORK FROM ENGINEERING AND TECHNOLOGY TO FABRICATION, CONSTRUCTION AND SERVICES

Royal Caribbean Cruises Ltd. Bunker World Conference May 5, 2010

International Conference on Integrated Modular Avionics Moscow

Press Release. Bilfinger with dynamic start to financial year 2018

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base

Agenda: SASP SAC Meeting 3

The Benefits of Attendee Travel Management

Transcription:

II xhibit -40, udget ine Item ustification: 2017 avy ate: ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 1508: rocurement of mmo, avy & / 01: roc mmo, avy / 1: avy mmunition -1 ine Item umber / itle: 0145 / eneral urpose ombs I ode (=ervice eady, =ot ervice eady): rogram lements for ode Items: / ther elated rogram lements: / ine Item /I ode: / esource ummary Item /I ode(s): / rior ears 2015 2016 2017 ase 2017 2017 otal 2018 2019 2020 2021 o omplete rocurement Quantity (nits in ach) - - - - - - - - - - - - ross/weapon ystem ost ($ in illions) 2,028.719 91.893 101.895 91.659 40.366 132.025 96.723 94.981 87.517 89.269 ontinuing ontinuing ess dvance rocurement ($ in illions) - - - - - - - - - - - - et rocurement (-1) ($ in illions) 2,028.719 91.893 101.895 91.659 40.366 132.025 96.723 94.981 87.517 89.269 ontinuing ontinuing lus dvance rocurement ($ in illions) - - - - - - - - - - - - otal bligation uthority ($ in illions) 2,028.719 91.893 101.895 91.659 40.366 132.025 96.723 94.981 87.517 89.269 ontinuing ontinuing (he following esource ummary rows are for informational purposes only. he corresponding budget requests are documented elsewhere.) Initial pares ($ in illions) - - - - - - - - - - - - lyaway nit ost ($ in ollars) - - - - - - - - - - - - ross/weapon ystem nit ost ($ in ollars) - - - - - - - - - - - - escription: he eneral urpose () bombs budget is intended to sustain munitions component inventory levels as defined in the avy unitions equirement rocess () model. his model produces inventory requirements based on fleet operational scenarios and the number of weapons required to engage defined target sets. he budget also procures on-going technology integration to optimize the production and capability of products within the irect ttack Weapons (W) portfolio. Inventory levels fluctuate year to year based on changes to the model as tactical targets are reassessed and weapons are expended in tactical operations and training. his variable requirement is assessed and a mean average is used buffer out the most extreme changes. he udget procures several different categories of munitions components. omb bodies vary in size, construction and explosive fill to provide the desired effect when employed against their targets. he flight and guidance of the bomb body is provided in three basic ways. irst, a basic fixed fin stabilizes the bomb and allows the weapon to travel on a ballistic line of fall as controlled by forward movement imparted by the aircraft and gravity. econdly, the aser uided components control the fall of the bomb using movable surfaces and a laser detecting device to guide the bomb to a location on the ground illuminated by a laser designator. astly, the oint irect ttack unition () tail kit guides the bomb with movable surfaces that are steer the bomb to a target based on a lobal ositioning atellite () coordinate. here is also a family of weapons which combine and laser capabilities to provide a ual ode weapon: a aser oint irect ttack unition (). is a capability, when combined with a converts the weapon into a. he various components that comprise a are procured individually under this budget to include but not limited to the -38 series recision aser uidance et (). he -38 is a emi-ctive aser (). hese weapons are improved through the inclusion of additional sensors enabling these weapons to engage moving and stationary targets at impact and as an airburst weapon. he -42 recision aser uidance et () is a modified kit that when fully integrated with the -109 provides an active laser sensor that detects and characterizes laser designation angle of arrival and then transmits this information to the guidance kit. his modification will enable the -109 to take advantage of an already demonstrated capability on the /-18 for other classes of weapons. he on-ecurring ngineering () effort is required to modify, produce and certify the -109 configuration. he certification will include verification and validation of the hardware to include: irst rticle esting, arrier uitability, aptive arriage and light esting, ive rops, Integrated ogistics ssessments, ystem erification and roduction eadiness eviews. ll of the various weapons assemblies utilize a family of fuzes that when installed into the weapon provides a controlled initiation of the explosive fill when commanded through impact with a target or at a predetermined time. his predetermined time may occur above the ground for an explosion above the target or below the ground after impact to engage a target that is buried. otal I 0145 - eneral urpose ombs II avy age 1 of 21-1 ine #1 olume 1-1

II xhibit -40, udget ine Item ustification: 2017 avy ate: ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 1508: rocurement of mmo, avy & / 01: roc mmo, avy / 1: avy mmunition -1 ine Item umber / itle: 0145 / eneral urpose ombs I ode (=ervice eady, =ot ervice eady): rogram lements for ode Items: / ther elated rogram lements: / ine Item /I ode: / Item /I ode(s): / here is also funding included in this budget to address a myriad of subcomponents that are used in the assembly of the various configurations, including arming wires, adapters, lugs, nose plugs and other components required for ll p ound () configurations. his budget also funds production engineering, integrated logistics, and product improvement efforts to sustain production and ongoing enhancements to ensure the weapons remain relevant in the environments they are used. I 0145 - eneral urpose ombs II avy age 2 of 21-1 ine #1 olume 1-2

II xhibit -40, udget ine Item ustification: 2017 avy ate: ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 1508: rocurement of mmo, avy & / 01: roc mmo, avy / 1: avy mmunition -1 ine Item umber / itle: 0145 / eneral urpose ombs I ode (=ervice eady, =ot ervice eady): rogram lements for ode Items: / ther elated rogram lements: / ine Item /I ode: / Item /I ode(s): / xhibits chedule rior ears 2015 2016 2017 ase 2017 2017 otal xhibit ype itle* ubexhibits I Quantity / otal ost (ach) / ($ ) Quantity / otal ost (ach) / ($ ) Quantity / otal ost (ach) / ($ ) Quantity / otal ost (ach) / ($ ) Quantity / otal ost (ach) / ($ ) Quantity / otal ost (ach) / ($ ) -5 1 / omb -5a, -21 - / 2,028.719 - / 91.893 - / 101.895 - / 91.659 - / 40.366 - / 132.025-40 otal ross/weapon ystem ost - / 2,028.719 - / 91.893 - / 101.895 - / 91.659 - / 40.366 - / 132.025 *itle represents 1) the umber / itle for Items; 2) the umber / itle [I] for mmunition; and/or 3) the umber / itle (odification ype) for odifications. ote: otals in this xhibit -40 set may not be exact or sum exactly due to rounding. ustification: he 2017 funding request was reduced by $7.8 million to account for the availability of prior year execution balances. 2017 baseline funding is required to meet aval unitions equirements rocess () inventory requirements. his model produces inventory requirements based on fleet operational scenarios and the number of weapons required to engage defined target sets. he budget also procures on-going technology integration to optimize the production and capability of products within the irect ttack Weapons (W) portfolio. Inventory levels fluctuate year to year based on changes to the model as tactical targets are reassessed and weapons are expended in tactical operations and training. his variable requirement is assessed and a mean average is used buffer out the most extreme changes. his budget supports critical avy itle 10 war reserve/operational, training and test requirements IW o Instruction 3000.04 (unitions equirements rocess) and I 8011.9 (avy unitions equirements rocess). War reserve requirements support -approved ombatant ommander perational lans, Homeland efense, and other -directed missions. raining requirements support individual and collective training of ctive and eserve omponent forces. est requirements support the verification, fielding, safety and quality assurance of avy weapons and equipment throughout their life cycle. nnual on-ombat xpenditure llowance () prepares aval viation units for deployment and is the largest cause of current and future eneral urpose () bombs procurement. utilization of bombs in support of leet readiness continues every year. rocurements are primarily designed to replenish the weapons used each year to achieve required readiness levels. nlike procurement of capital assets, a large percentage of weapons are consumed in annual fleet training expenditures; thereby, reducing the ability to simply adjust procurements a year in response to budget reductions. arring a reduction in fleet training expenditures and the correlating readiness degradation, any reductions in bombs procurements in a given year will have to be made up with increased procurements in the out years to restore inventory to a level adequate to support and fleet readiness. : 2017 verseas ontingency perations () funding is required to replenish components that were expended in direct support of combat operations in theater. hese operations were in support of peration Inherent esolve. I 0145 - eneral urpose ombs II avy age 3 of 21-1 ine #1 olume 1-3

II xhibit -5, ost nalysis: 2017 avy ate: ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 1508 / 01 / 1 I ode (=ervice eady, =ot ervice eady) : -1 ine Item umber / itle: 0145 / eneral urpose ombs /I ode: Item umber / itle [I]: 1 / omb esource ummary rior ears 2015 2016 2017 ase 2017 2017 otal rocurement Quantity (nits in ach) - - - - - - ross/weapon ystem ost ($ in illions) 2,028.719 91.893 101.895 91.659 40.366 132.025 ess dvance rocurement ($ in illions) - - - - - - et rocurement (-1) ($ in illions) 2,028.719 91.893 101.895 91.659 40.366 132.025 lus dvance rocurement ($ in illions) - - - - - - otal bligation uthority ($ in illions) 2,028.719 91.893 101.895 91.659 40.366 132.025 (he following esource ummary rows are for informational purposes only. he corresponding budget requests are documented elsewhere.) Initial pares ($ in illions) - - - - - - ross/weapon ystem nit ost ($ in ollars) - - - - - - ote: ubtotals or otals in this xhibit -5 may not be exact or sum exactly due to rounding. ost lements Hardware - ombs ost ecurring ost 1.1.1) Q2191 nit ost rior ears 2015 2016 2017 ase 2017 2017 otal (ach) otal ost ($ ) nit ost (ach) otal ost ($ ) nit ost (ach) -111 ( ) 3,574.37 7,530 26.915 - - - - - - - - - 6,765.41 934 6.319 6,765.41 934 6.319 1.1.2) Q2192-110 ( ) 11,488.55 131 1.505 - - - - - - - - - 12,706.73 11 0.140 12,706.73 11 0.140 1.1.3) Q2199-109 ( ) 28,194.26 906 25.544 25,995.00 77 2.002 - - - - - - 29,868.00 46 1.374 29,868.00 46 1.374 ubtotal: ecurring ost - - 53.964 - - 2.002 - - - - - - - - 7.833 - - 7.833 ubtotal: Hardware - ombs ost Hardware - uided ombs ost ost ecurring ost otal ost ($ ) nit ost - - 53.964 - - 2.002 - - - - - - - - 7.833 - - 7.833 2.1.1) Q2200 irect ttack oving arget apability -38 () ( ) (1) 11,629.94 6,145 71.466 13,920.00 1,677 23.344 14,198.40 960 13.630 14,482.36 742 10.746 14,981.65 259 3.880 14,611.39 1,001 14.626 2.1.2) Q2181 aser uided ombs 10,000.00 1,296 12.960 - - - - - - - - - 14,274.00 22 0.314 14,274.00 22 0.314 (aytheon) ( ) 2.1.3) Q2181 aser uided ombs - - 19.440 - - - - - - - - - 14,274.00 22 0.314 14,274.00 22 0.314 (ockheed) ( ) (ach) otal ost ($ ) nit ost (ach) otal ost ($ ) nit ost (ach) otal ost ($ ) I 0145 - eneral urpose ombs II avy age 4 of 21-1 ine #1 olume 1-4

II xhibit -5, ost nalysis: 2017 avy ate: ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 1508 / 01 / 1 I ode (=ervice eady, =ot ervice eady) : ote: ubtotals or otals in this xhibit -5 may not be exact or sum exactly due to rounding. ost lements 2.1.4) Q2187 aser nit ost -1 ine Item umber / itle: 0145 / eneral urpose ombs /I ode: Item umber / itle [I]: 1 / omb rior ears 2015 2016 2017 ase 2017 2017 otal (ach) otal ost ($ ) nit ost (ach) otal ost ($ ) nit ost (ach) uided ombs ( ) - - - - - - - - - - - - 4,417.00 44 0.194 4,417.00 44 0.194 2.1.5) Q2186 uided ombs ailkits ( ) (2) 20,855.34 1,348 28.113 21,383.84 876 18.732 21,811.51 1,437 31.343 22,247.74 1,696 37.732 22,247.74 1,083 24.094 22,247.74 2,779 61.826 2.1.6) Q2220-109 aser apability -42 2.1.7) Q2197 ombs otal ost ($ ) nit ost - - 0.001 - - - - - - - - - - - - - - - ubcomponents (3) - - 2.836 - - 1.225 - - - - - 1.300 - - - - - 1.300 ubtotal: ecurring ost - - 134.816 - - 43.301 - - 44.973 - - 49.778 - - 28.796 - - 78.574 on ecurring ost 2.2.1) Q2895-109 aser apability on - - - - - - - - 20.980 - - 23.701 - - - - - 23.701 ecurring (4) ubtotal: on ecurring ost ubtotal: Hardware - uided ombs ost ost Hardware - uzes ost ost ecurring ost 3.1.1) Q2196 - - - - - - - - 20.980 - - 23.701 - - - - - 23.701 - - 134.816 - - 43.301 - - 65.953 - - 73.479 - - 28.796 - - 102.275-143 ( ) 1,524.20 5,330 8.124 - - - - - - - - - - - - - - - 3.1.2) Q2032-139 lectrical 1,128.71 43,710 49.336 2,027.21 3,746 7.594 2,193.19 4,028 8.834 2,237.05 5,009 11.205 2,237.05 991 2.217 2,237.05 6,000 13.422 uze ( ) (5) 3.1.3) Q2210 Hard arget oid ensing - - - 22,312.29 50 1.116 19,493.33 450 8.772 - - - - - - - - - uze ( ) ubtotal: ecurring ost - - 57.460 - - 8.710 - - 17.606 - - 11.205 - - 2.217 - - 13.422 on ecurring ost 3.2.1) Q2896 Z on ecurring - - - - - 24.330 - - 7.066 - - - - - - - - - 3.2.2) Q2861 roduction cceptance est & valuation Z (6) - - - - - - - - 3.363 - - - - - - - - - ubtotal: on ecurring ost - - - - - 24.330 - - 10.429 - - - - - - - - - (ach) otal ost ($ ) nit ost (ach) otal ost ($ ) nit ost (ach) otal ost ($ ) I 0145 - eneral urpose ombs II avy age 5 of 21-1 ine #1 olume 1-5

II xhibit -5, ost nalysis: 2017 avy ate: ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 1508 / 01 / 1 I ode (=ervice eady, =ot ervice eady) : ote: ubtotals or otals in this xhibit -5 may not be exact or sum exactly due to rounding. ost lements ubtotal: Hardware - uzes ost ost nit ost -1 ine Item umber / itle: 0145 / eneral urpose ombs /I ode: Item umber / itle [I]: 1 / omb rior ears 2015 2016 2017 ase 2017 2017 otal (ach) Hardware - cceptance esting - uided ombs ost ecurring ost 4.1.1) Q2860 roduction cceptance est & valuation uided ombs otal ost ($ ) nit ost (ach) otal ost ($ ) nit ost (ach) otal ost ($ ) nit ost - - 57.460 - - 33.040 - - 28.035 - - 11.205 - - 2.217 - - 13.422 - - 22.178 - - 1.356 - - 1.383 - - - - - - - - - ubtotal: ecurring ost - - 22.178 - - 1.356 - - 1.383 - - - - - - - - - ubtotal: Hardware - cceptance esting - uided ombs ost Hardware - rior ears ost on ecurring ost 5.1.1) rior ears umulative unding ubtotal: on ecurring ost ubtotal: Hardware - rior ears ost upport - Integrated ogistics ost - - 22.178 - - 1.356 - - 1.383 - - - - - - - - - - - 1,679.690 - - - - - - - - - - - - - - - - - 1,679.690 - - - - - - - - - - - - - - - - - 1,679.690 - - - - - - - - - - - - - - - 6.1) Q2800 ombs (7) - - 1.778 - - 0.230 - - - - - - - - 0.239 - - 0.239 6.2) Q2800 uided ombs - - 2.212 - - 0.305 - - 0.309 - - 0.313 - - - - - 0.313 6.3) Q2800 uzes - - 1.131 - - 0.239 - - 0.243 - - 0.247 - - - - - 0.247 ubtotal: upport - Integrated ogistics ost upport - roduction ngineering ost - - 5.121 - - 0.774 - - 0.552 - - 0.560 - - 0.239 - - 0.799 7.1) Q2830 ombs (8) - - 18.763 - - 1.845 - - - - - - - - 1.281 - - 1.281 7.2) Q2830 uided ombs (9) - - 24.157 - - 3.025 - - 3.000 - - 3.385 - - - - - 3.385 7.3) Q2830 uzes (10) - - 12.195 - - 4.226 - - 2.093 - - 2.136 - - - - - 2.136 ubtotal: upport - roduction ngineering ost upport - iscellaneous upport ost 8.1) Q2850 roduct Improvement rogram (I) - - 55.115 - - 9.096 - - 5.093 - - 5.521 - - 1.281 - - 6.802 - - 17.173 - - 1.610 - - 0.152 - - 0.155 - - - - - 0.155 (ach) otal ost ($ ) nit ost (ach) otal ost ($ ) nit ost (ach) otal ost ($ ) I 0145 - eneral urpose ombs II avy age 6 of 21-1 ine #1 olume 1-6

II xhibit -5, ost nalysis: 2017 avy ate: ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 1508 / 01 / 1 I ode (=ervice eady, =ot ervice eady) : ote: ubtotals or otals in this xhibit -5 may not be exact or sum exactly due to rounding. ost lements 8.2) Q2892 on- tandard Items 8.3) Q2893 enovation omponents nit ost -1 ine Item umber / itle: 0145 / eneral urpose ombs /I ode: Item umber / itle [I]: 1 / omb rior ears 2015 2016 2017 ase 2017 2017 otal (ach) otal ost ($ ) nit ost (ach) otal ost ($ ) nit ost (ach) otal ost ($ ) nit ost - - 1.076 - - 0.237 - - 0.241 - - 0.245 - - - - - 0.245 - - 1.044 - - 0.223 - - 0.227 - - 0.230 - - - - - 0.230 8.4) Q2894 aging - - 1.082 - - 0.254 - - 0.259 - - 0.264 - - - - - 0.264 ubtotal: upport - iscellaneous upport ost ross/weapon ystem ost - - 20.375 - - 2.324 - - 0.879 - - 0.894 - - - - - 0.894 - - 2,028.719 - - 91.893 - - 101.895 - - 91.659 - - 40.366 - - 132.025 (ach) otal ost ($ ) nit ost (ach) otal ost ($ ) nit ost (ach) otal ost ($ ) ( ) indicates the presence of a -5a ootnotes: (1) 15 unit price updated for actual. (2) Q2186 uided ombs ailkits quantity increases between 2016 and 2017 are a result of the aval unitions equirements rocess () model, which addresses fleet inventory requirements. 2016 was realigned to uided omb ailkits to address critical fleet shortfalls. (3) Q2197 omb sub-components was realigned to the uided ombs Hardware section. he components procured out of this are required for assembly of -109, -110 and -111 bomb bodies into end item configuration weapons such as ree fall unguided bombs, aser uided ombs () and oint irect ttack unitions (). (4) Q2895-109 aser apability on-recurring effort is required to modify, produce and certify the -109 recision aser uidance et () configuration. (5) Q2032-139 lectrical uze 2015 and 2016 unit cost is based on actual contract award with negotiated options. (6) Q2861 roduction cceptance est & valuation Z H roduction cceptance est and valuation (&) is required for deliveries that will occur in 2016. (7) Q2800 ombs Integrated ogistics funding realigned from 16 to procure additional uided omb ailkits. o I baseline support required for 2016, 2017,and 2018. (8) Q2830 ombs roduction ngineering funding realigned to procure additional uided omb ailkits and increase the roduction ngineering in the uided omb line based on increase support required for all uided bomb procurements. (9) Q2830 uided omb funding support increase is required for the aser guided bomb and procurements. (10) Q2830 uzes 2015 increase from 16 is due to additional -143 Z led est requirements associated with new vendor qualification. dditionally, the engineering review associated with the increased penetration capability, and erial ata Interface inclusion in the -139/ substantially increased the roduction ngineering upport. I 0145 - eneral urpose ombs II avy age 7 of 21-1 ine #1 olume 1-7

II xhibit -5a, rocurement History and lanning: 2017 avy ate: ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 1508 / 01 / 1 ost lements 1.1.1) Q2191-111 ( ) 2012 1.1.1) Q2191-111 ( ) 2017 1.1.2) Q2192-110 ( ) 2017 1.1.3) Q2199-109 ( ) 2012 1.1.3) Q2199-109 ( ) 2013 1.1.3) Q2199-109 ( ) 2014 ontractor and ocation eneral ynamics -111 / arland, X/ eneral ynamics -111 / arland, X/ eneral ynamics -110 / arland X/ ational orge -109 / Irving, / ational orge -109 / Irving, / ational orge -109 / Irving, / -1 ine Item umber / itle: 0145 / eneral urpose ombs ethod/ype or unding ehicle ocation of ward ate ate of irst elivery Item umber / itle [I]: 1 / omb (ach) nit ost pecs vail ow? ate evision vailable Issue ate / ock Island, I ul 2014 ct 2017 200 6,655.00 un 2014 / ock Island, I ul 2017 ul 2020 934 6,765.41 un 2014 / ock Island, I ul 2017 ul 2019 11 12,706.73 ar 2014 / ock Island, I ay 2012 ov 2016 301 32,746.21 ec 2009 / ock Island, I ay 2014 ct 2017 106 31,250.00 ec 2013 / ock Island, I ay 2014 ct 2017 196 25,510.00 ec 2013 1.1.3) Q2199-109 ( ) 2015 (11) / / ock Island, I eb 2016 ul 2019 77 25,995.00 ec 2014 1.1.3) Q2199-109 ( ) 2017 / / ock Island, I ov 2017 ov 2020 46 29,868.00 ec 2014 2.1.1) Q2200 irect ttack oving arget apability -38 2015 (12) he oeing ompany () ( ) / t. harles, 2.1.1) Q2200 irect ttack oving arget apability -38 () ( ) 2016 2.1.1) Q2200 irect ttack oving arget apability -38 () ( ) 2017 2.1.1) Q2200 irect ttack oving arget apability -38 2017 () ( ) 2.1.2) Q2181 aser uided ombs (aytheon) ( ) 2017 2.1.3) Q2181 aser uided ombs (ockheed) ( ) 2017 2.1.4) Q2187 aser uided ombs ( ) 2017 he oeing ompany / t. harles, he oeing ompany / t. harles, he oeing ompany / t. harles, aytheon issile ystems (aytheon) / ucson, Z ockheed artin orporation / rchbald, aytheon issile ystems (aytheon) / ucson, Z 2.1.5) Q2186 uided ombs ailkits ( ) 2014 (13) he oeing ompany uided ombs (ailkits) / t. harles, 2.1.5) Q2186 uided ombs ailkits ( ) 2015 (14) he oeing ompany uided ombs (ailkits) / t. harles, / IIQ I, ax iver, ec 2015 an 2017 1,677 13,920.00 ct 2008 / IIQ I, ax iver, ar 2016 ar 2017 960 14,198.40 ar 2015 / IIQ I, ax iver, ar 2017 ar 2018 742 14,482.36 ar 2015 / IIQ I, ax iver, ar 2017 ar 2018 259 14,981.65 ar 2015 / IIQ Hill, ar 2017 ov 2018 22 14,274.00 an 2014 / IIQ Hill, ar 2017 ov 2018 22 14,274.00 an 2014 / IIQ Hill, ay 2017 an 2019 44 4,417.00 an 2012 / Hill, ct 2014 ct 2015 1,348 20,854.99 ct 2013 / Hill, ep 2015 ep 2016 579 21,383.84 ct 2013 I 0145 - eneral urpose ombs II avy age 8 of 21-1 ine #1 olume 1-8

II xhibit -5a, rocurement History and lanning: 2017 avy ate: ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 1508 / 01 / 1 ost lements 2.1.5) Q2186 uided ombs ailkits ( ) 2015 2.1.5) Q2186 uided ombs ailkits ( ) 2016 2.1.5) Q2186 uided ombs ailkits ( ) 2016 2.1.5) Q2186 uided ombs ailkits ( ) 2017 2.1.5) Q2186 uided ombs ailkits ( ) 2017 3.1.1) Q2196-143 ( ) 2011 3.1.2) Q2032-139 lectrical uze ( ) 2013 3.1.2) Q2032-139 lectrical uze ( ) 2014 3.1.2) Q2032-139 lectrical uze ( ) 2014 3.1.2) Q2032-139 lectrical uze ( ) 2015 3.1.2) Q2032-139 lectrical uze ( ) 2016 3.1.2) Q2032-139 lectrical uze ( ) 2017 3.1.2) Q2032-139 lectrical uze ( ) 2017 ontractor and ocation he oeing ompany uided ombs (ailkits) / t. harles, he oeing ompany uided ombs (ailkits) / t. harles, he oeing ompany uided ombs (ailkits) / t. harles, he oeing ompany uided ombs (ailkits) / t. harles, he oeing ompany uided ombs (ailkits) / t. harles, K actical ystems (143) / ock Island, I -3 ZI & I / III, H -3 ZI & I / III, H -3 ZI & I / III, H -3 ZI & I / III, H -3 ZI & I / III, H -3 ZI & I / III, H -3 ZI & I / III, H 3.1.3) Q2210 Hard arget oid ensing uze ( ) 2015 (15) K actical ystems (H) / Keyser, W 3.1.3) Q2210 Hard arget oid ensing uze ( ) 2016 (16) K actical ystems (H) / Keyser, W -1 ine Item umber / itle: 0145 / eneral urpose ombs ethod/ype or unding ehicle ocation of ward ate ate of irst elivery Item umber / itle [I]: 1 / omb (ach) nit ost pecs vail ow? ate evision vailable Issue ate / Hill, ep 2015 ep 2016 297 21,383.84 ct 2013 / IIQ Hill, pr 2016 pr 2017 992 21,811.51 ct 2014 / IIQ Hill, pr 2016 pr 2017 445 21,811.51 ct 2014 / IIQ Hill, pr 2017 pr 2018 1,696 22,247.74 ct 2014 / IIQ Hill, pr 2017 pr 2018 1,083 22,247.74 ct 2014 / ock Island, I ep 2012 ep 2016 3,205 2,534.79 un 2011 / I, ax iver, ep 2014 ep 2016 4,970 2,400.00 ar 2014 / I, ax iver, ar 2015 ar 2017 2,178 2,027.21 ar 2014 / I, ax iver, ep 2014 ep 2016 527 2,400.00 ar 2014 / I, ax iver, ar 2015 ar 2017 3,746 2,027.21 ar 2014 / I, ax iver, ar 2016 ar 2018 4,028 2,193.19 ar 2014 / I, ax iver, ar 2017 ar 2019 5,009 2,237.05 ar 2015 / I, ax iver, ar 2017 ar 2019 991 2,237.05 ar 2015 / glin, ul 2015 ul 2016 50 22,312.29 ov 2012 / glin, ul 2016 ul 2017 450 19,493.33 ov 2012 ( ) indicates the presence of a -21 ootnotes: (11) he contract award date slipped from ov 2015 to eb 2016 due to delay in source selection activities. I 0145 - eneral urpose ombs II avy age 9 of 21-1 ine #1 olume 1-9

II xhibit -5a, rocurement History and lanning: 2017 avy ate: ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 1508 / 01 / 1-1 ine Item umber / itle: 0145 / eneral urpose ombs Item umber / itle [I]: 1 / omb (12) ue to the delays in the requirements documentation and additional required reviews of the documentation the award date has slipped from une 2015 to ecember 2015. his will not affect the 2016 contract award. deliveries will occur during avy production break. (13) he ecretary of cquisition for the denied the request to waive the ruth In egotiations ct (I) requirement for the uided bomb ail kit contract. s a result, the awarded a ndefinitized ontract ction () for the 2014 procurement in ct 2014 and the order will definitize by an 2016. (14) he awarded a ndefinitized ontract ction () for the 15 procurement in ov 2015 and the order will definitize in an 2016 concurrently with the 14. (15) he Hard arget oid ensing uze is an ir orce lead effort. he 2015 I contract awarded uly 1, 2015. (16) 2016 contract award updated from ay 2016 to uly 2016 to align with the 2015 I delivery schedule. I 0145 - eneral urpose ombs II avy age 10 of 21-1 ine #1 olume 1-10

II xhibit -21, roduction chedule: 2017 avy ate: ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 1508 / 01 / 1 # I 1.1.1) Q2191-111 rior ears eliveries: 7330-1 ine Item umber / itle: 0145 / eneral urpose ombs ost lements (nits in ach) iscal ear 2012 iscal ear 2013 Q I 1 2011 1 Item umber / itle [I]: 1 / omb alendar ear 2012 alendar ear 2013 1 2012 200 (17) - 200 200 1 2017 934-934 934 1.1.2) Q2192-110 rior ears eliveries: 131 2 2017 11-11 11 1.1.3) Q2199-109 rior ears eliveries: 303 3 2012 301 (18) - 301 - - - - - - - - - - - - - - - - - 301 3 2013 106 (19) - 106 106 3 2014 196-196 196 4 2015 77-77 77 4 2017 46-46 46 2.1.1) Q2200 irect ttack oving arget apability -38 () (1) rior ears eliveries: 6145 5 2015 1,677-1,677 1,677 5 2016 960-960 960 5 2017 742-742 742 5 2017 259-259 259 2.1.2) Q2181 aser uided ombs (aytheon) rior ears eliveries: 1296 6 2017 22-22 22 2.1.3) Q2181 aser uided ombs (ockheed) 7 2017 22-22 22 2.1.4) Q2187 aser uided ombs 8 2017 44-44 44 2.1.5) Q2186 uided ombs ailkits (2) 9 2014 1,348 (20) - 1,348 1,348 9 2015 579-579 579 9 2015 297-297 297 I 0145 - eneral urpose ombs II avy age 11 of 21-1 ine #1 olume 1-11

II xhibit -21, roduction chedule: 2017 avy ate: ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 1508 / 01 / 1 # I -1 ine Item umber / itle: 0145 / eneral urpose ombs ost lements (nits in ach) iscal ear 2012 iscal ear 2013 Q I 1 2011 1 Item umber / itle [I]: 1 / omb alendar ear 2012 alendar ear 2013 9 2016 992-992 992 9 2016 445-445 445 9 2017 1,696-1,696 1,696 9 2017 1,083-1,083 1,083 3.1.1) Q2196-143 rior ears eliveries: 2125 10 2011 3,205-3,205 - - - - - - - - - - - - - 3,205 3.1.2) Q2032-139 lectrical uze (5) rior ears eliveries: 36035 11 2013 4,970 (21) - 4,970 4,970 11 2014 2,178-2,178 2,178 11 2014 527-527 527 11 2015 3,746-3,746 3,746 11 2016 4,028-4,028 4,028 11 2017 5,009-5,009 5,009 11 2017 991-991 991 3.1.3) Q2210 Hard arget oid ensing uze 12 2015 50-50 50 12 2016 450-450 450 I 0145 - eneral urpose ombs II avy age 12 of 21-1 ine #1 olume 1-12

II xhibit -21, roduction chedule: 2017 avy ate: ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 1508 / 01 / 1 # I 1.1.1) Q2191-111 rior ears eliveries: 7330-1 ine Item umber / itle: 0145 / eneral urpose ombs ost lements (nits in ach) iscal ear 2014 iscal ear 2015 Q I 1 2013 1 Item umber / itle [I]: 1 / omb alendar ear 2014 alendar ear 2015 1 2012 200 (17) - 200 - - - - - - - - - - - - - - - 200 1 2017 934-934 934 1.1.2) Q2192-110 rior ears eliveries: 131 2 2017 11-11 11 1.1.3) Q2199-109 rior ears eliveries: 303 3 2012 301 (18) - 301 - - - - - - - - - - - - - - - - - - - - - - - - 301 3 2013 106 (19) - 106 - - - - - - - - - - - - - - - - - 106 3 2014 196-196 - - - - - - - - - - - - - - - - - 196 4 2015 77-77 77 4 2017 46-46 46 2.1.1) Q2200 irect ttack oving arget apability -38 () (1) rior ears eliveries: 6145 5 2015 1,677-1,677 1,677 5 2016 960-960 960 5 2017 742-742 742 5 2017 259-259 259 2.1.2) Q2181 aser uided ombs (aytheon) rior ears eliveries: 1296 6 2017 22-22 22 2.1.3) Q2181 aser uided ombs (ockheed) 7 2017 22-22 22 2.1.4) Q2187 aser uided ombs 8 2017 44-44 44 2.1.5) Q2186 uided ombs ailkits (2) 9 2014 1,348 (20) - 1,348 - - - - - - - - - - - - 1,348 9 2015 579-579 - 579 9 2015 297-297 - 297 I 0145 - eneral urpose ombs II avy age 13 of 21-1 ine #1 olume 1-13

II xhibit -21, roduction chedule: 2017 avy ate: ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 1508 / 01 / 1 # I -1 ine Item umber / itle: 0145 / eneral urpose ombs ost lements (nits in ach) iscal ear 2014 iscal ear 2015 Q I 1 2013 1 Item umber / itle [I]: 1 / omb alendar ear 2014 alendar ear 2015 9 2016 992-992 992 9 2016 445-445 445 9 2017 1,696-1,696 1,696 9 2017 1,083-1,083 1,083 3.1.1) Q2196-143 rior ears eliveries: 2125 10 2011 3,205-3,205 - - - - - - - - - - - - - - - - - - - - - - - - 3,205 3.1.2) Q2032-139 lectrical uze (5) rior ears eliveries: 36035 11 2013 4,970 (21) - 4,970 - - - - - - - - - - - - - 4,970 11 2014 2,178-2,178 - - - - - - - 2,178 11 2014 527-527 - - - - - - - - - - - - - 527 11 2015 3,746-3,746 - - - - - - - 3,746 11 2016 4,028-4,028 4,028 11 2017 5,009-5,009 5,009 11 2017 991-991 991 3.1.3) Q2210 Hard arget oid ensing uze 12 2015 50-50 - - - 50 12 2016 450-450 450 I 0145 - eneral urpose ombs II avy age 14 of 21-1 ine #1 olume 1-14

II xhibit -21, roduction chedule: 2017 avy ate: ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 1508 / 01 / 1 # I 1.1.1) Q2191-111 rior ears eliveries: 7330-1 ine Item umber / itle: 0145 / eneral urpose ombs ost lements (nits in ach) iscal ear 2016 iscal ear 2017 Q I 1 2015 1 Item umber / itle [I]: 1 / omb alendar ear 2016 alendar ear 2017 1 2012 200 (17) - 200 - - - - - - - - - - - - - - - - - - - - - - - - 200 1 2017 934-934 - - - 934 1.1.2) Q2192-110 rior ears eliveries: 131 2 2017 11-11 - - - 11 1.1.3) Q2199-109 rior ears eliveries: 303 3 2012 301 (18) - 301 - - - - - - - - - - - - - 301-3 2013 106 (19) - 106 - - - - - - - - - - - - - - - - - - - - - - - - 106 3 2014 196-196 - - - - - - - - - - - - - - - - - - - - - - - - 196 4 2015 77-77 - - - - - - - - - - - - - - - - - - - - 77 4 2017 46-46 46 2.1.1) Q2200 irect ttack oving arget apability -38 () (1) rior ears eliveries: 6145 5 2015 1,677-1,677 - - - - - - - - - - - - - 139 139 139 140 140 140 140 140 140 420 5 2016 960-960 - - - - - - - - - - - - 80 80 80 80 80 80 80 400 5 2017 742-742 - - - - - - - 742 5 2017 259-259 - - - - - - - 259 2.1.2) Q2181 aser uided ombs (aytheon) rior ears eliveries: 1296 6 2017 22-22 - - - - - - - 22 2.1.3) Q2181 aser uided ombs (ockheed) 7 2017 22-22 - - - - - - - 22 2.1.4) Q2187 aser uided ombs 8 2017 44-44 - - - - - 44 2.1.5) Q2186 uided ombs ailkits (2) 9 2014 1,348 (20) - 1,348 324 288 208-36 - 318 174-9 2015 579-579 - - - - - - - - - - - 70 100 100 100 136 73-9 2015 297-297 - - - - - - - - - - - 60 100 100 37 - I 0145 - eneral urpose ombs II avy age 15 of 21-1 ine #1 olume 1-15

II xhibit -21, roduction chedule: 2017 avy ate: ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 1508 / 01 / 1 # I -1 ine Item umber / itle: 0145 / eneral urpose ombs ost lements (nits in ach) iscal ear 2016 iscal ear 2017 Q I 1 2015 1 Item umber / itle [I]: 1 / omb alendar ear 2016 alendar ear 2017 9 2016 992-992 - - - - - - - - - - - - 82 82 82 82 83 83 498 9 2016 445-445 - - - - - - - - - - - - 172 170 103-9 2017 1,696-1,696 - - - - - - 1,696 9 2017 1,083-1,083 - - - - - - 1,083 3.1.1) Q2196-143 rior ears eliveries: 2125 10 2011 3,205-3,205 - - - - - - - - - - - 267 267 267 267 267 267 267 267 267 267 267 268-3.1.2) Q2032-139 lectrical uze (5) rior ears eliveries: 36035 11 2013 4,970 (21) - 4,970 - - - - - - - - - - - 700 800 818 818 917 917-11 2014 2,178-2,178 - - - - - - - - - - - - - - - - - 98 180 180 180 180 180 180 1,000 11 2014 527-527 - - - - - - - - - - - 527-11 2015 3,746-3,746 - - - - - - - - - - - - - - - - - 146 200 300 300 400 400 400 1,600 11 2016 4,028-4,028 - - - - - - - - - - - - - - - - - - - 4,028 11 2017 5,009-5,009 - - - - - - - 5,009 11 2017 991-991 - - - - - - - 991 3.1.3) Q2210 Hard arget oid ensing uze 12 2015 50-50 - - - - - - - - - 10 10 10 10 10-12 2016 450-450 - - - - - - - - - - - - 40 40 40 330 I 0145 - eneral urpose ombs II avy age 16 of 21-1 ine #1 olume 1-16

II xhibit -21, roduction chedule: 2017 avy ate: ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 1508 / 01 / 1 # I 1.1.1) Q2191-111 rior ears eliveries: 7330-1 ine Item umber / itle: 0145 / eneral urpose ombs ost lements (nits in ach) iscal ear 2018 iscal ear 2019 Q I 1 2017 1 Item umber / itle [I]: 1 / omb alendar ear 2018 alendar ear 2019 1 2012 200 (17) - 200 200-1 2017 934-934 - - - - - - - - - - - - - - - - - - - - - - - - 934 1.1.2) Q2192-110 rior ears eliveries: 131 2 2017 11-11 - - - - - - - - - - - - - - - - - - - - - 11-1.1.3) Q2199-109 rior ears eliveries: 303 3 2012 301 (18) 301 - - 3 2013 106 (19) - 106 106-3 2014 196-196 196-4 2015 77-77 - - - - - - - - - - - - - - - - - - - - - 77-4 2017 46-46 - - - - - - - - - - - - - - - - - - - - - - - 46 2.1.1) Q2200 irect ttack oving arget apability -38 () (1) rior ears eliveries: 6145 5 2015 1,677 1,257 420 140 140 140-5 2016 960 560 400 80 80 80 80 80-5 2017 742-742 - - - - - 71 61 61 61 61 61 61 61 61 61 61 61-5 2017 259-259 - - - - - 86 86 87-2.1.2) Q2181 aser uided ombs (aytheon) rior ears eliveries: 1296 6 2017 22-22 - - - - - - - - - - - - - 22-2.1.3) Q2181 aser uided ombs (ockheed) 7 2017 22-22 - - - - - - - - - - - - - 22-2.1.4) Q2187 aser uided ombs 8 2017 44-44 - - - - - - - - - - - - - - - 44-2.1.5) Q2186 uided ombs ailkits (2) 9 2014 1,348 (20) 1,348 - - 9 2015 579 579 - - 9 2015 297 297 - - I 0145 - eneral urpose ombs II avy age 17 of 21-1 ine #1 olume 1-17

II xhibit -21, roduction chedule: 2017 avy ate: ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 1508 / 01 / 1 # I -1 ine Item umber / itle: 0145 / eneral urpose ombs ost lements (nits in ach) iscal ear 2018 iscal ear 2019 Q I 1 2017 1 Item umber / itle [I]: 1 / omb alendar ear 2018 alendar ear 2019 9 2016 992 494 498 83 83 83 83 83 83-9 2016 445 445 - - 9 2017 1,696-1,696 - - - - - - 141 141 141 141 141 141 141 142 142 142 142 141-9 2017 1,083-1,083 - - - - - - 90 90 90 90 90 90 90 90 90 91 91 91-3.1.1) Q2196-143 rior ears eliveries: 2125 10 2011 3,205 3,205 - - 3.1.2) Q2032-139 lectrical uze (5) rior ears eliveries: 36035 11 2013 4,970 (21) 4,970 - - 11 2014 2,178 1,178 1,000 200 200 200 200 200-11 2014 527 527 - - 11 2015 3,746 2,146 1,600 400 400 400 400-11 2016 4,028-4,028 - - - - - 336 336 336 336 336 336 335 335 345 345 346 306-11 2017 5,009-5,009 - - - - - - - - - - - - - - - - - 271 500 500 500 560 630 645 1,403 11 2017 991-991 - - - - - - - - - - - - - - - - - 61 70 70 70 90 90 90 450 3.1.3) Q2210 Hard arget oid ensing uze 12 2015 50 50 - - 12 2016 450 120 330 40 40 40 40 40 40 40 40 10 - I 0145 - eneral urpose ombs II avy age 18 of 21-1 ine #1 olume 1-18

II xhibit -21, roduction chedule: 2017 avy ate: ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 1508 / 01 / 1 # I 1.1.1) Q2191-111 rior ears eliveries: 7330-1 ine Item umber / itle: 0145 / eneral urpose ombs ost lements (nits in ach) iscal ear 2020 iscal ear 2021 Q I 1 2019 1 Item umber / itle [I]: 1 / omb alendar ear 2020 alendar ear 2021 1 2012 200 (17) 200 - - 1 2017 934-934 - - - - - - - - - 200 200 200 200 134-1.1.2) Q2192-110 rior ears eliveries: 131 2 2017 11 11 - - 1.1.3) Q2199-109 rior ears eliveries: 303 3 2012 301 (18) 301 - - 3 2013 106 (19) 106 - - 3 2014 196 196 - - 4 2015 77 77 - - 4 2017 46-46 - - - - - - - - - - - - - 46-2.1.1) Q2200 irect ttack oving arget apability -38 () (1) rior ears eliveries: 6145 5 2015 1,677 1,677 - - 5 2016 960 960 - - 5 2017 742 742 - - 5 2017 259 259 - - 2.1.2) Q2181 aser uided ombs (aytheon) rior ears eliveries: 1296 6 2017 22 22 - - 2.1.3) Q2181 aser uided ombs (ockheed) 7 2017 22 22 - - 2.1.4) Q2187 aser uided ombs 8 2017 44 44 - - 2.1.5) Q2186 uided ombs ailkits (2) 9 2014 1,348 (20) 1,348 - - 9 2015 579 579 - - 9 2015 297 297 - - I 0145 - eneral urpose ombs II avy age 19 of 21-1 ine #1 olume 1-19

II xhibit -21, roduction chedule: 2017 avy ate: ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 1508 / 01 / 1 # I -1 ine Item umber / itle: 0145 / eneral urpose ombs ost lements (nits in ach) iscal ear 2020 iscal ear 2021 Q I 1 2019 1 Item umber / itle [I]: 1 / omb alendar ear 2020 alendar ear 2021 9 2016 992 992 - - 9 2016 445 445 - - 9 2017 1,696 1,696 - - 9 2017 1,083 1,083 - - 3.1.1) Q2196-143 rior ears eliveries: 2125 10 2011 3,205 3,205 - - 3.1.2) Q2032-139 lectrical uze (5) rior ears eliveries: 36035 11 2013 4,970 (21) 4,970 - - 11 2014 2,178 2,178 - - 11 2014 527 527 - - 11 2015 3,746 3,746 - - 11 2016 4,028 4,028 - - 11 2017 5,009 3,606 1,403 680 680 43-11 2017 991 541 450 90 90 90 90 90-3.1.3) Q2210 Hard arget oid ensing uze 12 2015 50 50 - - 12 2016 450 450 - - I 0145 - eneral urpose ombs II avy age 20 of 21-1 ine #1 olume 1-20

II xhibit -21, roduction chedule: 2017 avy ate: ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 1508 / 01 / 1 ef # roduction ates (ach / ear) anufacturer ame - ocation or 2017 1-8-5 or 2017 X or 2017 1 eneral ynamics -111 - arland, X/ 2 eneral ynamics -110 - arland X/ 3 ational orge -109 - Irving, / -1 ine Item umber / itle: 0145 / eneral urpose ombs rior to ct 1 fter ct 1 Initial anufacturing rocurement eadtime (onths) otal fter ct 1 rior to ct 1 Item umber / itle [I]: 1 / omb fter ct 1 eorder anufacturing otal fter ct 1 21,359 38,544 100,200-10 24 34-10 36 46 12,222 21,300 55,296-9 24 33-11 36 47 1,344 2,232 6,480-12 24 36-8 36 44 4 - - - - - 12 24 36-8 36 44 5 he oeing ompany - t. harles, 6 aytheon issile ystems (aytheon) - ucson, Z 7 ockheed artin orporation - rchbald, 8 aytheon issile ystems (aytheon) - ucson, Z 9 he oeing ompany uided ombs (ailkits) - t. harles, 10 K actical ystems (143) - ock Island, I 11-3 ZI & I - III, H 12 K actical ystems (H) - Keyser, W 1,200 4,800 5,760-14 12 26-6 12 18 1,800 4,800 14,400-7 20 27 - - - - 1,728 4,500 36,000-7 20 27 - - - - 1,800 4,800 14,400-7 20 27 - - - - 4,000 10,000 36,000-12 12 24-7 12 19 6,000 10,000 20,000 - - - - - 12 48 60 6,000 10,000 20,000 - - - - - 6 24 30 166 773 992-10 12 22-10 12 22 "" in the elivery chedule indicates the ontract ward ate. ote: ue to space limitations, quantities in the xhibit -21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).if the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). ootnotes: (17) ue to program efficiencies, an additional 200 units were placed on contract in 2014 utilizing the 2012 funding to procure -111's to meet inventory objectives. (18) ational orge produces -109 bombs for both avy and ir orce. he production rate for bombs is based on the total number of bombs in production collectively across types and services. (19) luctuations and gaps in delivery schedules for the -109 are due to ulti-ervice deliveries. (20) luctuations and gaps in delivery schedules for the ailkits are due to ulti-ervice deliveries. (21) luctuations and gaps in delivery schedules for the -139 Z are due to ulti-ervice deliveries. I 0145 - eneral urpose ombs II avy age 21 of 21-1 ine #1 olume 1-21