THIS IS THE KEY LINK OF THE MEDITERRANEAN CORE NETWORK CORRIDOR (TEN-T NETWORK), WHICH WILL BE COMPLETED BY telt-sas.com 2

Similar documents
HANNIBAL Project High Altitude Network for the Needs of Integrated Border-Crossing Applications and Links

EDITORIAL A SHORT HISTORY

The missing link in the Trans-European network in the southern Alps The strategy : what needs to be done

Key figures Observation and analysis of transalpine freight traffic flows. European Commission DG MOVE

Air transport and high-speed train user choices. Expected impacts within the European transport scenario

Key figures Observation and analysis of transalpine freight traffic flows. European Commission DG MOVE

EDITORIAL Striving towards European economic integration and the need for sustainable development are frequently recurring themes of discussion.

Carbon footprint reduction

Mobility and transport

OUR NETWORK. 1:22 24 departures per day. 2:01 10 departures per day. 5:34 3 departures per day. 2:15 18 departures per day. 3:17 11 departures per day

ITA AITES WORLD TUNNEL CONGRESS 2009

TRANSPORT & MOBILITY CONFLICT MAP

PRODUCTS OCTOBER 2018

Further strong revenue increase for the first quarter of Eurotunnel Shuttle revenue showed strong growth to 138.

From policy to regional and local practice : the use of structural funds. The case of Île-de-France

MODAIR: Measure and development of intermodality at AIRport. INO WORKSHOP EEC, December 6 h 2005

HEAVY GOODS VEHICLES Schedule of special traffic bans

The ITGI Project Gas Corridor through Turkey, Greece and Italy

Contents. Executive summary 5

First Steps Towards Sustainable Operation of Road Tunnels. George Mavroyeni Australia

Fabienne MARGAIL HEAD OF HINTERLAND DEPARTMENT MARSEILLE FOS PORT AUTHORITY. HINTERPORT 18 may 201& - Marseille

Annual Performance Report. easier, faster, safer

Connecting Sydney Olympic Park and GPOP with Greater Sydney. Final Summary Report 29 May 2017

Japan India Cooperation on Railway Sector

Tourist residence. SOLEIL de Valfréjus SAVOIE. Traditional and contemporary

Apartment LAGEDON. Property Directions. Address:, 37 chemin de la Chna, CHAMONIX, Mont-Blanc. Coordinates: /

Project Data Sheet BASIC PROJECT DATA

Study Visit in Nouvelle-Aquitaine. Bordeaux. 7th-9th November

L. Issaia - Keramida Consultant to the Managing Director of ERGOSE

AIRPORT- RAIL INTERCONNECTIVITY THE MODAIR PROJECT

VINCI Airports 2017 Q2 traffic

VINCI Airports 2017 Q4 traffic and annual performance

Fast Track to Sustainable Mobility. TGV RHIN RHÔNE Pierre Messulam, Director SNCF-VFE

PRAGELATO VIA LATTEA NEW

Chateau Ste Genevieve Region: Rhone-Alpes Sleeps: 20

Eurailspeed Parallel Session A.1. Alessandro Guiducci Associate Partner KPMG Advisory, Roma

«Village Photovoltaic Plants» Involving a rural community in producing their own renewable energy

Tertiary Economic Activity. Providing services for people.

Chalet La Remuaz. Property Directions. Address: 112 Route du Tour, 74400, Montroc, Mont-Blanc. Coordinates: / 6.

Q3 Results. September 21, 2005» 1

Activity 1. Answer the questions

C O R P O R A T E N E W S

Happy Holiday Homes. Happy Services. Apartement La Creusettaz

TRASFORMATIONS OF WORK

Taking Saturation into account in investment projects: Case study on Paris Lyon line

DaHar Danube Inland Harbour Development

CITY OF BELGRADE BELGRADE LAND DEVELOPMENT PUBLIC AGENCY

CLLD Cooperation OFFER

Action 3.1: Mapping ongoing public and private investments

Towards an alpine macroregion. Francesco Dellagiacoma

Olivier Badard Senior Vice-President, Asia, Middle East & North Africa, Urban Mobility Forum- Cairo

FY key data Passenger. Cargo. Maintenance. Other. Operating result in m. Revenues in bn -10.4% 78% 11%

Safe, Timely & Comfortable Move for Better Future ~Japan-India Cooperation on Railway Sector ~

LIFE IN METROPOLITAN AREAS IN THE 21 ST CENTURY

For the international protection

The importance of travel information for tourists and residents in the Alps the AlpInfoNet project

DIRECT PUBLIC INVESTMENT

Special Coordination Service for Implementation (SCOS) - ROLE

The strategic importance of the Danube for a sustainable development of the region. Transnational pilot-workshop Cross-programme ETC Danube projects

Egnatia Odos: An axis for development and co-operation

2009 Carole Marsh/Gallopade International

The Baltic-Adriatic Axis. Better Infrastructure for Europe

K-AIR MAKES EXECUTIVE FLIGHT MORE ACCESSIBLE

Sino-European Sustainable Urbanisation Park (SUP)

Crossborder tramwayline Strasbourg (FR) Kehl (DE)

LAM September 2 st 6 th, Lyon, France. Chair & Co-Chair : Valentina Giordano (ILM, Lyon) and Beatrice Ruta (ILM, Lyon)

Transportation of Eastern gas to Italy

Aéroports de Montréal

Doing business. in Nuevo Leon

Chateau Ste Genevieve Region: Rhone-Alpes Guide Price: 11,624-13,078 per week Sleeps: 20

The support of an European ANSP

FY revenue on target, with growth of 6.5% (3.9% organic)

284,557 inhabitants + 23% 60,000 vehicles during peak periods Growing need in terms of moving people public transit Saturation of the road network

GREATER PARIS OUR SOLUTIONS FOR THE DEVELOPMENT OF YOUR REGIONS

UNIVERSITY OF AIX-MARSEILLES

Half-yearly Report 2013

IAT Annual Conference 'Driving Forward

AlpInfoNet Sustainable Mobility Information Network for the Alpine Space. Bolzano, 27th September 2013

INTERNATIONAL WORKSHOP THE ALPS AND THE ARDENNES: SHARING EXPERIENCES AMONG TRANSBOUNDARY MOUNTAIN AREAS

AN ECONOMIC PERSPECTIVE ON THE 5 YEARS AFTER ITS LAUNCH

MONTRÉAL IN NORTH AMERICA

PPP MODEL FOR REFURBISHING AND MANAGING PRAGUE CENTRAL STATION

INFRASTRUCTURE ENGINEERING

Nikolina Angelkova TRANSPORT AND ITC PRIORITIES. Minister of Transport, Information Technology and Communications. 28 August 2014 Sofia

General Information. Government

TRANSPORTS POLICIES IN PARIS-ILE-DE- FRANCE REGION

Noise impact of an international traffic corridor in alpine environment: traffic scenarios and population exposure in Mont Blanc area

Infrastructure development: Vienna Vienna Int. Airport Bruck/Leitha state border near Nickelsdorf ( airport link )

Ex-Ante Evaluation (for Japanese ODA Loan)

Sales increased and income will be on a recovery track in the second half of the fiscal year.

DNE Summit 2017 French Office

ANA HOLDINGS Financial Results for the Three Months Ended June 30, 2018

Società del Gruppo FS. Domestic and International Network OCRA PROJECT

Government of Montenegro. Ministry of Transport and Maritime Affairs. Podgorica, April 2013

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

Frankfurt Hotel 2014/2015. Frankfurt. Market Report. Accelerating success.

HAMBURG. APPLICATION FOR THE TITLE AS EUROPEAN GREEN CAPITAL.

Economic Development Sub- Committee

Air-baggage drop-off during train ride to the airport

Association for Rural Tourism - Rhône / Workshop on rural tourism - Ankara February 2013

Transcription:

telt-sas.com 1

LYON-TURIN: A EUROPEAN PROJECT telt-sas.com 2 The Lyon-Turin railway line is part of a global project which aims at connecting eastern and western Europe through a new cross-border line across the Alps. THIS IS THE KEY LINK OF THE MEDITERRANEAN CORE NETWORK CORRIDOR (TEN-T NETWORK), WHICH WILL BE COMPLETED BY 2030.

- 1 MILLION TRUCKS ACROSS THE ALPS telt-sas.com 4 There is a market for rail traffic, but the old Frejus railway does not match the demand. The rail mode is able to catch only a little part of it: 9% of the total, compared with the 64% on the Swiss axis and the 69% of the Austrian one. This is because of the constraints in terms of time and costs associated with the old railway line. According to the Lyon-Turin cost-benefit analysis, the new line will lead to an annual reduction greenhouse gas up to 3 Mln Tons a year. This amount is comparable to the emissions produced by a city of 300,000 inhabitants. This positive outcome will be guaranteed by the relocation of 1 Mln trucks from the road to the railway.

THE NEW LINE AND THE MONT-CENIS BASE TUNNEL NEW LYON-TURIN LINE: 269.8 Km from Lyon to Turin 70 % in France 30 % in Italy CROSS-BORDER SECTION MONT-CENIS BASE TUNNEL 57.5 km long 45 km in France 12.5 km in Italy

THE MONT-CENIS BASE TUNNEL telt-sas.com 5 162 km of tunnels

TELT: WHO WE ARE

TELT: SHAREHOLDERS 50% 50%

FINANCING The project is wholly financed by public funds EU 50% France Italy EU Financing of studies and reconnaissance works France 25% Italy 25% 8.6 billion (euro 2012, constant prices) COST CERTIFIED BY * EU 40% France Italy EU Financing of the main works France 25% Italy 35% Agreement 2016-2019

CROSS-BORDER SECTION: works already completed telt-sas.com 9 67 KM Exploratory tunnels 13% galleries already realized and equivalent to 20.6 Km drilled 20% works under contract

CROSS-BORDER SECTION: works already completed Access adit in Saint Martin La Porte (2,400 m) From 2003 to 2010 Exploratory Tunnel (9,000 m) From 2014 Access adit in Villarodin-Bourget / Modane (4,000 m) From 2002 to 2007 DONE «La Maddalena» Exploratory Tunnel From 2012 to 2016 DONE DONE Saint-Jean-de-Maurienne Access adit in La Praz (2,480 m) From 2005 to 2009 Susa-Bussoleno DONE

CROSS-BORDER SECTION: Saint-Martin-la-Porte work site, currently in activity More than 25% of the total 9 Km has already been excavated In axis and at the same diameter of the south pipe of the base tunnel telt-sas.com 11

CROSS-BORDER SECTION: the Chiomonte site, currently in activity telt-sas.com 12 In February 2017 all exploratory objectives were achieved: geological, environmental, and testing of mechanical drilling with TBM method

START OF DEFINITIVE WORKS The Interministerial Committee for Economic Planning has approved the REALISATION OF THE 1st AND 2nd PART OF THE Lyon-Turin railway link, international section, common FRENCH-ITALIAN part, cross-border section organized in constructive lots. telt-sas.com 13

CALLS FOR TENDERS

OVERVIEW ON THE TENDERS telt-sas.com 81 38 43 tenders WORKS 45 19 under threshold (< 5.2 M ) 8 5.2M < < 50 M 14 50M < < 500 M 36 ENGINEERING 8 underthreshold (< 418,000 ) 18 418,000 < < 5 M 6 5M < < 10 M 500M < 4 < 1,300 M 4 > 10 M WE EXPECT ABOUT 20,000 SUBCONTRACTORS AND SUPPLIERS

CROSS-BORDER SECTION: THE CALENDAR OF THE CALLS FOR TENDER 63 TENDERS before 2019 4 TENDERS in 2020 3 TENDERS in 2021 5 TENDERS in 2022 *Provisional terms Before 31/12/2019 1.9 Billion Awarded over 6.5 Billion of contracts telt-sas.com N CO 1 1 2 1 e 2 3 4 5 6 1 2 3 4 7 8 9 10 11 12 13 14 15 16 17 2 18 19 20 21 22 23 24 25 26 27 28 29 30 3-4 31 32 33 34 35 36 37 38 39 40 5 41 42 43 44 45 46 47 48 49 5 6 7 8 9 50 51 52 53 6 e 7 54 55 8 56 57 58 59 60 61 62 9 63 64 65 66 67 68 69 70 71 72 10 73 74 75 76 77 78 79 11 80 81 IT FR IT FR 2017 2018 2019 2020 2021 2022

THE TERRITORY

ITALY 2017-2029: SOLUTIONS FOR THE LOCAL AREAS 1 ASSESSING THE IMPACT ON CITIZENS' HEALTH (135 PARAMETERS UNDER CONTROL) 3 WORK SITES DESIGNED AS INDUSTRIAL SITES 2 RESTORATION OF BADLY AFFECTED AREAS ENVIRONMENTA L PROTECTION AND CITIZENS HEALTH PROTECTION 4RECOVERY OF PUBLIC BUILDINGS FOR WORKERS ACCOMMODATION

ITALY 2017-2029: SOLUTIONS FOR LOCAL AREAS 5 A NEW INTERNATIONAL STATION IN SUSA: INTERCONNECTION BETWEEN HISTORICAL AND NEW RAILWAY LINE LOCAL RESOURCES ENHANCEMENT The project for the new International Station, in Susa, is the result of an international architectural competition, awarded to the French-Japanese team Kengo Kuma & Associates.

CONNECTING LONDON, MADRID, AND PARIS TO THE ALPES

INTEGRATION WITH THE METROPOLITAN RAILWAY SYSTEM telt-sas.com 21 The metropolitan railway system (SFM), includes 8 lines for an overall length of 500 km, and 356 trains a day. Its purpose is to boost multimodality. This system allows passengers to travel across Turin, with a train every 8 minutes in the rush hour, as well as reaching Asti and Cuneo, in the Southern area of Piedmont.

INTEGRATION WITH THE METROPOLITAN RAILWAY SYSTEM telt-sas.com 22 The new SFM5 line will connect the Western hinterland and the freight hub in Orbassano with the central station of Porta Susa, in Turin. It will take only 15 minutes to cover this distance, thanks to this new connection, which is part of the so-called nodo di Torino. It will be the first part of the Lyon-Turin line to be fully operational, by 2020. Its overall cost is of 70.5 million euros.

IN FRANCE PROJECTS FOR LOCAL COMMUNITIES 9 40.7 MILLIONS TO SUPPORT THE WORK SITE A project to support the work site in the Auvergne- Rhône-Alpes region has already been implemented. It is the result of the cooperation between the Government, the Region, the Department,and the public promoter. GOALS: ØEconomy diversification and employment increase ØImproving life quality: renovation of buildings, historicaltown centers, international station ØNetwork and mobility enhancement ØReduce air pollution

THE INTERNATIONAL STATION IN SAINT-JEAN DE MAURIENNE THE NEW STATION WILL BE SURROUNDED BY NEW NEIGHBORHOODS, BUILT THANKS TO THE «DEMARCHE GRAND CHANTIER» FUNDS Modane Torino Ligne historique Susa Torino Ligne nouvelle Chambéry - Lyon Ligne historique Chambéry - Lyon Ligne nouvelle (Accès Français)