Bandra Worli Sea Link

Similar documents
Mumbai Metro Line-3 (Colaba-Bandra-SEEPZ) Civil work contracts awarded to five contractors Mumbai, July 5, The Mumbai Metro Line-3

Hong Kong International Airport (Chek-Lap Kok Airport)

THE BOMBAY COASTAL PROJECT ABRAHAM JOHN ARCHITECTS

Infrastructure Projects in Mumbai Metropolitan Region & Maharashtra

Congestion. Addressing urban congestion in SEQ. How do you define congestion? South East Queensland is growing. Sustained growth in motorised travel

A VISION FOR I-95. January 12, Delaware Department of Transportation

Dulles Corridor Improvements. Drive to Ride

How is air quality managed. in Sydney s road tunnels?

Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy

South East Traffic Solution

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

Japan India Cooperation on Railway Sector

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

Development of Road Infrastructure in India

$244 $45 OVERVIEW National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY

THE MERSEY GATEWAY LASTING INFRASTRUCTURE CONNECTING SOCIETIES

Transport in Melbourne s Westen Suburbs: Alternatives to the Westgate Tunnel

Safe, Timely & Comfortable Move for Better Future ~Japan-India Cooperation on Railway Sector ~

The Coalition s Policy to Build Melbourne s East West Link

The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

Eleven things you should know about the carpool lanes in Los Angeles County.

THE CHARTERED INSTITUTION OF HIGHWAYS & TRANSPORTATION. The A19 Trunk Road

Score. Category. Access Aesthetics Community Resources

waterview connection Completing the Western Ring Route the Waterview Connection

UNLOCKING THE BRIGHTON MAINLINE

Congestion Pricing The Latest Weapon the U.S. War on Traffic Congestion. Darren Henderson, AICP

Written evidence submitted by National Express West Midlands (BSB 15)

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

Commonwealth Avenue Bridge Deck Replacement Project. Legislative and Stakeholder Briefing. April 13, 2017

The Transportation Corridor Overlay District

PARTICIPATORY ARCHITECTURE AND URBANISM

Report on the Crafthole Traffic Light Project 3 rd July th September 2017

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Overview of Highway 37 Project. Napa County Board of Supervisors December 20, 2016

March 4, Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation Authority 347 Madison Avenue New York, NY Re: Report 2007-F-31

Overview of Highway 37 Project. Novato Rotary November 4, 2016

Hospital Link Project Project Update September 2015

NEW BRIGHTON Travel Plan October 2008

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

Organization Date. Sound Regional Council Regional Project Evaluation Committee. Brian Nielsen, Program Administrator

A140 study and Major Road Network

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

McLean Citizens Association Transportation Committee Project Briefing

MEMORANDUM. for HOV Monitoring on I-93 North and the Southeast Expressway, Boston Region MPO, November, 2011.

Connectivity continues to remain one of the biggest concerns for north Chennai residents with thousands of commuters struggling every day

Rail Budget 2013: Highlights

Why does Sydney need a new fast Metro to the West? A fast Metro to the west is a vital component of this Plan

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

%g 109 %g 9. %g 99. %g 9. %g 4. %g 4 %g ,95 (/ 1. Route 109 Corridor Study. %g 35. Corridor Study Area Study Area. Sanford.

5.1 Traffic and Transportation

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

We further recognise that some pain and changes are required from the entire City in order to construct and deliver the project.

PROJECT INFORMATION. Place of the Project Bangalore City District. Bangalore Urban Sector. 30 years (concession period)

Arlington County Board Meeting Project Briefing. October 20, 2015

Michèle Dix Managing Director 17 January 2018

Westshore Development Forum April 9, 2014

TBARTA: 2015 Master Plan and Tampa Bay Express Project

Delivering a stronger economy

CITY OF BELGRADE BELGRADE LAND DEVELOPMENT PUBLIC AGENCY

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Policy Transport. Policy highlights. Our plan

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

Sky Temporary Car Park Transport Statement

A Tour Across America s Managed Lanes Mike Heiligenstein, Executive Director Central Texas Regional Mobility Authority

Bus Priority Package. Presentation to Leigh Business Forum. 11 December 2015

PLANNING THE SUNBURY GROWTH CORRIDOR

Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options.

in the nineteen eighties, France built a freeway linking Paris directly with Spain 5:26

L&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL)

A303 Stonehenge Amesbury to Berwick Down

South of Fraser Transportation Priorities March 2017 Engagement

PROJECT UPDATE BETTER TIMES AHEAD ON CLEM7 CLEM JONES TUNNEL. Fast facts AUGUST 2008

Public Informational Meeting

THE VENUE CITY MUMBAI

New Domestic Cruise Terminal in Mumbai Inaugurated by Union Minister Shri Nitin Gadkari and Chief Minister of Maharashtra

Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

Proposed Dulles Toll Road Rate Adjustments

Business Growth (as of mid 2002)

Everett Riverwalk Life style explore

Manigurr-ma Palmerston partnership showcases city

TABLE OF CONTENTS. 1 P age

Smart Motorways Programme

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05

Ground Transportation Strategy. Victoria Airport Authority

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Elected Officials and Media Briefing I-395 Express Lanes Northern Extension

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required.

AnnualReport. introduction. key facts. information. May 2013-April stagecoachbus.com/south

ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY

Department for External Economic and International Relations The Government of Moscow. Potential of Moscow

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

I-405 Express Toll Lanes Coming in 2015

Investing in Greater Manchester transport 2017/2018

Transcription:

The Bridge to Mumbai's Future: Bandra Worli Sea Link With technology from across the world and engineers from seven countries, the Bandra-Worli Sea Link, India's first bridge across the sea seems like a long awaited dream come true for thousands of commuters who travel between Mumbai's sprawling, prosperous Western suburbs and its southern business heart. In a city that adds more than 500 vehicles every day, the Sea Link is the only hope for drivers who must cross 23 signals between Bandra and Worli currently. When it opens, it will carry 90,000 of the 1.30 lakh vehicles that now cross Mahim causeway. Conceived in the 1990s and contracted in 2000, the Bandra-Worli Sea Link is the visible evidence of the multi-crore Mumbai makeover dream. The Sea Link is the first of a ring of expressways skimming along the w e s t e r n c o a s t, including the Worli- Nariman Point Sea Link, with dispersal to Cuffe Parade. The Sea Link will also be supported by a series of flyovers, rail link, roadways and other public facilities. Its importance can be gauged from the f a c t t h a t t h e booming western sea board is not just home to the newly prosperous but to the exploding middle-class and thousands of companies and people that drive the city's new economy: entertainment, infotech and finance. Commuters on the rapidly grid-locking western link roads regard the Sea Link as a magic wand. Many have looked in awe at the Sea Link's grand central tower rising above the concrete decks inching towards each other from north and south. Project Background Commuters on the rapidly grid-locking western link roads regard the sea link as a magic wand The Bandra Worli Sea Link will be an 8-lane, cablestayed bridge with pre-stressed concrete viaduct approaches, which will link Bandra and the western 1

suburbs of Mumbai with Worli and central Mumbai. It is the first phase of the proposed West Island Freeway system proposed to be built to improve the connectivity between the island city of Mumbai and its western suburbs. The Rs. 1600 crore project of Maharashtra State Road Development Corporation (MSRDC) is being executed by Hindustan Construction Company. Designs and Project management is by M/s DAR Consultants. The bridge is now slated to open in the third week of June. The Sea Link will enable speedy travel between Bandra and Worli, cutting travel times from 60 75 minutes to around 7 minutes. The Bandra Worli Sea Link Project has been one of the most highly recommended projects of all the transport studies done for the metropolitan region during the last forty years. At present, Mahim causeway is the only link connecting western suburbs to island city of Mumbai. The existing north south western corridor is highly congested and during the peak hours results in a bottleneck at Mahim Causeway. Vehicular traffic admeasuring about 1,20,000 PCU travels on the Mahim causeway everyday and during peak hours and it takes about forty minutes to travel from Mahim causeway to Worli, a distance of about 8 km. Project Location Express Highway and Swami Vivekananda road at Bandra and connects to Worli at Worli end with overall length of 5.6 kms for the entire project. A cloverleaf interchange at Mahim intersection and a flyover at the Lovegrove intersection have been proposed as part of this project to enhance the faster and safe traffic dispersal. Tata Mutual Fund Employees and Distributors on a visit to the Bandra Worli Sea Link 2

Salient Features An 8-lane bridge with 2 lanes dedicated for buses. Unique bridge design for the Link Bridge to emerge as a land mark structure in the city. Single tower supported 500 meters long Cable Stayed Bridge at Bandra Channel and Twin tower supported 350m Cable Stayed Bridge at Worli Channel for each carriageway. 3

Modern toll plaza of 16 lanes with automated toll collection system. Benefits of the project An intelligent bridge with state - of - art systems for traffic monitoring, surveillance, information and guidance, instrumentation, emergency support etc. Development of promenade and landscaping to enhance the environment. Engineering Marvel The Bandra Cable Stay section of the Bandra Worli Sea Link is 600 metres in length and towers to a height of 126 metres. The length of steel used for the cable stayed bridge of the sea-link is estimated to be close to 40,000 km while the pylons through which they are passed are approximately 180 metres, the height of a sixstorey building. The cable stay system is made up of high strength galvanized steel wires which support the cable stay bridge weighing 20,000 tonne. The 500-metre-cable stayed portion, where a part of the sea link is held up by steel cables, has been completed in four months, officials from HCC, the construction company building the Bandra-Worli Sea Link. The second cable stayed bridge is estimated to take approximately three to four months to be completed. Project Benefits Savings in vehicle operating cost to the tune of Rs.100 crores per annum due to reduction in congestion in the existing roads and lower vehicle operating cost on the bridge. Considerable savings in travel time due to increased speed and reduced delays at intersections at existing roads. Ease in driving with reduced mental tension and overall improvement in the quality of life. 4

Improvement in environment especially in terms of reduction in carbon monoxide, oxides of nitrogen and reduction in noise pollution in areas of Mahim, Dadar, Prabhadevi and Worli. Project to have no adverse effect on fisheries, marine life and livelihood of fishermen. Reduced accidents. Proper landscaping measures along the approaches and promenade along waterfront to enhance environment of the area. Project Future The Maharashtra Government has announced the extension of Bandra-Worli sea link in Mumbai by another 3.6 km up to Haji Ali at an additional cost of Rs 1,200 crore (Rs 12 billion). The bidding process for the project will be completed and work orders be issued for the extension project by the end of this year. The extension project will be carried out on a buildoperate-own-transfer (BOOT) basis and the successful bidder will also have to buy out MSRDC from Bandra Worli Sea Link project. The successful bidder will get the rights to collect toll on both the sea links for next thirty years. The MSRDC is expected to incur a cost of Rs 1,640 crore (Rs 16.4 billion) on the Bandra Worli sea link. With technology from across the world, engineers from seven countries and workers from across India, the Bandra Worli Sea Link rises above the Arabian Sea. 5