1 CLEM JONES TUNNEL PROJECT UPDATE AUGUST 2008 Two kilometres of tunnel has been excavated at Kangaroo Point and tunnel lining work is now under way. BETTER TIMES AHEAD ON CLEM7 Fast facts Road length 6.8 kilometres Tunnel length 4.8 kilometre twin, 2-lane tunnels Rock to be excavated 3.5 million tonnes Tunnel lining segments 38,000 Concrete to construct tunnel 280,000 cubic metres Brisbane motorists can look forward to better times ahead with progress continuing ahead of schedule on Brisbane s first major road tunnel the Clem Jones Tunnel (CLEM7). The project s two massive tunnel boring machines have each advanced more than 1.2 kilometres and are currently digging 50 metres below Brisbane s Fortitude Valley. Tunnelling four kilometres from Bowen Hills to Woolloongabba, Matilda and Florence remain on track to be under the Brisbane River by September Smaller roadheader tunnelling machines working at Kangaroo Point and Woolloongabba have now completed more than 70% of their rock excavation. Above ground, 14 of 18 bridges are substantially built and 30% of road surface works is already complete. clem7.com.au 1
2 About the CLEM7 Clem Jones Tunnel (CLEM7) is Brisbane s first major road tunnel and the first section of the new M7 motorway. Formerly known as the North-South Bypass Tunnel, Brisbane City Council re-named the tunnel to recognise the enormous contribution made by Brisbane s longest serving Lord Mayor, Clem Jones. Clem Jones served as Lord Mayor from 1961 to 1975, overseeing the city s growth from a sleepy country town to a vibrant subtropical city. M7 He was a great advocate of progress and was responsible for Brisbane s first town plan. His achievements include establishing sewerage, water and road networks. Clem Jones passed away in 2007, aged 89. Scheduled to be open in 2010, the tunnel will link to five major roads on the north and south sides of the Brisbane River which together carry 400,000 vehicles every day. The benefits Motorists using the CLEM7 will enjoy faster, safer and more reliable travel as they avoid up to 18 sets of traffic lights and reduce their travel times by up to 30% Reduced stop-start traffic on congested roads will lower fuel costs and reduce wear and tear on vehicles Businesses delivering goods to customers, tradesman trying to get to their next job and taxi drivers will benefit from improved travel times, reduced operating costs and predictable travel CBD M7 M1 The additional river crossing and much needed bypass of the Brisbane CBD will reduce congestion on the traffic network M3 Local communities will benefit from new and upgraded bike and pedestrian paths, and improved local road connections CONTACT US For more information about the project: Call us on Visit the website clem7.com.au Or contactus@nsbt.incite.com.au For investor enquiries please call
3 CONSTRUCTION REACHES TOP GEAR There are now more than 1,500 people working above and below Brisbane streets constructing the CLEM7. Almost five kilometres of tunnel has been excavated by the project s tunnel boring machines and roadheaders. Activity Total advance by tunnel boring machines Progress 2.4 kilometres The project remains on target to complete all bridges at either end of the tunnel by the end of The construction team has been installing noise walls, cycle paths and street lights. Landscaping has also commenced with more than 250,000 trees, shrubs and ground cover plants to be planted prior to the CLEM7 opening. Roadheader excavation 260,000m 3 (70%) Number of tunnel lining segments manufactured 19,000 (50%) Bridges substantially complete 14 of 18 Surface roads 50,000m 2 (30%) Number of people working 1,500 1 Cut and cover tunnelling at Woolloongabba providing direct connections to the Pacific Motorway and Ipswich Road. 2 The project s two tunnel boring machines have each advanced more than 1.2 kilometres as they travel south towards Woolloongabba. 3 (From left) LBB JV Project Director Adam Hudson, RiverCity Motorway CEO Flan Cleary, Brisbane Lord Mayor Campbell Newman and Deputy Lord Mayor Councillor Graham Quirk unveiling the new CLEM7 logo. 3
4 Brisbane tuff not so tough The two massive tunnel boring machines digging the CLEM7 are finding Brisbane Tuff not so tough after eating their way through more than 550,000 tonnes of the City s hard rock. Tunnelling four kilometres from Bowen Hills to Woolloongabba, Matilda and Florence have each advanced more than 1.2 kilometres. Both tunnel boring machines and are now excavating rock and placing tunnel lining more than 50 metres below Brisbane s Fortitude Valley. The tunnel boring machines remain on track to be under the Brisbane River by September The machines are expected to breakthrough at Kangaroo Point in late 2008 and then finish their journey at Woolloongabba by mid To date, more than 19,000 concrete tunnel lining segments have been manufactured, which is more than 50% of the total number to be produced at the project s factory in Eagle Farm. 1 Rock excavated at the tunnel face is removed via an internal conveyor that runs the length of the tunnel. 2 38,000 concrete segments each weighing 8.5 tonnes will be used to fully line the 4.8km twin tunnels. 3 Tunnel boring machine operators use laser guidance systems to direct their journey below Brisbane streets. 4 A mini-tunnel is being constructed below the road surface to carry electrical, telecommunication and other cables. 5 Cross-passages are excavated every 120 metres to provide a connection between the twin tunnel tubes. 6 Each of the two tunnel boring machines is 12.4 metres in diameter, weighs 4000 tonne and is 261 metres long. 4
5 TUNNEL BORING MACHINES Diameter 12.4 metres Length 261 metres Weight 4,000 tonne Cutters 78 tungsten carbide tipped 19 inch disc cutters Cost A$50 million per machine Progress Up to 20 metres per day Crew 22 people per shift 5
6 Roadheaders making excellent headway Roadheader tunnelling is well advanced with 70% of the excavation now complete. At Kangaroo Point, 90% of the rock has been excavated on the two kilometre section of tunnel that will create the Shaftson Avenue on and off ramps and sections of the mainline tunnels. With the majority of the excavation now complete, final lining work has commenced including the installation of the waterproofing membrane, lattice girders, shotcrete and cast in-situ concrete tunnel walls. Tunnellers working at the Woolloongabba worksite have excavated 500 metres of tunnel as they dig sections of the northbound and southbound tunnel towards the Pacific Motorway and Ipswich Road. 1 Tunnel lining work has now commenced at Kangaroo Point. 2 Eight roadheaders working at Kangaroo Point and Woolloongabba will excavate 25 percent of the tunnel. 3 Tunnellers at Woolloongabba are excavating south towards the Pacific Motorway and Ipswich Road of the 18 bridges being constructed at either end of the tunnel are now substantially complete. 5 The construction team will install a total of 1,100 bridge deck units. 6 When complete, the 3-level northern interchange will carry more than 100,000 motorists every day. 6
7 Bridges provide smooth tunnel ride Eighteen bridges being constructed at either end of the CLEM7 will provide smooth access for motorists as they enter and exit the tunnel. The first section of the CLEM7 s northern interchange opened to traffic in April Providing a direct link north from the Inner City Bypass to Lutwyche Road, it is the first of 11 bridges that together create one of the largest traffic interchanges in Brisbane. When complete the 3-level northern interchange will cater for more than 100,000 motorists every day. The interchange will also provide a direct connection between the Clem Jones Tunnel and the planned Airport Link tunnel. This will enable motorists to travel from Woolloongabba to the Airport without passing through a single set of traffic lights. At the southern end of the tunnel Woolloongabba residents are now benefiting from a new local bridge and bike path, which were opened by the project at the end of May All 18 bridges will be substantially complete by the end of BRIDGES Total number of bridges 18 Number of bridge beams 350 Super T bridge beams Length of bridge beams 25 kilometres if placed end-to-end Number of bridge deck units 1,100 Biggest bridge beam 39 metres long and weighs 75 tonne 7
8 PROJECT PARTNERS BRISBANE CITY COUNCIL Brisbane City Council is the largest local government authority in Australia both in population and budget with jurisdiction over an area of 1,367 square kilometres. TransApex is Australia s largest urban road project and Council s long-term plan to improve travel for Brisbane motorists. It will provide a series of new tunnels and bridges that connect existing motorways and major arterial roads. In April 2006, Brisbane City Council selected RiverCity Motorway Group to finance, design, build, own and operate the first major component of the TransApex project Clem Jones Tunnel (CLEM7). RIVERCITY MOTORWAY GROUP RiverCity Motorway Group is a Queensland toll road company that will operate the CLEM7 until RiverCity Motorway Group is publicly listed on the Australian Stock Exchange and has more than 10,000 investors. Fifteen percent of the company s investors live in Queensland with the remaining investors from across Australia and overseas. The Group has a number of major institutional investors including AMP Capital, Perpetual Investments, ABN Amro, Macquarie Bank and Babcock and Brown. The company s board and management team have outstanding experience in the successful delivery and operation of toll roads. At the completion of the 45-year concession period RiverCity Motorway Group will hand the tunnel back to Brisbane City Council. Leighton Contractors and Baulderstone Hornibrook Bilfinger Berger Joint Venture RiverCity Motorway has contracted the design and construction of the tunnel to the Leighton Contractors and Baulderstone Hornibrook Bilfinger Berger Joint Venture (LBB JV). This joint venture unites the infrastructure expertise of Leighton Contractors and Baulderstone Hornibrook and the tunnelling experience of Bilfinger Berger. Leighton Services and Bilfinger Berger Services will maintain the North-South Bypass Tunnel during the concession period. The tunnel boring machines have each excavated more than 1.2 kilometres of tunnel and remain on target to be digging under the Brisbane River by September clem7.com.au
For personal use only
11 October 2018 September Quarter Update 2018 Transurban today released its September quarter 2018 update. During the period, Average Daily Traffic (ADT) increased by 3.3%, with growth across all markets.
More informationBridging Brisbane Survey 2017 Supplementary Report
1: Moggill Road Bridge (at Moggill ferry crossing) This river crossing connects Moggill Ferry Road at Riverview with the end of Moggill Road at Moggill where the ferry currently operates. It links the
More informationNorth South Bypass Tunnel Investor Briefing. Andy Summers, Chief Executive, UGL Infrastructure 26 th March 2009
North South Bypass Tunnel Investor Briefing Andy Summers, Chief Executive, UGL Infrastructure 26 th March 2009 UGL Infrastructure Overview Leading provider of construction, engineering and maintenance
More informationFor personal use only
asx release 21 October 2015 Presentation to Morgans Queensland Conference Please find attached the presentation that Transurban CEO Scott Charlton will be delivering at today s Morgans Queensland Conference.
More informationMoving Brisbane is the Newman Liberal team s blueprint for a modern and efficient transport system.
Moving Brisbane Moving Brisbane is the Newman Liberal team s blueprint for a modern and efficient transport system. From roads and river crossings, to buses and bikes, Moving Brisbane addresses every component
More informationWe further recognise that some pain and changes are required from the entire City in order to construct and deliver the project.
70 Merivale Street PO Box 2001 South Bank QLD 4101 Ph: 07 3846 5191 Email: janinew@businesssouthbank.com.au www.businesssouthbank.com.au ABN 28 285 012 048 21 May 2018 The Right Honourable Lord Mayor Councillor
More informationConcord Road Interchange. Standard hours of work
Artist impression of the Concord Road interchange, Concord - concept only WestConnex s M4 East will extend the M4 Motorway with two new 5.5 kilometre tunnels from Homebush to Haberfield, providing a bypass
More informationROAD AND HIGHWAY. we see things differently
CAPABILITY STATEMENT 2014 ROAD AND HIGHWAY we see things differently Legacy Way, QLD specialist expertise in road & highway national company 34 Years in business 1,700 employees 200 200 BMD delivers on
More informationWellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY
National Land Transport Programme 2015 18 Wellington WELLINGTON REGIONAL SUMMARY OVERVIEW The Wellington region is made up of a number of cities, urban areas and supporting rural hinterland. The city is
More informationICN Gateway Breakfast (SA) Jon Whelan A/Manager Project Delivery 9 July 2015
ICN Gateway Breakfast (SA) Jon Whelan A/Manager Project Delivery 9 July 2015 78 km running between Old Noarlunga and Gawler Adelaide s North South Corridor Torrens Road to River Torrens [due for completion
More informationCommunity Engagement and Community Representation in a Pressure Cooker
Community Engagement and Community Representation in a Pressure Cooker Tim Nicholls * For the past two decades, the rate of interstate migration to Queensland has been the prime driving force behind the
More informationMonthly Traffic Update
Brisbane Airport Corporation Monthly Traffic Update PAGE 1 ISSUE 26 DECEMBER 2009 Northern Access Road Project opens 3 December Brisbane Airport Corporation (BAC) is pleased to announce that after two
More information5.7 Local road upgrades
5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and
More informationTRANSURBAN QUEENSLAND S $512M LOGAN ENHANCEMENT PROJECT APPROVED
asx release 23 November 2016 TRANSURBAN QUEENSLAND S $512M LOGAN ENHANCEMENT PROJECT APPROVED Transurban announces that the Queensland Government has approved its $512 million Logan Enhancement Project.
More informationthe changing face of construction CEDA, Brisbane, 23 March 2004 Wal King AM CEO Leighton Holdings
the changing face of construction CEDA, Brisbane, 23 March 2004 Wal King AM CEO Leighton Holdings presentation outline - Australia s economic performance since 1990 - Performance of Australia s construction
More informationWestConnex. 6 - The Roadbuilder. Specialist hydrology & meteorology expertise & services Field sampling Training Environmental monitoring
WestConnex As peak production edges closer on Australia s largest transport infrastructure project, there is now a 3,600-strong workforce helping to deliver WestConnex. Local businesses and suppliers are
More informationTHE MERSEY GATEWAY LASTING INFRASTRUCTURE CONNECTING SOCIETIES
THE MERSEY GATEWAY LASTING INFRASTRUCTURE CONNECTING SOCIETIES WWW.RAMBOLL.CO.UK/MERSEYGATEWAY 2 THE MERSEY GATEWAY SHARED PASSION AND ENTHUSIASM Halton, which borders each side of the Mersey, is one of
More informationURBIS RESIDENTIAL MARKET & ECONOMIC OUTLOOK HAMILTON
URBIS RESIDENTIAL MARKET & ECONOMIC OUTLOOK FEBRUARY 2015 WALKABILITY & ACCESSIBILITY Hamilton NEW FARM 4 OXFORD STREET GOLD COAST 40MIN PORT OF BRISBANE 15MIN 2 1 7 ROYAL QUEENSLAND GOLF CLUB 3MIN NORTHSHORE
More information2017 POLICY DOCUMENT. M1 Action Plan. Putting Queenslanders First
2017 POLICY DOCUMENT Putting 2 Contents Message from the Premier 3 Our Commitment 4 The Newman-Nicholls Legacy 5 The Palaszczuk 6 Government s Record Our Plans: Putting 8 Call: 07 3844 8101 Mail: PO Box
More informationCLEM7 Project South Community Liaison Group Meeting #29
CLEM7 Project South Community Liaison Group Meeting #29 Venue: Date: 19 May 2009 Time: Attendees: Apologies: Distribution: Leckhampton House, Shafston Avenue, Kangaroo Point 6pm CLG MEMBERS: Joy Logie,
More informationIN THE FEDERAL COURT OF AUSTRALIA (FCA) NEW SOUTH WALES REGISTRY - FEDERAL COURT OF AUSTRALIA
IN THE FEDERAL COURT OF AUSTRALIA (FCA) NEW SOUTH WALES REGISTRY - FEDERAL COURT OF AUSTRALIA GENERAL DIVISION No: NSD757/2012 NOTICE OF FILING This document was filed electronically in the FEDERAL COURT
More informationNorth-South Bypass Tunnel Traffic and Transport
Technical Paper Brisbane City Council January 2005 Prepared for Brisbane City Council Prepared by Maunsell Australia Pty Ltd 12 Cribb Street PO Box 1823 Milton QLD 4064 Australia ABN 20 093 846 925 Tel
More information& CONSTRUCTION TUNNEL DESIGN THE ATS SHORT COURSE 2015
Short Course 7-8 October 2015, Marriott Hotel, Brisbane, Australia Tunnelling Applications Workshop 9 October 2015, Mount Coot-tha Quarry, Brisbane Program For further information visit: www.engineersaustralia.org.au/ats2015
More informationDay and night work: Hills M2 Motorway tunnel portals and Coral Tree Drive electrical substation
T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 2 July 2018 Ref: N0202 Day and night work: Hills M2 Motorway tunnel portals and Coral Tree
More information4 Transport projects underway in Western Sydney
4 Transport projects underway in Western Sydney About this chapter This chapter provides an overview of the Australian and NSW government s significant investments in road, bus and rail infrastructure
More informationTECH tools THE COOLEST GADGETS IN CONSTRUCTION. our mobile platform is live! Edition. >> Learn the benefits of going mobile
THE ANNUAL PUBLICATION FOR VICTORIAN CONSTRUCTION WORKERS 2018 THE COOLEST GADGETS IN CONSTRUCTION our mobile platform is live! >> Learn the benefits of going mobile TECH tools >> check out the latest
More informationThe opportunity to participate in an iconic precinct
The opportunity to participate in an iconic precinct EXPRESSIONS OF INTEREST Queenland Rugby Union (QRU) is one of the largest sports governing bodies in Australia with more that 350,000+ participants
More informationChermside, North Brisbane
Location Report Chermside, North Brisbane Retire with Property 1300 U Retire (873 847) www.superannuationproperty.com Chermside, North Brisbane Location Population & Demographics Chermside is an inner
More informationThe Coalition s Policy to Build Melbourne s East West Link
1 Our Plan Real Solutions for all Australians The direction, values and policy priorities of the next Coalition Government. The Coalition s Policy to Build Melbourne s East West Link August 2013 Our Plan
More informationSTONES CORNER SUBURBPROFILE. Situated three kilometres from the Brisbane CBD, Stones Corner is located within one of Brisbane s key growth areas.
1 SUBURBPROFILE Situated three kilometres from the Brisbane CBD, Stones Corner is located within one of Brisbane s key growth areas. OVERVIEW Situated three kilometres from the Brisbane CBD, Stones Corner
More informationState Route 8 Corridor. Northern Summit County s Path to Success
State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity
More informationLaunceston and Tamar Valley Traffic Vision
Launceston and Tamar Valley Traffic Vision A MAJORITY LIBERAL GOVERNMENT WILL: Address growing congestion issues in the Launceston and Tamar Valley road network Provide high productivity freight movement
More informationHong Kong International Airport (Chek-Lap Kok Airport)
Hong Kong International Airport (Chek-Lap Kok Airport) General Information Hong Kong International Airport (HKIA) is the principal airport serving Hong Kong. As the world's fifth busiest (2004) international
More informationHome About us Contact
Page 1 of 5 Home About us Contact IN THIS EDITION 1. A message from IPA s Chief Executive Brendan Lyon 2. Added 3. Status Changes 4. Updates 1. A message from IPA s Chief Executive Brendan Lyon I am delighted
More informationIndustry briefing NOVEMBER 2017
Industry briefing NOVEMBER 2017 SYDNEY METRO AUSTRALIA S BIGGEST PUBLIC TRANSPORT PROJECT A new stand-alone railway, this 21st century network will revolutionise the way Sydney travels. Services start
More information8 HUNT ST, HAMILTON, BRISBANE, QUEENSLAND. 1.
8 HUNT ST, HAMILTON, BRISBANE, QUEENSLAND. 1. 8 HUNT ST, HAMILTON, BRISBANE, QUEENSLAND. 2. 8 HUNT ST, HAMILTON, BRISBANE, QUEENSLAND. 3. - SURROUND YOURSELF WITH ALL THE THINGS THAT THRILL YOU - RIVERS
More informationFY16 Sustainability snapshot
FY16 Sustainability snapshot transurban.com/sr16 FY16 Sustainability Report snapshot At Transurban, we aim to continuously improve our sustainability performance. We are making our roads safer and more
More informationHALF YEAR REPORT February Leighton Holdings Limited
HALF YEAR REPORT February 2009 PRESENTATION OUTLINE Results highlights Operational update Financial statements Strategy and outlook 2 Half Year Report I 12 February 2009 I RESULTS HIGHLIGHTS 3 Half Year
More informationwaterview connection Completing the Western Ring Route the Waterview Connection
waterview connection MAY 2009 Completing the Western Ring Route the Waterview Connection The NZ Transport Agency (NZTA) has a new proposal to complete the Western Ring Route around Auckland by connecting
More informationContact details. Signage clarity
Toll Road Review The primary objective of this review of South East Queensland (SEQ) toll roads was to assess the adequacy and effectiveness of toll road price, payment and contact information signage
More informationState Budget Comment
$ millions 2014-2015 State Budget Comment Introduction RACQ considers that the Queensland Government delivered motorists a good budget in 2014-15. Allocations for road and transport infrastructure remained
More information2017 Major Projects Pipeline Report Adrian Hart, Senior Manager Infrastructure & Mining
2017 Major Projects Pipeline Report Adrian Hart, Senior Manager Infrastructure & Mining Major Projects Pipeline Report - 2017 Presentation Outline Overview and key findings of the 2017 Pipeline Report
More information*Artist Impression. *Artist Impression
Your Urban Oasis Urban Ingenuity It s not hard to feel renewed and inspired at Forest Ridge Estate, where you can experience beautiful countryside, wide-open spaces, and retain all the advantages of City
More informationBRISBANE INDUSTRIAL MARKET OVERVIEW API State of the Market Brisbane Industrial 22 nd of March 2018
BRISBANE INDUSTRIAL MARKET OVERVIEW API State of the Market Brisbane Industrial 22 nd of March 2018 QLD GROWTH QLD KEY DRIVERS OF GROWTH Fueled by Tourism up 80% over next decade $43b infrastructure Investment
More informationThe Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway
1 Our Plan Real Solutions for all Australians The direction, values and policy priorities of the next Coalition Government. The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway August
More informationInquiry into the operations of toll roads in Queensland
Transport and Public Works Committee Inquiry into the operations of toll roads in Queensland Transurban Queensland submission 7 August 2018 Transurban Queensland submission August 2018 01 Fantastic service.
More informationM4 M5 Link Tunnels Community guide to the M4-M5 Link Modification Report September 2018
M4 M5 Link Tunnels Community guide to the M4-M5 Link Modification Report September 2018 Artist impression of the M4-M5 Link tunnel Sydney s population is set to grow by more than one million people in
More informationWHY INVEST IN QUEENSLAND URBIS MARKET OUTLOOK
WHY INVEST IN QUEENSLAND URBIS MARKET OUTLOOK WHO IS URBIS? PERTH AUSTRALIA ADELAIDE BRISBANE GOLD COAST SYDNEY MELBOURNE Urbis is an integrated multi-disciplinary consulting firm with a unique and comprehensive
More informationA new master planned community.
A new master planned community. COOPERS PLAINS STATION ORANGE GROVE ROAD BRITTAIN PARK BOUNDARY ROAD T U Q BABBIDGE STREET T LOW STREE P S R AUGSTEIN STREET COMER STREET J MACDEVITT STREET BOUNDARY ROAD
More informationNumber 1 Gross Regional Product per capita in Queensland
Number 1 Gross Regional Product per capita in Queensland Whitsunday Region is the nation building region of Australia providing over $22 billion of economic value to the Australian economy. Our region
More informationSTEVE ABSON SENIOR ASSOCIATE
QUALIFICATIONS HNC Civil Engineering, Sheffield Hallam University (UK) HND Engineering Technology, Rotherham Technical College (UK) PROFESSIONAL AFFILIATIONS Member of the Australian Institute of Company
More information$960 $1,175 $91 OVERVIEW National Land Transport Programme Auckland AUCKLAND REGIONAL SUMMARY
2015 18 National Land Transport Programme Auckland AUCKLAND REGIONAL SUMMARY OVERVIEW Achieving an effective and efficient transport system is central to supporting Auckland s future. Auckland is home
More informationInfrastructure Priority List. Infrastructure Priority List Printed as at 28 April
Infrastructure Priority List Infrastructure Priority List Printed as at 28 April 2018 1 High Priority Projects High Priority Projects are potential infrastructure solutions for which a full business case
More informationSouth East Traffic Solution
South East Traffic Solution A MAJORITY LIBERAL GOVERNMENT WILL: Complete the Hobart Airport Interchange project Fix the Tasman Highway near Tasmania Golf Club Replace the Midway Point Roundabout with additional
More informationFor personal use only
ASX Announcement 16 November 2015 DESTINATION BRISBANE CONSORTIUM AND QUEENSLAND GOVERNMENT ENTER INTO AGREEMENTS FOR QUEEN S WHARF BRISBANE Echo Entertainment Group Limited (Echo) 1 today announced that
More informationBRT in Developed Countries The Brisbane Experience
Symposium on Public Transportation in Indian Cities with Special focus on Bus Rapid Transit (BRT) System New Delhi 20-21 Jan 2010 BRT in Developed Countries The Brisbane Experience Brian Bothwell Network
More informationWhy does Sydney need a new fast Metro to the West? A fast Metro to the west is a vital component of this Plan
Why does Sydney need a new fast Metro to the West? (as shown in 10,000 Friends of Greater Sydney Stage 1 Rail Plan) The Stage 1 Rail Plan was developed to support an integrated transport plan that would
More informationHow is air quality managed. in Sydney s road tunnels?
How is air quality managed in Sydney s road tunnels? The Sydney Orbital Network includes over 160 kilometres of surface roads, tunnels, bridges and underpasses. There are five main tunnels along the network;
More information1231 SANDGATE ROAD, NUNDAH, QLD
1231 SANDGATE ROAD, NUNDAH, QLD LEASING INFORMATION MEMORANDUM 2015 Introduction Knight Frank are proud to present this leasing opportunity located at 1231 Sandgate Road, Nundah. Built in 2012, this masterfully
More informationNorthern Beaches Transport Action Plan
Northern Beaches Transport Action Plan The NSW Government is taking action now to deliver transport improvements for the Northern Beaches, as well as planning for the future growth of the area. $633 million
More informationFigure 3: Global Sydney. Draft Metropolitan Strategy for Sydney. North Sydney CBD. Second Harbour Crossing. Walsh Bay Arts Precinct.
Newtown Glebe Macdonaldtown Pyrmont Ultimo Sydney International Convention, Exhibition & Entertainment Precinct Sydney Education & Health Erskineville Figure 3: Global Sydney Waterloo Second Harbour Crossing
More informationProjects overview 2018
Projects overview 2018 Projects overview Qatar 2022 FIFA World Cup Stadiums 5 2030 Deliverables 800 200+ 300+ km Doha of new road network new or upgraded major interchanges bridges and underpasses 78
More informationThe Coalition s Policy
The Coalition s Policy Key Commitments The Coalition s plan for a strong new economy will provide jobs and growth and secure the future for Australian families through smart investment in infrastructure.
More informationPrice Tags. Australian Style. April 11, 2010 Issue 109. S o u t h e a s t Q u e e n s l a n d
Price Tags April 11, 2010 Issue 109 S o u t h e a s t Q u e e n s l a n d Australian Style Ipswich CBD / Blueprint Architects / De Martini Fletcher and Rohrig Properties Price Tags first featured Australian
More informationFor personal use only
7 August 2014 LAMBOO RESOURCES Limited ABN 27 099 098 192 ASX: LMB CORPORATE OFFICE Level 7, Christie Offices, 320 Adelaide Street Brisbane QLD 4000 OPERATIONS OFFICE Unit 2, 7 Packard Street Joondalup
More informationLOCAL GOVERNMENT ROADS AND TRANSPORT STRATEGY
LOCAL GOVERNMENT ROADS AND TRANSPORT STRATEGY 2006 2016 AUSTRALIAN LOCAL GOVERNMENT ASSOCIATION LOCAL GOVERNMENT ROADS AND TRANSPORT STRATEGY 2006 2016 For more information: www.alga.asn.au/policy/transport/congress/2006/strategy.php
More informationCONTENTS 5 MARKET LEADER IN RETAIL 6 SECURE INVESTMENT RETURNS 7 RETAIL PARTNERSHIP 8 EXPERIENCED TEAM 10 CORNERSTONE RELATIONSHIPS
RETAIL WORKBOOK 2 CONSOLIDATED PROPERTIES HAS UNPARALLELED DEVELOPMENT EXPERTISE, HAVING DELIVERED OVER 200 PROJECTS ALONG AUSTRALIA S EASTERN SEABOARD. THIS EQUATES TO $3 BILLION IN PROJECT VALUE, INCLUDING
More informationNovember 21, 2012 Barbara Kelleher, (954)
November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related
More informationOUTLOOK REDBANK PLAINS A CONTEXT ON BUSINESS, CULTURE, LIFESTYLE AND RESIDENTIAL
OUTLOOK REDBANK PLAINS A CONTEXT ON BUSINESS, CULTURE, LIFESTYLE AND RESIDENTIAL Located within seven minutes of the Springfield CBD and 30 minutes of the Brisbane CBD, Redbank Plains proximity to major
More informationEconomic Stimulus Plan A progress report. Investing in Australia s Future
Economic Stimulus Plan A progress report Investing in Australia s Future future The Australian Government s Nation Building Economic Stimulus Plan was put in place to protect the nation from the global
More informationEngineering & Services Market Update
28 April 2017 Engineering & Services Market Update Attached is the presentation to be given today by Craig Laslett, Chief Executive Officer, Engineering & Services, Australia, Lendlease. The presentation
More informationAuthored by Cr Bob Manning Mayor
Queensland Treasury Corporation Investor Conference Presentation Authored by Cr Bob Manning Mayor Cairns Regional Council 1 Two and half years ago, I stood before the Public Hearing for the Joint Select
More informationMaking the connection
Making the connection The Airport Link And Northern Busway is the longest road tunnel system & largest ever road infrastructure project of its kind in Australia. Below The tunnel connects Brisbane s CBD
More informationConnected to memories. And the future.
Connected to memories. And the future. Remember what it was like when you were a kid? How you used to play outdoors with the other kids from your street without a care in the world. It seems like a simpler
More informationFDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015
June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane
More informationSustainable Urban Development. Presentation to WVCC 1 December 2010
Sustainable Urban Development Presentation to WVCC 1 December 2010 Introduction Paul Carmody Hindmarsh (Consultation Manager) Tony Adams CB Richard Ellis (Planners) Simon Parsons PTW (Architects) Brett
More informationNEWS RELEASE 8 NOVEMBER Gladstone LNG Project Arrow-AGL Joint Venture Acquires Enertrade s Gas and Pipeline Business
NEWS RELEASE 8 NOVEMBER 2007 Gladstone LNG Project Arrow-AGL Joint Venture Acquires Enertrade s Gas and Pipeline Business The Company s directors are pleased to attach a copy of Arrow Energy NL s (Arrow)
More informationAshburn Road, Bundamba, QLD
Ashburn Road, Bundamba, QLD Citiswich is a premium industrial estate located in the logistics hub of Brisbane s south-western corridor. The 350ha estate is Queensland s largest industrial development,
More informationITA AITES WORLD TUNNEL CONGRESS 2009
ITA AITES WORLD TUNNEL CONGRESS 2009 Budapest, Hungary, May 23 29, 2009 OF SAFE AND EFFICIENT UNDERGROUND URBAN ROAD AND RAIL INFRASTRUCTURES Manuel Arnáiz Ronda PhD. Civil Engineering President of AETOS
More informationTransport in Melbourne s Westen Suburbs: Alternatives to the Westgate Tunnel
Transport in Melbourne s Westen Suburbs: Alternatives to the Westgate Tunnel The people of Melbourne s west have a huge problem with noise and poisonous exhaust from hundreds of trucks on their residential
More informationOur local knowledge teamed with our global expertise provides our customer base with the complete heavylift and transportation solution across
Our local knowledge teamed with our global expertise provides our customer base with the complete heavylift and transportation solution across Australia. www.ale-ecr.com.au OVERVIEW ALE ECR Heavylift is
More informationISSUE 36 SEPTEMBER 2015 MOVING AHEAD CROSSRAIL PROJECT SEPTEMBER UPDATE WATCH! WATCH THE LATEST MOVING AHEAD VIDEO ON YOUTUBE.
ISSUE 36 SEPTEMBER 2015 MOVING AHEAD CROSSRAIL PROJECT SEPTEMBER UPDATE Andrew Wolstenholme CEO Crossrail Ltd CROSSRAIL PROGRAMME 67% 60% The programme to build the new railway for London and the South
More informationCrossrail / Elizabeth Line An Update
Crossrail / Elizabeth Line An Update Howard Smith Operations Director, Crossrail Railfuture Autumn 2018 Conference 10 th November 2018 Novotel Reading (uploaded to the www.railfuture.org.uk website with
More informationNight work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road
T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 28 April 2017 Ref: N0075M Night work update: and westbound on ramp at Dear resident, NorthConnex
More informationAUSTRALIAN TRAVEL TIME METRIC 2017 EDITION
AUSTRALIAN TRAVEL TIME METRIC 217 EDITION For more information please contact: Brendan Lyon Chief Executive Officer Infrastructure Partnerships Australia Suite 3.3, Level 3, 9 Pitt Street Sydney NSW 2
More informationState Road Upgrades Southern Region
State Road Upgrades Southern Region A MAJORITY LIBERAL GOVERNMENT WILL: Undertake an historic reset of roads and traffic management in Southern Tasmania taking roads to the next level. Underpin the extraordinary
More informationThe implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.
The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. Connecting People Building Opportunities 198 Brisbane Airport Corporation CHAPTER 10
More informationSOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER
SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER Proposal to Eliminate Traffic Gridlock in South North York Centre Area With Southbound Yonge Street to Eastbound Highway 401 Fly-UNDER A much
More informationRE: SUBMISSION TO THE JOINT SELECT PARLIAMENTARY COMMITTEE INQUIRY ON NORTHERN AUSTRALIA
Dr Bill Pender Committee Secretary Joint Select Committee on Northern Australia PO Box 6021 Parliament House CANBERRA ACT 2600 Via email: jscna@aph.gov.au Friday 7th March 2014 Dear Dr Pender, RE: SUBMISSION
More informationDEXUS Property Group (ASX: DXS) ASX release
11 February 2016 DEXUS and DWPF acquire North Sydney site for premium office development DEXUS Property Group (DEXUS) and DEXUS Wholesale Property Fund (DWPF) today announced that they have jointly entered
More informationChapter 2 Route window W25 Maidenhead station. Transport for London
Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,
More informationAdvocacy. Review of the Queensland State Budget
Advocacy Budget Briefing Review of the 2009-10 Queensland State Budget Introduction As of 1 July 2009, Queensland is the most expensive state in which to own and operate a vehicle. Registration increases
More informationPolitics, Finance and Transport: Megaprojects in Australia. Scott Elaurant and Jennie Louise Infrastructure Symposium, Brisbane 2015
Politics, Finance and Transport: Megaprojects in Australia Scott Elaurant and Jennie Louise Infrastructure Symposium, Brisbane 2015 Overview 1. Introduction 2. The Macro Level: Transport funding 3. The
More informationCapital City Report Greater Brisbane, Queensland
Capital City Report - 2016 Greater Brisbane, Queensland Contents Overview Brisbane Summary Growth Drivers Market Outlook Property Market Demographic Details Urban development Infrastructure Upgrades Existing
More informationDay and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April
New M5 Work notification 4 April 2018 Day and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April A significant amount
More informationPCAL Case Study Retail Areas: Rouse Hill Town Centre
PCAL Case Study Retail Areas: Rouse Hill Town Centre Introduction Rouse Hill Town Centre is a new mixed use development on a greenfield site in Sydney s North West. It has been planned to be a major hub
More informationMOUNT GRAVATT KEY DRIVER OVERVIEW
MOUNT GRAVATT KEY DRIVER OVERVIEW PREPARED FOR OPALYN SEPTEMBER 2017 WALKABILITY & ACCESSIBILITY 12 19 11 08 20 07 Macgregor 16 PACIFIC MOTORWAY SOUTH EAST BUSWAY 23 01 21 LOGAN ROAD 22 Brisbane contains
More informationPolicy Transport. Policy highlights. Our plan
Policy 2017 Our plan Policy highlights National is committed to building the world-class infrastructure to ensure New Zealand continues to grow. Record investment in transport Delivering the Roads of National
More informationUpdate on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan
Update on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan Presentation Overview Introductions Susan Miller, Director of Projects, Contra
More informationCHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010
CHRISTCHURCH MOTORWAYS Project Summary Statement February 2010 Table of Contents 1. Purpose of Document 2. Strategic Context 3. Benefits 4. Project Scope and Economics 5. Implementation Plan 1 ROADS OF
More information