ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

Similar documents
ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

CATFM CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA. ATFM TF 1 Meeting September 2018

Bits to Blocks Aviation System Block Upgrades (ASBU)

CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA CATFM. ATFM Global Symposium /22/2017 ATFM Global Symposium 2017

AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI

Air Traffic Flow & Capacity Management Frederic Cuq

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

ATFM/CDM ICAO s Perspective

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016

The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, September, 2014.

AIRPORTS AUTHORITY OF INDIA AIR NAVIGATION SERVICES

2012 Performance Framework AFI

Towards a Global ATFM Manual. Brian Flynn Head Network Operations

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

TWELFTH AIR NAVIGATION CONFERENCE

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

Russian Federation ATM modernization program

Seen through an IATA lens A-CDM Globally

AIRPORTS AUTHORITY OF INDIA S AIRPORT COLLABORATIVE DECISION MAKING SYSTEM. (Presented by Airports Authority of India) SUMMARY

Considerations for Facility Consolidation

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

ECOsystem: MET-ATM integration to improve Aviation efficiency

Multi Nodal Regional ATFM/CDM Concept and Operational Trials Colombo 7 May 2014

PUBLIC V E R S I O N. Air Traffic Control Officer Long-Term Planning USTDA Activity Number A. Prepared for: The Airports Authority of India

Asia/Pacific Air Traffic Management Perspectives

Welcome to AVI AFRIQUE 2017

Asia/Pacific Region A-CDM Planning

AIR TRAFFIC FLOW MANAGEMENT SYSTEM (ATFMS)

Presented by: Trinidad and Tobago

ATC Global 2014 EUROCONTROL WORKSHOP Towards GLOBAL ATFM 18 September Ken Mclean Director SFO IATA Singapore

Federal Aviation Administration. Air Traffic Control System Command Center (ATCSCC)

REG ASP MIL APO USE INT IND NM

ORGANISER HOST LEAD SPONSOR

TWELFTH AIR NAVIGATION CONFERENCE

Civil/Military Cooperation ICAO Workshop. Civil/Military Cooperation in Ukraine

PART II AIR TRAFFIC FLOW MANAGEMENT (ATFM) DRAFT

Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry

U.S. India Aviation Cooperation Program. Air Traffic Management Training Program Update March 2009

AEROTHAI Air Traffic Management Network Management Centre IATA ICAO Cross Border ATFM Workshop

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

ATNS Operations Division. Air Traffic Flow Management

Making the World A better place to live SFO

International Civil Aviation Organization. (Presented by the Arab Civil Aviation Commission- ACAC)

Network Manager Adding value to the Network 29 September 2011

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

Operations Hand Book. Air Traffic Flow Management. Central Command Center Central - Air Traffic Flow Management New Delhi

ATM Collaboration & Data Sharing

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

Defining and Managing capacities Brian Flynn, EUROCONTROL

Air Traffic Flow Management India V.Somasundaram Executive Director [ATM] Airports Authority of India

Collaborative Decision Making at JCAB ATMC

DISHA NOV CNS- P Initiatives, Communication, Navigation and Surveillance Infrastructure

Regional air navigation planning and implementation performance framework: Review of programmes and projects

ATFM Update - EUROCONTROL Day 1-16h45

ACI EUROPE POSITION PAPER

F r o m B O B C AT t o C r o s s - B o r d e r AT F M

Cooperative traffic management

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/3) Hyderabad, India. 22 nd 24 th October 2013

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013.

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

Why ANSP Management Needs to Drive ATFM Implementation Stuart Ratcliffe, Co-Chair CANSO ATFM Workgroup Metron Aviation

Extending the Reach of Your Flight Department Team

ASIA PACIFIC Air Traffic Flow Management

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat)

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

Efficiency and Automation

Civil and military integration in the same workspace

STATUS OF IMPLEMENTATION OF FLEXIBLE USE OF AIRSPACE (FUA) CONCEPT IN INDIA

Civil Military Cooperation

Hosted by General Civil Aviation Authority (GCAA)

Traffic Flow Management

Civil-Military Cooperation. Advanced Flexible Use of Airspace

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

MID Region Air Navigation Strategy

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

Air Traffic Control System Command Center (ATCSCC) Crisis Management. Federal Aviation Administration 1

User Forum ASM Recent Improvements. Anders HALLGREN Manager, ASM/ATFCM Procedures EUROCONTROL Network Management

An Overview of Airport Infrastructure in India. By V.P.Agrawal, Chairman, Airports Authority of India

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY

ASBU IMPLEMENTATION. ASBU industry consideration. Date 16/08/2017. Edson Fagundes Gomes

PBN Implementation Plan Tonga

ATFM Implementation Thailand and Southeast Asia. 55 th DGCA Conference October 2018 Nadi, Fiji

Continuous Improvement of the Global Air Traffic Management System

Agenda Item 6-ATM Coordination - Airspace restructuring COLLABORATIVE AIRSPACE DESIGN AND MANAGEMENT. (Presented by Airports Authority of India)

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen

Global ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization

User Forum Capacity Planning with DDR2 & NEST. Thierry Champougny / Laszlo Elbert / Stephanie Vincent

Packaging Tomorrow s Aviation System

TWELFTH AIR NAVIGATION CONFERENCE

INTERNATIONAL CIVIL AVIATION ORGANIZATION

Transcription:

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

CONTENTS 1 India Civil Aviation Scenario 2 C-ATFM Concepts 3 C-ATFM Implementation 4 4 Road Value Ahead Addition 9/3/2015 ATFM WORKSHOP - Delhi 2015 2

INDIA AIRSPACE SYSTEM Total airspace : 2.8 million Sq.NM (9.5 M Sq.Km) Oceanic : 1.74 million Sq.Nm (Bay of Bengal, Arabian Sea & Indian Ocean) Continental : 1.04 million Sq.NM 4 FIRs (Kolkata, Delhi, Mumbai, Chennai ) Sub FIR : Guwahati 14 neighboring FIRs Air Traffic Routes: International 93, Domestic 178 NEIGHBORING STATES 12 ANS WORK FORCE 4700 9/3/2015 ATFM WORKSHOP - Delhi 2015 3

Indian ATM Environment FOUR Upper ACC ( Proposed ); 2 Functional Upper Airspace Centers at Chennai and Kolkata 12 ACC / 55+ Sectors ( including 7 OCC Sectors ) 125 Airports (17 International ; 62 Domestic ) 13 Scheduled (Domestic) Airlines / 70 International Airlines 1.7 Million ATM + 0.3 Million Overflights (Approx.) One CCC + 36 FMP ( Proposed ATFM Structure ) 9/3/2015 ATFM WORKSHOP - Delhi 2015 4

GROWTH OF INDIAN AVIATION 60 Million Passengers 50 Operational Airports 123 million Passengers 190 million passengers 4 th Largest Domestic Aviation Market 40 Million passengers 2000 2005 2010 2015

TRAFFIC DATA Traffic Data 1999-2014 Can Indian ATC cope with this? Maybe.. Can we efficiently cope 2000000 1800000 1600000 1400000 1200000 1000000 800000 600000 400000 200000 with this? 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Year Landing & take-off Overflying Total 9/3/2015 ATFM WORKSHOP - Delhi 2015 6

INDIA-ANS STRATEGIES To ensure safety and efficiency of air traffic through airspace with least average delay to users. Achieved through Capacity and Efficiency enhancements Initiatives Resource Management Constraint Management Airspace/Airport Airspace complexity ATM Automation Capacity ATM Procedures Fleet mix ANS Infrastructure Special use airspace ATCO Weather Noise 9/3/2015 ATFM WORKSHOP - Delhi 2015 7

KEY ANS SOLUTIONS PBN implementation Airspace restructuring ATM automation ATS route realignment Conditional ATS route Reduction in separation Taxiways ARR/DEP ROT Reduction Better final approach aids Final approach spacing Departure Slot Management Infrastructure provision Continuous Descent Ops Airspace Airport 9/3/2015 ATFM WORKSHOP - Delhi 2015 8

FOCUSSED ANS INITIATIVES PBN Airspace and Route optimization Nationwide Surveillance Coverage Upper Airspace harmonization ATM Automation FUA GAGAN (SBAS), GBAS FTI ATFM 9/3/2015 ATFM WORKSHOP - Delhi 2015 9

NEED FOR ATFM WHY DO WE NEED ATFM? Finite Resources Airport, Airspace Ever increasing growth Increasing Demand for access Contingencies Unexpected decrease in capacity (weather, emergencies) Saturation of Capacity Need for balancing Demand and Capacity for PLANNED optimum utilization of resources 9/3/2015 ATFM WORKSHOP - Delhi 2015 10

ATFM integral to ATM Strategic ATFM Planning Tactical ATC Intervention Strategic / Pre Tactical TFM Tactical ATC TFM Measures ATM Environment Today ATM Environment with ATFM 9/3/2015 ATFM WORKSHOP - Delhi 2015 11

ATFM OBJECTIVES Ensure safety Maximize throughput; Make efficient use of available capacity; Manage controller workload; Provide equitable service; Achieve environmental efficiencies. Improved on-time arrivals; Minimizing delays; Optimizing passenger/crew/aircraft connections; Optimize flight profiles and routes during adverse weather conditions; and Optimize recovery solutions during and after disruptive events. 9/3/2015 ATFM WORKSHOP - Delhi 2015 12

ATFM IMPLEMENTATION - TRIGGERS Mature ANS Environment Automation, PBN Mature Civil Military Coordination - FUA Developing Modern Airport Systems Infrastructure, A- CDM Enabling Information Management Stakeholders realization of the benefits of ATFM Optimum Resource Management Progressive Regulatory Environment Enabler 9/3/2015 ATFM WORKSHOP - Delhi 2015 13

C-ATFM PROJECT PROGRESS AAI and FAA Consultancy -2009-2011 AAI ATFM Core Group Deliberations 2011-2013 Global Tender for C-ATFM 2013 C-ATFM Tender awarded to M/s ATECH, Brazil June 2014 C-ATFM System Installation, testing and Training in progress 9/3/2015 ATFM WORKSHOP - Delhi 2015 14

ATFM WITH CDM Collaboration with all Stakeholders is key to a successful ATFM. Each Partner has a holistic system wide view. A Sensitivity to each others needs A recognition of relative benefits of system decision vis-à-vis local decision Objective to create more efficient and responsive Airspace System with equal or improved safety parameters. CDM is now an integral part of ATFM 9/3/2015 ATFM WORKSHOP - Delhi 2015 15

ATFM STAKEHOLDERS State Agencies AIRSPACE USERS Airports Authorities Military ANSP AIS 9/3/2015 ATFM WORKSHOP - Delhi 2015 16

THE CDM PROCESS STAKEHOLDERS PROCEDURES CDM COMMUNICATION CDM WITH PARTNERS!!!! TOOLS 9/3/2015 ATFM WORKSHOP - Delhi 2015 17

AAI C-ATFM CONCEPT Integrated ATFM/CDM (connectivity and data exchange between all participating systems) Strategic to Tactical ATFM by focusing on Weather Airspace management Airline operational requirements Airport constraints departure and arrival airport Terminal Airspace constraints (CCO and CDO) En-route constraints Demand and Capacity Balancing (Traffic Management Initiatives at departure and arrival airport and En-route airspace ) Robust Post Operation Analysis 9/3/2015 ATFM WORKSHOP - Delhi 2015 18

AAI CENTRAL ATFM STRUCTURE Objective is to manage and optimize traffic flows by actively collaborating with airlines, airport, defense and other stakeholders on daily basis. ATFM Command Centre WEB PORTAL The Central Command Center ( CCC) will receive strategic and tactical FPL, Weather, Airspace,Traffic, Airport information for accurate Situational Awareness Flow Management Position(FMP) will be the unit implementing ATFM program TWR- FMP APP- FMP ACC- FMP APP- FMP ACC- FMP TWR- FMP APP- FMP 9/3/2015 ATFM WORKSHOP - Delhi 2015 19

C-ATFM ARCHITECTURE Airlines FMP E x t e r n a l s y s t e m s Airports Met C- ATFM/CCC ATC Military FPL data AIS Data ATFM Portal CDM Portal TWR-FMP Web Client 9/3/2015 ATFM WORKSHOP - Delhi 2015 20

CCC POSITIONS CCC operational supervisor Flight data management units ATFM Manager W ATFM Manager E ATFM Manager N ATFM Manager S ASM (FUA, routes coordination) CDM (airports, GA, Military CDM (airlines) AIS and CNS facilities monitoring Replay position Military representative Airline representative Special events monitoring 9/3/2015 ATFM WORKSHOP - Delhi 2015 21

CCC REPRESENTATION MAIN ROOM 9/3/2015 ATFM WORKSHOP - Delhi 2015 22

DEPARTURE FLOWS ( PER WEEK ) 2500 2000 DEPARTURE FLOWS FROM MAJOR AIRPORTS Domestic Departures: About 13000 Flights per week 1500 1000 500 0 NO OF DOMESTIC DEPARTURES in first week of may. NO OF DOMESTIC DEPARTURES in last week of october 9/3/2015 ATFM WORKSHOP - Delhi 2015 23

C-ATFM PHASE 1 MUMBAI DELHIi BANGALORE HYDERABAD CHENNAI Operational CCC Backup/Training CCC Delhi KOLKATA CCC at Delhi FMP( Flow Management Positions at Mumbai, Delhi, Kolkata, Chennai, Bangalore and Hyderabad Phase I in 2015 FMP at other ACC and APP in 2016 9/3/2015 ATFM WORKSHOP - Delhi 2015 24

AAI C-ATFM - SNAPSHOTS Layers Airspace element search tool Properties RPL Database Route Detail Aircraft Performance Database Status Monitor Weather Information Regulated Elements Database 9/3/2015 ATFM WORKSHOP - Delhi 2015 25

AAI C-ATFM - SNAPSHOTS Capacity & Demand Analysis Capacity & Demand General View CDM Proposal (Ground Delay Program) Capacity & Demand Analysis by timeframe 9/3/2015 ATFM WORKSHOP - Delhi 2015 26

ATFM MEASURES ATFM MEASURES ARE INITIATED IN TACTICAL PHASE TO BALACE DEMAND AND CAPACITY MILT MINT LEVEL CAPPING GDP ( ADP, ASP) SBP/FB REROUTING

IMPLEMENTATION CHALLENGES CHANGE MANAGEMENT BUY IN FROM STAKEHOLDERS TECHNOLOGY ABSORPTION MANPOWER DEFINING METRICS

ROAD AHEAD Begin Operational Trials ( December 2015 ) Process of Safety Management throughout ATFM Letters of Agreement ATFM Personnel and Training Develop and Publish ATFM Regulations 9/3/2015 ATFM WORKSHOP - Delhi 2015 29

AAI C-ATFM SYSTEM VISION Adopt the best practices from ATFM lessons learned around the world Develop and Implement OUR OWN NATIONAL ATFM SOLUTION with CDM then Harmonize the INDIA C-ATFM SYSTEM with other National/Regional ATFM systems to enable SEAMLESS ATM. 9/3/2015 ATFM WORKSHOP - Delhi 2015 30

THANK YOU Airports Authority of India