PEDESTRIAN ONLY TRAFFIC SIGNALS.

Similar documents
02/06/2016. TSRGD 2016: Signals and cycling. Sally Gibbons Senior Engineer Traffic Division 2 June Legislation. IHE Traffic Signal Design Course

Location Outside 27 West Street (Ladbrokes) see picture Fig4. This location seems to give most viability in both directions. West Street, Buckingham

"TOUCAN" - An unsegregated crossing for pedestrians and cyclists

FOREWORD. July 2006 July Release 1.0 Page 2

For the theory test you could be asked about all of them so what are the differences?

The bypass is west of the current crossing, leaving only local traffic using the existing road.

Trial of farside pedestrian signals at a Puffin crossing

APPENDIX A RELEVANT DOCUMENTATION

TR 2181 Issue C July 2001

USING SCOOT MULTI-NODES TO REDUCE PEDESTRIAN DELAY AT DUAL CROSSINGS IN BRISTOL

Integration of Pedestrian Traffic Signal Control within SCOOT-UTC Systems

Puffins at Junctions Design & Modelling Implications. JCT Symposium Paper 18 September 2003

ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982

FILLED WITH FACTS & ACTIVITIES. e s. t o. e f. f l BE SAFE, STAY ALIVE!

London Borough of Barnet Traffic & Development Design Team

V6 Revised & Updated Oct 10 A Fitch A Marson D Moore J Silvester 04/11/10. V5 Revised & Updated Jun 07 A Fitch D Moore - J Silvester 08/06/07

Safer Crossings Qualitative Research October 2014

Dyke Road Cycle and Pedestrian Improvements 14/02/2014 Reference number PEDESTRIAN CROSSING AND GUARDRAILING ASSESSMENT

Gap Acceptance for Pelicans under SCOOT Implementation (GAPS) Guide Lines

Road and street crossings for blind and partially sighted people:

Chapter 21 Route window W6 West Ealing station. Transport for London

2011 No ROAD TRAFFIC. The Traffic Signs (Amendment) Regulations and General Directions 2011

We recommend you cite the published version. The publisher s URL is

Road Signs, Markings and Their Meaning

Nump on the Bose!! Games transposing vonsanants and cowels.

GAS STOVE GUARD for natural gas and propane stoves

Low cost solutions to improve safety at level crossings in Hungary

Come on board. An introduction to accessible transport in London MAYOR OF LONDON. Transport for London

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Alpha Systems AOA Classic & Ultra CALIBRATION PROCEDURES

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by

Accessible. Transport. Helpful advice and information about accessible travel in Guernsey. Buses

HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.30pm on 23 MARCH 2015

INVENTOR S KIT MAKING A PEDESTRIAN CROSSING. FOR BBC micro:bit ADDITIONAL EXPERIMENT EXPERIMENT 11.

CITY OF WESTMINSTER. 2. The general effects of the Orders, in relation to the implementation of Phase 2 of the Piccadilly 2 Way Scheme, would be in:

Queen s Circus Roundabout

Disability Access Facilitation Plan ALICE SPRINGS AIRPORT

Context. Site Development. Brassington Avenue

Toll Booth. Build a toll booth with an arm that raises and lowers. This does not need to be very large.

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE

CITY OF NEWCASTLE UPON TYNE JOHN DOBSON STREET AREA. Traffic Regulation (Consolidation) Order 2009 (John Dobson Street Area Variation) Order 2015

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011.

Improving Safety at Level Crossings - JR East Developments

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Prepared on 06/06/ :51:19

Grade Crossings in High Speed Rail Corridors

Toyostove Error Code EE 2 (EE 6)

Measures of Urban Trail Use in Minneapolis

PRIOR TO ARRIVAL... 2 ACCESSIBLE PARKING... 2 TERMINAL KERBSIDE ACCESS (PICK-UP AND DROP-OFF ZONE)... 2 GROUND TRANSPORT OPTIONS...

Disability Access Facilitation Plan DARWIN INTERNATIONAL AIRPORT

1.0 PURPOSE. a) Ensure safe movement with the objective of preventing collisions between aircraft, and between aircraft and obstacles;

HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES. William H. Watson. Amtrak

Transport Assessment Appendix M: Avonmouth Impacts

Stoke Bishop, Westbury-on-Trym & Henleaze Neighbourhood Partnership

HIGHWAYS (ROAD HUMPS) (JERSEY) REGULATIONS 2002

Mercer SCOOT Adaptive Signal Control. Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017

Logistical information

APRON MANAGEMENT SERVICES

Signalling Record Society - Archive Index BR(M) S and T Plans - ex Birmingham S and T (Box 515)

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014

1. Case Study Area and Character Sections

Chapter 4 Route window W23 Taplow station. Transport for London

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

November 21, 2012 Barbara Kelleher, (954)

Manual for External Batch/Screw Counter (NEX-PLC) for Screw Feeder FM-36

The Blue Badge Scheme in Scotland. Rights and responsibilities of a Blue Badge holder in Scotland

PBN Operational Approval Continental En Route Navigation Specifications

Chapter 2 Route window W25 Maidenhead station. Transport for London

Venue Access Information and Access Statement for Disabled Visitors

Rockland County Safety & Quiet Zone Project. Town of Orangetown Public Meeting January 30, 2008

DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION TYPE CERTIFICATE DATA SHEET NO. 3A19

Chapter 4 Route Window NE3 Manor Park station. Transport for London

Shotgate Parish Council

Sky Temporary Car Park Transport Statement

Access Statement for. Jurys Inn Belfast

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

4. The Council s LTCCP decision on 30 June 2009 confirmed the extended tram route and funding.

CHILEAN SEA LEVEL NETWORK

Travel safe. A guide about community safety

Test of Traficon SafeWalk and C-Walk pedestrian detectors

Level Crossing Interface Requirements

Air India Ticketing procedures

212iLM Mullion (ILLUMINATED WEATHER RESISTANT) Keypad

Traffic Calming and Road Safety Provision Options Woore Village

Commissioning Director - Environment. Officer Contact Details Jane Shipman;

SCOPE Chapter 2D shall Apply to Any Road or

SUPPORTING ECONOMIC GROWTH (Improving journey times, enabling people to get to jobs, supporting new housing growth)

Appendix C Stage 1 Road Safety Audit

Outline. 1. Timetable Development 2. Fleet Size. Nigel H.M. Wilson. 3. Vehicle Scheduling J/11.543J/ESD.226J Spring 2010, Lecture 18

Speed control humps - Scotland, England and Wales

Property. Jurys Inn Cheltenham Introduction

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

CONFERENCE CENTRE ORGANISER S INFORMATION MANUAL

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document No: TCAA/FRM/ANS/AIS-30 Title: AIC Page 1 of 7. The following circular is hereby promulgated for information, guidance and necessary action

Sunshine Coast Airport Master Plan September 2007

Appendix 6 Fulbourn Greenway Review

The Point Roundabout Improvement Scheme

TECHNICAL MEMORANDUM. DATE: August 31, Pamela Dalcin-Walling/Dokken Engineering. Daniel Yau and Victor Baltazar/Y&C

CAMBRIAN LINES FRANCHISE 2018

Transcription:

colin.subryan@tfl.gov.uk www.theihe.org - Traffic Signal Control course - Conference Aston Birmingham - 18 th May to May 21 st 2015

What is POTS? POTS is a generic name for pedestrian crossings for stand-alone (Mid Block) locations or a pedestrian stream associated with a junction

Why POTS? Changes to the Zebra, Pelican and Puffin Pedestrian Crossings Regulations and General Directions 1997 will phase out the Pelican crossing. This means that the use of the flashing green man / flashing amber will no longer be permitted as part of the light sequence.

When and how do we use POTS? The POTS pedestrian crossing can be used for ; Pedestrian Cycle Horse Pedestrians and cycles can be combined to create a TOUCAN crossing.

When and how do we use POTS? Far-side or near-side pedestrian signals can be used but NOT in combination. High level repeaters can be used with near-side signals. An unlatched pedestrian demand using kerbside detection can be used with near-side signals ONLY. There is provision for a variable blackout period with far-side signals and extending all red period with near-side signals. Zigzag markings to indicate a controlled zone on the approach and exit are required.

FAR-SIDE PEDESTRIAN PEDESTRIAN ONLY TRAFFIC SIGNALS TIMINGS: I PERIOD VEH PED VA MIN = 6 15 FVP = 20 60 VA MAX = 10 60 ii 3 sec A R iii 1 3 sec R R iv 4 9 sec stand-alone R G v 3 15 sec R BO vi 0 30 sec R VBO vii 1 3 sec R BO vii 1 3 sec R R ix 2 sec R/A R G R FACILITY MANDATORY OPTIONAL FAR SIDED SIGNALS PEDESTRIAN INDICATOR (2 BOX) AUDIBLE INDICATOR UNIT TACTILE UNIT ABOVE GROUND VEHICLE DETECTION LOOP DETECTORS SPEED DISCRIMINATION/ASSESMENT ON CROSSING DETECTION The Far-Side pedestrian Crossing operates WITHOUT the flashing green man / flashing amber and has a BLACKOUT period following the green man invitation period.

FAR-SIDE PEDESTRIAN TOUCAN TIMINGS: I PERIOD VEH PED VA MIN = 6 15 FVP = 20 60 VA MAX = 10 60 ii 3 sec A R iii 1 3 sec R R iv 4 9 sec stand-alone R G v 3 15 sec R BO vi 0 30 sec R VBO vii 1 3 sec R BO vii 1 3 sec R R ix 2 sec R/A R G R FACILITY MANDATORY OPTIONAL FAR SIDED SIGNALS PEDESTRIAN INDICATOR (2 BOX) AUDIBLE INDICATOR UNIT TACTILE UNIT ABOVE GROUND VEHICLE DETECTION LOOP DETECTORS SPEED DISCRIMINATION/ASSESMENT ON CROSSING DETECTION The Far-Side TOUCAN crossing operates WITHOUT the flashing green man / flashing amber and has a BLACKOUT period following the green man invitation period. Note that the legend on the push button is different from the Far-Side pedestrian

FAR-SIDE PEDESTRIAN with COUNTDOWN - PCATs TIMINGS: I PERIOD VEH PED VA MIN = 6 15 FVP = 20 60 VA MAX = 10 60 ii 3 sec A R iii 1 3 sec R R iv 4 9 sec stand-alone R G v 3 15 sec R BO vi 0 30 sec R VBO vii 1 3 sec R BO vii 1 3 sec R R ix 2 sec R/A R G R FACILITY MANDATORY OPTIONAL FAR SIDED SIGNALS PEDESTRIAN INDICATOR (2 BOX) AUDIBLE INDICATOR UNIT TACTILE UNIT ABOVE GROUND VEHICLE DETECTION LOOP DETECTORS SPEED DISCRIMINATION/ASSESMENT ON CROSSING DETECTION The PCATs pedestrian countdown crossing operates with a fixed invitation period (Typically 6s) and a fixed blackout period which is displayed via the countdown signal.

NEAR-SIDE PEDESTRIAN - PUFFIN TIMINGS PERIOD VEH PED 1 VA MIN = 6 15 FVP = 20 60 VA MAX = 10-60 G R 2 3 sec A R 3 1 3 sec R R 4 4 9 sec R G 5 1-5 sec R R 6 0 30 sec R XR 7 or 8 0 3 sec/1 3 sec R R 9 2 sec R/A R FACILITY MANDATORY OPTIONAL NEAR SIDED SIGNALS KERB SIDE DETECTION AUDIBLE INDICATOR UNIT TACTILE UNIT ABOVE GROUND VEHICLE DETECTION LOOP DETECTORS SPEED DISCRIMINATION/ASSESMENT ON CROSSING DETECTION The Near-Side pedestrian Crossing operates with an Unlatched pedestrian demand using kerbside detection. There is no BLACKOUT period following the green man invitation period. A fixed or extendable red period runs after the invitation to cross.

NEAR-SIDE PEDESTRIAN - TOUCAN TIMINGS PERIOD VEH PED 1 VA MIN = 6 15 FVP = 20 60 VA MAX = 10-60 G R 2 3 sec A R 3 1 3 sec R R 4 4 9 sec R G 5 1-5 sec R R 6 0 30 sec R XR 7 or 8 0 3 sec/1 3 sec R R 9 2 sec R/A R FACILITY MANDATORY OPTIONAL NEAR SIDED SIGNALS KERB SIDE DETECTION AUDIBLE INDICATOR UNIT TACTILE UNIT ABOVE GROUND VEHICLE DETECTION LOOP DETECTORS SPEED DISCRIMINATION/ASSESMENT ON CROSSING DETECTION The Near-Side TOUCAN Crossing can operate with an Unlatched demand using kerbside detection. There is no BLACKOUT period following the green invitation period and a fixed or extendable red period runs after the invitation to cross.