Stittsville Ward 6 Development Overview

Similar documents
November 11, 2009 BY . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr.

February 26 Town Hall Meeting AGENDA

June 18 Town Hall Meeting AGENDA

October 23 Town Hall Meeting AGENDA

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report

To subscribe, unsubscribe or comment, send an message to

The purpose of this Open House is to share the third draft of the Area Concept Plan and supporting studies before the drafts are finalized.

Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study

City of Surrey PLANNING & DEVELOPMENT REPORT File:

377 Spadina Rd & 17 Montclair Ave Zoning Amendment Application Final Report

Appendix B Connecting Track Options Evaluation Criteria

Spadina Avenue Built Form Study Preliminary Report

2018 Development Cost Charges (DCCs) Update

LIVE. WORK. PLAY. STATUS OF DEVELOPMENT FALL Produced for information by the Town of Markham

STAFF REPORT FOR ACTION

LIVE. WORK. PLAY. STATUS OF DEVELOPMENT SPRING Produced for information by the City of Markham

Councillor s Column KEEPING YOU INFORMED

The District of North Vancouver FACT SHEET

Table of Contents TABLE OF CONTENTS. HOW THIS BY-LAW WORKS... i PART 1 - ADMINISTRATION, INTERPRETATION, ENFORCEMENT, AND DEFINITIONS

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

Construction Staging Area Blue Jays Way (357 King Street West)

CA CA CA CA CA CA CA CA CA CA Educational facilities - public elementary and high schools and private schools with a curriculum similar to public

Construction Staging Area 19 Western Battery Road

Stittsville Parks Information Session

MINUTES FIRST MEETING OF 2016 ECONOMIC DEVELOPMENT COMMITTEE OF THE WHOLE

Request for Decision. Resolution. Presented: Monday, Feb 22, Report Date Tuesday, Feb 02, Routine Management Reports.

October 23, 2017 Council Workshop

Director, Community Planning, Toronto and East York District

Changing Lanes. Click to edit Master title style. Community Consultation Meeting #1. Second level Third level. Fourth level.

Keele Street Draft Plan of Standard Condominium Application Status Report

Plaza Business Park Hotel, Office, and Restaurant Sites

Western Development Lands Transportation Brief Richmond Village, (Ottawa), ON Mattamy Homes. Prepared By: Stantec Consulting Ltd.

Construction Staging Adelaide Street West

REGIONAL BOARD REPORT

Pre-application submission for Committee: Phase 4 development at West Hendon

COLLEGE STREET STUDY Community Consultation Meeting. December 2015

Construction Staging Area 700 Bay Street - Elizabeth Street and Walton Street

Director, Community Planning, North York District

Councillor s Column KEEPING YOU INFORMED

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE PUBLIC WORKS AND UTILITIES DEPARTMENT

Changing Lanes. Click to edit Master title style. Residents Associations Forum. Second level Third level. Fourth level.

RAY YENKANA Willowbrook Cr, Dawson Creek BC Canada $2,847,000

SPA3. Erbsville SPA1 SPA2. Laurel Creek Conservation Area BEAVER CREEK MEADOWS DISTRICT PLAN MAP 1 DISTRICT PLAN AREA. Conser vation Drive

Public Meeting Information Report Development Approval and Planning Policy Department

3450 Dufferin Street - Official Plan Amendment, Zoning Amendment and Draft Plan of Subdivision Applications Request for Directions Report

440, 444, 450 and 462 Front Street West; 425, 439, 441 and 443 Wellington Street West and 6-18 Spadina Ave. Official Plan Amendment Final Report

Paul D. Ralph, BES, RPP, MCIP, Commissioner, Development Services Department

Construction Staging Area 197 Redpath Avenue

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

FISCHLER PROPERTY COMPANY LLC 1605 HENDRY STREET FORT MYERS, FL

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

ORDINANCE NO. JACKSON TOWNSHIP, CAMBRIA COUNTY

ISTRIO MUNICIPALITY OF MUSKOK

MAPLEWOOD VILLAGE CENTRE AND INNOVATION DISTRICT IMPLEMENTATION PLAN & DESIGN GUIDELINES. November 6, 2017 Regular Meeting of Council

PARRAMORE OAKS FRAMEWORK PLANNED DEVELOPMENT OVERVIEW. Presented by Dean Grandin, AICP ZON

2016 Development Cost Charges (DCC) UPDATE

NOTICE OF A PUBLIC HEARING

Click to edit Master text styles 6:30 Walk around / Chat with Staff / View the Display Boards

Toronto and East York Community Council. Director, Community Planning, Toronto and East York District

City of Surrey PLANNING & DEVELOPMENT REPORT File:

LESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #6 January 30, 2014

Naples Big Cypress PHASE II INDUSTRIAL PARK. P H A S E I I I and I V of the Naples Big Cypress Storage and Industrial Park.

Land off Stonnal Grove, & Rowden Drive (Phase 1A), Lyndhurst Estate, Sutton Road, Erdington, Birmingham, B23 5US

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10)

MANAGEMENT S DISCUSSION AND ANALYSIS

DECISION/DIRECTION NOTE

OCEAN VIEW VILLAGE APPROVED LOTS/UNITS WITH FINAL MAP

ARLINGTON COUNTY, VIRGINIA

11th and Vermont Streets Special General Land Use Plan (GLUP) Study

Meteor Building, St Mary's Row, Moseley, Birmingham, B13 9EG

Loretta Roth ext 204

AIRD & BERLIS LLP. Barristers and Solicitors. Kim M. Kovar Direct:

Newfoundland Labrador

Location. Site Attributes. List Price: 660 Acres - Santa Fe, New Mexico. Al Lilly Qualifying Broker R.E. search Associates (505)

This economic statement provides analysis with respect to land at Tarneit North, and has been prepared on behalf of Amex Corporation.

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Committee. Presentation Outline

Toronto and East York Community Council. Director, Community Planning, Toronto and East York District

David acts an Independent Hearing Commissioner and has considered plan changes, resource consents and notices of requirements.

FY2016 Financial Results

Caloundra South overview Ben Allen, General Manager Sustainable Communities

Council Committee Memorandum

2006 Residential Property Taxes and Utility Charges Survey

401, and 415 King Street West - Zoning Amendment Application - Preliminary Report

Under Review: Recently Approved:

PROPOSED ALTERATION AND EXPANSION OF THE MOUNT PEARL MUNICIPAL BOUNDARY TO INCLUDE THE AREA OF THE FORMER PEARL ESTATE LANDS & ENVIRONS

Interim Growth Management Policies City of Brampton Council

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

Developmental Cost Charge (DCC) Program Summary

Tinker Air Force Base, Oklahoma

YOUR NAME HERE. Lily Masters Vice-President, Broker

Changing Lanes. Click to edit Master title style. Toronto and East York Community Council. Second level Third level. Fourth level.

TOTEM APARTMENTS $2,300,000. Offering Memorandum , & st Ave S SeaTac, WA Investment Highlights

State of the Economy St. John's Metro

University Heights Square

Members of the Administrative Staff Committee. Award of Tender T Trans Canada Trail Extension

MASONRY COMMUNITY AFFORDABLE FOR COMMUTING FAMILY-ORIENTED IDEALLY POSITIONED CLOSE TO ALL AMENITIES

Energy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B

286 Partially Developed Lots

Transcription:

Stittsville Ward 6 Development Overview April 2017 Prepared by Councillor Qadri

Porter Place Patten Homes Chenier lands 6279 Fernbank Road Residential development located in South end of Stittsville, north of Fernbank Rd and West of Stittsville Main St.

Porter Place Patten Homes Chenier lands 6279 Fernbank Road 148 lots being a mix of 22 single, 26 semidetached and 100 townhouse units. Draft Approved, under construction

Traditions II Mattamy Homes Rathwell Landings - Valecraft Homes Stittsville South Area 6 Residential development located in south end of Stittsville, south of Fernbank Road and east of Stittsville Main Street.

Traditions II Mattamy Homes Rathwell Landings - Valecraft Homes Stittsville South Area 6 Approx. 339 single detached, 162 multiple attached and 152 low-rise apartment dwelling units as well as two parks and a stormwater management pond Active and File Pending Approx. Development Timelines 2017-2020

Eden Wylde - Tartan Homes Stittsville South Area 6 Residential subdivision located to the east of the Mattamy and Valecraft development, it is south of Fernbank and west of Shea Road.

Eden Wylde - Tartan Homes Stittsville South Area 6 Residential Development Approx. 329 single detached units, 108 semidetached units, 122 townhouse units and 172 low rise stacked/apartment units as well as a park. Active and File Pending

Proposed commercial development at southwest corner of Fernbank and Shea. Grocery store, two retail stores and a restaurant. Approx. total of 5,511 square metres of retail space Active and File Pending Commercial Plaza 5960 Fernbank Road

Tartan Fernbank Lands Residential development located within Fernbank Community Design Plan area. Located north of Fernbank Rd, west of Shea Rd. 6041 Fernbank Road

Tartan Fernbank Lands 6041 Fernbank Road 264 lots for single detached dwellings and 141 blocks for 282 semidetached units. A neighbourhood park and linear park are also proposed. Draft Approved. To be developed after Eden Wylde.

Residential development located in Fernbank lands north of Fernbank, South of Abbott St and east of Shea Road. CRT Lands Fernbank

CRT Lands Fernbank 523 lots including 25 blocks for attached and stacked dwellings (approximately 300-350 units). Includes a Community Park, a Neighbourhood Park, stormwater management areas, proposed OCDSB secondary school and CEPEO elementary school. Draft Approved

Metric Homes Fernbank Lands 950 Terry Fox Drive Residential development located in Fernbank CDP and is west of Terry Fox Dr and north of the Trans Canada Trail.

Metric Homes Fernbank Lands 950 Terry Fox Drive Approx. 245 dwelling units, made up of 101 lots for detached dwellings, 16 blocks for townhouses and one block to be developed with low-rise apartment buildings. Draft Approved

Abbottsville Mattamy Homes Residential development located in Fernbank CDP, west of Terry Fox and south of Trans Canada Trail. 570 Hazeldean Road

Abbottsville Mattamy Homes 570 Hazeldean Road 600 dwelling units, with 393 detached homes, 117 townhouse units and 90 back-to-back townhouse units. 2 parks, portions of land for future district park, an open space corridor abutting the storm water facility and the Carp River West Tributary Draft Approved, under construction

Bradley Commons Richcraft Homes 590 Hazeldean Road Residential development located to the west of the Mattamy Homes development, south of Hazeldean Road and north of the Trans Canada Trail.

Bradley Commons Richcraft Homes 590 Hazeldean Road Approx. 700 dwelling units, with 200 detached homes and 70 blocks for approx. 500 townhouse units. 2 blocks for commercial development fronting onto Hazeldean Road Proposed elementary school site, a portion of Fernbank District Park, community park and open space along the Carp River West Tributary Active and File Pending Approx. Development Timelines 2017-2023 with construction to start from south end.

5618 Hazeldean Road Mixed use development located west of the Richcraft development, north of Trans Canada Trail, east of Iber Road, and north of Hazeldean Road. Fernbank lands

5618 Hazeldean Road Fernbank lands Approx. 1845 residential dwelling units of low, medium and high density housing types Commercial blocks, proposed elementary school, a park and ride, a stormwater management pond, 4 parks and open space corridors along the watercourse and Hydro transmission corridor. Active and File Pending and Public Meeting TBC

Residential development located north of Hazeldean Road and the Lowes plaza, west of the Carp River, south of Maple Grove Road and east of the Fairwinds Subdivision. Richcraft Lands 1620 Maple Grove

Richcraft Lands 1620 Maple Grove Approx. 947 units with 72 single lots, 45 attached street dwelling unit blocks and two medium density housing blocks. 2 park blocks, a proposed OCDSB elementary school site, storm water management, one commercial block, one block for Kanata West Sanitary Pumping Station, and open space Carp River Corridor. Draft Approved Development must wait till Kanata West Pumping Station is constructed, which is estimated for 2018.

The Keg Steakhouse 15 Huntmar Drive Northwest corner of Hazeldean Road and Huntmar. The development will consist of a single storey 228 seat Keg Restaurant with an enclosed patio on the west side of the building. The building will have a Gross Floor Area of 1037.6 square metres. Construction will be starting soon with anticipated opening of November 30, 2017

Wellings of Stittsville 5731 Hazeldean Road Residential care facility located on north side of Hazeldean Road, west of the Keg site and east of Cedarow Court.

Wellings of Stittsville 5731 Hazeldean Road Mixed use development with 4 buildings in total 2 two-storey commercial buildings fronting Hazeldean Rd. Four-storey residential care facility along the eastern property line consisting of 256 units. Five-storey retirement home along the western property line is a fivestorey retirement home consisting of 185 units.

195 Huntmar Approx.1120 residential units consisting of 174 detached dwellings, 285 townhouse dwellings, approximately 520 stacked townhouse dwellings and 140 units in low-rise apartment buildings. The commercial use for small retail, restaurants, service commercial uses. The three automobile dealership blocks Includes district park block Active and File Pending and Public Meeting TBC

Potter s Key Minto Homes 6111 & 6141 Hazeldean Rd Residential development located on former Flea Market parking lot. North of Hazeldean Road, west of Jackson Trails and east of Echowoods

Potter s Key Minto Homes 6111 & 6141 Hazeldean Rd Phase 1 (North of Creek) start all this year/close in 2018 Phase 1 (South of the Creek) approx. 40% to start this year and close 2018 with remainder to occupy in 2019 Phase 2 to start home construction and close in 2019 400 residential units consisting of 141 townhouses and 259 singledetached dwellings. Two parks and Feedmill Creek Corridor Draft Approved Construction Progress Tree removal & blasting complete Sewers and Road Installation February December 2017 House Construction Start August 2017 Home Occupancies starting in March 2018

Hazeldean Gardens 6176 Hazeldean Road Five-storey retirement residence will provide Independent Supportive Living, Assisted Care and Memory Care. Phase 1 is 173 units Phase 2 is 57 units. Development Approved and under construction. Opening 2018

Wildpine Court Residence Wildpine Court/Stittsville Main St Four-storey retirement home with a total of 189 retirement (rooming) units. File Active and Pending

Stittsville Walk 1491 & 1493 Stittsville Main ST Rear approved for 22 townhouses, 4 stacked townhouse unit. Front approved for five-storey building with retail on the ground floor, offices on the second and third floor and residential apartments in the fourth and fifth floors.

Key Contacts Councillor Shad Qadri www.shadqadri.com -> Register for weekly e- newsletter under Contact Shad.Qadri@ottawa.ca 613-580-2476 Development Information Officer In-person at a Client Service Centre diokanata@ottawa.ca 613-580-2424, ext. 33321 File lead for a development application is listed on the onsite sign and DevApps Key Websites Councillor Qadri s Planning & Development section of www.shadqadri.com City of Ottawa Website www.ottawa.ca/planning Development Application Search (DevApps) www.ottawa.ca/devapps GeoOttawa maps and zoning http://maps.ottawa.ca