December 20,2016. George T. Webb, P.E. County Engineer. Tanya N. McConnell, P. Deputy County Engineer

Similar documents
February 15, Honorable Melissa McKinlay, Mayor and Members of the Board of County Commissioners. FayeW:~~~ Assistal}f' LOUT}'~drnlnistrator

IST FUNDING THROUGH CURRENT FISCAL YEAR ONLY

Land Use Context Definitions

Ocean Way at U.S. #1 (Town of Jupiter) Installation of a new traffic signal.

Palm Beach County Infrastructure Sales Tax Program Project Tracking. FY 2017 Projects

Road widening from 2 lanes to 4 lanes. Bridge removal and piping of the canal. Lane closures are not expected.

PALM BEACH COUNTY INFRASTRUCTURE SURTAX REVENUES As of November 30, 2017

Draft Year 2040 Cost Feasible Plan

DCD:Z.ty Ea.~~ /{/Kile(

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

Palm Beach County Traffic Report July 13 through July 20, 2012

1 6:52 AM BUS YARD 4:38 PM 2 7:12 AM N SEACREST BLVD & NE 16TH AVE 4:18 PM

Palm Beach County Traffic Report. Aug. 25 through Sept. 1, 2017

Palm Beach County Traffic Report August 24 through August 31, 2012

Government in Palm Beach County

FALL Construction Project Status Report PROJECT HIGHLIGHT CURRENT PROJECTS. NORTH COUNTY DISTRICT PARK New Construction PROJECT SCOPE

PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY I. EXECUTIVE BRIEF

Infrastructure Sales Tax Capital Projects April 4, 2017

Future Land Use Amendments History Report

TRANDERSOL SAMPLING OF CENTRAL STATIONS BEGINNING IN FLORIDA CURRENT PROJECTS FLORIDA TRANDERSOL - EDERP MIAMI GRAND CENTRAL LONG EXPRESS EXPRESS

SUMMER Construction Project Status Report PROJECT HIGHLIGHT CURRENT PROJECTS. BRIDGEMAN DRIVE PARK New Construction PROJECT SCOPE

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

PALM BEACH MPO. May 3, Valerie Neilson, AICP Multimodal Manager Palm Beach MPO

What is Shovel Ready Palm Beach? What is a Shovel Ready Site?

APPENDIX A: Planning Consistency Checklist

FDOT Treasure Coast Traffic Report through

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 9

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

East Coast Greenway (ECG) Southeast Region Miami-Dade/Broward/Palm Beach/Martin/St. Lucie/Indian River

Forest Hill Blvd. at Kirk Road Widening Project FM#:

PALM BEACH MPO TRANSPORTATION IMPROVEMENT ADOPTED JUNE 15, Amended 7/20/17

State Highway System Key Sheet Broward County ²

FPL FiberNet Locations List CLLI ADDRESS MARKET SITE TYPE MIANFLHF W DIXIE HWY (Arcos) MIAMI CABLE LANDING STATION MIAMFLEL 1 NE 1ST ST MIAMI

Facility Renewal Project Budget Report July 01, 2018

Completion: August 2011 LS #321 Design LS #8

2016 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON ORLANDO, GRANDE LAKES August 4-7, 2016

068D 420B 068C 421E SEMINOLE PRATT WHITNEY RD 420A SOUTHERN BLVD 500J 500Q 500B

AGENDA ITEM I. EXECUTIVE BRIEF PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

FDOT Treasure Coast Traffic Impact Report

Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP)

BCC Meeting Schedule for 10/1/2014 To 10/31/2014

SL~~ ===============================;;=~ Ill~, IIB\~t1,~l~,y]!~:; d' i Meeting Date: March 14, 2017 [] i1 D1:1 " l(t\\,: 1 t. I. Executive Brief [ ]

City of Grand Island Tuesday, December 12, 2017 Council Session

BOND 2012 PROPOSITION 1

FDOT Treasure Coast Traffic Impact Report

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

Palm Beach County School District Eligibility Survey - Free/Reduced Count of Students Aged 5-17 as of 4/14/2019

Whittier Bridge Project

October 31, 2014 Chuck McGinness, (954)

January 2018 Air Traffic Activity Summary

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Fixed Capital Outlay: Facilities

Tri-Rail Coastal Link Project Update

Capital Program Delivery

Culpeper District. Albemarle County Monthly Report December 2011

Culpeper District. Albemarle County Monthly Report. September 2012

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

FY Candidate Sidewalk Projects. Sidewalk Advisory Committee

November 21, 2012 Barbara Kelleher, (954)

2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director

Toll Rates for Florida Turnpike System and Florida Department of Transportation (FDOT) Toll Facilities. South Florida

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

Highways: State Highways

Project Update to Treasure Coast Regional Planning Council

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

Glades Target Area Projects Summary

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

Highways: Interstate. Highways: State Highways

Delaware County Engineer

Major Projects Overview

Campus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

lakeside centre Page 3

AGENDA. Call to Order ~ Roll Call. Public Comments (Non Agenda Items). Commissioners and Manager Comments.

AGENDA. WEDNESDAY, SEPTEMBER 23, :00 PM or immediately after the ICTC meeting

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

BOND 2012 PROPOSITION 1

Most people notice when ODOT builds something

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

Projected Advertisement Date

LIHTC Properties in Florida's 20th District LIHTC (1997 to. (Alcee Hastings - D) Through ) Source: HUD LIHTC

WELCOME. Glades Plaza is a 182,704 SF retail center in the. heart of Boca Raton, Florida and sits at the

AGENDA REQUEST. AGENDA ITEM NO: XII.A.2. BY Financial Administration John Lege Financial Administration Deputy Director Strickland


ALTON TOWN CENTER PALM BEACH GARDENS, FLORIDA

FAMILY LAW CHILDREN'S ISSUES (FL994)

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

APPENDIX K RURAL ENVIRONMENTAL CLEARANCE PROJECTS

FASTRAK PROGRESS REPORT

City of Grand Island Tuesday, February 28, 2017 Council Session

Homes Sold in Boca Raton 2/17/15 to 2/22/15

Penny for Pasco Renewal. FY2014/15 thru FY2024/25

INTER-OFFICE MEMORANDUM

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:

Palm Beach County Redevelopment Sites State Road 7, Delray Beach, FL 33446

State Route 8 Corridor. Northern Summit County s Path to Success

MUNICIPAL COMMISSION/COUNCIL TERMS, TERM LIMITS, SALARIES AND BENEFITS SURVEY

Customer Service:

Transcription:

Department of Engineering and Public Works P.O Box 2 1229 \Vesr Palm Beach. FL 334 16-1229 (561) 684-4000 FAX. (561) 684-4050 www.pbcgov com Palm Beach County Board of County Commissioners Paulen e Burdick. Mayor Melissa \!ckinlay, Vice t\layor Hal R \'aleche DATE: TO: THRU: FROM: RE: INTEROFFICE MEMORANDUM December 20,2016 George T. Webb, P.E. County Engineer Tanya N. McConnell, P. Deputy County Engineer Omelio A. Fernandez, P.E., Director Roadway Production Division(i)~ ROADWAY PRODUCTION DIVISION FY2016 ANNUAL REPORT Dave Kernr-r Sreven L. Abrams Mary Lou Berger t\!ack Bernard County Administrator Verden1a C. Baker This report addresses 160 projects which are presently under Design, Right-of-Way Acquisition, or Construction (see Exhibit G). The Construction Status report (see Exhibit A) addresses a total of35 projects. Construction projects include intersection improvements, bridges, slope protection, pathways, seawall repair, drainage improvements, safety improvements, milling and resurfacing, and miscellaneous roadway work in approximately 22.70 road miles, resulting in 19 new lane miles. \n Lqua/ Opporrwuc; A},(11 mauve Acrion Employer PAGE 1 OF3 FY 2016 -ANNUAL ROADWAY PRODUCTION REPORT @ pnncecj on recycled paper

A total of 12 construction projects were awarded, 10 county funded and 2 federally funded projects. The county funded projects resulted in the following Office of Small Business Assistance (OSBA) commitments (see Exhibit E, Page lof 1). Goal Commitment County Funded Projects 15.0% 25.94% A total of 6 projects were finaled, 3 were federally funded and 3 were county funded. The county funded projects resulted in the following OSBA achievements (see Exhibit F, Page 1 of 1 ). Commitment Achievement Overall 25.39% 33.34% The following attached Exhibits provide a summary of Roadway Production Thoroughfare Road activity. Exhibit A Exhibit B Exhibit C Exhibit D Exhibit E Exhibit F Exhibit G Exhibit H Construction Status Annual Bidding Schedule Actual Awards Consultant Competitive Negotiations Goals Set By OSBA & Contractor Commitment Contractor Achievement of OSBA Goals Active Project Status Thoroughfare Roads Construction Historical Record PAGE 2 OF3 FY2016 - ANNUAL ROADWAY PRODUCTION REPORT

cc: AI-Turk, Motasem, P.E., Manager Traffic Engineering Operations Bengston, Carl, Manager, Streetscape Brown, Sherry, Director OFMB Carrier, Steven P.E., Assistant County Engineer Corry, Laura, Director, SFWMD, PBC Service Center Dawson, Daryl, Director, Road & Bridge Harris, Amy, P.E., Special Projects Engineer, Traffic Division Hering, Ross, Director, PREM Jacobowitz, Irwin, Director, Contract Development & Control Jeedigunta, Giridhar, P.E., Manager Traffic Signal Systems Johnson, Tonya D., Director, OSBA Keller, Joanne, P.E., Director, Land Development Kissner, Linda, Engineering FDOT Martz, Mike, Fiscal Director, Fire Rescue Mohyuddin, Khurshid, PBC Planning Division Mugavero, Philip, Senior Assistant County Attorney Palumbo, Duane, PBC Water Utilities Robbins Rob, Director, DERM Thomson, Bruce, Planner II, PBC Planning Division Tomlinson, Mark, Director, Construction Coordination Division Uhren, Nick, P.E., Executive Director, MPO Willhite, Alexis, Director, Administrative Services Division Wilson John, Director, Budget Division ec: Roadway Production Division Staff: Rose, Morton, P.E., Assistant Director Young, David, P.E., Special Projects Section Manager Farrell, Kathleen, P.E., Thoroughfare Roads Section Manager Frazeii-Smith, Kristine, P.E., Local Roads Section Manager Knight, Holly, P.E., Contracts Section Manager Mark, Glenn, P.L.S., Survey Section Manager Cioci, Tripp, Right-of-Way Section Manager Lewis, Donna, Technical Assistant III PAGE3 OF 3 FY2016- ANNUAL ROADWAY PRODUCTION REPORT F:\ROADW A YIEXCEL\SEMI ANNUAL & ANNUAL120 16\ANNUAL_ 16.Doc

ROADWAY PRODUCTION DIVISION CONSTRUCTION STATUS Project Project Name, Limits Description Contract Amount Road Lane Number Mil. $ Miles Miles Projects Under Construction Start - Finish (1) 2012101 Australian Ave., W. 10th St. to 330' N. ofw 13th St. Intersection Improvements 0.700 0.1 0.1 NTP Pending 2013601 Canal Point Pedestrian Bridge Bridge 0.812 0.0 0.0 NTP Pending 2015525 CR880 Twenty Mile Bend Slope Protection Phase II Slope Protection 0.884 0.0 0.0 06/16-10/16 2011904 Garden Rd., S. of FOOT Canal to S. of B lue Heron Blvd. 0.3 mi, 3 L 0.908 0.3 0.3 NTP Pending 2009602 (2) Haverhill Rd., Lantana Rd. to South of the LWDD L-14Canal 4LD 7.445 2.2 5.9 NTP Pending 2010503 (2) Haverhill Rd., South of the LWDD L-14 Canal to Lake Worth Road Widen 2L to 5L 2010504A Lyons Rd.; Lantana Rd ton. of LWDD L-14 Canal Widen 2L to 4LO 4.307 0.9 1.4 05/16. 05/17 2015223 Old Dixie Hwy., 45th Street to Park Avenue Milling and Resurfacing 1.048 3.3 0.0 08/16. 01/17 2004506 Old Dixie Hwy., Park Ave. to Northlake Blvd. 0.9 mi, 3 L 3.084 0.9 0.9 NTP Pending 2013131 Penny Ln., Melaleuca Ln., to Dead End MSTU 0.455 0.1 0.2 09/16 03/17 2010906 Point Chosen Swing Bridge over Rim Canal Fender System Replacement Fender System 1.288 0.0 0.0 0711 5.01116 2002109 Toney Penna Dr. and Old Dixie Hwy. Intersection Improvements 2.079 0.1 0.1 NTP Pending 12 Projects 23.010 7.9 8.9 Notes: (1) Start date is notice to proceed date. Finish date Is the scheduled contract completion date at the time of this report. (2) Projects #2009602 and #2010503 combined and let as one contract. Projects Substantially Complete ( semi-final inspections are complete ) Sub. Complete 2004507C 60th St. N. from 120th Ave. N. to East of Royal Palm Beach Blvd. 0.5 mi, 3 L 4.528 0.5 0.9 07115-10/16 2013617 Bluegill Trail from Grassy Waters Preserve/Northlake Blvd. ton. of PGA Blvd Pathway 0.567 0.0 0.0 08/16 2007102 Bums Road & Military Trail Intersection Improvements Intersection Improvements 1.338 0.1 0.1 07116 2013619 County Road 880 Twenty Mile Bend Slope Protection Slope Protection 4.064 0.0 0.0 10/15 1997511A (3) Seminole Pratt Whitney Rd., S.R. 80 to S. of Okeechobee Blvd. 1.4mi, 4L 9.734 1.4 2.8 04/14 1997511B (3) Seminole Pratt Whitney Rd., S. of Okeechobee Blvd. to N. of Sycamore Dr. 2.8 mi,4 L 2.8 5.6 1997511C1 (3) Seminole Pratt Whitney Rd., Sycamore Dr. ton. of Sycamore Dr. 0.1 ml,4 L 0.1 0.2 7 Projects 20.231 4.9 9.6 (3) 1997511A, 19975118, 1997511C1 combined and let as one contract. Projects substantially complete and on hold since April 2014.!Projects Finaled ( accepted by contract review committee ) Flnaled 2014608 45th St. from 1-95 to Old Dixie Highway/Greenwood Avenue Safety Improvements & Resurfacing 1.278 1.9 0.0 05/16 2014616 Belvedere Road from Club House Dr. to Australian Avenue Safety Improvements & Resurfacing 0.748 1.2 0.0 05/16 2012513 Clint Moore Rd. & Military Trail Intersection Drainage Improvements Drainage Improvements 0.339 0.0 0.0 02/16 2013618 Historic Jupiter-Indiantown Rlverbend Park to Cypress Creek Natural Pathway 0.498 0.0 0.0 11/15 2013612 Intracoastal Road Seawall Repair Seawall Repair 0.126 0.0 0.0 02/16 2014610 Palmetto Park Road Bridge over the L.W.D.D. E-1 Canal Sidewalk & Barrier Modifications 0.119 0.0 0.0 08/16 6 Projects 3.108 3.1 0.0 ROADWAY PRODUCTION DIVISION ANNUAL REPORT FY 2016 EXHIBIT "A", PAGE 1 OF 2

ROADWAY PRODUCTION DIVISION CONSTRUCTION STATUS Project Number Project Name, Limits Description Contract Amount Road Lane Mil. $ Miles Miles!Projects Under Construction (Annual Contract) Start- Finish 2013528A Haverhill Rd.; N. of Caribbean Blvd. to Oyer Park N. 2016102 Island Way and Limestone Creek Road 2015514 Jog Rd., S. of Hypoluxo Rd. to 10th Ave. N. 2015513 Jog Rd., S. of Clint Moore Rd. to Linton Blvd. 2013106 Okeechobee Blvd. & Ponce de Leon Sl Intersection Improvements 2015102 PGA Blvd. & Ellison Wilson Rd. Intersection Improvements 2013560 Tradewlnd Rd. and Winding Creek Lane Pathway Intersection Improvements Safety Improvements & Resurfacing Safety Improvements & Resurfacing Safety Improvements & Resurfacing Intersection Improvements Intersection Improvements 0.450 0.0 0.0 NTP Pending 0.041 0.0 0.0 11/16-12116 1.417 4.1 0.0 04/16-06/16 1.349 2.2 0.0 11/16-01/17 0.138 0.1 0.1 10/16-12116 0.148 0.1 0.1 07/16-11/16 0.048 0.0 0.0 NTP Pending 7 Projects 3.591 6.5 0.2 I Projects Finaled (Annual Contract) Flnaled 2014518 Oyer Blvd. & Military Tr. 2009100 RCA Blvd & All A1A 2015503 SR 80 and Kirk Rd. Intersection Improvements Intersection Improvements Intersection Improvements Intersection Improvements 0.063 0.2 0.2 01/16 0.176 0.1 0.1 08/15 0.002 0.0 0.0 11/16-11/16 3 Projects 0.241 0.3 0.3 P.B.C. Construction Project Totals - 35 Projects 50.181 22.70 19.00 ROADWAY PRODUCTION DIVISION ANNUAL REPORT FY 2016 EXHIBIT ''A", PAGE 2 OF 2

111812017 ROADWAY PRODUCTION DIVISION FY 2017 BIDDING SCHEDULE Proposed Bid Date Project Number Project Name, Limits Description Rd. Miles AddL Ln. Miles 'Bid-Est $(X 1000) PM/PE Consultant Aug-16 2014615 Palmwood Road- 750' N. of Don<~ld Ross Rd. to Susan Ave. Slope Stabilization 0.0 0.0 $1,100 DY-FM Wantman Oct-16 2015502 Connector Rd., Lyons Rd. to Acme Dairy Rd. 0.5ml, 2/3L 0.5 1.0 $600 DY-FM Civil Design Oct-16 2014512 Gun Club Rd. over LWDD E-3 Canal Bridge lf11jrovements 0.0 0.0 $470 KF-EF Wantman Nov-16 2017050 Annual Trame Loops 0.0 0.0 $815 HK ln House Nov-16 2015524 Summit Blvd. over LWDD E-3 Canal Bridge I111Jrovements 0.0 0,0 $260 DY-WC Behar Dec-16 2017051 Annual Traf!ic Signal 0.0 0.0 $4,700 HK In-House Dec-16 2017052 Annual Guardrail 0.0 0.0 $670 HK Jn.House Dec-16 2014510 Drexel Rd., Fair Green Rd. to 15th Ln. N. 0.1 ml 3L, Bridge Replacement-Culvert 0.1 3.0 $810 KFS-MCD Behar Dec-16 2014519 SW 18th & Military Trail Intersection Improvements 0.4 0.2 $1,150 DY-FM HSQ Feb-17 2007058A Center St., Thelma Ave. to Woodland Estates Dr. 0.3 mi, 3 L 0.3 0.3 $1,100 KFS-MCD Civil Design Feb-17 2015525B CR880 West of 20 mile bend Slope Stabilization - Phase Ill Slope Stabilization 1.0 0.0 $1,300 SC-HK Wantman Feb-17 2014515 Kirk Rd. S. over LWDD L-7 Canal to Pot '0 Gold St. 0.1 mi 3 L, Bridge Replacement-Culvert 0.1 0.1 $1,300 KFS-MCD Gerwig Feb-17 2013523 Purdy Lane, Forest Hill Elementary to E. of Major Dr. 0.2 mi, 3 L, Bridge Replacement 0.2 1.0 $2,300 KF-EF Wantman Mar-17 2013519 Northlake Blvd. & Military Trail Intersection Improvements 0.1 0.1 $1,380 DY-MA Area dis Mar-17 2011906 Wallis Rd., LWDD E-3 Canal to Haverhill Rd. Pathway 0.6 0.0 $900 KFS-MCD Schorah Apr-17 2015504 Coral Ridge Dr. - S. County Regina! Park N. Entrance to 750' N. 0.1 ml, 2L 0.0 0.3 $1,130 DY-MA Area dis May-17 2003501 Camino Real Rd.IBoca Club over Intracoastal Waterway Bridge Rehabilitation Bridge Rehatilitation 0.1 2.0 $9,000 KFS SMO Wantman May-17 2013526 Flavor Pict Rd., SR7 to Lyons Rd. 1.0 mi, 2L 1.0 2.0 $3,800 KF-AK Stantec May-17 2006500 Indiantown Rd. & Jupiter Farms Rd. lntersecl on Improvements 0.3 0.3 $1,100 DY-WC K-F Group May-17 2015506 Kirk Rd. over LWDD L-5 Canal Bridge Replacerrent-Culvert 0.1 2.0 $500 KFS-MCD Gerwig May-17 2014504 PGA Blvd. & Central Blvd. Intersection Improvements 0.1 0.1 $400 DY-FM Area dis RO.ADWAYPROOUCTION DMSION ANNUAL REPORT - FY2016 EXHIBIT.. 8 ~, PAGE 1 OF 3

111812017 ROADWAY PRODUCTION DIVISION FY 2017 BIDDING SCHEDULE Proposed Bid Da11e Project Number Project Name, Umits Deocriptlon Rd. Miles Addl. Ln. Miles "Bid-Est $(X 1000) PMIPE Consultant Jun-17 2005502 Australian Ave. and Palm Beach Lakes Bhd. Intersection Improvements 0.5 0.5 $1,200 KF-EF Wantman Jun-17 2014508A Boynton Beach Blvd and Acme Dairy Rd. Intersection Improvements 0.1 0.1 $200 DY-MA Klmley-Hom Jun-17 (1) 2013522 (1) 2014502 Hood Rd.- E. of Florida's Tumplke tow. of Central Blvd. Hood Rd. and Central Blvd. 1.2 ml, 4L Includes new Bridge over 1-95 lnterseclon Improvements 1.5 1.9 $14,200 DY-MA KF-SJ Stanley Arcadls Jun-17 2013530 Lyons Rd., Hillsboro Canal to SW 18th Street 0.31111,6 L 0.3 2.0 $2,000 KF-AMD LDI Jun-17 2013527 Lyons Rd., Oint Moore Rd. to Atlantic Ave. 3.0 ml, 4 L 3.0 6.0 $8,600 KF-ABK HSQ Jun-17 2016100 Okeechobee Blvd. & Skees Rd. lnterseclon Improvements 0.1 0.1 $450 DY-WC HSQ Jun-17 (2) 2013529A (2) 2013529B Roebuck Rd. - Jog Road to Haverhill Rd. Jog Rd./Roebuck Rd. 1.0 ml, 5 L lnterseclon Improvements 1.3 2.0 $6,000 KF-SJ Mock Roos Jun-17 (3) 2013524 (3) 2013525 Sandalfoot BlvdJSR 7 over LWDD E-1 Canal S.W. 3rd. Sl/SR 7 over LWDD E-1 Canal Bridge Replacement and Intersection Improvement 0.4 0.4 $3,000 KF ABK AGA Jun-17 2014300 Sherwood Forest Blvd. over LWDO L-8 Canol Bridge Improvements 0.1 0.0 $550 KFS-MCD Wantman (1) 2013522 and 2014502 wu be combined and let as one contract (2) 2013529Aand 2013529B,..II be combined and let as one contract (3) 2013524 and 2013525 Yill be combined and let as one contract FY 2017 TOTAL 33 PROJECTS 12.2 25.4 $70,985 ROADWAY PRODUCTION OMSION ANNUAL REPo:tT FY2016 E.XHI81T e. PAGE 2 OF 3

11t8J2017 ROADWAY PRODUCTION DIVISION FY 2017 BIDDING SCHEDULE Project Number Project Name, Limits Description Rd. Miles Addl. Ln. Miles "Estimate $(X 1000) PMIPE Consultant ANNUAL CONTRACT PROJECTS 2017100 100th Street South and SR 7 lntersecton Improvements 0.1 0.0 $25 KF-SJ In-House 2014104 Fairgrounds Rd. and Weisman Way lnterseclon Improvements 0.2 0.2 $250 KFS-MCD In-House 2016104 Glades Rd. & Sandpiper Shores Elementary School lnterseclon Improvements 0.1 0.1 $150 OY-WC Area dis 2006500A Indiantown Rd. & Sierra Square lnterseclon Improvements 0.2 0.2 $80 OY-WC K-f Group 2016102 Island Way and limestone Creek Road Intersection Improvements 0.0 0.0 $40 KF-SJ In-House 2017103 Jog Road and LWOD L-16 Canal Intersection Improvements 0.2 0.1 $35 KF-SJ In-House 2016105 Lantana Rd. and Brentwood Rd. lnterseclon Improvements 0.0 0.0 $25 KF-SJ In-House 2016108 Lantana Rd. and Willowood Lane Intersection Improvements 0.0 0.0 $20 KF-SJ In-House 2016109 Loxahatchee RJver Rd. and Via Rio Intersection Improvements 0.1 0.0 $25 KF-SJ In-House 2017102 Lyons Road from PBCHS Entrance to LWDD L-7 Canal lnterseclon Improvements 0.2 0.1 $35 KF-SJ In-House 2015515 Northlake Blvd., SR 710 to Military Trail Milling and Resurfacing 2.8 0.0 $1,075 DY-WC In-House 2015516 Woolbright Rd. -Military Trail to lawrence Rd. Milling, Resurfacing and Drahage Improvements 1.0 0.0 $990 DY-WC In-House FY 2017 ANNUAL CONTRAClOR 12 PROJECTS 4.9 0.7 $2,750 ROADWAY PRODUCTION DMSION ANNUAL REPORT - FY201 6 EXHIBIT "B", PAGE 3 OF 3

ROADWAY PRODUCTION DIVISION CONSTRUCTION CONTRACT AWARDS FY 2016 Project Number Project Name, Limits Description Miles Bid ($X 1000) Rd. Ln. Est. Act. Award Date Mgr. / Act. Eng. FY 2016 Project Contracts 2012101 Australian Ave., W. 10th St. to 330' N. of W 13th St. Intersection Improvements 0.1 0.1 $450 $700 Sep-16 DY-MA 2013601 Canal Point Pedestrian Bridge Bridge 0.0 0.0 $700 $812 Aug-16 HK 201552 CR880 Canal Bank Stobllizatlon Project Bank Stabilization 0.0 0.0 $1,400 $884 Apr-16 HK-SC 2011904 Garden Rd., S. of FOOT Canal to S. of Blue Heron Blvd. 0.3 ml, 3 L 0.3 0.3 $1,090 $908 Sep-16 KFS-MCD (1) 200960 Haverhill Rd., Lantana Rd. to South of the LWOO L~14 Canal (1) 201050 Haverhill Rd., South of the LWOD L 1 4 Canal to Lake Worth Road 4LD Widen 2L to SL 2.2 5.9 $8,900 $7,445 Sep-16 KF-SJ 2010500 Lyons Rd.: Lantana Rd ton. of LWDD L-14 Canal Widen 2L to 4LD 0.9 1.4 $5,100 $4,307 Mar-16 KF-ABK 2015223 Old Dixie Hwy., 45th Street to Park Avenue Milling and Resurfacing 3.3 0.0 $1,200 $1,048 Jul-16 HK 2004506 Old Dixie Hwy., Park Ave. to Northlake Blvd. 0.9 mi, 3 L 0.9 0.9 $3,500 $3,084 Sep-16 DY-MA 2014610 Palmetto Park Rd. Bridge over LWOD E-1 Canal Sidewalk & Banner Modifications 0.0 0.0 $120 $119 Feb-16 KF-EF 2013131 Penny Ln., Melaleuca Ln. to dead end MSTU 0.1 0.2 $300 $455 Aug-16 KFS-SMO 200210 9 Toney Penna Or. and Old Oixie Hwy. Intersection Improvements 0.1 0.1 $1,600 $2,079 Sep-16 DY MA (1) Projects 2009602 and 2010503 combined and let as one contract FY 2016 TOTAL 12 Projects 7.9 8.9 24,360 21,8-41 Annual Contracts 2015054 Annual Roadway Landscaping 0.0 0.0 $1,250 $1,404 Feb-16 HK 201505 Annual 2015053 Annual Asphalt Milling and Resurfacing Asphalt Milling and Resurfacing 0.0 o.o $5,600 $5,632 $5,688 Feb-16 HK 2015055 Annual 2015051 Annual 2015051 Annual Pathway and Minor Construction Pathway and Minor Construction Federalized} Traffic Signal 0.0 0.0 ss.soo $4,300 0.0 0.0 $2,800 $3,881 0.0 0.0 $9,800 $5,152 Feb-16 Mor-16 May-16 HK HK HK 2016051 Annual 2016051 Annual Pavement Mart(lng Pavement Mart(ing 0.0 0.0 $3,500 $2,030 $2,203 Jun-16 HK 2016050 Annuli Guardrail 0.0 0.0 $625 $556 Jul-16 HK 2016052 Annual Traffic Loops 0.0 0.0 $815 $916 Sep-16 HK FY 2016 TOTAL 10 Projects 0.0 0.0 29,890 31,762 PROJECTS BUILT BY ANNUAL CONTRACTORS 201451 rovements 0.2 0.2 $60 2. 2 0.0 $1000 4.1 0.0 $1,970 0.1 0.1 $440 FY 2016 TOTAL 4 Projects 6.6 0.3 $3,470 ROADWAY PRODUCTION DIVISION ANNUAL REPORT FY 2016 EXHIBIT "C", PAGE 1 OF 1

CONSULTANT COMPETITIVE NEGOTIATIONS ROADWAY PRODUCTION CONSULTANT CONTRACT DOLLAR AWARDS Project Number Project Name, Limits Amount 2016500 Florida Mango Road: 1Oth to Edgewater Drive $653,807.37 2015508 6th Ave. over Lake Osborne $281,599.88 2015509 Benoist Farms Road: SR 80 to Belvedere Road FY2016- TOTAL $490,256.67 $1,425,663.92 I Annual Agreements Issued Renewed Intersection Improvements Street Lighting Design Services Traffic Signal Design Services Construction Materials Testing, Geotechnical Engineering & Inspections Structural Engineering Services Surveying & Mapping Services Civil Engineering Services I FY2016 ANNUAL AGREEMENT- TOTALS 0 1 0 0 0 0 3 4 2 0 2 6 3 1 0 14 Miscellaneous Consultants Certified Consultants Re-Certified New Tasks to Annuals Supplements to Selected Projects Supplements to Annual Tasks MISCELLANEOUS TOTALS 19 14 21 21 35 110 ROADWAY PRODUCTION DIVISION ANNUAL REPORT FY- 2016 EXHIBIT "D", PAGE 1 of 1

ROADWAY PRODUCTION DIVISION SBE GOAL & CONTRACTOR COMMITMENT FOR PROJECTS AWARDED Project Number Project Name Award Amount Award/Minus Contingent Items Contractor "/o SBEGoal $$ Contractor Commitment % $$ FY 2016 County Funded Projects 2012101 Australian Ave., W. 10th St. to 330' N. of W 13th St. $699,820.90 $658,120.90 R & D Paving, LLC 15.00% $98,718.14 51.70% $340,247.00 2015525 CR880 Canal Bank Stabilization Project $883,590.00 $883,590.00 Dickerson Florida, Inc. 15.00% $132,538.50 15.50% $136,956.05 2011904 Garden Rd., S. of FOOT Canal to S. of Blue Heron Blvd. $907,916.20 $882,898.00 Community Asphalt Corp. 15.00% $1 32,434.70 14.86% $131,209.00 Haverhill Rd., Lantana Rd. to South of the LWDD L-14 (1) 2009602 Canal Haverhill Rd., South of the LWDD L-14 Canal to Lake Worth (1) 2010503 Road 2010504A Lyons Rd.; Lantana Rd ton. of LWDD L-14 Canal $7,444,791.05 $4,307,307.30 $7,366,339.55 $4,262,802.27 J.W. Cheatham, LLC Rosso Site Development, Inc. 15.00% $1,104,950.93 15.00% $639,420.34 15.95% $1,174,704.14 57.98% $2,471,513.93 2004506 Old Dixie Hwy., Park Ave. to Northlake Blvd. $3,084,001.95 $2,998,039.95 Community Asphalt Corp. 15.00% $449,705.99 15.60% $467,789.53 2014610 Palmetto Park Rd. Bridge over LWDD E-1 Canal $118,540.00 $118,540.00 West Construction 15.00% $17,781.00 15.60% $1 8,489.00 2013131 Penny Ln., Melaleuca Ln. to dead end $454,770.85 $348,932.85 R & D Paving, LLC 15.00% $52,339.93 27.39% $95,589.00 2002109 Toney Penna Dr. and Old Dixie Hwy. $2,079,181.90 $2,040,260.90 Community Asphalt Corp. 15.00% $306,039.14 11.62% $236,985.55 (1) Projects #2009602 and #2010503 combined and let as one contract FY 2016 TOTAL 10 PROJECTS $19,979,920.15 $19,559,524.42 15.00% $2,933,928.66 25.94% $5,073,483.20 FY 2016 Federally Funded Projects 2013601 Canal Point Pedestrian Bridge Award Amount $811,585.00 Contractor West Construction 2015223 Old Dixie Hwy., 45th Street to Park Avenue $1,048,217.00 Ranger Construction, Industries, Inc. FY 2016 TOTAL 2 PROJECTS s1,859,8o2.oo I Project was federally funded, and the responsive bidder could not be ranked for SBE compliance due to federal funding restrictions. Notes: Award amounts include Utility Company Participation. Percentage figures are not rounded. ROADWAY PRODUCTION DIVISION ANNUAL REPORT- FY 2016 EXHIBIT "E", PAGE 1 OF 1

ROADWAY PRODUCTION DIVISION SBE GOAL & CONTRACTOR ACHIEVEMENT FOR PROJECT FINALED Project Number Project Name Initial Amount Final Amount % +I Contractor Initial Amount Less Less Contingency Contractor Commitment ss % Final Contract Amount Less Final Contingency ss Contractor Achiev em ent,4 FY2016 County Funded Projects 2012513 Clint Moore Road and Military Trail Drainage Improvements $339,217.00 $263,106.00 22.23'!. Foster M1rine Contr~c:totS, Inc. $33.,617.00 S56,7 o.so 16.96% $261,006.00 $57,312.10 21.96% 2013612 Intracoastal Road SeawaU Repair $125,995." $133,151." 6.24% Coston M1rine Services, Inc. $125,995.94 $11,117.61 57.00% SU3,15U n2,uu 69.36% 201"10 PahTH!ftO Pi"' Road Bridge over the LW.O.O. E-1 Canal $111,5.0.00 $121,U...50 2.79% West Construction, Inc. $111,5.0.00 S11,U9.00 15.60% S1Z1,U...50 $22,10'-52 11.14'.4 FY 2016 TOTAL 3 PROJECTS $513,752." $519,509... 11.01 % $57!,152.94 FY 2016 Federaltv Funded Pro!ects 201.616 Selveoere Road from Club "ouse Ortve to Australian Avenue 201-1601.45th Slreet from 1-95 to Old OilCie Highway/Greenwood Avenue $7 67,915.20 $1,2n,S06.25 $611,465.75 11.31% $1,352,U9.50 5.90% Ranger Construction. In<. J.W. Cheathlm, LLC 2013&18 Historic Jupiter Indiantown Trail Riverbend Par1t to Cypress Creek Natural Area $098,031.10 $099,231.80 0.24% Rosso Site Development, Inc. Notes: Initial and Final Award Amounts include Util ~y Company Par1 1cipatlon. Percentage f.gures are not rounded ROADWAY PROOUCTlON DNISION ANNUAL REPORT FY 2015 EXHIBIT " F", PAGE 1 OF 1

ROADWAY PRODUCTION -ACTIVE PROJECT STATUS PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SCHED. ACTUAL 10th Ave. North and Boutwell Rd. 2012511 Intersection s 2012 2013 2S2013 Complete KOF SJ Mock Roos D 2016 2016 2018 Master Plan R 2019 2020 Awaiting Design c 2021 2022 Awaiting Design 45th Street and Military Trail Intersection Improvement 2016501 Intersection D 2016 2S2016 2017 N.T.P Issued DY MA HSQ Group, Inc. R 2018 2018 Awaiting Design c 2020 2020 Awaiting Design 45th St. from 1-95 to Old Dixie Highway/Greenwood 2014608 Milling & Resurfacing c 2015 2S2015 2S2016 Finaled HK In-House Avenue 6th Avenue South over Lake Osborne Drive 2015508 Bridge Replacement D 2016 2018 Study NTP Issued DY FM Stantec R 2018 2020 Awaiting RIW c 2020 2022 Awaiting Design 60th St. N., W. of Royal Palm Beach Blvd. to E. of 2004507C 0.5 mi, 3 L D 2004 252005 2013 2S2014 100% Complete KOF KOF K-F Group Royal Palm Beach Blvd. R 2004 2S2012 2013 2S2014 Complete c 2015 2S2015 2016 1S2017 Substantially Complete Atlantic Ave. and Florida's Turnpike 2012501 Intersection s 2013 2S2014 2014 1S2015 Complete DY MA Kim ley-horn D 2015 2S2015 2016 35% Complete c 2017 2018 Awaiting Design Roadway Production Division- Annual Report FY 2016 1 S - First Semester / 2S- Seco11d Semester Exhibit G Page 1 of24

PROJECT NAME. LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCIIED. ACTUAL SC/IED. ACTUAL Australian Ave. and Palm Beach Lakes Blvd. 2005502 0.6 mi, 5/6 L D 2011 1S2011 2016 35% Complete KOF EF Wantman c 2017 2018 Awaiting Design Australian Ave Over Carver Canal 2015517 Bridge s 2015 2S2015 2016 1S2016 Complete OY MA RJ Behar Australian Ave., W. 10th St. to 330' N. Of W.13th St. 2012101 Intersection 0 2013 2S2013 2015 2S2015 Complete DY MA Kimley-Horn R 2014 2S2015 2015 2S2016 Complete c 2016 2S2016 2017 Under Construction Belvedere Road & Sansbury's Way 2016508 Safety S/D 0 2016 2017 Scope and Fee DY MA Arcadis c 2018 2018 Awaiting Design Belvedere Road from Club House Dr. to Australian 2014616 Milling & Resurfacing c 2015 2S2015 2S2016 Finaled HK In-House Avenue Benoist Farms Rd., SR 80 to Belvedere Rd. 2015509 1 mi. 3L 0 2016 2S2016 2017 Master Plan Submitted KOF AMO Scalar R 2017 2018 Awaiting Design c 2019 2020 Awaiting Design Bishoff Rd., Dead End to Jog Rd. 2016085 MSTU Paving & 0 2017 2018 Scope & Fee Pending KFS SMO COl Drainage c 2019 2019 Awaiting Design Blue Heron Blvd. and Congress Ave. 2013101 Intersection 0 2013 1S2013 2014 1S2015 Complete OY MA Arcadis R 2015 1S2015 2016 R/W Acquisition c 2018 2018 Awaiting R/W Roadway Production Division -Annual Report FY 2016 IS- First Semester / 2S- Seco11d Semester Exhibit G Page 2 of24

PROJECT NAME, LlMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SC/fED. ACTUAL Blue Heron Blvd. and Australian Ave. 2013102 Intersection D 2013 1S2013 2015 96% Complete DY MA Kim ley-hom R 2015 1S2015 2016 FOOT Review c 2018 2018 Awaiting Design Bluegill Trail from Grassy Waters Preserve/Northlake 2013617 Pathway c 2015 1S2016 2016 2S2016 Substantially Complete HK HK Blvd. ton. of PGA Blvd. Boca Del Mar Dr.. Montoya Cir. N. to Palmetto Park 2014371 Pathway D 2014 1S2014 2017 Permit Pending KFS SMO In-House Rd. c 2017 2017 Awaiting Design Boca Del Mar Or.. Montoya Cir. S. to Power1ine 2014372 Pathway 0 2014 1S2014 2016 35% Complete KFS SMO In-House c 2016 2017 Awaiting Design Boynton Beach Blvd. and Southbound Entrance to 2014509S Study s 2014 1$2014 2015 Work Stopped- FOOT KOF KOF Kimley-Hom Florida's Turnpike Boynton Beach Blvd. and Acme Dairy Rd. 2014508A Intersection D 2015 182015 2016 96% OY MA Kim ley-horn R 2016 282016 2017 RIW Acquisition in Process c 2017 2018 Awaiting RIW Burns Rd. and Military Tr. 2007102 Intersection D 2008 282008 2009 182013 Complete DY MA Arcadis/ Abacoa R 2009 282009 2010 2S2014 Complete c 2015 2S2015 2016 2S2016 Substantially Complete Cabana Colony Missing Links 2015372 Pathway 0 2015 1S2015 2016 1S2016 Complete KFS SMO In-House c 2016 2017 Under Construction Roadway Production Division- Amrua/ Report FY 2016 IS- First Semester!2S- Seco11d Semester Exhibit G Page3 o/24

PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS SCHED. ACTUAL SCHED. ACTUAL PM PE CONSULTANT Camino Real Rd./Boca Club Bridge over Intracoastal 2003501 Bridge Rehab. D Waterway 2014 2S2014 2017 100% Review KFS SMO WGI/BDA R NIA NIA NIA c 2017 2018 Awaiting Design Camino Real Rd.IMilitary to 7th 2015610 Safety Improvements D & Resurfacing 2016 2017 96% Complete DY we In-House R c NIA NIA NIA 2018 2018 Awaiting Design Canal Point Pedestrian Bridge over L-10 Canal 2013601 Improvements D 2013 2S2013 2016 2016 Complete HK HK AGA R c NIA NIA NIA NIA NI A 2016 2017 Under Construction Center St.. Thelma Ln. to Woodland Estates Dr. 2007058A 0.3 m i. 3L D 2014 1S2014 2017 100% Review Pending KFS MCD CDI R c 2016 2S2016 2017 RIWI Acquisition in Process 2017 2018 Awaiting Design Central Blvd.IUniversity Blvd. 2015601 Roundabout s 2015 1S2015 2015 2S2015 Complete KOF ABK HSQ Church St., Limestone Creek Rd. to W. of Central Blvd. 2014503 0.5 mi. 3 L D 2014 2S2014 2018 35% Revision pending KFS SMO Simmons & White R c 2017 2018 Awaiting Design 2018 2019 Awaiting Design Clint Moore Rd. and Military Tr. 2012513 Drainage D c 2013 2S2013 2014 1S2015 Complete 2015 2S2015 1S2016 1S2016 Finaled DY HK Civil Design Roadway Production Division- Ammo/ Report FY 2016 JS- First Semester / 2S- Second Semester Exhibit G Page4of24

PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCI/ED. ACTUAL SCHED. ACTUAL Clint Moore Rd. E of Congress Ave. to E. of LWDD E- 2015510 Bridge Replacement D 2015 2016 Cancelled KOF AMD WGI 4 Canal c 2019 2020 Cancelled Congress Ave over WPB 'F' Canal, N of Okeechobee 2015518 Bridge Replacement D 2015 2S2016 2017 35% plan complete KOF AMD HSQ Blvd to Ware Dr. c 2017 2018 Awaiting Design Congress Avenue & Palm Beach Lakes Blvd. 2013520 Intersection D 2015 2S2015 2017 65% Review DY MA Arcadis R 2017 2018 Awaiting Design c 2019 2020 Awaiting Design Congress Ave., N. of Northlake Blvd. to Alt. A-1-A 2012517 0.6 mi, 2 L & 3 L s 2013 1S2013 2015 2S2016 Study Complete KOF AK Kimley-Horn D 2016 2S2016 2018 N.T.P. Issued R 2017 2018 Awaiting Design c 2019 2020 Awaiting Design Connector Rd., Lyons Rd. to Acme Dairy Road 2015502 0.5 mi. 213 L D 2015 1S2015 2016 2S2016 Complete DY FM Civil Design c 2017 2018 Bid Process Coral Ridge Drive Park Road to 750' N 2015504.20 Miles D 2015 1S2015 2016 65% Complete DY MA Arcadis c 2017 2018 Awaiting Design Roadway Production Division -Annual Report FY 2016 JS- First Semester I 2S- Seco11d Semester Exhibit G PageS of24

PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS SCHED. ACTUAL SCHED. ACTUAL PM PE CONSULTANT C.R. 880 Twenty Mile Bend Slope Protection 2013619 Slope Protection D 2013 2S2013 2014 2S2014 Complete DY HK BOA R N/A N/A N/A c 2015 1S2015 2015 2S2015 Substantially Complete CR 880 Twenty Mile Bend Slope Protection - Phase II 2015525 Slope Protection c 2016 2016 2016 2S2016 Under Construction HK HK Wantman Group CR 880 Bridge over C-51 Canal 2015500 Bridge Replacement D 2015 2S2015 2018 Master plan complete KOF EF AGA R c 2017 2019 Awaiting Design 2019 2020 F Davis Rd. Bridge over LWDD L-6 Canal 2014514 Bridge Replacement D 2014 2S2014 2017 96% submittal pending KFS MCD AGA R c N/A N/A N/A 2018 2018 Awaiting Design Dr. Martin Luther King Jr. Blvd. from Rosenwald Elem. 2015032 Canst. Inspection JPA c School to US 27 2016 2016 2017 Under Construction HK In-House Drexel Rd. Bridge over LWDD L-2 Canal, S of Fair 2014510 Bridge Replacement D Green to 15th Ln 2014 2S2014 2017 1 00% Review Pending KFS MCD RJ Behar R 2016 1S2016 2016 2S2016 Complete c 2017 2018 Awaiting Design Dyer Blvd. and Military Tr. 2014518 Intersection D 2014 2S2014 2015 2S2015 Complete KOF SJ In-House R N/A N/A N/A c 2015 1S2015 2016 1S2016 Finaled Fairgrounds Rd., North of Southern Blvd. to Detention 2013454 Pathway D Center 2016 2S2016 2017 35% Complete KFS SMO In-House R c 2016 2S2016 2017 R/W Acquisition in Process 2018 2018 Awaiting Design Roadway Production Division -Annual Report FY 2016 IS- First Semester / 2S- Second Semester Exhibit G Page6of24

PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCflED. ACTUAL SCHED. ACTUAL Fairgrounds Rd. and Weisman Way 2014104 Intersection D 2015 1S2015 2015 g6% Design Complete KFS MCD In-House c 2017 2017 Awaiting Design Flavor Pict Rd.. S.R. 7 to Lyons Rd. 2013526 1.0 mi, 2 L D 2013 1S2014 2015 100% Review KOF AK Stantec R N/A N/A c 2017 2018 Awaiting Design Florida Mango Road Widening from 10th Ave North to 2016500 0.9 mi. 3 L D 2016 2S2016 2018 N.T.P. Issued KOF AMD Stanley Edgewater Dr. R 2018 2019 Awaiting Design c 2020 2022 Awaiting Design Florida Mango Rd., Edgewater Dr. to Barbados Rd. 2015520 0.6 mi, 3L D 2016 1S2016 2018 35% Submittal KOF AMD AGA R 2017 2018 Awaiting Design c 2019 2020 Awaiting Design Florida Mango Rd. Bridge, N. of Myrica Rd to Summit 2014511 0.5 mi, 3 L D 2014 2S2014 2018 35% Submittal KFS SMO AGA Blvd. R 2017 2018 Awaiting Design c 2018 2019 Awaiting Design Florida Mango Rd. over LWDD L-5 Canal 2015523 Bridge Replacement D 2015 1S2015 2018 Design Change KFS SMO AGA R 2017 2018 Awaiting Design c 2018 2018 Awaiting Design Florida Mango Rd. over PBC L-2 Canal 2017512 Bridge Replacement D 2017 2019 Scope & Fee Pending KFS MCD RJ Behar c 2019 2019 Awaiting Design Roadway Production Division- Annual Report FY 2016 IS- First Semester 12S- Seco11d Semester Exhibit G Page 7 o/24

PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SCHED. ACTUAL Forest Hill Blvd. and Military Tr. 2012504S Study s 2012 1S2012 2013 2015 Study Complete KOF SJ Kim ley-horn Garden Rd.. S. of FOOT Canal to S. of Blue Heron 2011904 0.3 mi, 3 L D 2013 2S2013 2015 1S2016 Complete KFS MCD LDI Blvd. c 2016 2S2016 2017 Under Construction Gateway Blvd. and Military Tr. 2014507 Intersection D 2015 2S2015 2016 96% Complete DY FM Kimley-Horn R 2017 2S2016 2019 Appraisals c 2020 2020 Awaiting Design Gateway Blvd. I High Ridge Rd. 2015511 Intersection D 2016 1S2016 2017 96% Complete DY we HSQ R 2017 2018 N/A c 2019 2019 Awaiting Design Glades Road & Sandpiper Shores Elementary School 2016104 Intersection D 2016 2S2016 2017 65% Review DY we Arcadis Improvements c 2017 2017 Awaiting Design Glades Rd. and Florida's Turnpike 2012502 Intersection D 2015 1S2015 2016 1S2016 Complete by FOOT KOF AMD Turnpike c 2017 1S2017 2018 NTP Pending Glades Rd. and Butts Rd. 2012503 Intersection D 2013 2S2014 2014 65% Complete DY FM Kim ley-horn/boca R 2016 2016 Awaiting Design c 2018 2018 Awaiting Design Roadway Production Division - Allllual Report FY 2016 1 S - First Semester I 2S - Seco11d Semester Exhibit G Page 8of24

PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SCHED. ACTUAL Gun Club Rd. over LWDD E-3 Canal 2014512 Bridge Improvement s 2014 1S2014 2015 2S2014 Complete KOF EF WGI D 2015 1S2015 2015 2S2016 Complete c 2017 1S2017 2018 2S2017 Bid Process Haverhill Rd. Lantana Rd. to S. of LWDD L-14 Canal 2009602 0.9 mi, 4 L D 2010 1S2010 2015 2S2016 Complete KOF SJ In-House c 2016 1S2017 2017 NTP Pending Haverhill Rd, S. of LWDD L-14 Canal to Lake Worth 2010503 1.3 mi, 4 L & 5 L D 2010 1S2010 2011 2S2016 Complete KOF SJ Arcadis Rd. R 2010 1S2012 2013 2S2016 Complete c 2016 1S2017 2017 NTP Pending Haverhill Rd. from Summit Blvd. to Belvedere Rd. 2016220 Milling & Resurfacing c 2017 2017 Awaiting Design HK In-House Haverhill Rd., N. of Caribbean to Bee Line Hwy. 2013528 1.6 mi, 5 L D 2013 2S2013 2015 96% Review Pending KOF EF R.J. Behar R 2014 1S2017 2017 Awaiting Design c 2017 2018 Awaiting Design Haverhill Rd.; N. of Caribbean Blvd. to Dyer Park N. 2013528A Pathway D 2013 2S2013 2016 2016 Complete KOF EF RJ Behar Entrance c 2016 1S2017 2017 NTP Pending Historic Jupiter Indiantown Trail: Pathway from 2013618 Pathway c 2014 2S2014 2015 2S2015 Finaled DY HK S&WIERM Riverbend Park to Martin County line Roadway Production Divisioll- Annual Report FY 2016 JS- First Semester I 2S- Second Semester Exhibit G Page 9 of24

PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SCf/ED. ACTUAL Hood Rd., E. of Florida's Turnpike tow. of Central 2013522 1.2 mi, 4 L D 2013 1S201 3 2015 96% Complete DY MA Stanley Blvd. R 2015 2S2016 2017 R!W Acquisition in Process c 2017 2018 Awaiting Design Hood Rd. and Central Blvd. 2014502 Intersection D 2014 2S2014 2017 96% Complete KOF SJ Arcadis c 2017 2019 Awaiting Design Indiantown Rd. and Jupiter Farms 2006500 Intersection D 2015 1S2015 2017 35% Complete DY we K-F Group R 2017 2017 Awaiting Design c 2017 2018 Awaiting Design Indiantown Road at Sierra Square 2006500A Intersection D 2016 1S2016 2016 2S2016 Complete DY we K-F Group c 2017 2018 NTP Pending Intracoastal Seawall Repair 2013612 Seawall Repair c 2015 1S2015 2016 1S2016 Finaled DY DY BDNWGI Island Way and Limestone Creek Rd. 2016102 Intersection D 2016 2016 2S2016 2S2016 Complete KOF SJ In-House R N/A N/A NJA c 2016 2016 2S2016 Awaiting Design Island Way/Casa Circle - Church Street 2016502 Study s 2016 2S2016 2017 Draft Study DY MA HSQ Jog Rd., S. of Clint Moore Rd. to Linton Blvd. 2015513 Safety Improvement & D 2015 Resurface 1S2015 2016 2S2016 Complete DY we ln-house(aga) c 2016 2S2016 2016 Under Construction Roadway Production Division -Annual Report FY 2016 IS- First Semester I 2S- Second Semester Exltibit G Page 10 o/24

PRO.JECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULT ANT SCHED. ACTUAL SCHED. ACTUAL Jog Rd., S. of Hypoluxo Rd. to 10th Ave. N. 2015514 Safety Improvements D 2015 152015 2016 152016 Complete DY DY In-House & Resurface c 2016 1S2016 2016 Under Construction Jog Rd. Bridge over Florida's Turnpike 2014614 Slope Stabilization D 2015 1S2015 2016 65% Complete DY FM RJ Behar c 2017 2018 Awaiting Design Jupiter Farms Rd., 167th Place N. to ERM Property 2013562 Pathway D 2015 1S2015 2015 1S2016 Complete KF5 SMO In-House c 2016 1S2016 2017 Under Construction Kirk Rd. BridgeS. of LWDD l-7 Canal ton. of Pot 0 ' 2014515 Bridge Replacement D 2014 2S2014 2017 96% Complete KFS MCD AGA GoldSt c 2017 2017 Awaiting Design Kirk Rd., 80' N. of l-7 Canal to Summit Blvd. 2011081-30 Pathway D 2014 152014 2016 2S2016 Design Complete KFS SMO In-House R N/A N/A NIA c 2017 2017 Awaiting Bridge construction Kirk Rd from Summit Blvd to Gun Club Rd 2011081-44 Pathway D 2014 1S2014 2016 Design complete KFS SMO In-House R NIA N/A NIA c 2017 2017 Awaiting Bridge construction Roadway Production Division- Annual Report FY 2016 1 S - First Semester I 2S- Second Semester Exhibit G Page 11 of24

PROJECT NAME, LIMITS PROJ. N O. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCIJED. ACTUAL SCHED. ACTUAL Kirk Rd. over LWDD L-5 Canal 2015506 Bridge Replacement D 2015 2015 2017 65% Review KFS MCD AGA c 2017 2017 Awaiting Design Kudza Rd. over LWDD L-8 Canal 2017513 Bridge Replacement D 2017 201 9 Scope & Fee Pending KFS SMO WGI c 2019 201 9 Awaiting Design Lake Worth Rd. and Jog Rd. 2012505 Intersection D 2012 2S2012 2013 Scope Revised KOF AK Arcadis R 201 4 2S2014 2015 Awaiting Design c 2017 2018 Awaiting Design Lantana Rd. & Brentwood Blvd. 2016105 Intersection D 2016 2S2016 2017 65% Complete KOF SJ In-House c 2017 2017 Awaiting Design Lantana Rd. and Edgecliff Rd. 2013107 Intersection D 2014 2S2014 2015 96% Complete KOF AK In-House R 2015 152016 2016 R/W Acquisition in Process c 2017 2018 Awaiting R/IN Lantana Rd & Willowood Lane 2016108 Intersection D 2016 2S2016 2017 65% Complete KOF SJ In-House c 2017 2017 Awaiting Design Lantana Rd. and Lawrence Rd. 2014506 Intersection D 2014 2S2014 2015 65% Complete KOF AMD Arcadis R 2016 2017 Awaiting Design c 2017 201 8 Awaiting Design Roadway Production Division- Annual Report FY 2016 IS- First Semester 1 2S- Seco11d Semester Exhibit G Page 12 of24

PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED.ACTUAL SCI/ED. ACTUAL Linton Blvd. and Military Tr. 2013500 Intersection 0 2013 2S2013 2015 Revised 65% Complete KOF SJ Arcadis R 2014 2016 2015 Legals & Sketches Review c 2016 2018 Awaiting R/W Linton Blvd and Federal Hwy 2015103 Intersection 0 2015 2S2015 2016 1S2017 100% Complete DY MA HSQ c 2017 2018 Awaiting Design Lyons Rd., Hillsboro Canal to S.W. 18th St. 2013530 0.3 mi. 6 L D 2013 1S2013 2015 96% Submittal Review KOF AMD LDI R 2015 2016 2017 RIW Acquisition in Process c 2017 2018 Awaiting Design Lyons Rd., Clint Moore Rd. tow. Atlantic Ave. 2013527 3.0 mi, 4L D 2013 2014 2017 35% plans complete KOF AK HSQ c 2017 2018 Awaiting Design Lyons Rd., L-38 Canal to N. of L-37 Canal 2014609 1.0 mi, 4 L D 2014 2S2014 2015 2S2014 Complete KOF AK LDI/Developer c 2014 2014 2014 2S2014 Finaled Lyons Rd. and Atlantic Ave. 2015602 Intersection 0 2014 1S2014 2015 2S2016 Complete KOF AK LDI/Developer c 2016 2S2016 2016 Under Construction Lyons Rd., Lantana Rd. ton. of L.W.D.D. L-14 Canal 2010504A 1.0 mi. 4 L 0 2010 1S2010 2011 1S2016 Complete KOF AK HSQ c 2017 2S2016 2017 Under Construction Roadway Production Division- Annual Report FY 2016 IS- First Semester I 2S- Seco11d Semester Exhibit G Page 13 of24

PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SCHED. ACTUAL Lyons Rd.. N. of LWDD L-14 Canal to Lake Worth Rd. 20105049 1.1mi,4L 0 2010 1S2010 2011 65% Submittal Pending KOF AK HSQ R 2013 2014 Awaiting design c 2018 2019 Awaiting Design Lyons Rd.. Lake Worth Rd. to S. of L.W.O.O. L-11 2007500A 0.2 mi, 2/3 L 0 2007 1S2007 2009 65% Resubmittal KOF AK HSQ Canal Pending R 2012 2013 Awaiting design c 2018 2019 Awaiting Design Lyons Rd., S. of LWDD L-11 Canal ton. of LWDD L- 20075006 1.2 mi, 2/3 L 0 2007 1S2007 2009 On Hold KOF AK HSQ 10 Canal R 2012 2013 On Hold c F F On Hold Lyons Rd., S. of S.R. 80 2013105 Right Turn Lane 0 2014 1S2014 2015 1S2015 Complete DY MA In-House c 2015 1S2015 2016 1S2015 Complete Lyons Road -Norte Lago to Pine Springs Drive 2015609 Safety Reconstruction DY FOOT Muck City Rd. 2016373 Pathway 0 2016 2S2016 2017 35% Complete KFS SMO In-House c 2017 2017 Awaiting Design Myrtle Or. and 47th Way 2013127 MSTU 0 2014 2S2014 2016 2S2016 Complete KFS SMO LDI c 2017 2018 Bids Rejected Roadway Production Division- Annual Report FY 2016 IS - First Semester I 2S- Scco11d Semester Exhibit G Page 14 o/24

PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SCHED. ACTUAL Northlake Blvd.. Osprey Isles Blvd. to Ibis Blvd. 2016362 Pathway D 2016 2S2015 2017 Survey Pending KFS SMO In-House c 2017 2017 Awaiting Design Northlake Blvd., E. of Seminole Pratt Whitney Rd. to 2003503A 1.0 mi, 4 L D 2004 2S2004 2013 96% Submittal KOF EF Metric E. of Hall Blvd. R 2006 1S2006 2013 Legals & Sketches c 2017 2018 Awaiting RIW Northlake Blvd., E. of Hall Blvd. to Coconut Blvd. 2003503B 2.4 mi, 4 L D 2004 2S2004 2013 On Hold KOF EF Metric R 2006 1S2006 2013 Legals & Sketches c 2018 2020 Awaiting Design Northlake Blvd., SR 710 to Military Trail 2015515 Safety Improvements D 2015 2S2015 2016 Under design DY we In-House & Resurface c 2017 2017 Awaiting Design Northlake Blvd. and Military Tr. 2013519 Intersection D 2013 1S2013 2016 2S2016 Complete DY MA Arcadis R 2015 2S2016 2016 RIW Acquisition in Process c 2017 2018 Awaiting RIW Northlake Blvd., Alt. A1A & Prosperity Farms Road 2016101 Study s 2016 2S2016 2017 Draft Study DY we A rca dis Oakwood Lakes Dr from Boynton Bch Blvd to Old 2015363 Pathway D 2014 1S2015 2016 1S2016 Complete KFS SMO In-House Boynton Rd R N/A NIA N/A c 2016 2017 Awaiting Design Roadway Production Division- Annual Report FY 2016 IS- First Semester I 2S- Seco11d Semester Exhibit G Page 15 of24

PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCH 0. ACTUAL SCH 0. ACTUAL Okeechobee Blvd., Cheetham Hill Rd. to 168th Tr. N. 2015374 Pathway D 2014 1S2015 2016 Permits Pending KFS SMO In-House c 2016 2017 Awaiting Design Okeechobee Blvd. and Ponce de Leon St. 2013106 WB Turn Lane D 2013 1S2013 2015 2S2015 Complete KOF SJ In-House R 2014 2S2014 2015 2S2016 Complete c 2016 2S2016 2016 1S2017 Under Construction Okeechobee Blvd. and Skees Road 2016100 Intersection D 2016 1S2016 2017 65% Complete DY we HSQ Group, Inc. R N/A N/A c 2017 2018 Awaiting Design Okeechobee Blvd. & Jog Road 2016509 3 NB Lefts, Study s 2016 2S2016 2017 Draft Study DY MA HSQ Okeechobee Blvd. and Church St. 2013534 Intersection D 2013 2S2013 2014 1S2017 65% Review KOF SJ Arcadls R 2017 2019 Awaiting Design c 2019 2020 Awaiting Design Old Dixie Hwy., Yamato Rd., Linton Blvd. 2014500 3.9 mi. 3 L D 2015 2S2015 2017 35% Complete DY MA American R 2017 2018 Awaiting Design c 2018 2020 Awaiting Design Old Dixie Hwy., 45th St. to Park Ave. 2015223 Milling & Resurfacing c 2016 2016 2016 Under Construction HK HK In-House Old Dixie Hwy., Park Ave. to Northlake Blvd. 2004506 0.9 mi. 3 L D 2010 1S2010 2011 2S2016 Complete DY MA American R 2010 2S2012 2011 2S2016 Complete c 2016 1S2017 2017 N.T.P. Pending Roadway Pmduction Division- Annual Report FY 2016 IS- First Semester I 2S- Second Semester Exhibit G Page 16 of24

PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SCHED. ACTUAL Orange Blvd., Seminole Pratt Whitney Rd. to 120th 2013263 Pathway s 2013 2S2013 2016 1S2014 Complete KFS SMO In-House Ave. D 2016 1S2015 2017 35% Complete c 2017 2017 Awaiting Design Palm Beach Lakes Blvd. Bridge over FEC Railroad 20145165 Study s 2014 2S2014 2015 2S2015 Complete KOF EF R.J. Behar Palm Beach Lakes Blvd. & N. Robbins Drive 2016504 Intersection D 2016 2S2016 2017 Awaiting NTP KOF SJ HSQ R 2018 2019 Awaiting Design c 2020 2021 Awaiting Design Palmetto Park Rd. Bridge over LWDD E-1 Canal 2014610 Bridge Replacement D 2014 2S2014 2015 2S2015 Complete KOF EF WGI c 2016 2016 2S2016 Finaled Palmetto Park Road & Boca Rio Road 2016107 Intersection D 2016 2S2016 2017 Master plan review DY FM HSQ c 2018 2018 Awaiting Design Palmetto Park Road, E. of Military to 1-95 2016506 Intersection D 2017 2019 Consultant Selection KOF EF TBD Improvement R 2019 2020 Awaiting Design c 2021 2022 Awaiting Design Palmetto Park Rd., SW 7th Ave. to SW 5th Ave. 2013531 0.2 mi, 4/6 L D 2013 2S2013 2016 65% Complete KOF EF WGI R 2016 2017 Awaiting design c 2018 2019 Awaiting Design Roadway Production Division -Annual Report FY 2016 IS- First Semester I 2S- Seco11d Semester Exhibit G Page 17 of24

PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCf/ED. ACTUAL SCHED. ACTUAL Palmetto Park Rd. Bridge over Intracoastal Waterway 2013607 Rehab/Painting D 2014 2S2014 2015 2S2015 Complete DY DY BDAIWGI c 2019 2019 Awaiting Design Palmwood Rd. Slope Stabilization 2014615 Slope Stabilization D 2014 1S2015 2016 2S2016 Finaled DY FM BDA!WGI c 2016 2017 Award Pending Penny Ln., Melaleuca Ln. to dead end 2013131 MSTU D 2013 1S2013 2015 1S2016 Complete KFS SMO S&W R 2014 2S2014 2015 2S2015 Complete c 201 6 1S2017 2017 Under Construction P.G.A. Blvd. and Central Blvd. 2014504 Intersection D 2014 2S2014 2015 2S2016 Complete DY FM Arcadis R 2016 2017 RIW Acquisition in Process c 2017 2018 Awaiting RIW P.G.A. Blvd. and Military Tr. 2012506 Intersection D 2014 2S2014 2015 96% Review KOF AMD Civil Design R 2015 2016 2017 Legals & Sketches c 2017 2018 Awaiting RIW P.G.A. Blvd. and Ellison Wilson Rd. 2015102 Intersection D 2015 2S2015 2016 1S2016 Complete DY FM HSQ c 2016 2S2016 2017 Under Construction Point Chosen Swing Bridge over Rim Canal 2010906 Fender System c 2015 2S2015 2016 Under Construction DY DY BDA!WGI Polo Road - LWDD L-13 Canal to Lake Worth Road 2016602 2L, 0.5 mi D 2S2016 Developer 65% DY FM Schnars/Pulte complete c F Roadway Production Division- Annual Report FY 2016 IS- First Semester / 1S- Second Semester Exhibit G Page 18 of24

PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SCHED. ACTUAL Prairie Road over LWDD L-8 Canal 2016505 Bridge Replacement D 1S201 1S2018 Scope & Fee Pending KFS MCD WGI R N/A N/A NIA c 2018 2018 Awaiting Design Purdy Ln., Forest Hill Elem. to E. of Major Dr. 2013523 0.2 mi, 3 L D 2013 1S201 3 2015 100% Review Complete KOF EF WGI R 2015 2S2015 2016 RIW Acquisition in Process c 2017 2017 Awaiting Design R.C.A. Blvd. and Alt. A-1 -A 2009100 Right turn lane D 2011 2S2011 2012 1S2016 Complete DY MA Arcadis R 2013 2S2013 2014 2S2014 Complete c 2015 2S2015 2016 1S2016 Finaled Redding Rd and Sunup Tr. 201 461 2 Drainage Study s 2014 2S2014 2015 1S2016 Complete DY FM Civil Roebuck Rd. and Jog Rd. 2013529A Intersection D 2013 2016 2S2013 1S2016 Complete KOF SJ Mock Roos N/A c 2017 2018 Awaiting Design Roebuck Rd., Jog Rd. to Haverhill Rd. 2013529 1.0 mi, 5 L D 2013 2S2013 2015 65% Complete KOF SJ Mock, Roos R 2016 2S2016 2017 RIW Acquisition in Process c 2017 2018 Awaiting Design Roebuck Rd.. Little Oaks to Loxahatchee Pines 2015375 Pathway D 2015 1S2015 2016 35% Complete KFS SMO In-House R 2017 1S2017 2017 Awaiting Design c 2018 2018 Awaiting Design Roadway Production Division -Annual Report FY 2016 IS- First Semester I 2S- Seco11d Semester Exhibit G Page 19 of24

PROJECT NAME, LIMITS PRO.!. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SCHED. ACTUAL Roebuck Rd., Loxahatchee Pines Dr. to Loxahatchee 2016374 Pathway D 2014 1S2014 2017 Permits Pending KFS SMO In-House River Rd. R 2017 1S2016 2017 Acquisition Pending c 2017 2017 Awaiting Design Royal Palm Beach Blvd., M-Canal to S. of Orange 2014501 1.0 mi. 315 L D 2015 2S2015 2017 35% Complete KOF AMD K-F Group Blvd. R 2016 2017 Awaiting Design c 2018 2019 Awaiting Design Sandalfoot Blvd., S.R. 7 to E. of S.R. 7 2013524 Bridge D 2013 2S2013 2014 96% Complete KOF AK AGA c 2017 2018 Awaiting Design SE 23rd Ave./Federal Highway 2016510 Intersection s 2016 2S2016 2017 N.T.P. Issued DY FM Arcadis Seminole Pratt Whitney Rd., S.R. 80 to S. of 1997511A 1.4mi,4L D 2000 1S2000 2002 2S2010 Complete KOF ws Crossroads Okeechobee Blvd. R 2003 2S2003 2004 1S2009 Complete c 2010 1S2011 2011 Substantially Complete Seminole Pratt Whitney Rd., S. of Okeechobee Blvd. 1997511B 2.8 mi. 4 L D 2000 1S2000 2002 2S2010 Complete KOF ws CH2MHILL to N. of Sycamore Dr. R 2002 2S2002 2003 1S2009 Complete c 2010 1S2011 2011 Substantially Complete Seminole Pratt Whitney Rd., Sycamore Dr. to N. of 1997511C1 0.1 mi. 4 L c 2010 1S2011 2011 Substantially Complete KOF WS Metric Sycamore Dr. Roadway Production Division- Allnual Report FY 2016 IS- First Semester I 2S- Second Semester Exhibit G Page 20of24

PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SCHED. ACTUAL Seminole Pratt Whitney Rd.. Seminole Ridge HS to M- 2015607 1.4 mi, 4L D 2S2014 2S2016 Developer Complete DY FM Minto/Farner Canal c 1S2017 Developer-Under Construction Seminole Pratt Whitney Rd.. Orange Blvd. to S. of 1997511D 1.8 mi, 4/6 L D 2002 2S2002 2003 100% Pending KOF EF AECom Northlake Blvd. R 2005 1S2005 2006 Legals & Sketches review c 2017 2017 Awaiting R/W Seminole Pratt Whitney Rd. and Northlake Blvd. 1997512A3 Intersection D 2001 2S2001 2002 96% Complete KOF EF Arcadis R 2004 1S2004 2006 Legals & Sketches c 2017 2018 Awaiting R/W Sherwood Forest Blvd., S. of L-9 Canal to S. of L-8 201 4377 Pathway D 2014 2S2014 2016 1S2017 Complete KFS SMO In-House Canal c 2017 2017 Awaiting Bridge construction Sherwood Forest Blvd., over L.W.D.D. L-8 Canal 2014300 Bridge Widening D 2014 2S2014 2016 96% Complete KFS MCD BDA/WGI c 2017 2017 Awaiting Design Silver Beach Rd., E. of Congress Ave. to Old Dixie 2003514 0.9 mi, 2 & 3 L D 2004 2S2004 2005 96% Review KOF AK Metric Hwy. R 2005 1S2005 2006 R/W Acquisition in Process c 2017 2018 Awaiting Design Roadway Production Division -Annual Report FY 2016 1 S- First Semester I 2S - Seco11d Semester Exhibit G Page 21 of24

PROJECT NAME, LIMITS PRO.!. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SCIIED. ACTUAL Smith Sundry Rd. over LWDD L-33 Canal 2017514 Bridge Replacement D 2017 2019 Scope & Fee Pending KFS SMO WGI c 2019 2019 Awaiting Design Southern Blvd. (SR 80) & Kirk Rd. 2015503 Intersection D 2015 1S2015 2015 2S2015 DY MA Arcadis c 2015 1S2016 2016 152016 Finaled MA SR 80 & Lyons Rd./Sansbury's Way 2015606 Intersection D FOOT DY FM FOOT c FOOT Summit Blvd. Bridge over LWDD E-3 Canal 2015524 Canal Bank Erosion D 2015 2S2015 2016 Complete DY we RJ Behar c 2017 2017 Bid Process Summit Blvd. Bridge over SFWMD C-51 Canal 2014513S Study s 2014 2S2014 2015 152016 Complete DY FM AGA S.W. 3rd. St.. S.R. 7 to E. of S.R. 7 2013525 Bridge D 2013 2S2013 2014 96% Complete KOF AK AGA c 2017 2018 Awaiting Design S.W. 18th St. and Military Tr. 2014519 Intersection D 2014 2S2014 2015 2S2016 Complete DY FM HSQ c 2017 2018 Bid Process Toney Penna Dr. and Old Dixie Hwy. 2002109 Intersection D 2008 2S2008 2009 2S2014 Complete DY MA Arcadis R 2011 2S2011 2012 1S2013 Complete c 2016 2017 NTP Pending Roadway Production Divisiou- Aunua/ Report FY 2016 IS- First Semester / 2S- Second Semester Exhibit G Page 22 of24