NDG/Westmount Neighbourhood Committee May 16, 2016
2 Presentation Outline Feedback on previous questions What s new on the Turcot website Public consultations online Reconstruction of Saint-Jacques overpass Turcot Interchange Implementation of long term hindrances Construction of the A-15 south ramp toward R-136 east Reconstruction of rue Notre-Dame Ouest Route 136 east Closure of exit 3 - Montréal (downtown) / rue Guy Closure of exit 2 - rue Atwater Construction of the new Atwater exit Closure of Avenue Greene Opening of the first two lanes on R-136 east Landscaping concepts
3 Feedback on Previous Questions 1. Will the noise barrier be removed along rue Saint-Jacques after the reconstruction of the overpass? 2. Why the parking located on the west side of Prud homme was removed? 3. Is it possible to get the presentation before the committee meetings?
4 What s New on the Turcot Website 3D model of the project Animated trips Autoroute 20 et route 136 eastbound Autoroute 15 northbound Live work (3 cameras)
5 Online Public Consultation Until June 3, 2016 Consultations on : Planned noise barriers design Landscaping on both side of rue Notre-Dame Ouest, under the infrastructures Noise barrier East sector Rue Notre-Dame Ouest
6 Diverting the Haut Saint-Pierre Collector Sewer Reinforcement work in progress
7 Diverting the Haut Saint-Pierre Collector Sewer Reinforcement work in progress
8 Diverting the Haut Saint-Pierre Collector Sewer Tunnel-boring machine work in progress
9 Diverting the Haut Saint-Pierre Collector Sewer Tunnel-boring machine work in progress Diverting will start on : May 14, 2016
10 Reconstruction of Saint-Jacques Overpass Preparatory work since April 3, 2016 Overpass dismantling - Preparatory work weekend of July 2, 2016 - Dismantling weekends of July 9, 16, 23 (back-up), 2016 and 2 weekends this fall The reconstruction of the overpass will begin as soon as the dismantling is complete July/ August, 2016
11 Reconstruction of Saint-Jacques Overpass Complete closure of the overpass since April 3, 2016
12 Reconstruction of Saint-Jacques Overpass Important dismantling work 6 highway links are located below the Saint-Jacques overpass
13 Reconstruction of Saint-Jacques Overpass Weekend of July 2 Preloading Closure of 2 ramps at night Exemple
14 Reconstruction of Saint-Jacques Overpass Weekend of July 2 Closures of 2 ramps at night Exemple
15 Reconstruction of Saint-Jacques Overpass Weekend of July 9 Dismantling from Friday to Monday 24 hours a day
16 Reconstruction of Saint-Jacques Overpass Weekend of July 16 Dismantling from Friday to Monday 24 hours a day
17 Reconstruction of Saint-Jacques Overpass Weekends of July 9 and 16 Complete closure of A-15
18 Reconstruction of Saint-Jacques Overpass Weekends of July 9 and 16 Main detour by : A-20 A-13 A-40
19 Reconstruction of Saint-Jacques Overpass Completion of dismantling Concreting of a section of the Haut Saint-Pierre collector sewer Dismantling of the last span - 2 weekends this fall
20 Reconstruction of Saint-Jacques Overpass Completion of dismantling Dismantling of the last span - 2 weekends this fall
21 Reconstruction of Saint-Jacques Overpass Reconstruction work As soon as the dismantling work from July are completed Next months : Partial closures during the day + Complete closures at night of some ramps of the interchange
22 Reconstruction of Saint-Jacques Overpass Communications activities Neighbourhood committees NDG-Westmount (May 16) et Sud-Ouest (May 30) Turcot website Letters to Montréal Mobility Committee Emails to partners Technical working sessions with the press Press releases Twitter account @MTQ_Turcot et @Qc511_Mtl Notices to residents distributed door to door Advertisements in major daily newspapers and local newspapers Monthly electronic bulletin June 2016 Québec 511 website Radio circulation (730 AM) Notices to columnists
23 Discovery of new remains Discovery of a cistern and possibly 5 rectangular basins Upcoming digs by archeologists for 2-3 weeks
24 Turcot Interchange long term hindrances PARTIAL CLOSURE (1 out of 2 lanes) until 2019 PARTIAL CLOSURE (1 out of 2 lanes) until 2019 COMPLETE CLOSURE until end of 2017 Reduction to 1 lane on the A-15 South towards A-720 East ramp and A-720 West towards A-15 North Complete closure of A-15 North to A-720 East ramp Closing 1 out of 3 lanes on A-15 South and North between exits 62 and 61 Exits stays open PARTIAL CLOSURE (1 out of 3 lanes) South : until 2019 North : until 2019
25 A-15 south ramp toward R-136 east Construction of temporary structures to free up the work area for the permanent ramp Temporary structures Construction of new permanent pavement from A-15 south to R-136 east A-15 N A-20 E A-15 N A-15 S to A-720 E A-720 W to A-15 N
26 Work Construction of a temporary deviation between A-15 S towards A-720 E and A-20 E towards A-15 N
27 Reconstruction of rue Notre-Dame Ouest Relocation of the Turcot Holding spur Work period: April to September Turcot Holding
28 Reconstruction of rue Notre-Dame Ouest Step 1 : From April 11, 2016 to May 25, 2016 Closure of eastbound direction Detour through boul. Monk and chemin de la Côte- Saint-Paul
29 Reconstruction of rue Notre-Dame Ouest Step 2: From May 25, 2016 to July, 2016 Complete closure of Notre-Dame Street West Detour through boul. Monk and chemin de la Côte-Saint-Paul
30 Reconstruction of rue Notre-Dame Ouest Step 3: From mid-july, 2016 to September 2016 Closure of eastbound direction Opening of the new access to the recreational complex Gadbois, going west on rue Notre-Dame Ouest. Work area Eastbound detour Added stops
31 Reconstruction of rue Notre-Dame Ouest Looking west near Gadbois recreational complex
32 Construction of Route 136 east Use of existing, new and temporary structures to create a new traffic movement during construction of the Turcot Project. Reduced to 1 lane Reduced to 2 lanes New permanent links Temporary link Dismantling
33 Construction of route 136 east Closure of exit 3 - Montréal (centre-ville) / Rue Guy Complete closure Duration : Approximately 2 weeks Period : June 2016 Exit 3 - Rue Guy Exit 4 - De la Montagne Closure Detour
34 Construction of route 136 east Closure of exit 2 - Rue Atwater Complete closure Duration: 4 months Period: Summer 2016 - after the reopening of exit 3 - Montréal (downtown) / rue Guy CLOSURE OF EXIT 2 RUE ATWATER FROM JULY TO NOVEMBRE 2016
35 Construction of route 136 east New Atwater exit Embankment, dismantling, drainage, and construction of retaining walls Temporary structures Construction of new permanent pavement
36 Construction of route 136 east Closure of Avenue Greene Complete closure Duration: 1 month Period: Fall 2016 Sidewalk is maintained on the east side Closure Local traffic
37 Construction of route 136 east Construction of the A-720 deviation Embankment West of Aevenue Greene
38 Construction of Route 136 east Foundations and columns of the structure over rue Saint-Rémi
39 Landscaping concepts
40 Types of plantation Trees, few examples out of twenty species
41 Types of plantation Shrubs Grasses
42 West Sector Boul. Sainte-Anne-de-Bellevue and boul. Angrignon
43 Boul. Sainte-Anne-de-Bellevue Street tree Grass and perennial areas Meadow seeding Boul. Sainte-Anne-de-Bellevue Ornamental tree Retention pond seeding Brock S. Ave. Reforestation including seeding Bush area and slope naturalization CCDG-type seeding Climbing plants Informal tree groupings (deciduous/evergreen) rue Notre-Dame Ouest
44 Boul. Angrignon Street tree Grass and perennial areas Meadow seeding Ornamental tree Retention pond seeding Reforestation including seeding Bush area and slope naturalization CCDG-type seeding Climbing plants Informal tree groupings (deciduous/evergreen) Boul. Angrignon Rue Notre-Dame Ouest
45 Center Sector Boul. Pullman
46 Boul. Pullman / Highway 20 Street tree Grass and perennial areas Meadow seeding Ornamental tree Retention pond seeding Reforestation including seeding Bush area and slope naturalization CCDG-type seeding Climbing plants Informal tree groupings (deciduous/evergreen) Boul. Pullman Rue Notre-Dame Ouest
47 East Sector Route 136 / Rue Rose-de-Lima
48 Route 136 Street tree Grass and perennial areas Meadow seeding Ornamental tree Retention pond seeding Reforestation including seeding Bush area and slope naturalization CCDG-type seeding Climbing plants Informal tree groupings (deciduous/evergreen)
49 Rue Rose-de-Lima (Atwater exit) Street tree Grass and perennial areas Meadow seeding Ornamental tree Retention pond seeding Reforestation including seeding Bush area and slope naturalization CCDG-type seeding Climbing plants Informal tree groupings (deciduous/evergreen)
50 For More Information NDG-Westmount neighbourhood committee July 11, 2016 Sud-Ouest neighbourhood committee May 30, 2016 Website dedicated to the project: www.turcot.gouv.qc.ca Twitter @MTQ_Turcot Monthly electronic bulletins (subscribe via the Turcot website) Dedicated telephone line: 514 873-1372 Turcot email: turcot.commentaires@transports.gouv.qc.ca
51 www.turcot.gouv.qc.ca