Fischer s Park Master Plan

Similar documents
5.0 Estimate of Probable cost

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

Chapter 6. Action Program. Heart of the Lakes Area Recreation Plan

Chapter 2: Summary of Existing Open Space System

Lake Myra County Park. Wake County, North Carolina Community Forum #2 June 12, 2008

MASTER PLAN EXECUTIVE SUMMARY

PALO CORONA REGIONAL PARK MPRPD BOARD MEETING AUGUST 8, 2018

Welcome to the future of Terwillegar Park a Unique Natural Park

City of Haslett. City of East Lansing. City of East Lansing

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

THOMAS A. SWIFT METROPARK Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics

Classifications, Inventory and Level of Service

MINUTES FILED WITH TOWN CLERK

Yard Creek Provincial Park. Management Plan

Port Gamble Shoreline Area Conceptual Trail Proposal

THAT the Board approve the final proposed concept plan for the Jericho Marginal Wharf site as shown in Figure C-4 of Appendix C.

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Dover Park Master Plan. Community Design Event Tuesday, May 22, 5 7 pm

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

The Recreational Trail along Cushing Park road has been a successful addition to the city

BRYAN REGIONAL PARK. Presented by: Burditt Consultants November 13, 2018

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

Welcome and thank you for being here! Kick-Off Public Workshop November 19, 2014

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

3.0 LEARNING FROM CHATHAM-KENT S CITIZENS

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

Silver Lake Park An Environmental Jewel for the Citizens of Prince William County

Flow Stand Up Paddle Board Parkway Plan Analysis

OAKLAND TOWNSHIP PARKS AND RECREATION MILLAGE RENEWAL AUGUST 2, 2016 BALLOT PROPOSAL QUESTIONS & ANSWERS PULL-OUT SECTION (APRIL 21, 2016)

YOU CAN MAKE A DIFFERENCE! VISIONING SESSION FOR THREAD LAKE OCTOBER 8, 2013

Waterfront Concept Plan: Community Survey Summary

PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

Committee. Presentation Outline

Acquisition in fee simple of approximately one-half acre of property on the shore of Spring Lake to expand the Lakeside Beach Park.

NORTH HEMPSTEAD BEACH PARK MASTER PLAN

COCONUT GROVE WATERFRONT MASTER PLAN. ERA / Curtis Rogers / ConsulTech / Paul George Ph.D.

LANDING S PARK CONCEPTUAL PLAN HAMILTON ANDERSON JANUARY City of Novi, Michigan. The Park at 13 Mile and Old Novi Road

M E S T I Z O C U R T I S P A R K

Fair Oaks Ranch Homeowners Association Parks and Trails Master Plan Survey Results

Great Wolf Lodge Fact Sheet & Frequently Asked Questions Potential Location in Gilroy, California 8/30/17

1803 West Hwy 160 Monte Vista, CO (719) TTY (719)

Plaza Park, Village Park, and Community Clubhouse

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

Community Advisory Committee Meeting #3 April 21, 2015

EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE EXISTING SETTING EXPANDING PARKLAND

Public Park System. Township of Derry. Providing natural open space for the recreational use of our residents and guests.

David Johnson. Tom, Attached please find the final scoping letter and figures for your review. David

STORY MILL COMMUNITY PARK

Northeast Quadrant Distinctive Features

Establishing a National Urban Park in the Rouge Valley

J. Recreation Plan of Conservation and Development. The Town of Hebron. Section 2. Preservation of Unique Assets. 1 P a g e

Chuckanut Ridge Fairhaven Highlands EIS Scoping Concerns

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

CITY COUNCIL MARCH 15, 2016 CEDAR LAKE AND LAKE OLATHE PARKS MASTER PLAN. Lake Olathe and Cedar Lake Parks Olathe, Kansas OLATHE PARKS AND RECREATION

Parks, Recreation and Cultural Needs Assessment and Facilities Plan. November 21, 2016 City Council Worksession

Rockin River Ranch State Park

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

Tracy Ridge Shared Use Trails and Plan Amendment Project

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road

Trail Etiquette. Hours of Operation. Trail Accessibility

MONTVILLE PARKS AND RECREATION COMMISSION REGULAR MEETING JUNE 17, 2009 CAMP OAKDALE LOWER PAVILION

FEASIBILITY STUDY. holdings SEPTEMBER 13, prepared for: prepared by:

PEMBERTON VALLEY RECREATIONAL TRAILS MASTER PLAN UPDATE Community Open House. April 2018

SAN ANTONIO RIVER IMPROVEMENTS PROJECT. April 27, 2009

Former Middle School Site Green Space & Brecksville Road Streetscape. March 27, 2018

White Mountain National Forest Saco Ranger District

National Forests and Grasslands in Texas

WEST JORDAN PARKS, RECREATION AND TRAILS MASTER PLAN Advisory Committee Meeting #2

Chapter 1: Introduction Draft

FEASIBILITY CRITERIA

Frederickson LUAC. Community Plan Update. Parks & Recreation. September 25, 2017

2016 Regional Transportation Alternatives Program (TAP) Grant Application

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Dakota County Planning Commission Advisory Committee Meeting Minutes Date: May 23, 2017 Time: 6:00 p.m. to 8:30 p.m.

Stambaugh Township 5-Year Recreation Plan - DRAFT

Otter Lake Landowners Association (OLLA) Otter Lake News

SOUTH INTERCHANGE AREA

NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

Dungeness Recreation Area County Park Master Plan

MINUTES OF THE SPECIAL MEETING OF THE LADY LAKE TOWN COMMISSION LADY LAKE, FLORIDA June 20, 2016

CHAPTER 1: INTRODUCTION

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT

Chapter 9 Recreation

Fossil Creek Wild & Scenic River Comprehensive River Management Plan Forest Service Proposed Action - details March 28, 2011

Nantucket Memorial Airport Master Plan Update

Rogue River Access and Management Plan Draft Alternatives

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

1. Overview of Aberdeen Township and Its Waterfront

Clam Harbour Provincial Park

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Daisy Dean Trail 628/619 ATV Trail Construction

APPLICATION FOR SITE DEVELOPMENT PLAN LETTER OF INTENT Amended

crrv OF DALLAS Memorandum Trinity River Corridor Project Update On Recreation

DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD. Revised 12/12/03

4MRV Parks Master Plan: Site Analysis

NEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS

Transcription:

Fischer s Park Master Plan Towamencin Township, Montgomery County May 2010 Prepared by Simone Collins Bursich Associates and Urban Partners Mission Statement: Maintain and enhance the aesthetic, natural and heritage elements of Fischer s Park through a measured improvement program that includes enhanced accessibility, protection and restoration of natural resources blended with a program of primarily passive recreational activities. This project was financed in part by a grant from the Community Conservation Partnerships Program, The Keystone Recreation, Park and Conservation Fund under the administration of the Department of Conservation and Natural Resources, Bureau of Recreation and Conservation. Fischer s Park Master Plan Update 1

Acknowledgements Open Space and Parks Advisory Committee Joe Meehan, Chair Tom Hollenbeck, BOS Liaison (deceased) Mike Bianchini, Recreation Coordinator Nancy Becker, Resident Rich Marino, Resident Mike Mannes, Resident David Mosesso, Resident Arlene Smith, Resident Bill Jernegan, Easter Seals of SE PA Betsi Strasser, Easter Seals of SE PA Board of Supervisors Daniel M. Littley, Jr., Chairman Thomas M. Hollenbeck, Vice Chairman (deceased) H. Charles Wilson, III, Treasurer James P. Sinz, Secretary John V. Gottschall Patricia Younce Towamencin Staff Robert A. Ford, Manager Sharon Luma, Administrative Assistant David Hillmantel, Director of Public Works Michael Bianchini, Recreation Coordinator 2 Towamencin Township, Montgomery County

Table of Contents 1. Introduction 7 1.1 Location 8 1.2 History 9 1.3 Scope of Work 13 1.4 Planning Process 14 1.4.1 Open Space and Parks Advisory Committee 14 1.4.2 Committee Meetings 14 1.4.3 Public Meetings 14 1.4.4 Survey 15 1.5 Planning summary 15 1.5.1 Overview 1998 Fischer s Park Master Plan 15 1.5.2 Towamencin Township Park, Recreation, and Open Space Preservation Plan Update (Sept. 2006) 15 1.5.3 Township-Wide Trail Master Plan (Jan. 1996) 16 2. Site analysis 17 2.1 Park Assessment 17 2.1.1 Restroom and Pavilions 17 2.1.2 Arneth Tract Structures 20 2.1.3 Play Facilities 22 2.1.4 Trails 23 2.1.5 Park Site Furnishings 24 2.1.6 Dam 25 Fischer s Park Master Plan Update 3

2.2 Natural Conditions 26 2.2.1 Hydrology - Creek Corridor 26 2.2.2 Topography 27 2.2.3 Geology 27 2.2.3 Soils 28 2.2.3 Vegetation 29 2.3 Circulation 30 2.4 Accessibility Analysis 32 3.0 Conceptual Elements 35 3.1 Connectivity Elements 37 3.2 Natural Area Enhancement Elements 37 3.3 Access / Mainstreaming Elements 39 3.4 Active Elements 39 4.0 Master Plan 41 4.1 Inclusive Design Enhancements 42 4.2 Kriebel Road/ Arneth Improvements 45 4.3 Woodland Sensory Garden 47 4.4 Resource Restoration 48 4.5 Entry Plaza and Inclusive Play Areas 49 4 Towamencin Township, Montgomery County

4.6 Evansburg Trail Connector 50 4.7 Game Pavilion Area 50 4.8 Pedestrian Bridge 51 4.9 Universal Softball Field 51 4.10 Dam Improvements 52 4.11 Fry Road Parking 52 4.12 Phasing 52 5.0 Estimate of Probable Cost 53 6.0 Appendix 55 Meeting Minutes Newspaper Articles Opinion Survey Dam Inspection Report Fischer s Park Master Plan Update 5

List of Tables Table 1 1998 Master Plan Recommendations Status 11 Table 2 Survey Highlights 15 Table 3 Table 4 Table 5 Percent Reporting Disability in PA, 2000 32 Percent Reporting Disability in Montgomery County, 2000 33 Percent in Pennsylvania Reporting Disability, 2007 33 Table 6 Local Bird Species 48 Table 7 Local Reptiles and Amphibians 48 List of Figures Figure 1 100-Year Floodplain 26 Figure 2 Park Soils 28 Figure 3 Master Site Plan 43 6 Towamencin Township, Montgomery County

1. Introduction Fischer s Park is a 74-acre passive park located in the southern pan-handle section of Towamencin Township which is located in central Montgomery County, Pennsylvania. It is one of 12 parks in Towamencin, a growing community of nearly 18,000 residents. The Fisher s Park Master Plan Update contains a series of recommended improvements, which were guided by a dedicated committee of residents. The committee adopted a Fischer s Park Master Plan Mission Statement: Maintain and enhance the aesthetic, natural and heritage elements of Fischer s Park through a measured improvement program that includes enhanced accessibility, protection and restoration of natural resources blended with a program of primarily passive recreational activities. This master plan report is divided into four sections that provide: 1) background information on the history and development of Fischer s Park, 2) an analysis of existing conditions and facilities, 3) alternative improvement concepts, and 4) proposed master plan, improvement phasing plan, and cost estimates. Bustard Pond Bridge Fischer s Park Master Plan Update 7

1.1 Location Fischer s Park is generally contained by Bustard, Springer, Kriebel, and Metz and Fry Roads. Bustard Road provides the eastern border, and Kriebel and Springer Roads are the park s western border. Kriebel Road also cuts through the northern third of the park, paralleling Towamencin Creek. The southern edge of the park is confined by the rear yards of a handful of residences on Metz and Fry Roads. The park abuts Fry Road, where there is a gap in the line of residences, providing a service access. Primary vehicle access is taken from Bustard Road. The northern section of the park is bordered by residential lands. Towamencin Creek flows east to west through the north central section of the site and effectively divides the park into a southern, heavily-used section, and a northern less-used section. Evansburg State Park is located approximately 1,200 feet to the west of Fischer s Park. SPRINGER KRIEBEL 100 YR. FLOOD PLAIN BUSTARD 100 YR. FLOOD PLAIN FISCHER S PARK MORRIS METZ 8 Towamencin Township, Montgomery County

1.2 History A thorough history of Fischer s Park was developed for the 1998 Master Plan. This history includes a chronological timeline, which is shown on the next page. The following summarizes the park s history: The lands that are now Fischer s Park were settled in the 1800s and contained a grist mill known as Kooker s Mill. Mr.. Fischer purchased the mill, adjacent buildings, and 14 acres in the early 1900s. As early as the 1920s, the spot became popular with motorists who would picnic on the property. In the late 1920s, Mr. Fischer began adding facilities to accommodate visitors including a candy and ice cream pavilion, a boardwalk over the dam, cabanas, and a swimming pool. Hugo and Helen Fischer Mr.. Fisher was swept away during a flashflood in 1930 and his widow invited her nephew from Germany, Mr. Arneth, to continue to run the park. From the 1930s through the 1970s Mr.. Arneth made several improvements to the property including the demolition of the mill, construction of the upper club pool, filling of the mill raceway, and some additions to the houses. Kriebel Road / Arneth Farmstead Fischer s Park Master Plan Update 9

pre 1750 FISCHER S PARK TIME LINE The mill and house (upper house) on the north side of Kriebel Road were built. The original dam is probably of similar date. 1850 Ruth Arneth sold five acres which included the old mill to David Fry. 1851 David Fry built the house (lower house), today known as the Arneth home. 1900? Mr.. Fischer purchased the house and mill with fourteen acres. 1920s Automobile travelers begin picnicking on the Fischer property. 1925 Mr.. Fischer builds a small pavilion to sell candy and ice cream. Late 1920 s Mill operation ceases - not profitable. Slide erected on creek s edge, boardwalk over dam, several cabanas were built on piers. 1927 Construction started on swimming pool. Built with a hand crank cement mixer. 1928 July, the swimming pool is opened for public use (paid admission). 1931 Mr.. Fischer, crossing the creek on the foot bridge, was swept away in high water. 1932/3 The widowed Mrs.. Fischer asked her nephew from Germany to help run the park. Twenty-one year old Arneth arrived to help operate the park. 1930s Mill demolished. 1936 Dining room, powder room, and kitchen addition to Arneth Home. 1935/40 Mill Race filled. 1957 Porch addition to Arneth Home. 1960 Upper Club Pool built near Bustard Road. 1965/70 Mr.. Arneth purchased farmstead across Kriebel Road to ward off development of the land. 1975 Second story added to back of Arneth Home. 1980 Mr.. Arneth passed away. 1989 Towamencin Township acquired Fischer s Park. Several buildings were demolished and the pools filled. 1989 First Master plan for Fischer s Park. Township subsequently makes improvements to the park. 1992 Construction of parking area, restroom, nature trail and baseball field were completed. 1996 Towamencin Township acquires Arneth property. 10 Towamencin Township, Montgomery County

Towamencin Township purchased the 57-acre Fischer s Park Property south of Towamencin Creek in 1989. Many of the buildings, pavilions and pools were in disrepair and were demolished by the Township. The Township continued the use of the property as a park and constructed an enlarged parking area, restroom facility, nature trails, and baseball diamond in 1992. In 1996, the Township purchased the Arneth Farmstead on the north side of Towamencin Creek, which includes 23 acres, the former mill site, two houses, and two barns. The Township commissioned the Fischer s Park Master Plan in 1998. The plan recommended the development of a number of facilities many of which were constructed and exist today. A number of other recommendations were not achieved due to cost and shifting priorities. Table 1 outlines which recommendations have been completed and which are still under consideration in this plan update. Circa 1960 Recommendation Description Status Parking (main lot) Picnic pavilions Commons Tot lot/play area The main parking lot will be located at the commons and will accommodate 100 paved spaces and 50+ overflow on stabilized turf Four new open picnic pavilions will be located around the central circular common green Four pavilions (above), a gazebo and restrooms located around a central tree-lined lawn area. An environmental play area modeled on Towamencin Creek with water features and paths. The Township also constructed the Arneth Entertainment Center, which was not part of the 1998 Plan. The Center was built in 2006 and is a major attraction with its summer concert series, movie nights, and similar activities. Complete Complete Partially Complete (restroom has been installed) Partially complete. The tot lot and play areas were developed, but the environmental components were not. Baseball field Maintained as a baseball field. Complete Picnic grove Additional picnic tables located adjacent to the pavilions. Not developed Play courts Volleyball courts Not developed Signage A map illustrating trails and features of the park should be located near the drop-off area/commons Complete Kriebel Road Close Kriebel Road Not developed Farmstead The farmstead recommendation included several components for parking, utilities, signage, a pedestrian court, reuse of the structures. Reuse options included a restaurant and conference center, equestrian center, bed and Not developed breakfast, classroom space, nature center, arts center, and others. Riparian buffer Restore the riparian buffer along Towamencin Creek Partially complete. A portion of the creek was stabilized Pedestrian bridge Install a pedestrian bridge across Towamencin Creek Not developed Nursery / Nature preserve Develop a nature/horticultural center at the Metz/Fry Road entrance of the park Table 1: 1998 Master Plan Recommendations Status Trails Specifications for stone dust and asphalt trails were made Complete Complete. The horticultural center was never developed, but the native plant nursery exists. Fischer s Park Master Plan Update 11

1998 Fischer s Park Master Plan 12 Towamencin Township, Montgomery County

1.3 Scope of Work The Fischer s Park Master Plan Update was developed using a planning process and scope of work that comply with standards specified by the Pennsylvania Department of Conservation and Natural Resources (DCNR) Community Conservation Partnership Program (C2P2). DCNR funded this master plan update in partnership with the Township. The following five steps summarize the scope of work. 1. Programming Programming determines what facilities and activities are needed in the park. The Open Space, Parks and Recreation Advisory Committee as well as the Township Staff and local residents participated in the development of the program. 2. Community Meetings A series of four community meetings were held during the work effort. Public comment was solicited and encouraged as part of the master planning process. 3. Site Analysis The natural and man-made influences of the site were inventoried and analyzed. 4. Concept Design Options The functional relationships for the desired uses were examined and preliminary design plans were developed. 5. Master Plan Design Taking into consideration community comments and suggestions, a final plan, implementation phasing plan, recommendations, and cost estimates were prepared. Fischer s Park Master Plan Update 13

1.4 Planning Process 1.4.1 Open Space and Parks Advisory Committee The Towamencin Open Space and Parks Advisory Committee guided the development of the Fischer s Park Master Plan Update through the comments at four committee meetings and numerous emails and attendance at four public meetings. The committee is comprised of ten members including township residents, staff, and officials. Meetings were conducted by the project consultant team led by Simone Collins Landscape Architecture with support from Bursich Associates, engineers, and Urban Partners, market analysts. Agendas, minutes, handouts, and presentations for each meeting are included in the appendices of this plan. The focus of each meeting is summarized below. Master Plan Committee meeting 1.4.2 Committee Meetings June 29 Committee Meeting # 1 Project kick-off and site work held at park. Confirm goals and objectives September 14 Committee Meeting # 2 Review site design options November 9 January 11 Committee Meeting # 3 Review draft plan Committee Meeting # 4 Finalize Changes to the Draft Plan 1.4.3 Public Meetings July 14 Public Meeting # 1 Present existing conditions and solicit ideas / get community feedback. October 19 November 16 February 24 Public Meeting # 2 Present options for site improvements Public Meeting # 3 Present Draft Plan Public Meeting # 4 Final Plan Presentation to Board of Supervisors 14 Towamencin Township, Montgomery County

Table 2: Survey Highlights Top survey responses are presented below. See the appendix for full survey results. Are you a resident of Towamencin Township? Response Count Yes 128 How frequently do you use the Fischer s Park? Response Count A few times a month 45 During which season(s) do you use the park (check all that apply)? Response Count All year 77 Which days do you use the park? Response Count All days 90 What time of day do you use the park (check all that apply)? Response Count Early evening 55 Why do you visit Fischer s Park (list all that apply)? Response Count Walk the dog 69 Get away 60 Walk the trails 110 What do you like best about Fischer s Park (check all that apply)? Response Count Trails 122 Towamencin Creek 97 Scenery 108 How many people are in your household and what are their ages? Response Total 0 12 years 95 12 18 years 35 18 24 years 45 24 45 years 138 46 65 years 106 65 + years 19 Recognizing that organized sport leagues / teams are programmed for other Township Parks, and that Fischer s Park is to remain primarily a passiveuse park, please check the top three potential improvements you would like to see for Fischer s Park. Response Count Pedestrian bridge over 83 Towamencin Creek Fitness stations 42 Improved tot lots 32 Other (please specify) 66 1.4.4 Survey A survey was developed to better understand who uses the park, what amenities they like best and what additional needs are desired. The survey was posted on the Township website, emailed to park users, and distributed at the township building in the township s October newsletter. Over 130 responses were recorded and summarized to the left. 1.5 Planning Summary Towamencin Township has developed a number of plans and studies in recent years that contribute to and support the Fischer s Park Master Plan Update. These documents are summarized as follows. 1.5.1 1998 Fischer s Park Master Plan The 1998 Fischer s Park Master Plan provided an overall design and priorities for the park, including trails, picnic pavilions, and an overflow parking area, all of which have been developed. Recommendations that have not been addressed at the writing of this plan include: Play courts Pedestrian bridge across Towamencin creek A commons area Closing of Kriebel Road within the park Development of the Arneth farmstead Each of these elements was further considered in this update. 1.5.2 Towamencin Township Park, Recreation, and Open Space Preservation Plan Update (Sept. 2006) The Towamencin Park, Recreation, and Open Space Preservation Plan Update documents existing open space and recreation facilities in the township and makes recommendations for the preservation, improvement and expansion of those facilities. The plan provides three related trail recommendations that are relevant to Fischer s Park. The first is the development of an on-road trail on Kriebel Road running from Lower Salford to the west, through Fischer s Fischer s Park Master Plan Update 15

Park, and to residential areas further east. The plan also recommends developing trails connecting to and within Evansburg State Park. The Kriebel Road Trail would provide a portion of this connection. Finally, the plan recommends working with neighboring municipalities and the County on developing trail connections, which would include connecting Fischer s Park to Evansburg. 1.5.3 Township-Wide Trail Master Plan (Jan. 1996) The Township-Wide Trail Master Plan provides for alternative, non-motor vehicle oriented transportation and recreation opportunities. The plan develops a series of system wide improvement priorities. Relevant improvements include cost estimates for an on-road trail along Kriebel Road connecting Fischer s Park to Evansburg State Park. This improvement ties into a trail proposed by Evansburg State Park that would travel along the north side of Towamencin Creek between Kriebel and Old Forty Foot Road. The development of the state park trail is reported to be planned within the next five to six years, according to state park officials. 16 Towamencin Township, Montgomery County