FibreGuard Closure with SLIDE-N-LOCK Fiber Management

Similar documents
2522 and 2523 Fiber Optic Splice Organizer Tray

STOP BOX SCRAPER/GRADER BLADE. Owner's Manual. Model No Safety Assembly Operation Maintenance Parts

Blue Series Hot Melt Hose with RediFlext II Hanger System

Antenna Tower Positioning System

PL500A Platform Extension

Roller Bar End Cap (w/round Drive Shaft) Replacement Instructions for Vista and Motorized Awnings * Helpers needed *

LBH18BPK. Instruction Sheet

Splice Trays A LANscape Solutions Product

RAFTER VI. Installation and Operation CAREFREE WITH AUTOMATIC AWNING SUPPORT. RV Accessory PRODUCT OVERVIEW

FREEDOM BUTTON KIT INSTALLATION GUIDE STEP 1

INSTRUCTION SHEET DETHATCHER KIT. STS-422LX LPSTS-42JD Assembly Installation Operation Repair Parts L-1660-D. Visit us on the web!

Crimp & Cleave Termination Instructions

Crimp & Cleave Termination Instructions for 200 µm F07 Connectors

Crimp & Cleave Termination Instructions for 200 µm Harsh Environment SMA

front runner READ ME! IMPORTANT WARNING! ENG Foxwing Awning Brackets

Crimp & Cleave Termination Instructions

Crimp & Cleave Termination Instructions for 200 µm Factory5 Cable with ST and SMA Connectors

VEPR Round Drum Disassembly and Assembly

Product instruction manual Ream Cutting Systems RE3943, RE3946, RE3947, RE3971, RE3952E

PR-429BF-600M. Bell 429 Blade Fold Kit Operations Manual

Installation Guide. LPKPDR - Universal LP Conversion Kit for Professional & Designer Ranges/Rangetops. Viking Range, LLC.

1000M MANUAL Signature Series Slicer OPERATORS MANUAL

Crimp & Cleave Termination Instructions

AND LOAD CANOPY RACK SPECIFICATIONS

MYRIAD Banner Stand is a trademark of Skyline Exhibits. Patent Pending PN32294-B. MYRIAD Banner Stand

RETRACTABLE AWNING w/ OPTIONAL HOOD ASSEMBLY INSTRUCTIONS

NEWMAR SERVICE SCHOOL

WARNING: There is a possibility of death, serious injury, or physical loss resulting from improper use by ignoring this indication.

EEZI - AWN series 1000 / 2000 Awning bracket

UTV BLADE MOUNT HARDWARE

HANDLE AND WHEEL KIT INSTALLATION

Tarp Return. Questions? Contact Customer Or Parts Diagrams see Parts and Diagrams section on web at

Wenger Corporation 2014 Printed in USA 05/14 Part #049B015-09

--- BIG LEAGUE BATTING CAGE ---

Model. Oasis Automatic and Manual RV Door Awning System INSTALLATION & OPERATING INSTRUCTIONS

1612P MODEL 1612P SLICER MODEL EXECUTIVE OFFICES 701 RIDGE AVENUE TROY, OHIO FORM (4-95)

An Improved Pedestal To A Version One Worksurface

Fyre-Stones Set C Installation Instructions (sku )

Retractable Awning Owner s Manual

Instruction for edge trimming knife sharpening of M-Type shoe sewing machines

Operation, Cleaning & Maintenance. For Aluminium Secondary

FORM (Apr. 2006)

HARD DOOR UPGRADE KIT

Instructions. Fibrlok TM 2670 Multi-Fiber Ribbon Construction Tool. November, B

Ratchet Strap Operation

BILLY GOAT KV HOSE KIT (P/N ) PURPOSE: To allow for vacuuming in hard to reach places.

NORDIC PLOW TORO Time Cutter Plow PLOW KIT for TORO Time Cutter SW developed by Nordic Plow

42" SNOW BLADE. Owner's Manual. Model No Safety Assembly Operation Maintenance Parts

Operating Instructions

SYSTIMAX RoloSplice Multiple Splice Organizer Installation

Termination Procedure LC 1.6mm & 2.0mm Connectors: 1060XX Series

functionality with the necessary maintenance tools stored in a convenient built in tool box, as well as parallel handles for

Installation Instructions for Wall Mount, Deck Mount and Pre-rinse Faucets

Professional Mandoline Manual. Model: 90757

Operating Instructions

INSTRUCTIONS INSTALLATION UNIVERSAL SERIES PATIO AWNING HARDWARE , , ,

INFRARED BURNER KIT INSTRUCTIONS

Butler Tactical Parachute Systems, LLC TT-600 TETHERED TANDEM BUNDLE DELIVERY SYSTEM. ASSEMBLY MANUAL (Revision D) 18 FEB 2009

quick and easy installation guide

Step by Step Set Up Guide

Anchor Family Product Manual for the Rifton Anchors

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V

Installation & Operation Manual VHM Variable Height Series Arms with Fixed Angle Front End

Assembly and Installation Instructions

Mazdaspeed6 Stage 1 Location 2 OCC Kit Install guide

READ ME! IMPORTANT WARNING! ENG. Quick Release Tent Mount Kit

COOPER FREESTANDING TUB FAUCET INSTALLATION

PLATINUM MODEL WITH AUTO-RETRACT AND REMOTE CONTROL. Owner s Manual

Assembly. Step 3. Attach the safety bracket (7) to the Pivot ARM (6).

INSTALLATION INSTRUCTIONS for folding arm awnings

INSTRUCTION SHEET TWISTLOCK VEHICLE STABILIZER (TVS) SYSTEM PN S: , ,

Genesis. Side Burner Accessory Installation. Step 3. Step 1. Step 2. For use with Genesis Gas Barbecues Only

Butler Personnel Parachute Systems, LLC

Mazdaspeed Version 1 Oil Catch Can Kit Install Guide

FEATHER-LITE ROOF TOP TENT SET-UP GUIDE

BERYL Service Guide. Travel Adjust OTT Change

ZICO 3090PM4. Horizontal Hard Suction Mount Kits HHS-TM-1, HHS-TM-2, HHS-TM-1-ST, HHS-TM-2-ST, HHS-TMV-2, HHS-TMV-2-ST Parts and Instruction Manual

JARVIS. Model 70 Airsnip Air Powered Scissors

LM601 Landmark Permanent Blind

S P A OWNER'S MANUAL. Rev: Page 1 Solera Power Awning Owner's Manual

PLATINUM MODEL WITH AUTO-RETRACT AND REMOTE CONTROL. Owner s Manual

NS 200 Series Hose Reel January 2011

RUPHIS Blade Clamp. Instruction Manual

FOSC 400 A8/B8 Closure

BowDown. MiniMuM Crossbar spread 24 (61CM) Steel Hook (2X) Buckle Strap (2X) Plastic Tube (2X) Plain Strap (2X) SHORT BLACK T-BOLT (2x) BOWDOWN (2x)

INSTRUCTION MANUAL ALEKO RETRACTABLE AWNING

TC30 HEARTWOOD BURNER INSTALLATION INSTRUCTIONS

OPERATOR INSTRUCTION MANUAL INCLUDING REPAIR PARTS FOR MODULAR GENERAL PURPOSE TENT SYSTEM (MGPTS) TYPE I

Installation & User Manual EW5000 Outdoor Cooking Fire

User s Manual Trampoline 8

ipad mini 4 Wi-Fi Volume Control Buttons Replacement

Two Piece Low Torque Kelly Valve

NORDIC PLOW TORO Time Cutter Plow PLOW KIT for TORO Time Cutter SW developed by Nordic Plow

Nordic Plow. Lawn Tractor Plow w / Handle (PLOW) 771 W. North Avenue, West Chicago, IL Copyright 1/1/16

Installation and User s Manual 12 x 10 MOTORIZED AWNING

SPIRAL SLICER Instruction Manual Model #5280 & 5280M. Part No Revised Feb. 2010

Gas Go Anywhere /23/01

TC36 CHALET II BURNER KIT INSTALLATION INSTRUCTIONS

AscTec Mastermind integration. Unmount the AscTec Atomboard

280 Propane Barbecue Assembly Manual

Transcription:

DECEMBER 2008 FibreGuard Closure with SLIDE-N-LOCK Fiber Management PREPARATION Express Fiber Cable 1. From the expressed cable loop, identify and select the loose buffer tube with the fibers required for distribution and separate from the main group. (Figure 1) 3. Route the loose buffer tube inside the buffer tube bracket storage and management system keeping to the inside of the FANG Bracket (FG 800 & 650) or 500 Bracket (Fg500) and protected pin (End Plate end) until the final turn which passes through the outside guides of the FANG Bracket (Figure 3) or 500 Bracket. (Figure 3a) Fang Figure 3 Protected Pin Figure 1 2. Identify which is the CO/Exchange (feed) side providing the service and cut the loose tube and fibers at the midway point approximately 2m (78 ) from the End Plate or as per company practice. (Figure 2) Figure 3a Figure 2 10771901 Rev C 4126 1

4. Organize the loose buffer tube without stress or undue bending to enter the SLIDE-N-LOCK splice tray. (Figure 4) 7. With the cleaning wipe provided, carefully remove the grease and clean the exposed fibers. (Figure 7) Figure 4 5. Mark the loose buffer tube at a point 50mm (2 ) inside the splice tray. (Figure 5) Figure 7 8. Apply 2 turns of protective sticky blue felt to the buffer tube 10mm (0.5 ) from the cut end. (Figure 8) Figure 5 6. At the mark, use approved company tools and practice to remove the loose buffer tube to expose the fibers. (Figure 6) OCC Tip: Complete this job by removing a number of short manageable tube lengths a piece at a time. Figure 8 9. With the ties provided, secure the loose buffer tube in two slotted positions on the SLIDE-N- LOCK splice tray over the blue felt. (Figure 9) OCC Tip: Organize the cleaned fiber group inside the SLIDE-N-LOCK splice tray. Figure 6 2

Figure 11 Figure 9 Drop Fiber Cable 10. Prepare the appropriate drop cable loose buffer tube to be spliced to the previously prepared express cable following steps 3 through 9. Once prepared, attach the drop cable loose buffer tube with the ties provided to the SLIDE-N-LOCK splice tray opposite side to the secured express cable loose buffer tube. (Figure 10) 12. Extend in a straight line away from the splice area and cable butt. This will be your reference point for all-additional preparation and splicing (Figure 12) Figure 12 Figure 10 Fiber Storage 11. With the loose buffer tube attached, remove the SLIDE-N-LOCK splice tray from the SLIDE-N- LOCK splice tray bracket. (Figure 11) Figure 12 General Preparation 13. Prepare all express and drop loose buffer tubes and fibers to be spliced into additional SLIDE-N-LOCK splice trays following steps 3 through 12. (Figure 13) 3

15. Select and carefully remove the two fibers to be spliced from splice tray. Position a splice protector over one fiber only away from the work area. Prepare, clean, and cleave both fibers for splicing as per company practice. (Figure 15) Figure 15 Figure 13 FIBER SPLICING 14. By color code, select the individual fibers from the express and drop. Buffer tubes should be spliced and route around the SLIDE-N-LOCK splice tray in opposite directions. Allow up to 1 meter (39 ) of fiber to be stored each side of the splice. Cut an overlap of approximately 60mm (2.3 ) at the point of splicing. (Figure 14) 16. Splice the two prepared fibers together using tools and equipment as per company practices. Once the splice has tested acceptable, centrally position the splice protector over the fiber splice and shrink in position as per company practices. (Figure 16) Figure 16 17. Once cool, reposition the splice protector back into the splice block. Carefully store and route the fiber around the splice tray with minimum bending. (Figure 17) Fiber Overlap Figure 14 4 Figure 17

18. Continue the practice until the splice tray has been filled (24 splices). Introduce additional splice trays as required. (Figure 18) Figure 19a SPLICE ORGANIZATION 20. Once the SLIDE-N-LOCK splice tray is full, reroute the buffer tubes back through the organization system keeping inside the FANG Brackets/500 Brackets and protected pin until the final lay-up onto the splice tray which is routed through the outside FANG guide (Figures 20 or 3) or 500 guide. (Figure 3a) Figure 18 SPLICE PROTECTION 19. Protect the spliced fibers by fitting a tray cover to each completed SLIDE-N-LOCK splice tray. For FibreGuard 800 & 650 closures, locate the front cover indentations between the tray tabs and friction fit a larger third indentation into the bottom recess. (Figure 19) Figure 20 21. If necessary, buffer tube crossovers can be made within the bracketed organizational system. (Figure 21) Figure 19 For the FibreGuard 500, slide the front of the cover between the tray tabs and bend the tray slightly to fit into a rear tray location. OCC Tip & Upgrade: At times there is a need/advantage to route fiber in the opposite direction than provided by the straight on tray entrance. SLIDE-N-LOCK splice tray provides a facility allowing fibers to be routed from one entrance across the face of the tray and be organized to rotate in the opposite direction. (Figure 19a) Figure 21 5

22. Replace the SLIDE-N-LOCK SPLICE tray with the spliced fibers securely back in the SLIDE-N- LOCK Bracket. (Figure 22) SECURE POSITIONING 24. Secure the stacked SLIDE-N-LOCK trays in position with a wing/butterfly nut. (Figure 24) Figure 22 Additional Trays 23. To stack additional trays, first add another SLIDE- N-LOCK bracket to the one fitted to the mounting plate. Slide into position until the locking tabs engage. Additional units can be added up to the recommended SLIDE-N-LOCK splice tray capacity. (Figure 23) Figure 24 OCC Option & Tip: Individual fibers or groups of fibers can be fastened into a fixed position for additional stability on the buffer tube storage brackets and FANG Bracket. NOTE: Do not over-tighten and always remove the ties when maneuvering the splice trays. (Figure 24a) Figure 24a 25. The completed splice is now ready for the fitting of the FibreGuard Closure Dome. (Figure 25) See Installation Procedures for FibreGuard Closures. Figure 23 Figure 25 6

MAINTENANCE & SPLICE RE-VISITS SMP SLIDE-N-LOCK Splice Tray technology and tips: Individual splice tray access is made simple by the SLIDE-N-LOCK fiber organization system. 26. Simply raise, slide, and lock the stacked tray in one continuous upward - backward movement until the desired (horizontal) tray has been reached. (Figure 26) 27. Any SLIDE-N-LOCK splice tray can be removed from the raised stack and positioned away from the splice for individual attention. (Figure 27) Figure 27 Figure 26 7

DECEMBER 2008 SAFETY CONSIDERATIONS 1. This application procedure is not intended to supersede any company construction or safety standards. This procedure is offered only to illustrate safe application for the individual. CAUTION: FAILURE TO FOLLOW THESE PROCEDURES AND RESTRICTIONS MAY RESULT IN PERSONAL INJURY OR DEATH. 2. This product is intended for the specified application. CAUTION: DO NOT MODIFY THIS PRODUCT UNDER ANY CIRCUMSTANCES. 3. This product is intended for use by trained craftspeople only. This product SHOULD NOT BE USED by anyone who is not familiar with and trained in the use of it. 4. When working in the area of energized lines with this product, EXTRA CARE should be taken to prevent accidental electrical contact. 5. For PROPER PERFORMANCE AND PERSONAL SAFETY be sure to select the proper size OCC products before application. 6. OCC products are precision devices. To insure proper performance, they should be stored in cartons under cover and handled carefully. 8 5290 Concourse Drive Roanoke, VA USA 24019 540-265-0690 Fax: 540-265-0724 Sales Dept.: 1-800-622-7711 Canada: 1-800-443-5262 www.occfiber.com 10771901 Rev C 4126