Bremerton National Airport Airport Master Plan Project Update February 12, 2013

Similar documents
Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

Westover Metropolitan Airport Master Plan Update

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

FORECASTING FUTURE ACTIVITY

General Aviation Master Plan Update

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #4 March 19, 2018

Master Plan Update Technical Advisory Committee Meeting

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

Yakima Air Terminal/McAllister Field Airport Master Plan Update

Addendum - Airport Development Alternatives (Chapter 6)

CHAPTER 1: INTRODUCTION

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER THREE AVIATION ACTIVITY FORECASTS

CHAPTER THREE AVIATION ACTIVITY FORECASTS INTRODUCTION

Welcome to the Boise Airport Master Plan Update Open House

Merritt Island Airport

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Technical Memorandum. Synopsis. Steve Carrillo, PE. Bryan Oscarson/Carmen Au Lindgren, PE. April 3, 2018 (Revised)

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING

COMMERCIAL AND GENERAL AVIATION

INDEPENDENCE STATE AIRPORT (7S5)

Table of Contents. Overview Objectives Key Issues Process...1-3

General Aviation Master Plan Update Peter O. Knight Airport Public Meeting #1 September 24, Peter O. Knight Airport

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1

Forecast of Aviation Activity

MASTER PLAN CONCEPT 1 DRAFT

Chapter 3 Aviation Activity Forecasts

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

CHAPTER 4: ALTERNATIVES

Forecast and Overview

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012

Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Airport Master Plan Update

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES

Request for Proposals. Aviation Service Providers At Tri-Cities Airport

Airport Master Plan Open House Front Range Airport February 23, 2017

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Buchanan Field. Airport Planning Program. Steering Committee. December 14, Master Plan FAR Part 150 Noise Study Strategic Business Plan

BNA Master Plan Update Community Advisory Committee Meeting No. 5

AIRPORT MASTER PLAN UPDATE

ENVISIONING AUSTIN s Airport of the Future

Chapter 2 FINDINGS & CONCLUSIONS

Introduction DRAFT March 9, 2017

STUDY WORK GROUP MEETING No. 4. July 12, 2017

Chapter 5 Airport Development Alternatives

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

Regional Jets ,360 A319/ , , , ,780

Financial Plan/Capital Improvements - DRAFT 6-1

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES

Norfolk International Airport

Chapter 4 Airport Facility Requirements

CHAPTER 3 ALTERNATIVES CONSIDERED

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

STUDY WORK GROUP MEETING No. 3. November 29, 2016

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Lake Tahoe Airport Master Plan

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

AIRSIDE CAPACITY AND FACILITY REQUIREMENTS

Birmingham Airport 2033

Airport Master Plan 1

AIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

Punta Gorda Airport Master Plan Update

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

Chapter 9 Airport Financial Plan

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017

PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #4 MASTER PLAN ADVISORY COMMITTEE (MPAC) - MEETING #4

Chapter Two FORECAST OF AVIATION DEMAND A. DESCRIPTION OF FORECAST ELEMENTS

1. Background and Proposed Action

City of Monett, Missouri. Pride and Progress. Airport Master Plan Update. for the Monett Municipal Airport

RSAT RUNUP ANALYSIS 1. INTRODUCTION 2. METHODOLOGY

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

SECTION 3 AVIATION ACTIVITY FORECASTS

BNA Master Plan Update Public Meeting No. 2

Fort Wayne International Airport Master Plan Study. Executive Summary

Current and Forecast Demand

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

CHAPTER 4 DEMAND/CAPACITY ANALYSIS

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017

Dallas Executive Airport Town Hall Meeting April 3, 2014

DALLAS LOVE FIELD MAY 2015 DRAFT

Transcription:

Bremerton National Airport Airport Master Plan Project Update February 12, 2013

Project Team Century West Engineering Northwest firm founded in 1969 500+ airport projects completed throughout the Pacific Northwest Specialize in the planning, design and construction of airport facilities Experienced in FAA Process Capital Improvement Program Public Involvement Parametrix Environmental Evaluation Knowledge of Site Conditions Local Base of Operations Airport Business Solutions (ABS) Airport Financial Planning

FAA Airport Master Planning Purpose is to define the current, short and long-term needs of the airport Comprehensive evaluation of facilities, conditions, and FAA airport planning and design standards Incorporate elements of local planning (land use, transportation, environmental, economic development, etc.) that may affect the planning, development, and operation of the airport

FAA Design Standards Applicable design standards for an airport are determined by the Design Aircraft, or family grouping of similar aircraft. The Design Aircraft is defined as the most demanding aircraft that uses an airport and has at least 500 takeoffs and landings annually FAA funding is only available for projects that are consistent with FAA design standards. Projects must be included on the FAA approved Airport Layout Plan

Master Plan Key Work Elements Inventory of Existing Conditions and Activity Aviation Activity Forecasts Define Planning Assumptions (design aircraft, etc.) Demand-Capacity & Facility Requirements Analyses Identify and Evaluate Development Alternatives Define Preferred Alternative Environmental Review Prepare 20-Year Airport Capital Improvement Program Prepare Airport Layout Plan Drawing Set

The 2004 Master Plan provided a development concept that has guided recent airfield improvements Changing conditions present new challenges and a need to update and refine the Airport s long-term vision Our Task: develop an Airport Master Plan that reflects the Port s long term vision for the airport while addressing current operational needs and challenges

Financial Planning Financial Planning for the airport will reflect an understanding of revenue opportunities and anticipated costs associated with the Port s preferred development option The updated Capital Improvement Plan (CIP) will be consistent with the Port s financial goals and funding capabilities

Financial Planning The Airport Business/Strategic Plan being done simultaneously will address market-based rental rates and fees and define market opportunities and development potential The Airport Business/Strategic Plan and the CIP share common financial data

Inventory of Existing Conditions Since the last master plan was completed Kitsap County s population has grown by about 22,500 (<1% per year) Bremerton National Airport and the Olympic View Industrial Park were annexed into the City of Bremerton SKIA Subarea created Phase 1 of the SKIA connector road (Airport Way) was completed, providing surface access to the east side of the airport and adjacent property

Inventory of Existing Conditions Runway 1/19 was reconfigured/shifted south and rehabilitated with upgraded drainage New conventional hangars and access taxilane constructed in the north hangar area Six new multi-unit hangars constructed in south hangar area (south of Taxiway G) Avian Flight Center constructed

Aviation Activity Forecasts Based aircraft increased from 160 to 192, including 3 locally-based business jets Recent AVGAS deliveries are down significantly compared to 2002, despite an increase in based aircraft Jet Fuel deliveries steadily increased since the last master plan, accounting for 67 percent of total aviation fuel deliveries at the airport in 2012 2012 airport operations (takeoffs and landings) at Bremerton National Airport are estimated at 55,588, up from 50,800 in 2002

Aviation Activity Forecasts U.S. General Aviation Activity Trends from 2000 and 2011 AVGAS consumption and piston aircraft hours flown declined 35% Active piston engine aircraft in the U.S. fleet declined by 9% Active sport and experimental aircraft accounted for nearly 14% of U.S. fleet in 2011, up from 9% in 2000 Active turbine aircraft accounted for nearly 10% of the U.S. fleet in 2011, up from less than 6% in 2000 Jet Fuel consumption increased by 47% Turbine hours flown increased by 29%

Aviation Activity Forecasts Recommended Forecast (typical mid-range) Based Aircraft: 192 to 276 (1.8% avg. annual growth) Annual Aircraft Operations (2.5% avg. annual growth): General Aviation, Air Taxi and Military: 55,588 to 90,503 Design Aircraft: Medium Business Jet (ARC B-II) Development Reserves Recommended on ARC C/D-II (Large/High Performance Business Jet)

Next Steps Facility Requirements Determine Aircraft Operational Requirements Airport Service Area Facility Analysis Perform Aircraft Demand/Capacity Analysis Design Standards & FAR Part 77 Airspace Standards Evaluation Define Airside & Landside Facilities Requirements

Questions?