US 19 Sunset Point Rd to Countryside Blvd.

Similar documents
AVE S 12 AVE S 6 AVE S SR-682 EB - RDWY ID / " X 48" X X 4 X 125 CBC 1-9 X 6 X 708 CBC TER S

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

Major Projects Overview

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

November 21, 2012 Barbara Kelleher, (954)

FDOT Treasure Coast Traffic Impact Report

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

5.1 Traffic and Transportation

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

Welcome to Dayton Parkway Interchange Open House. November 26, 2018

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

Ocean Way at U.S. #1 (Town of Jupiter) Installation of a new traffic signal.

Project Location. Connects I-10 in Duval County to I-95 in St. John County Four lane limited access toll facility. Jacksonville

Route 29 Solutions Projects

Traffic Analysis Final Report

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

%g 109 %g 9. %g 99. %g 9. %g 4. %g 4 %g ,95 (/ 1. Route 109 Corridor Study. %g 35. Corridor Study Area Study Area. Sanford.

Road School. Project Overview. March 8, 2011

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

SANTA CLARA COUNTY I-280 CORRIDOR STUDY

Pedestrian Safety Review Spadina Avenue

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5

State Route 8 Corridor. Northern Summit County s Path to Success

APPENDIX A DATA COLLECTION BIBLIOGRAPHY SANTA CLARA COUNTY I-680 CORRIDOR STUDY

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Project Location MP A44.5 MP A38 PRELIMINARY. A A57 (Future Project) A42 - A44.5 (Fall Fall 2019) A38 - A42. A31 - A38 - In Design

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY

SR 934 Project Development And Environment (PD&E) Study

Palm Beach County Traffic Report July 13 through July 20, 2012

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

Northeast Corridor Transportation Update

NDG-Westmount Neighbourhood Committee. November 16, 2015

DALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016

Transportation Improvement District (TID) Exercise New Castle County Unified Development Code

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

Construction Staging Adelaide Street West

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010

Public Open House. Chief Peguis Trail Project

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

TBARTA: 2015 Master Plan and Tampa Bay Express Project

Basic Project Information

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required.

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

Appendix B Connecting Track Options Evaluation Criteria

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

Site Location and Setting

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

MEMORANDUM. Bob Zagozda, Chief Financial Officer Westside Community Schools. Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig. DATE: June 11, 2018

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

PRIORITIES COMMITTEE MEETING

October 31, 2014 Chuck McGinness, (954)

TRANSPORTATION ELEMENT

Second Street Improvements Project Project Update Archive

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

Caliber Charter School VALLEJO, CA

1.0 Purpose and Organization of the Community Impact Assessment Addendum

Road Construction Ahead January-April 2015 NORTHWEST REGION

Southern Oregon Transportation Engineering, LLC

Pardon Our Dust Public Information Meeting

BONITA BEACH ROAD. May 18, Ian Lockwood, PE Cindy Zerger, AICP, ASLA Ken Ray, RLA. Greg Diserio, RLA. Tara Salmieri, AICP

Damen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

Important Lane Closures, April 3 9, 2011

Guide to. Road Construction Projects

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

Milestone: Bridge to Nowhere scheduled for demolition Aug 14

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

DOGWOOD AT VILLA AVENUE PROJECT

Update on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan

Chapter 6 Existing and Proposed Transportation Facilities

Williamsburg Town Hall Meeting

Palm Beach County Traffic Report August 24 through August 31, 2012

1.2 Corridor History and Current Characteristics

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

Long water shutdown scheduled for Tuesday, September 18

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Springettsbury Township. Road Improvement Projects

PennDOT Interstate Work next week March 30-April 3:

Mission Statement. Spur 601 Project Highlights

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

Fairfax County Parkway Widening Fairfax County

PROGRESS PARK CONNECTOR

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

2 Construction Program

2009 Regional Solicitation Selected Projects*

Progress Report for Projects of Regional Significance

A VISION FOR I-95. January 12, Delaware Department of Transportation

Full I-35E Mainlane Closure at Beckley Avenue - July 27-30

Transcription:

Frontage Lanes Alternative Six-Lane Roadway Two-Lane, One-Way Frontage Lanes Close All Median Openings w/ Concrete Median Barrier Construct Within Existing Right-of-Way

Status Update Construction started July 2012 Estimated project completion March 2015 Median openings have been closed Enterprise Blvd. intersection closed Access to businesses and communities is provided using 2-lane, one-way frontage roads

/ Enterprise Road Intersection Alternatives Existing Proposed Enterprise Road 0.9 Miles Countryside Blvd N W E S

FREE FLOW U-TURN REPLACING MEDIAN OPENINGS FREE FLOW U-TURN REPLACING MEDIAN OPENINGS SUNSET POINT ROAD SR 55 (U.S. 19) MCCORMICK DR. CLOSED MEDIAN OPENINGS FIRST AVE. Average southbound median opening traffic delay under existing conditions 184.1 sec/veh. ENTERPRISE ROAD *Note: Sunset Point u-turn travel time is estimated. Average travel time for southbound traffic taking Sunset Point u-turn 260.2 seconds.

MEDIAN CLOSURE AT CYPRESS POINT SHOPPING CENTER VILLAGE DRIVE ALTERNATE ROUTE TO CYPRESS POINT SHOPPING CENTER FOR SB U.S. 19 CYPRESS POINT SHOPPING CENTER

From North of SR 580 (Main St.) to North of CR 95

From North of SR 580 (Main St.) to North of CR 95 Removal of Traffic Signals: Republic Drive and Curlew Road Uninterrupted traffic flow from 49 th Street to Tampa Road Access to local businesses along frontage roads Funding: Design only New Overpass north of Boy Scout Drive New Interchange Curlew Road

From North of SR 580 (Main St.) to North of CR 95 Typical Section Six-Lane, Controlled Access Facility with Frontage Roads Urban Arterial SIS & FIHS Facility Posted Speed: 55 MPH mainline, 40 MPH frontage roads

From North of SR 580 (Main St.) to North of CR 95 Typical Section (Curlew Road) Six-Lane, Urban Arterial Posted Speed: 45 MPH Addition of Bike Key Holes through Intersection

From North of SR 580 (Main St.) to North of CR 95 Overpass North of Boy Scout Drive: U-Turn Movements Pedestrian Crossing Located at Midpoint for Circulation Located to Minimize Conflicts

From North of SR 580 (Main St.) to North of CR 95 Curlew Road Interchange: Dual Left Turn Lanes Dedicated Right Turn Lanes U-Turn under Elevated Section

Gandy Blvd. SR 694 from U.S. 19 to East of 4 th St. 2002 PD&E Study Corridor divided into 4 Segments FPID 257086-1: Segments A, B and part of C FPID 256931-2: Part of Segment C and Segment D

Gandy Blvd. SR 694 from U.S. 19 to East of 4 th St. FPID 257086-1, Gandy Boulevard from east of to east of I 275 Reconstruction of Gandy Boulevard Length: 1.6 miles No Funding for Design or Construction Estimated Construction Cost: $ 49.6 Million FPID 256931-2, Gandy Boulevard from west of Martin Luther King Jr. Street to east of 4 th Street Design/Build Execution on or before March 29, 2013 Improve safety, reduce congestion, accommodate future traffic demands. Controlled Access with Frontage Roads Pedestrian and Bicycle Accommodations Length: Approximately 2.5 miles Bid Price Proposal $ 82.9 Million

Gandy Blvd. From North of SR SR 694 580 from (Main U.S. St.) 19 to to North East of CR 4 th St. 95 FPID 256931-2 Gandy Blvd. from west of Martin Luther King Jr. St. to east of 4 th St. End Project Begin Project

Gandy Blvd. From North of SR SR 694 580 from (Main U.S. St.) 19 to to North East of CR 4 th St. 95 Typical Section Six-Lane roadway from west of MLK Jr. St. to the MLK Jr. St. bridge Four-Lane roadway from the MLK Jr. St. bridge to east of 4 th St.

Gandy Blvd. From North of SR SR 694 580 from (Main U.S. St.) 19 to to North East of CR 4 th St. 95 Proposed Improvements Overpass locations at 94 th Ave. N., MLK Jr. St. N., and Roosevelt Blvd./4 th St. Pedestrian and Bicycle Accommodations

Gandy Blvd. From North of SR SR 694 580 from (Main U.S. St.) 19 to to North East of CR 4 th St. 95