FUNDED FOR CONSTRUCTION

Similar documents
FY 2018/19 CENTRAL FLORIDA MPO ALLIANCE - LIST OF PRIORITY PROJECTS

Coast to Coast Connector Summit

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

Toll Rates for Florida Turnpike System and Florida Department of Transportation (FDOT) Toll Facilities. Central Florida

2017 LIST OF PRIORITY PROJECTS

2018 LIST OF PRIORITY PROJECTS

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5

Major Projects Overview

MISSION RISE & THE RESERVE COMMERCIAL LAND EXCLUSIVE LISTING HOWEY-IN-THE-HILLS, LAKE COUNTY, FLORIDA

A Presentation to: Project Advisory Group Meeting #6

LIST OF PRIORITY PROJECTS (LOPP) 2017/ /35

Williamsburg Town Hall Meeting

Project Location. Connects I-10 in Duval County to I-95 in St. John County Four lane limited access toll facility. Jacksonville

Orlando International Airport (OIA) Connector Refresh Alternatives Analysis

APPENDIX G MULTI-USE TRAILS DOWNTOWN LAKELAND

Capital City to Sea Trail (CC2ST) SUMMARY

Draft Year 2040 Cost Feasible Plan

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

TRANSPORTATION ELEMENT

GATEWAY PLAZA NWC OF ROCK SPRINGS RD & LESTER RD APOPKA, FLORIDA NEW RETAIL DEVELOPMENT FOR LEASE

Highways: Interstate. Highways: State Highways

BICYCLE & PEDESTRIAN ADVISORY COMMITTEE

The Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m.

NEW YORK AVENUE TOWN HOME SITE

List of Priority Projects

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

2016 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON ORLANDO, GRANDE LAKES August 4-7, 2016

APPENDIX A: Planning Consistency Checklist

Lee County Board of County Commissioners January 24, 2017 Workshop Meeting

Update of MDX Open Road Tolling

Current Installed APS Inventory

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

East Coast Greenway (ECG) Southeast Region Miami-Dade/Broward/Palm Beach/Martin/St. Lucie/Indian River

2017 FTBA CONSTRUCTION CONFERENCE February 2-3, 2017 Hyatt Regency, Orlando FDOT WORK PROGRAM OVERVIEW

PASCO COUNTY METROPOLITAN PLANNING ORGANIZATION 2016 LIST OF PRIORITY PROJECTS September 8, 2016

Florida Department of TRANSPORTATION. First Coast Expressway

FLORIDA DEPARTMENT OF TRANSPORTATION Bay County Citizen s Plan Tentative Work Program Fiscal Years

Toll Rates for Florida Turnpike System and Florida Department of Transportation (FDOT) Toll Facilities. West Central Florida

Basic Project Information

Highways: State Highways

TBARTA: 2015 Master Plan and Tampa Bay Express Project

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010

Highways: Interstate. Highways: State Highways

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Report through

Tolling New Capacity An Important Policy Direction for Florida DOT. Ed Regan CDM Smith

TRANSPORTATION IMPROVEMENT PROGRAM. This Year s Document: FY 2017/ /22 Effective October 1, 2017 September 30, 2018

Transit Development Plan

APPENDIX A Florida Clerk of Court s Offices

Westshore Development Forum April 9, 2014

THE 429 OCOEE, FL. ...Orlando s Premier Distribution Location. Developed By:

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2014 Through June 30, 2019

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

FY Annualized. FY Annualized

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Fixed Capital Outlay: Facilities

Penny for Pasco Renewal. FY2014/15 thru FY2024/25

Daytona Beach/Melbourne

More than just express lanes

THE RICHMOND REGION Transportation Priority Projects

ASSESSMENT OF MULTI-USE TRAIL ACCOMMODATION

1500+ Miles of Byways FLORIDA SCENIC HIGHWAYS PROGRAM. All-American Road. National Scenic Byways. Counties. Scenic Highways. A 20-Year Partnership

COVINGTON COUNTY Century 4 89 Gonzalez 10 Pensacola INTERSTATE De Funiak Springs INTERSTATE Chipley Escambia Bay

A New Era of Transportation Solutions

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

Additional Economic Development Strategy submissions- Klickitat County

Fiscal Year

CityStats Central Florida Trends

TRANSITIONAL PASTOR TRAINING September 11-14, 2006 Lake Yale Conference Center

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

FDOT Treasure Coast Traffic Impact Report

Table of Recommended Functional Classification Changes East Volusia County. Page 1

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

District 5 - Mrs. Diane Smith READ-PATTILLO ELEMENTARY SPRUCE CREEK ELEMENTARY SWEETWATER ELEMENTARY

Update on Palm Beach MPO Funded Projects

CityStats Central Florida Trends

LCTA Trail Prioritization Surveys Final Report (September 2012)

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

FPL FiberNet Locations List CLLI ADDRESS MARKET SITE TYPE MIANFLHF W DIXIE HWY (Arcos) MIAMI CABLE LANDING STATION MIAMFLEL 1 NE 1ST ST MIAMI

Transportation TRANSPORTATION PROJECTS

Real Estate and Recreation

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting

Measure R Program Update

Welcome Central Florida Expressway Authority

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026

Transportation Supporting Dulles Airport

FDOT Treasure Coast Traffic Impact Report

SR 934 Project Development And Environment (PD&E) Study

Florida's Turnpike System Turnpike Enterprise, Florida Department of Transportation Figure 1

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

Broward County Hollywood Memorial Regional Hospital Esther L Grossman Ctr 4320 Sheridan St. Hollywood, FL (954)

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016

DEVELOPMENT LAND FOR SALE

AMTRAK / FEC CORRIDOR PROJECT High Speed / Intercity Passenger Rail Application

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

Central Florida Commuter Rail Commission MEETING MINUTES

APPENDIX C TRANSPORTATION PLANNING DOCUMENTS

FY Transportation Improvement Program Basic Project List (in Thousands)

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 9

Transcription:

Priority CENTRAL FLORIDA ALLIANCE 2016 SIS HIGHWAY PROJECTS FOR PRIORITIZATION FDOT Financial Project Phase(s) Estimated Management Project Name or Length Latest Project Remaining Remaining Cost Designation From To (Miles) Work Description Phase Funded Unfunded (Present-Day) /TPO 1 4269054 Ellis Rd Widening 1 I-95 (John Rhodes Blvd) Wickham Rd. 2.00 Widening 2 to 4 Lanes ROW 2020-2023 CST $10,000,000 Space TPO 2 4336521 I-75 Interchange Impr. at SR 40 SW 40th Avenue 3a 3b 3c 4a 4b 5 6 2424847 I-4 S of SR 528/Beachline Expy. W of SR 435/Kirkman Rd. 3.90 2424848 I-4 Orange/Osceola Co. Line W of SR 528/Beachline Expy. 5.80 4314561 I-4 2.8 mi. S of Polk/Osceola Co. Line --- Orange/Osceola Co. Line 10.65 2425924 I-4 E of SR 434 Seminole/Volusia Co. Line 10.30 4084642 I-4 Volusia/Seminole Co. Line SR 472 --- 1.25 Operations and capacity improvements Add 4 managed-use/variable toll lanes Design underway; ROW $8M 2017/18-2018/19 CST $15,000,000 Ocala/Marion TPO Partial PE 2015/16 ROW/CST $224,500,000 Partial PE 2015/16 ROW/CST $301,200,000 Partial PE 2015/16 ROW/CST $70,930,000 Partial PE 2015/16 ROW/CST $455,000,000 PE 2015/16 PE/ROW/CST To be determined River to Sea TPO 4102511 SR 15 (US 17) Ponce de Leon Blvd. SR 40 --- Widen 2 to 4 lanes ROW 2014/15 CST $30,000,000 River to Sea TPO 4371811 SR 528 W of I-95 SR 524 (Industry) 4.30 Widen 4 to 6 lanes, New PE ROW/CST $91,271,658 Space 4074023 SR 528 2 SR 524 (Industry) East of SR 3 3.70 Indian River Bridge PE ROW/CST $421,924,750 TPO 4074024 SR 528 2 SR 3 Port Canaveral Interchange 5.10 PE ROW/CST $269,405,898 7 4289471 SR 40 Williamson Blvd. Breakaway Trail --- Widen 4 to 6 lanes PD&E complete ROW/CST To be determined River to Sea TPO 8 2408371 SR 40 Cone Rd. SR 11 --- Widen 2 to 4 lanes ENV 2012/13 ROW/CST To be determined River to Sea TPO 9 10 N/A SR 25/US 27 CR 561 (west) Florida's Turnpike (northern ramps) 2.14 Widen to 6 lanes --- PD&E/PE/ $25,000,000 Lake~Sumter ROW/CST 2408361 SR 40 SR 11 SR 15 --- Widen 2 to 4 lanes PE 2013/14 ROW/CST To be determined River to Sea TPO ENV 2014/15 11 410674-3 SR 40 CR 314 CR 314A 6.1 12 410674-4 SR 40 CR 314A Levy Hammock Road 2.8 Widen to 4 lanes w/ multi-use trail (Black Bear Scenic Trail) Widen to 4 lanes w/ multi-use trail (Black Bear Scenic Trail) 1 Request to designate as SIS Connector now before FDOT; 2 Top priority segment of SR 528 widening between SR 524 and Port Canaveral; I-4 Ultimate Configuration is noted as a PPP project. DES underway ROW/CST $93,000,000 Ocala/Marion TPO - DES/ROW/CST $35,000,000 Ocala/Marion TPO CENTRAL FLORIDA ALLIANCE SIS HIGHWAY PROJECTS FOR PRIORITIZATION FUNDED FOR CONSTRUCTION Old Priority # FDOT Financial Project Phase(s) Estimated Management Project Name or Length Latest Project Remaining Remaining Cost Designation From To (Miles) Work Description Phase Funded Unfunded (Present-Day) /TPO 1 2427152 I-95/I-4 Systems Interchange --- --- Interchange upgrade CST 2014/15 --- --- River to Sea TPO 2 N/A I-95/Matanzas Woods --- --- Interchange Improvements CST 2014/15 --- --- River to Sea TPO 3a 4269053 I-95/Ellis Road Interchange --- --- New Interchange CST 2016/17 --- --- Space 5 2384221 SR 25/US 27 Boggy Marsh Rd. Lake Louisa Rd. 6.70 Widen to 6 lanes CST 2015/16 --- --- Lake~Sumter 10 4106742 SR 40 SR 35 CR 314 4.5 Widen 2 to 4 lanes Design underway; ROW $7.6M 2014/15-2017/18 Partial ROW/CST $105,300,000 Ocala/Marion TPO NOTE: Although funded for construction, projects will continue to be shown until construction starts. 7/24/2015

CFA Regional Trail Programmed Through Construction Limits A Limits B Length (Miles) Mega-Trails Latest Project Phase Funded Wayside Park Spring to Spring Trail Heart of Florida: Seminole Volusia Gap 436434-1 0.80 PE $720,289 in FY 2015/16 and CST $1,379,067 in FY 2017/18 (Seminole County) (Volusia County) to River to Sea/Metroplan South Lake Trail Phase 3C SR 33 Villa City 1.04 Heart of Florida: to Design underway - ROW, CST as part of the Grovelnd SR 50 Realignment # 427056-1 Lake~Sumter Clarcona-Ocoee Trail West Orange Trail Clarcona-Ocoee Road 0.20 -to- Design programmed for 2015; ROW programmed for 2018; Construction programmed for 2020 Land Bridge Gap Santos Gap Silver Springs Gap 436358-1 SR 200 SW 49th Ave Trailhead 5.20 Heart of Florida Design/build - FY 2016 Ocala/Marion 436291-1 SW 49th Ave Trailhead Santos Trailhead 9.00 Heart of Florida Design/build - FY 2016 Ocala/Marion 435486-1 SE 64th Ave Trailhead Silver Springs State Park 6.00 Heart of Florida Design - FY 2016, Construction - FY 2018 Ocala/Marion Halifax River Beville Road Wilder Blvd 0.50 Halifax River Beach Street Riverfront Park 0.15 East Central FL Rail Trail; Garden St Pedestrian Overpass 424040-6 Canaveral Avenue Draa Road 0.60 East Central FL Rail Trail (county424040-4 Kingman Road Volusia County Line 12.80 East East -to- -to- River to Sea River to Sea Space Space Total Mileage of Programmed Through Construction 36.29 Page 1 of 5

Ranked CFA Regional Trail Priority Limits A Limits B Length (Miles) Mega-Trails Latest Project Phase Funded Project Phase(s) Remaining Unfunded Estimated Remaining Cost (Present Day) 1 Space Trail Part of SR405/Gard en St Canaveral Avenue corridor study Max Brewer Causeway/MINWR Entrance 1.90 River to Sea; -to-; East Feasibility Study in Fy 2014/15; Downtown connector between ECFRRT Design/build $1,000,000 Space and MINWR 2 Spring to Spring Trail, Seg. 3a Detroit Terrace US 17/92 4.90 River to Sea Study underway $3,010,000 River to Sea 3A Space Trail 437093-1 Max Brewer Causeway/MINWR Entrance Atlantic Ocean 10.50 3B Space Trail Max Brewer Causeway US 1 12.90 River to Sea; -to-; East River to Sea; East $450,000 PD&E FY 2015/16; $802,660 Design FY 2017/18 Construction $10,500,000 Space Construction $12,900,000 Space 4 Pruitt Gap 435484-1 4 Silver Springs to Mount Dora Withlacoochee River Trail Bridge SR 200 8.80 Heart of Florida Design - FY 2016 Construction $3,200,000 Ocala/Marion Silver Springs CR 42 22.00 Study needed; significant portion of trail in Marion County will be on existing public lands $500,000 for PD&E programmed for 2016. $500,000 Ocala/Marion 5 Pine Hills Trail Phase 3 Clarcona-Ocoee Rd. Seminole County Line 3.00 -to- ROW and Design needed $1,090,000 for PD&E & design for 2014/15 from 2014 special allocation $9,948,000 6 South Sumter Connector Van Fleet Trail Withlacoochee Trail 19.50 -to- PD&E programmed for 2016 ($350k)- FDOT to advance to 2015 $350,000 for PD&E for 2015/16, corridor feasibility study underway $16,705,923 Lake-Sumter Page 2 of 5

Ranked (cont.) Priority Limits A Limits B CFA Regional Trail Length (Miles) Mega-Trails Latest Project Phase Funded Project Phase(s) Remaining Unfunded Estimated Remaining Cost (Present Day) 7 West Orange Trail Phase 5a Lester Road Kelly Park 4.20 ROW and design needed $7,800,000 8 South Lake Trail Phase 3B Silver Eagle SR 33 (Crittengen St.) 2.50 -to- Design Underway ROW $4.73 million CST $2.0 million $10,090,000 Lake-Sumter 9 Space Loop US 1 Aurantia Rd/ECFRRT 9.36 River to Sea North connector ECFRRT/KSC loop; no ROW or PD&E needed $3,200,000 Space 10 Neighborhood Lakes Trail Kelly Park Lake County Line 2.66 ROW and design needed $1,300,000 11 South Lake Trail Phase 4 Villa City Rd. Van Fleet Trail 8.40 -to- Design Phase underway Design $3.4 million, ROW $6.3 million CST $4.445 million $12,035,000 Lake~Sumter 12 Wekiva Trail Segment 1 Tremain St. CR 437 7.14 PD&E Underway/ Design Funded in 2016 Design $505,000, ROW $5,000,000, CST $4,000,000 $9,000,505 Lake~Sumter 13 Wekiva Trail Segment 2 CR 437 Red Tail Blvd. 2.66 PD&E Underway/ Design Funded in 2016 Design $155,000, ROW $1,000,000, CST $750,000 $1,750,155 Lake~Sumter 14 West Orange Trail Phase 5b Rock Springs Road Wekiva Springs SP entrance 2.80 ROW and design needed Spur off Heart-of-Florida loop to Wekiva State Park entrance $5,200,000 15 Clarcona-Ocoee Trail Pine Hills Trail Hiawassee Road 1.50 Total Mileage of Ranked 124.7 -to- Widening existing sidewalk to shared use path standards; ROW and design needed $530,000 for PD&E & design for 2014/15 from 2014 special allocation Total Estimated Remaining Costs of Ranked $4,371,600 $112,511,183 Page 3 of 5

Unranked Projects Tave-Dora Trail Tav-Lee Trail Phase 2 Sabal Bluff Connector Lake Yale Loop Trail Black Bear Scenic Trail North Lake Trail Halifax River - Beach Street Halifax River - Donnelly Place US 17 Trail Black Bear Scenic Trail CFA Regional Trail Limits A Limits B Length Mega-Trails Latest Project Phase Funded Tremain St Wooten Park 8.30 Lakes Blvd. Sleepy Hollow 3.87 Tav-Lee Trail Sabal Bluff Preserve 0.50 Sabal Bluff Preserve Marion County Line 11.71 Project Phase(s) Remaining Unfunded Estimated Remaining Cost (Present Day) Study completed Design, ROW & CST Phases needed $4,500,000 Lake~Sumter Study completed Design, ROW & CST Phases needed $2,902,000 Lake~Sumter Study completed Design, ROW & CST Phases needed $375,000 Lake~Sumter Study completed Design, ROW & CST Phases needed $8,782,000 Lake~Sumter Volusia County Line Marion County Line 7.73 Heart of Florida PD&E Funded in FY2020 Design, ROW & CST Phases needed $6,500,000 Lake~Sumter Spur off Heart PD&E, Design, ROW & CST Phases CR 450 SR 40 19.50 $24,857,000 Lake~Sumter of Florida needed to ; Wilder to Shady Place Live Oak to Orange Ave 0.53 None CST phase needed $523,282 River-to-Sea ECGA to ; Shady Place Bellevue Ave. 0.28 None Design & CST Phases needed $240,039 River-to-Sea ECGA Heart of Design funded in FY 2014/15 & To be constructed as part of road Ponce DeLeon Blvd SR 40 6.35 Florida; River-to-ROW funded in FY 2015/16 through River-to-Sea widening project Sea 2019/20 Volusia County Line US 17 6.40 Heart of Florida Study completed Design, ROW & CST Phases needed $5,381,630 River-to-Sea Black Bear Scenic Trail Spring-to-Spring Trail 436360-1 Levy Hammock Road Lake County Line 13.60 US 17-92 Detroit Terrace 5.00 Space Trail/US 1 SR 50 Grace Street 3.10 Total Mileage of Uuranked Total Mileage of Programmed Through Construction Total Mileage of Ranked Total Mileage of All 86.9 36.3 124.7 PD&E Funded in FY2020 Heart of Florida Design, ROW & CST Phases needed $13,600,000 Ocala/Marion Heart of Florida; River-to- CST phase needed $3,010,000 River-to-Sea Sea East Feasibility Study complete Design, CST Phases needed $3,700,000 Space Total Estimated Costs of Unranked $74,370,951 Total Programmed Through Construction Total Estimated Remaining Costs of Ranked NA $112,511,183 247.9 Total Estimated Costs of All $186,882,134 Page 4 of 5

CFA Regional Trail Programmed Projects Limits A Limits B Mega-Trails Status Cost Length Notes Lake-Sumter South Lake Trail Phase 3A West Beach, Clermont Silver Eagle Lake-Sumter Tav-Lee Trail Extension Wooten Park Sinclair Ave. Seminole-Wekiva Trail Phase 4 SR 436 Orange Co. line Space East Central Regional Rail Trail Draa Road Kingman Road Space East Central Regional Rail Trail Glenn Road Kingman Road Space East Central Regional Rail Trail Draa Road Canaveral Avenue to- Mt. Dora to- Construction underway $2,800,000 3.10 Dec. 2014 completion date Programmed for CST 2017 $659,198 1.00 Shovel ready Programmed for construction 9/2013 $2,500,000 2.60 Programmed for construction in 2013 $1,500,000 1.4 Includes trailhead Programmed for construction in 2014 $838,522 3.70 off road trail Programmed for construction in 2014 $3,005,000 0.60 Includes overpass River to Sea Spring to Spring Trail, Seg. 3b French Avenue Detroit Terrace River to Sea Design/build contract approved by Volusia County Council on April 3, 2014 $3,059,000 2.40 River to Sea East Central Regional Rail Trail South of SR 442 Brevard Co. Line River to Sea East Central Regional Rail Trail West side of SR 415 East side of SR 415 River to Sea East Central Regional Rail Trail South side of SR 442 North side of SR 442 River to Sea East Central Regional Rail Trail South side of SR 442 Dale Ave. River to Sea East Central Regional Rail Trail SR 415 Guise Road Programmed for construction in 2015 & 2016 $7,129,000 13.50 Includes $3,700,000 in local funds. Construction underway $1,965,000 0.12 Overpass Construction underway $2,159,500 0.12 Overpass Advertised for construction $2,234,655 3.80 Advertised for construction $1,390,000 2.58 Lake-Sumter Neighborhood Lakes Trail SR 46 Orange Co. line Mt. Dora PD&E Underway; design funded in 2014/15; ROW acquired, CST funded in 2018 $2,547,160 2.20 Design $247,160 (2015), CST $2,300,000 (2018) Ocala/Marion Pruitt Trailhead Connection Bridges Road SR 200 Heart of Florida Programmed for design/build in FY 2015 $5,000,000 8.00 River to Sea East Central Regional Rail Trail Gobblers Lodge Maytown Spur Programmed for construction in FY 2014/15 $5,576,987 6.50 River to Sea East Central Regional Rail Trail Guise Road Gobblers Lodge ROW underway; Programmed for construction in FY 2018/19 $4,539,000 3.50 Lake-Sumter Wekiva Trail Segment 3 Red Tail Blvd. Wekiva River Mt. Dora Design underway $1,600,000 6.90 CST as part of Wekiva Parkway Segment 6 in 2017, ROW acquired Rinehart Road Path CR 46A SR 46 -to- ROW acquired; design/build $554,000 0.88 Total Programmed $49,057,022 62.9 Page 5 of 5

Regional Transit Proposed transit priorities are focused on high capacity rail or bus projects requiring a significant investment of federal, state and local funds. These are shown in three tiers: (1) projects currently underway; (2) prospective projects currently being studied; and (3) future projects that will be studied. Privately-funded projects are shown for information purposes. Transit Projects Currently Underway SunRail Phase II (DeBary-Deland; Sand Lake Road-Poinciana) International Airport (OIA) Intermodal Terminal Facility (ITF) Parramore Lymmo (Lime Line) Prospective Transit Projects Currently Being Studied or in Development SunRail Phase III (Meadow Wood Station to OIA) OIA Refresh Alternatives Analysis US 192 Bus Rapid Transit SR 50 Bus Rapid Transit Lymmo Expansion (North/South) Volusia Transit Connector Study Prospective All Aboard Florida Brevard Station Study Future Transit Projects That Will Be Studied SunRail extension from Sanford to -Sanford International Airport SunRail extension to Polk County Jacksonville to Miami Commuter Rail Privately-Funded Transit Projects All Aboard Florida (-West Palm Beach-Ft. Lauderdale-Miami) EMMI/AMT (Orange County Convention Center to International Airport) 1 P age